About this file

This document contains a solicitation for the lease of a modular building at Jefferson Barracks in St. Louis, Missouri. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is seeking to lease a 9,150 square foot modular building to house personnel and operations during a major renovation at the St. Louis VAMC, Jefferson Barracks Division campus. The temporary modular building is needed for a base year and four option years and must comply with ADA, IBC, NFPA, and NEC codes. It will be located on a prepared site with underground utilities and must match the 164 by 56 foot floor plan in Exhibit B with allowances for minor manufacturing or construction constraints.

36C25520R0066 BUILDING 25T LAYOUT - 657-17-181BJB.pdf

View the file

Other files

File Type Posted
36C25520R0066-0004000.docx DOCX document
36C25520R0066-0003002.pdf PDF
36C25520R0066-0003000.docx DOCX document
36C25520R0066-0003001.pdf PDF
36C25520R0066-0002000.docx DOCX document
36C25520R0066-0001003.pdf PDF
36C25520R0066-0001000.docx DOCX document
36C25520R0066-0001001.pdf PDF
36C25520R0066-0001002.pdf PDF
36C25520R0066-020.pdf PDF
36C25520R0066-016.docx DOCX document
36C25520R0066-017.docx DOCX document
36C25520R0066-015.docx DOCX document
36C25520R0066-018.pdf PDF
36C25520R0066-019.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9D/4V 4D/2V

4D/2V

4D/2V

4D/2V

8D/2V 4D/2V 0D/1V 4D/2V

0D/2V

4D/2V

8D/2V

4D/2V

4D/2V 4D/2V

4D/2V

2D/1V

2D/1V 9D/4V

4D/2V

6D/3V 6D/3V

10D/5V

4D/2V4D/2V 4D/2V 4D/2V

9D/4V 4D/2V

4D/2V

8D/4V 8D/4V

4D/2V

4D/2V 4D/2V

9D/4V

8D/4V

2D/1V

LEASE OF MODULAR BUILDING 25T AT

JEFFERSON BARRACKS, ST. LOUIS, MO

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE

ST. LOUIS, MO 63125

25T

KMF02/06/2020

EXHIBIT B

SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 Price/Cost Schedule
Item Information
Accounting and Appropriation Data

B.3 Delivery Schedule

SECTION C - CONTRACT CLAUSES
C.1 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (AUG 2012)
C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
C.3 52.247-35 F.O.B. DESTINATION, WITHIN CONSIGNEE'S PREMISES (APR 1984)
C.4 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)
C.5 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992)
C.6 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (DEC 2009)
C.7 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009)
C.8 VAAR 852.246-71 INSPECTION (JAN 2008)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Blank Page
VA Enterprise Facility IT Support Infrastructure Standard - 11 Jun 18 Final.pdf
Table of Contents
Figures
Tables
1 Introduction
1.1 Authority of This Standard
1.2 Scope
1.3 Purpose
1.4 Objectives
1.5 Theory of Operation
2 Data Center Classification
2.1 Core Data Centers (CDC)
2.2 Mission Support Centers (MSC)
2.3 Campus Support Centers (CSC)
2.4 Network Support Center (NSC)
3 Standards
3.1 Facility IT Support Infrastructure Standard
3.1.1 Structured Cabling
3.1.1.1 Unshielded Twisted Pair (UTP)
Evaluation Factors
Implementation Guidance
3.1.1.2 UTP Patch Panel Standards
Evaluation Factors
Implementation Guidance
3.1.1.3 UTP Patch Cord
Evaluation Factors
Implementation Guidance
3.1.1.4 Fiber Optic Cable
Evaluation Factors
Implementation Guidance
3.1.1.5 Fiber Distribution Cassettes
Evaluation Factors
Implementation Guidance
3.1.1.6 Fiber Patch Cords
Evaluation Factors
Implementation Guidance
3.1.1.7 Fiber Distribution Panel/Cabinet
Evaluation Factors
Implementation Guidance
3.1.1.8 Cable Support Infrastructure
Evaluation Factors
Implementation Guidance
3.1.1.9 Work Area Outlets (WAOs)
Evaluation Factors
3.1.1.10 Horizontal Distribution
3.1.1.11 Vertical (Backbone) Distribution
3.1.2 Telecommunications Space Design
3.1.2.1 Building Specifications for Common Telecommunications Spaces
3.1.2.2 Data Center Layout Standard
Implementation Guidance

3.1.2.3 Data Center Planned Redundancy Levels

1
2
2.1
2.1.1
Mission Support Center (MSC) Planned Redundancy Levels
3.1.2.3.1 Network Support Center (NSC) Planned Redundancy Levels
3.1.2.4 Telecommunications Room Layout
3.1.2.5 Entrance Facility
3.1.2.6 Network Equipment Racks
Evaluation Factors
Implementation Guidance
3.1.2.7 Equipment Cabinets
Evaluation Factors
Implementation Guidance
3.1.3 Telecommunications Space Environment Conditioning
3.1.3.1 Data Center Facility Environment Conditioning Standards (CDC, MSC, and CSC)
Evaluation Factors
Implementation Guidance
3.1.3.2 Data Center Facility Environmental Standards – Exceptions
3.1.3.3 Environmental Control Equipment Requirements
3.1.3.4 Airflow Control
3.1.3.4.1 Room Height
3.1.3.4.2 Air-Distribution Ceiling Plenums
3.1.3.4.3 Air-Distribution Floor Plenums
3.1.3.4.4 Perforated Tiles and High Capacity Grate Tiles
3.1.3.4.5 Air Containment Devices
3.1.3.4.5.1 Brushed Floor Grommets
3.1.3.4.5.2 Air Dam Foam Sheets
3.1.3.4.5.3 Blanking Panels
3.1.3.4.5.4 Blocking Other Recirculation Paths
3.1.3.4.5.5 Air Distribution Containment Systems
3.1.3.4.5.6 Containment Equipment
3.1.3.4.5.7 Cold Containment
3.1.3.4.5.8 Heat Containment
3.1.3.5 HVAC Environmental Control Equipment
3.1.3.6 Computer Room Air Conditioners (CRAC) Units
3.1.3.7 Split System Air Conditioners
3.1.3.8 Self-Contained Air Conditioners
3.1.3.9 Close-Coupled Air-Conditioners
3.1.3.10 Humidity Control Equipment
Evaluation Factors
Implementation Guidance
3.1.3.11 Monitoring
Evaluation Factors
Implementation Guidance
3.1.4 Facility IT Support Power Distribution
3.1.4.1 Topology for Power Distribution Standard (CDC, CSC, MSC)
3.1.4.2 Branch Power Circuit to Rack/Cabinet
3.1.4.3 Zone PDUs
Evaluation Factors
Implementation Guidance
3.1.4.4 Rack Mounted UPS
Evaluation Factors
Implementation Guidance
3.1.4.5 Vertical Rack PDUs
Evaluation Factors
Implementation Guidance
3.1.4.6 Cable Distribution
Evaluation Factors
Implementation Guidance
3.1.4.7 Metering
Evaluation Factors
Implementation Guidance
3.1.4.7.1 Facility Total Electrical Consumption (FEC):
3.1.4.7.2 Total Data Center Energy Consumption (TEC):
3.1.4.7.3 Total Data Center Physical Infrastructure Energy Consumption (TPIEC):
3.1.4.7.4 Total IT Equipment Energy Consumption (TITEC):
3.1.4.7.5 Total UPS Load Energy Consumption (TUPSC):
3.1.4.7.6 Total Renewable Energy Usage by Data Center (RENEW):
3.1.4.7.7 Power Usage Effectiveness (PUE):
3.1.4.7.8 Site Infrastructure Energy Efficiency Rating (SIEER):
3.2 Facility IT Support Administration Standard
3.2.1 Data Center Position Identification
3.2.2 Cross-Reference to Other Identification Systems
3.2.3 Standardized Data Center Facility Type Identification
3.2.4 Standardized Data Center Naming Convention
3.2.5 Color Coded Identification
3.2.5.1 Data Communication Cabling Color Coding
3.2.5.2 Power Distribution Color Coding
3.2.6 ITS Equipment and Component Labeling
3.2.6.1 Label Materials
Approved Materials
Unapproved Materials
Evaluation Factors
Implementation Guidance
3.2.6.2 Support Infrastructure Identification
3.2.6.3 IT Equipment Cabinet/Rack Location Identification
3.2.6.4 Transport Media and Interface Identification
3.2.6.5 Power Distribution Identification
3.2.6.6 Data Communications Cabling Labeling
3.2.6.7 IT Equipment Rack/Cabinet Labeling
3.2.6.8 IT Equipment In-Rack/In-Cabinet Power Distribution Labeling
3.2.6.9 Power Distribution to Information Technology Labeling
3.2.6.10 Physical Label Format
3.3 Facility IT Support Operations Standard
3.3.1 Facilities Physical Support Equipment Sustainment
3.3.2 Facilities Physical Support Equipment Maintenance & Repair
3.3.3 Data Center IT Support Operations Standard
3.3.3.1 Telecommunications Rooms (TRs)
Evaluation Factors
Implementation Guidance
3.3.3.2 IT Equipment
Evaluation Factors
Implementation Guidance
3.3.3.3 Management of Telecommunications Cabling
Evaluation Factors
Implementation Guidance
3.3.3.4 Installation Guidance
3.3.3.5 Cable Bundling Guidance
3.3.3.6 UTP, Fiber, and Power Cabling Guidance
3.3.4 Data Center Facility Management Standard
3.3.4.1 Computer Room Operation Specifications
Evaluation Factors
Implementation Guidance
3.3.4.2 Recommended Tools & Bench Stock for Data Centers
Evaluation Factors
Implementation Guidance

3.3.5 Data Center Facility Engineering Standard

Appendix A: Definitions
Appendix B: References
Appendix C: Baseline and Configuration Management
Appendix E: Acronyms
Appendix F: Contributors

File details come from the government source that posted it. Updated .