About this file

This solicitation is for the lease of a modular building to temporarily house personnel and operations during a renovation project at the St. Louis VA Medical Center, Jefferson Barracks Division. The VA requires a 9,150 square foot modular unit for a minimum of one base year with four option years. The unit must have a layout consisting of one building with nominal dimensions of 164 feet by 56 feet. Final floor plans will be based on the attached exhibit but may have minor changes due to manufacturing or construction constraints. The typical building shall comply with all applicable local, ADA, IBC, NFPA and NEC codes. The agency issuing this solicitation is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15.

36C25520R0066 MODULAR BUILDING LOCATION - 657-17-181BJB.pdf

View the file

Other files

File Type Posted
36C25520R0066-0004000.docx DOCX document
36C25520R0066-0003002.pdf PDF
36C25520R0066-0003000.docx DOCX document
36C25520R0066-0003001.pdf PDF
36C25520R0066-0002000.docx DOCX document
36C25520R0066-0001003.pdf PDF
36C25520R0066-0001000.docx DOCX document
36C25520R0066-0001001.pdf PDF
36C25520R0066-0001002.pdf PDF
36C25520R0066-016.docx DOCX document
36C25520R0066-017.docx DOCX document
36C25520R0066-015.docx DOCX document
36C25520R0066-018.pdf PDF
36C25520R0066-021.pdf PDF
36C25520R0066-019.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

VHASTLMcCarC1 Text Box

GENERAL

1. ALL QUANTITIES ARE CONSIDERED APPROXIMATE AND ARE FOR ESTIMATING PURPOSES ONLY.

2. THE CONTRACTOR SHALL INCLUDE ALL MATERIALS, TOOLS, EQUIPMENT, LABOR AND

APPURTENANT ITEMS TO COMPLETE THE WORK WITHIN THE BID PRICE.

3. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE SITE PRIOR TO BIDDING AND

CONSTRUCTION.

4. LEGAL LOAD LIMIT REQUIREMENTS SHALL BE ENFORCED ON ALL STATE HIGHWAYS, CITY STREETS

AND COUNTY ROADS.

1. CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES WITH A 48-HOUR ADVANCED NOTICE AND

DETERMINE THE EXACT LOCATION OF ALL UNDERGROUND UTILITIES BEFORE COMMENCING

WORK. CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND PROPERLY REPAIRING ANY

DAMAGED UTILITIES.

2. UTILITY LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE BASED ON RECORDS OF

VETERANS AFFAIRS AND FIELD VERIFICATION BY THE MAINTENANCE CREWS. FIELD

VERIFICATION OF BURIED GAS, ELECTRIC, TELEPHONE, WATER, SEWER AND CABLE TV LINES

ARE BY ELECTRONIC OR MAGNETIC DETECTION METHODS. ALL UTILITY LOCATIONS ARE

SUBJECT TO THE ACCURACY OF THE LOCATION METHOD AND ARE SUBJECT TO RELOCATION

FROM THE TIME THAT THE DRAWINGS WERE PREPARED. NO EXCAVATION WAS PERFORMED.

3. THE CONTRACTOR MUST NOTIFY THE COR OF ALL UTILITIES ENCOUNTERED DURING

CONSTRUCTION AND MUST NOT BACKFILL UNTIL THE CONTRACTOR HAS MADE RECORD OF ITS

TYPE, SIZE AND LOCATION.

4. CONTRACTOR MUST CONTACT THE ENGINEERING DIVISION OF VETERANS AFFAIRS FOR ANY

NEEDED LOCATES.

5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT, ADJUST AND RE-LOCATE ANY UTILITIES

INTERFERING WITH THE SPECIFIED CROSS-SECTIONS AND DEPTHS AS DESIGNED IN THE SITE

PLAN AND GRADING PLANS.

1. CONTRACTOR MUST RESPECT ALL CONSTRUCTION PERMIT BOUNDARIES AS SHOWN.

ALL WORK MUST BE DONE WITHIN THESE BOUNDARIES. ANY WORK OR STORAGE OF

MATERIALS OUTSIDE OF THE CONSTRUCTION LIMITS MAY BE DONE ONLY AFTER

RECEIVING PERMISSION FROM THE COR. THIS PERMISSION MUST BE OBTAINED BY THE

CONTRACTOR PRIOR TO COMMENCING WORK OUTSIDE OF THE ESTABLISHED

BOUNDARIES. CONTRACTOR IS FULLY LIABLE FOR THE COST OF ANY DAMAGES TO THE

PROPERTY, AS WELL AS ANY COSTS TO REMEDY SUCH CIRCUMSTANCES WITH THE COR.

1. GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR DESIGNING AND CONSTRUCTING STABLE

TEMPORARY EXCAVATIONS AND SHOULD SHORE, SLOPE OR BENCH THE SIDES OF THE

EXCAVATIONS AS REQUIRED TO MAINTAIN STABILITY OF BOTH THE EXCAVATION SIDES AND BOTTOM.

ALL EXCAVATIONS MUST COMPLY WITH APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS, INCLUDING THE CURRENT OSHA EXCAVATION AND TRENCH SAFETY STANDARDS. CONSTRUCTION

SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR, WHO MUST ALSO BE SOLELY

RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCING OF CONSTRUCTION OPERATIONS.

UNDER NO CIRCUMSTANCES SHOULD THE INFORMATION PROVIDED BE INTERPRETED TO MEAN

THAT THE COR IS ASSUMING RESPONSIBILITY FOR CONSTRUCTION SAFETY OF THE CONTRACTOR'S

ACTIVITIES. SUCH RESPONSIBILITY IS NOT BEING IMPLIED AND WILL NOT BE INFERRED.

2. EXCAVATION AND SLOPES: IN NO CASE SHOULD SLOPE HEIGHT, SLOPE INCLINATION, OR

EXCAVATION DEPTH, INCLUDING UTILITY TRENCH EXCAVATION DEPTH, EXCEED THOSE SPECIFIED IN LOCAL, STATE AND FEDERAL SAFETY REGULATIONS. SPECIFICALLY, THE CURRENT OSHA HEALTH AND SAFETY STANDARDS FOR EXCAVATIONS, 29 CFR PART 1926 MUST BE FOLLOWED. IT IS THE COR's UNDERSTANDING THAT THESE REGULATIONS ARE BEING STRICTLY ENFORCED AND IF THEY ARE NOT CLOSELY FOLLOWED, THE CONTRACTOR COULD BE LIABLE FOR SUBSTANTIAL PENALTIES.

3. CONTRACTOR MUST CLEARLY MARK AND/OR FENCE ALL OBSTRUCTIONS, EXCAVATIONS AND

CONSTRUCTION MATERIALS AND EQUIPMENT. THE PROJECT SUPERINTENDENT (OR A DESIGNATED REPRESENTATIVE) MUST MONITOR THE PROJECT FOR SAFETY CONCERNS AND POTENTIAL HAZARDS

AT ALL TIMES.

SAFETY

PERMITS

1. CONTRACTOR MUST OBTAIN STORMWATER PERMIT FROM MO DEPT. OF NATURAL RESOURCES

PRIOR TO CONSTRUCTION, IF REQUIRED.

2. CONTRACTOR MUST OBTAIN CONSTRUCTION DISCHARGE PERMIT FROM MO DEPT. OF NATURAL

RESOURCES, IF REQUIRED.

3. IF ABOVE PERMITS ARE REQUIRED, WORK CANNOT COMMENCE UNTIL PERMITS ARE OBTAINED.

4. CONTRACTOR MUST IMPLEMENT SWPPP PRIOR TO CONSTRUCTION. COSTS ASSOCIATED WITH

IMPLEMENTATION OF SWPPP WILL BE SUBSIDIARY.

1. CONTRACTOR MUST COORDINATE ALL CONSTRUCTION, SHUTDOWNS, DETOURS AND ANY

OTHER OBSTRUCTION OF NORMAL USE OF ROADWAYS AND PARKING LOTS NEAR THE

CONSTRUCTION LIMITS WITH THE COR NO LESS THAN 24 HOURS PRIOR TO BEGINNING.

1. ALL DISTURBED AREAS MUST BE RECLAIMED WITH A MINIMUM OF 6" TOPSOIL IN ALL

SEEDED AREAS PRIOR TO THE PLACEMENT OF SEED. THE CONTRACTOR MUST SALVAGE

EXISTING TOPSOIL FROM AREAS WHERE REMOVED.

2. SUBGRADE PLACEMENT MUST BE PROOF ROLLED AFTER BEING COMPACTED TO SPECIFIED

DENSITIES. PROOF ROLLING MUST BE APPROVED BY THE COR PRIOR TO PLACEMENT OF

ANY PAVEMENT.

EXISTING UTILITIES

SCHEDULING / ACCESS

GRADING / LIMIT OF DISTURBANCE

N o r t h

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

CONSULTANTS:

Drawing # of

657-17-182AJB

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

MODULAR SITE PREP

VEG 4.17A

100% CONTRACT DOCUMENTS

12/30/2019

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

25T

NOT FOR

CONSTRUCTION

SCALE: NO SCALE

VICINITY MAP

SCALE: 1" = 40'

0 20' 40' 80' 120' 160'10'

SITE PLAN

PROPOSED MODULAR

BUILDING LOCATION

N o r t h

CONSTRUCTION LIMITS

25T-CC-001

CIVIL COVER SHEET

RAG MLH

EXHIBIT A

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

CONC. WALK

AutoCAD SHX Text

GUARDRAIL

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text 30"

AutoCAD SHX Text 10"

AutoCAD SHX Text

84" CLF

AutoCAD SHX Text

72" CLF

AutoCAD SHX Text C.O.

AutoCAD SHX Text C.O.

AutoCAD SHX Text

CONC. WALK

AutoCAD SHX Text

BWW

AutoCAD SHX Text

DENSE VEGETATION

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

TRANS.

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

AutoCAD SHX Text

2454VS

SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 Price/Cost Schedule
Item Information
Accounting and Appropriation Data

B.3 Delivery Schedule

SECTION C - CONTRACT CLAUSES
C.1 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (AUG 2012)
C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
C.3 52.247-35 F.O.B. DESTINATION, WITHIN CONSIGNEE'S PREMISES (APR 1984)
C.4 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)
C.5 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992)
C.6 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (DEC 2009)
C.7 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009)
C.8 VAAR 852.246-71 INSPECTION (JAN 2008)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Blank Page
VA Enterprise Facility IT Support Infrastructure Standard - 11 Jun 18 Final.pdf
Table of Contents
Figures
Tables
1 Introduction
1.1 Authority of This Standard
1.2 Scope
1.3 Purpose
1.4 Objectives
1.5 Theory of Operation
2 Data Center Classification
2.1 Core Data Centers (CDC)
2.2 Mission Support Centers (MSC)
2.3 Campus Support Centers (CSC)
2.4 Network Support Center (NSC)
3 Standards
3.1 Facility IT Support Infrastructure Standard
3.1.1 Structured Cabling
3.1.1.1 Unshielded Twisted Pair (UTP)
Evaluation Factors
Implementation Guidance
3.1.1.2 UTP Patch Panel Standards
Evaluation Factors
Implementation Guidance
3.1.1.3 UTP Patch Cord
Evaluation Factors
Implementation Guidance
3.1.1.4 Fiber Optic Cable
Evaluation Factors
Implementation Guidance
3.1.1.5 Fiber Distribution Cassettes
Evaluation Factors
Implementation Guidance
3.1.1.6 Fiber Patch Cords
Evaluation Factors
Implementation Guidance
3.1.1.7 Fiber Distribution Panel/Cabinet
Evaluation Factors
Implementation Guidance
3.1.1.8 Cable Support Infrastructure
Evaluation Factors
Implementation Guidance
3.1.1.9 Work Area Outlets (WAOs)
Evaluation Factors
3.1.1.10 Horizontal Distribution
3.1.1.11 Vertical (Backbone) Distribution
3.1.2 Telecommunications Space Design
3.1.2.1 Building Specifications for Common Telecommunications Spaces
3.1.2.2 Data Center Layout Standard
Implementation Guidance

3.1.2.3 Data Center Planned Redundancy Levels

1
2
2.1
2.1.1
Mission Support Center (MSC) Planned Redundancy Levels
3.1.2.3.1 Network Support Center (NSC) Planned Redundancy Levels
3.1.2.4 Telecommunications Room Layout
3.1.2.5 Entrance Facility
3.1.2.6 Network Equipment Racks
Evaluation Factors
Implementation Guidance
3.1.2.7 Equipment Cabinets
Evaluation Factors
Implementation Guidance
3.1.3 Telecommunications Space Environment Conditioning
3.1.3.1 Data Center Facility Environment Conditioning Standards (CDC, MSC, and CSC)
Evaluation Factors
Implementation Guidance
3.1.3.2 Data Center Facility Environmental Standards – Exceptions
3.1.3.3 Environmental Control Equipment Requirements
3.1.3.4 Airflow Control
3.1.3.4.1 Room Height
3.1.3.4.2 Air-Distribution Ceiling Plenums
3.1.3.4.3 Air-Distribution Floor Plenums
3.1.3.4.4 Perforated Tiles and High Capacity Grate Tiles
3.1.3.4.5 Air Containment Devices
3.1.3.4.5.1 Brushed Floor Grommets
3.1.3.4.5.2 Air Dam Foam Sheets
3.1.3.4.5.3 Blanking Panels
3.1.3.4.5.4 Blocking Other Recirculation Paths
3.1.3.4.5.5 Air Distribution Containment Systems
3.1.3.4.5.6 Containment Equipment
3.1.3.4.5.7 Cold Containment
3.1.3.4.5.8 Heat Containment
3.1.3.5 HVAC Environmental Control Equipment
3.1.3.6 Computer Room Air Conditioners (CRAC) Units
3.1.3.7 Split System Air Conditioners
3.1.3.8 Self-Contained Air Conditioners
3.1.3.9 Close-Coupled Air-Conditioners
3.1.3.10 Humidity Control Equipment
Evaluation Factors
Implementation Guidance
3.1.3.11 Monitoring
Evaluation Factors
Implementation Guidance
3.1.4 Facility IT Support Power Distribution
3.1.4.1 Topology for Power Distribution Standard (CDC, CSC, MSC)
3.1.4.2 Branch Power Circuit to Rack/Cabinet
3.1.4.3 Zone PDUs
Evaluation Factors
Implementation Guidance
3.1.4.4 Rack Mounted UPS
Evaluation Factors
Implementation Guidance
3.1.4.5 Vertical Rack PDUs
Evaluation Factors
Implementation Guidance
3.1.4.6 Cable Distribution
Evaluation Factors
Implementation Guidance
3.1.4.7 Metering
Evaluation Factors
Implementation Guidance
3.1.4.7.1 Facility Total Electrical Consumption (FEC):
3.1.4.7.2 Total Data Center Energy Consumption (TEC):
3.1.4.7.3 Total Data Center Physical Infrastructure Energy Consumption (TPIEC):
3.1.4.7.4 Total IT Equipment Energy Consumption (TITEC):
3.1.4.7.5 Total UPS Load Energy Consumption (TUPSC):
3.1.4.7.6 Total Renewable Energy Usage by Data Center (RENEW):
3.1.4.7.7 Power Usage Effectiveness (PUE):
3.1.4.7.8 Site Infrastructure Energy Efficiency Rating (SIEER):
3.2 Facility IT Support Administration Standard
3.2.1 Data Center Position Identification
3.2.2 Cross-Reference to Other Identification Systems
3.2.3 Standardized Data Center Facility Type Identification
3.2.4 Standardized Data Center Naming Convention
3.2.5 Color Coded Identification
3.2.5.1 Data Communication Cabling Color Coding
3.2.5.2 Power Distribution Color Coding
3.2.6 ITS Equipment and Component Labeling
3.2.6.1 Label Materials
Approved Materials
Unapproved Materials
Evaluation Factors
Implementation Guidance
3.2.6.2 Support Infrastructure Identification
3.2.6.3 IT Equipment Cabinet/Rack Location Identification
3.2.6.4 Transport Media and Interface Identification
3.2.6.5 Power Distribution Identification
3.2.6.6 Data Communications Cabling Labeling
3.2.6.7 IT Equipment Rack/Cabinet Labeling
3.2.6.8 IT Equipment In-Rack/In-Cabinet Power Distribution Labeling
3.2.6.9 Power Distribution to Information Technology Labeling
3.2.6.10 Physical Label Format
3.3 Facility IT Support Operations Standard
3.3.1 Facilities Physical Support Equipment Sustainment
3.3.2 Facilities Physical Support Equipment Maintenance & Repair
3.3.3 Data Center IT Support Operations Standard
3.3.3.1 Telecommunications Rooms (TRs)
Evaluation Factors
Implementation Guidance
3.3.3.2 IT Equipment
Evaluation Factors
Implementation Guidance
3.3.3.3 Management of Telecommunications Cabling
Evaluation Factors
Implementation Guidance
3.3.3.4 Installation Guidance
3.3.3.5 Cable Bundling Guidance
3.3.3.6 UTP, Fiber, and Power Cabling Guidance
3.3.4 Data Center Facility Management Standard
3.3.4.1 Computer Room Operation Specifications
Evaluation Factors
Implementation Guidance
3.3.4.2 Recommended Tools & Bench Stock for Data Centers
Evaluation Factors
Implementation Guidance

3.3.5 Data Center Facility Engineering Standard

Appendix A: Definitions
Appendix B: References
Appendix C: Baseline and Configuration Management
Appendix E: Acronyms
Appendix F: Contributors

File details come from the government source that posted it. Updated .