36C25519Q0307-0001000.docx
DOCX document 29 KB Posted
- Solicitation number
- 36C25519Q0307
About this file
36C25519Q0307 0001 36C25519Q0307 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25519Q0307-0001004.pdf | ||
| 36C25519Q0307-0001001.pdf | ||
| 36C25519Q0307-0001003.pdf | ||
| 36C25519Q0307-0001002.pdf | ||
| 36C25519Q0307-003.pdf | ||
| 36C25519Q0307-002.pdf | ||
| 36C25519Q0307-001.docx | DOCX document | |
| 36C25519Q0307-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25519Q0307 0001
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
NA
36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 To all Offerors/Bidders
36C25519Q0307 04-12-2019
X X X Date and Hour for Receipt of Offers is Extended to: 04/19/2019 at 2:00pm CST x The Purpose of this amendment is to:
1. Extend the Offer Due Date (Block 8) of the RFQ from 04/15/2019 to 04/19/2020
2. Answer Vendor Questions and provide statio n Drawings and Diagrahms (attached at page 2)
William K. Webb Contracting Officer
CONTINUATION PAGE OF SF 30 BLOCK 14
Question 1. Can the software package options include using ETAP? (This can provide the VA with a cost savings, with the same results.)
Answer: Yes Question 2. Does the requirement to provide AF mitigation options include providing recommended settings for circuit breakers with adjustable trip units? This is considered good practice in the industry but is something many firms avoid doing. (This is recommended).
Answer: Yes Question 3. Do the labels need to have a required PPE list in addition to the arc flash level?
Answer: Yes Question 4. Can data found on one-lines and other documents be used in place of field verified information? (improves safety and minimizes equipment outages) Answer: Yes Question 5. Will the test reports for the equipment be provided and can the data on those reports be used in place of field verified data?
Answer: I am in the process of locating previous test reports but have not located yet. But yes, If I can locate these the data can be used.
Question 6. Is the scope limited to the equipment shown on the one-lines?
Answer: No. All equipment included and not included on one-lines needs to be included in the study.
Question 7. Is the arc flash report required to have both a coordination section and short circuit evaluation section? (This is recommended Answer: yes Question 8. “What is the total count of “serviceable” pieces of equipment 208/480/160 volts and 60 amps and greater. This includes, but is not limited to: fused disconnects, panelboards, transformers, motor starters, vfd’s, control cabinets, air compressors, generators, rtu’s, hvac units, main switchboards, etc.”
Answer: Undetermined Question 9. Has a previous arc flash study been performed?
Answer: Yes Question 10. Could we get a list of the buildings to be included in the study, with square footage, number of floors, age?
Answer: I have one-lines from 2010 but have no way to send due to large file.
Question 11. Will there be an addendum to include the new chiller building?
Answer No.
Question 12. Are there any specific procedures for infectious control?
Answer: Some procedures may apply in certain areas. I.e. Surgery, SPD, Blood lab etc.
Question 13. The RFP does not mention the successful bidder to perform an NFPA 70E Arc Flash Awareness training. This is an integral part of the arc flash assessment as this will instruct the maintenance staff how to interpret the arc flash labels and select the appropriate PPE.
Answer Training will need to be provided.
Question 14. It was mentioned during the walk through that only electrical equipment on drawings would be assessed. However, to have a complete arc flash study per NFPA 70E and IEEE 1584 would require assessments performed on all three-phase equipment including small disconnects and control panels. Can we have clarification on scope of work in regard to the equipment that will be assessed.
Answer All equipment Question 16. Are drawings/reports from previous Arc Flash studies available?
Answer: I possess hard copies on station Question 17. What is the approximate number of busses in the system?
Answer: Undetermined at this time Question 18. Are existing system single line drawings and panel schedules available?
Answer: One-line drawings are available in hard copy on station.
Question 19. It is assumed all buildings on the campus are included in the scope, is there an electrical site plan showing electrical utilities and infrastructure routing?
Answer Yes Question 20. Is it acceptable during data collection to remove panel covers for visual observation of breaker/feeder information with the panels energized, or will de-energizing be required?
Answer Yes Question 21. Is there a preference for size, format and color scheme for the Arc Flash labels, or will this be left to the contractor to determine?
Answer I have no preference; however, the label will need to be reviewed by myself before installation.
See attached document: Attachment 1 Section C Short Circuit Study Topeka.
See attached document: Attachment 2 Topeka Power System Study_2011.
See attached document: Attachment 3 Topeka Drawing 1-10.
See attached document: attachment 4 Drawings 11-21.