36C25519Q0307 0001 Attachment 1 Section C Short Circuit Study Topeka.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25519Q0307-0001004.pdf | ||
| 36C25519Q0307-0001003.pdf | ||
| 36C25519Q0307-0001002.pdf | ||
| 36C25519Q0307-0001000.docx | DOCX document | |
| 36C25519Q0307-003.pdf | ||
| 36C25519Q0307-002.pdf | ||
| 36C25519Q0307-001.docx | DOCX document | |
| 36C25519Q0307-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Topeka VA Medical Center, Topeka, KS Power System Study
Prepared by: LEO A DALY Page 1 of 2 8600 Indian Hills Drive Omaha, NE 68114 (402)-391-8111
C. SHORT CIRCUIT STUDY
C.1. Introduction
LAD team collected the field data on primary service cables, switchgear, transformers, switchboards, panelboards, MCCs and 600 Volts feeders. Using the SKM Power Tools, LAD team developed the model to calculate the short circuit currents at various nodes in the system.
The power distribution system consists of medium voltage service entrance, service switchgear, pad mount transformers and unit substations, and low voltage distribution system inside the buildings.
The LAD team developed one line diagrams for the medium voltage power distribution system. The results of the study are included in Section A of this report.
C.2. Sources of Fault Current
Westar Energy primary service is 12.47 kV.
Three Phase Fault: P09105 (North): 6,388 Amps P09104 (South): 6,388 Amps
C.3. Calculation Scenarios
Normal operation of primary service and VAMC 3-phase loads.
Operation of emergency service and emergency 3-phase loads.
C.4. SKM Power Tools Input Data reports
Fault Analysis Input Reports are included in Appendix 2.
C.5. Short Circuit Calculation Results
The short circuit analysis calculates the available fault current at all points in the distribution system from the service entrance to the distribution panels. The results are compared to the short circuit ratings of the distribution equipment.
Refer to Tab G for analysis and recommendations and Appendix 3 for Short Circuit Analysis Reports.
Due to buildings 60 and 61 having only single phase panels, no SKM calculations could be obtained. Due to the condition and age of the panels in building 273, not all the information could be obtained and therefore no SKM calculations could be
Topeka VA Medical Center, Topeka, KS Power System Study
Prepared by: LEO A DALY Page 2 of 2 8600 Indian Hills Drive Omaha, NE 68114 (402)-391-8111 obtained. For this reason it is recommended that the panels in building 273 be replaced.
C.6. Short Circuit Tables
See the short circuit tables in this tab that show information determined by the SKM short circuit study for 3-phase loads.
| C. SHORT CIRCUIT STUDY |
| C.1. Introduction |
| C.2. Sources of Fault Current |
| C.3. Calculation Scenarios |
| C.4. SKM Power Tools Input Data reports |
| C.5. Short Circuit Calculation Results |
| C.6. Short Circuit Tables |