This document contains an amendment to a federal solicitation for relocating a medical ward at a Department of Veterans Affairs facility.
The amendment provides revised Davis Bacon wage determinations, answers to questions received from potential offerors, a pre-bid attendance roster, and revised specifications and drawings. It clarifies that flooring will be fully removed and replaced, confirms qualifications for competent persons and site superintendents, and notes that ceiling lifts will be supplied and installed by the contractor if certain bid items are awarded. The response to questions also provides parking information for the facility and advises that the project is tax exempt. The solicitation number is 36C25522R00240001 and is being conducted by the VA Veterans Health Administration VISN 15 for a relocation project numbered 589A4-21-100 at a medical facility in Missouri. Offers are due by March 10, 2022 at 2:00 PM Central Time.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 14
589A4-21-100
36C255
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
36C255
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
To all Offerors/Bidders
36C25522R0024
X
X X
March 10, 2022 by 2:00 PM CT
Relocate Medical Ward for Patient Privacy, Project number 589A4-21-100 This amendment provides the below :
a. Questions and Answers received. Question period concluded February 23, 2022.
b. Revised Davis Bacon wage determination
c. Provides Pre-bid Attendance roster.
d. Revised specifications 05-75-10, 27-10-00, 27-15-00, 28-05-13, 28-13-00, 28-23-00, 28-31-00 and drawings AD105, AD106 and E-001, EY501.
e. All other terms and conditions remain in full force and effect.
CONTINUATION PAGE
VA COLUMBIA RELOCATE MEDICAL WARD FOR PATIENT PRIVACY 589A4-21-
BID QUESTIONS AND ANSWERS
1. Can the new 3rd floor electrical closet be refed overhead on the 3rd floor versus under the 2nd floor slab?
a. Bid as currently designed.
2. One of the potential bidders want me to verify the Sleep lab hours and days of operation.
a. 7pm - 7am, 7 days a week. Scheduling with COR and department required a minimum of 4-week lead time for work impacting this area.
3. At the locations where the current CLC outside patio supports attach to the roof, what is the scope of the roof repair following that removal?
a. See Keynote 2.14 on Sheets AD105 & AD106 as part of Addendum #1
4. The current CLC patio has power, water spicket, wireless access point and lights that are mounted to the outside of the building at the elevation of the 3rd floor, do they stay after the patio is removed?
a. See Sheets ED131, ED132 & PD103
5. Data cabling needs to be CAT6A per new ERHM requirements, specifications call out CAT6 which has a lower maximum data transmission speed.
a. All references to CAT6 shall be changed to CAT6A per changes to VA OIT design guide on July 1, 2021. Revised drawings to be part of Addendum #1.
6. Need to provide all potential bidders with the MU parking information that is accessible/ leasable/ metered and available for contractor parking at the VA.
a. The VA cannot assure that MU Parking policy will not change without notice and cannot make any assurances regarding access to their parking lots. Please contact MU parking at https://parking.missouri.edu/ or 573-882-4568
7. After reviewing the plans some additional information regarding the metal equipment screening system is needed. This system is referred to on pages AE120, AE120.2, AE201, AE301 S201, S201.2, and S510. There is no information in the plans or specs that refer to a manufacturer or material. Specs on several instances refer to color shown in contract drawings. There is no color indicated on any note or finish schedule. Please clarify, thanks.
a. See added spec 05 75 10 as part of Addendum #1
8. Would you please confirm if the ceiling lifts will be a remove and reinstall for this project? Looks like about 25 of them. If not, we would like to provide a quote for 25 ceiling lifts. Would we send the quote to you or the general contractor? If it’s the general contractor, do you have a list you can provide? Here is a link to our ceiling lift section of our website: https://www.arjo.com/en-us/products/safe-patient-handling/ceiling-lift/ Please let us know how we can help with any other current or future healthcare projects.
a. See Keynote 2.16 on sheets AD107 & AD108.
9. Will there be specification published for the Fire Alarm? Section 283100 is missing from specification manual.
a. VA Upload to SAMS moved the 28 31 00 spec section to page 53 of spec section
28 13 00. Spec sections 28 13 00 and 28 31 00 will be provided via amendment to replace the corrupted sections.
10. The existing system is a Siemens Desigo Modular Voice fire alarm system. Some areas of the hospital, including this area, have legacy field devices. In order to use the new devices, the other devices on the existing loop will need to be upgraded to current model devices. Are we to include that in our scope?
a. No; however, contractor shall maintain the existing fire alarm system infrastructure for new system is operation and approved by VA. Note, the facility is in the process of a full building fire alarm system upgrade via a separate project. That will replace devices in areas not in Contract.
11. Typically, the corridors in the hospital, have smoke detection to meet Joint Commission and other code requirements (I-2 Occupancy). Are we to include detectors in corridors?
a. Smoke detection is not required in the corridors of VA facilities. VA facility fire alarm systems are required to be designed to NFPA 101 and NFPA 72 requirements, not the IBC. Per NFPA 101, detection in corridors is not required for Health Care occupancies, except for nursing home facilities. NFPA 101 requires initiation of the fire alarm system to be via manual pull stations and fire suppression monitoring devices, as shown on the plans. Note, this project went through a third party FPE review which concurred with this design.
12. Verify if all flooring was to be removed in this project or if it was just the asbestos flooring?
a. All flooring will be removed, and new flooring installed. See Keynote 2.08 on sheets
AD105, AD105.2, AD106 & AD106.2
13. Please advise if the designated SSHO and Competent Person role can be fulfilled by the site superintendent?
a. Yes, if the superintendent has the appropriate training and experience and resume indicates the appropriate experience and training to fulfill these roles.
14. Will the SSHO be full time separate person?
a. Not required if person in question 13 qualifies
15. Patient lifts who furnishes and installs?
a. The GC will provide and install if Bid item 1 or Bid item 2 (deduct) is awarded. If bid item 3 (deduct) is awarded, then the hospital will provide.
b. Per Bid item 1 and bid item 2(deduct) contractor to supply and install overhead lifts and above ceiling supports. Bid deduct 3 removes supply and installation of overhead lifts and above ceiling supports from contractor.
16. Patient lift support steel or uni strut who furnishes and installs?
a. All work associated with the patient lifts is performed by the patient lift installer.
Question 15 describes who will be responsible for managing the subcontractor.
17. Is the project taxable?
a. The project is tax exempt.
18. I would like to present an equal’s package for the lighting on this job. I wanted to see if I send that package to you first for review, or if this one go direct to the engineer for approval.
a. If the lighting package meets ALL of the VA’s requirements as stated in specifications, we can accept it during the submittal stage of the project.
19. Also, I would like to verify whether this job will be BAA or TAA.
a. Must abide by the requirement of the Buy American Requirements-Construction
Materials under Trade Agreement FAR Clauses 52.225-011 and 52.225-12 in the solicitation.
20. Can we start phase 1 and phase 2 at the same time?
a. Phase 1 will be available immediately and phase 2 will be available less than 90 days after NTP.
21. Be advised, Specification Section 10 90 00 Miscellaneous Specialties conveys Oxygen Tank
Holders to be furnished by GC. Please provide basis of design manufacturer.
a. No new oxygen tank racks are required. The existing Full oxygen tank rack 06041E and the Empty oxygen 06042E tank rack will be reused. Please disregard the specification.
A.1 Davis Bacon Wage Rates
"General Decision Number: MO20220036 02/18/2022
Superseded General Decision Number: MO20210036
State: Missouri
Construction Type: Building
County: Boone County in Missouri.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that aresubject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022 1 02/18/2022
ASBE0001-005 10/02/2020
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 40.44 25.14
BOIL0083-005 01/01/2021
Rates Fringes
BOILERMAKER......................$ 41.52 30.36
BRMO0011-002 03/01/2020
Rates Fringes
BRICKLAYER.......................$ 30.75 18.73
TILE SETTER......................$ 30.75 18.73
CARP0010-009 05/01/2021
Rates Fringes
CARPENTER (Including Drywall Hanging, Form Work & Metal Stud Installation)...............$ 27.57 19.12
ELEC0257-001 03/01/2021
Rates Fringes
ELECTRICIAN......................$ 34.60 16.38
ENGI0513-002 05/01/2021
Rates Fringes
Power equipment operators:
Backhoe/Excavator...........$ 32.41 28.24 Bobcat/Skid Loader..........$ 32.41 28.24 Crane.......................$ 32.41 28.24 Forklift....................$ 32.41 28.24
Grader/Blade................$ 32.41 28.24 Loader......................$ 32.41 28.24 Paver.......................$ 32.41 28.24 Roller......................$ 32.41 28.24
IRON0396-005 08/04/2021
Rates Fringes
IRONWORKER, ORNAMENTAL,
REINFORCING AND STRUCTURAL.......$ 32.24 28.96
LABO0955-006 03/01/2021
Rates Fringes
LABORER
Asbestos Abatement from Floors, Walls & Ceilings....$ 25.01 13.49 Brick & Cement/Concrete Mason Tender................$ 27.56 14.94 Common or General; Asphalt Shoveler; Pipelayer.........$ 25.56 14.94
PAIN0002-004 04/01/2020
Rates Fringes
Painters:
Brush and Roller............$ 24.64 13.98 Drywall Finishing/Taping....$ 24.64 13.98
PAIN0513-002 11/01/2011
Rates Fringes
GLAZIER..........................$ 27.35 17.17
PLAS0518-013 03/01/2020
PLASTERER........................$ 27.37 13.98
PLAS0518-014 03/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.92 13.93
PLUM0562-001 07/01/2021
Rates Fringes
PIPEFITTER, Excludes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & over.........$ 45.10 27.85 Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 43.16 21.49 PLUMBER, Includes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & over.........$ 45.10 27.85 Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 43.16 21.49
ROOF0020-012 09/19/2020
Rates Fringes
ROOFER...........................$ 31.30 17.59
* SFMO0669-001 01/01/2022
SPRINKLER FITTER (Fire Sprinklers)......................$ 39.22 23.94
SHEE0036-002 07/01/2018
Rates Fringes
SHEET METAL WORKER, Includes HVAC Duct and Unit Installation.....................$ 50.67 16.91
SUMO2010-035 06/14/2010
Rates Fringes
OPERATOR: Hoist.................$ 26.02 13.01
PAINTER: Spray..................$ 17.78 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the
EO
is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
A.2 Pre-Bid Attendance List
See attached document: Relocate Med Ward Pre Bid Attendence.
A.3 List of Specifications and Drawings
See attached document: 271000 CONTROL, COMMUNICATION AND SIGNAL WIRING.
See attached document: 2022-02-23 ADD #1_AD105 _ AD106.
See attached document: 057510 FORMED ALUMIUM SCREENING.
See attached document: 200686-000-ELEC-Bid Questions Response.
See attached document: 270511 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS.
See attached document: 271500 COMMUNICATIONS STRUCTURED CABLING.
See attached document: 280513 CONDUCTORS AND CABLES FOR ELECTRONIC
SAFETY AND SECURITY.
See attached document: 281300 PHYSICAL ACCESS CONTROL SYSTEMS.
See attached document: 282300 VIDEO SURVEILLANCE.
See attached document: 283100 FIRE DETECTION AND ALARM.
| A.1 Davis Bacon Wage Rates |
| A.2 Pre-Bid Attendance List |
| A.3 List of Specifications and Drawings |