This is a Regulated Building Materials (RBM) Survey Report for the demolition of Building 100 (Boiler Plant) at Danville Veterans Affairs Medical Center in Danville, Illinois. The survey was conducted January 5-6, 2020, by Mabbett & Associates, Inc. for the A/E Design Services project (VA Project No. 550-20-121).

The survey identified 129 bulk asbestos-containing material (ACM) samples, of which 17 materials tested positive for asbestos greater than 1%. Identified ACMs include brown sheet flooring (20% chrysotile), pipe insulation ranging from 10-20% asbestos, fitting insulation (10-30% chrysotile), interior window and door caulk (5-8% chrysotile), tank insulation (60% chrysotile), boiler drum insulation (35-45% chrysotile), boiler gaskets (60% chrysotile), boiler breeching insulation (40% chrysotile), door frame caulk (2% chrysotile), black damp proofing (15% chrysotile), and roof flashing caulk (up to 2% chrysotile). Lead-containing paint sampling of ten paint chip samples revealed two samples exceeded the HUD threshold of 0.5% by weight: metal stairs at 11% lead and metal railing at 8.5% lead. The survey also documented 36 other hazardous materials including light fixtures, transformers, batteries, compressors, and storage tanks. The report recommends removal of all identified ACM by licensed contractors prior to disturbance and proper handling of lead-containing paint according to OSHA 29 CFR 1926.62 and applicable waste disposal regulations.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

p

REGULATED BUILDING MATERIALS

SURVEY REPORT

Danville Veterans Affairs Medical Center Building 100 (Boiler Plant)

A/E Design Services, Demolish Old Boiler Plant VA Project No 550-20-121

1900 East Main Street Danville, IL

Mabbett Project No. R2020058.000.001 February 8, 2021

Prepared for:

Miller-Remick, LLC.

1010 Kings Highway South Cherry Hill, NJ 08034

Mabbett & Associates, Inc. www.mabbett.com 105 Central Street, Suite 4100 Stoneham, MA 02180-1260 T. 781-275-6050 Massachusetts | Virginia | Rhode Island | New York

© 2021, Mabbett & Associates, Inc.

REGULATED BUILDING MATERIALS SURVEY REPORT

Demolish Old Boiler Plant B100 ꟾ VAMC Danville, IL

Page i February 8, 2021 © 2021, Mabbett & Associates, Inc.

Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

ACKNOWLEDGEMENT

This Regulated Building Materials Survey Report has been prepared by Mabbett and Associates, Inc. (Mabbett®) for the A/E Design Services to Demolish Old Boiler Plant Building 100 at the Danville Veterans Affairs Medical Center located in Danville, Illinois. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc. (Mabbett®) during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.

The attached Regulated Building Materials Survey Report was prepared by Brendan Clune, Environmental, Health & Safety Specialist of Mabbett & Associates, Inc.

This report has been reviewed and approved by:

Michael F. Delaney Director, Building Sciences Group

MFD/rsg

© 2021, Mabbett & Associates, Inc. Page ii February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

TABLE OF CONTENTS

SECTION PAGE

1.0 INTRODUCTION

1.1 Summary of Survey Results

1.2 Purpose and Objectives

2.0 ASBESTOS SURVEY

2.1 Sampling Methodology

2.2 Analytical Methodology

2.3 Summary of Asbestos Containing Materials Findings

3.0 LEAD-CONTAINING PAINT SURVEY

4.0 INVENTORY OF OTHER HAZARDOUS MATERIALS

5.0 CONCLUSIONS AND RECOMMENDATIONS

5.1 Asbestos

5.2 Lead Containing Paint

5.3 Other Hazardous Materials

6.0 LIMITATIONS

TABLES

Table 1 – Summary of Identified ACM Table 2 – Summary of Lead Paint Chip Analytical Results Table 3 – Inventory of Other Hazardous Materials

FIGURE

RBM-1 – Asbestos & Lead Sampling Location Plan, Building 100

APPENDICES

Appendix A – Accreditation Certificates Appendix B – Summary of ACM Sampling Results Appendix C – Asbestos Laboratory Reports and Chain of Custody Appendix D – Lead Paint Chip Laboratory Reports and Chain of Custody

© 2021, Mabbett & Associates, Inc. Page 1 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

1.0 INTRODUCTION

Mabbett and Associates, Inc. (Mabbett®) performed surveys for regulated building materials (RBM) as part of the A/E Design Services to Demolish Old Boiler Plant, Building 100 at the Danville Veterans Affairs Medical Center (VAMC) located in Danville, Illinois, VA Project No. 550-20-121. The purpose of this survey was to assess Building 100 for the presence of regulated building materials, including asbestos-containing materials (ACMs) lead-containing paint (LCP) and other hazardous materials (OHMs.) Building 100 is an approximately 14,300 square foot (SF) structure previously used as the Danville VAMC Boiler Plant. Site surveys were performed from January 5 to January 6, 2020 by a team of Mabbett inspectors. Team member accreditation certificates are provided in Appendix A. Site surveys consisted of the following activities:

A review of provided facility building information;

An Asbestos Containing Material (ACM) survey of suspect materials Analysis by Polarized Light Microscopy

(PLM)

Limited Lead Containing Paint (LCP) sampling (Analysis by Flame Atomic Absorption Spectroscopy [AA]), and;

A visual estimation and inventory of other hazardous materials (OHM).

The survey was limited to this building and areas identified in this report. Sampling locations were determined based upon a thorough inspection of each area. Areas and materials outside of this scope of work were not surveyed by Mabbett.

1.1 Summary of Survey Results

Bulk samples of suspected ACM were collected and submitted to a certified analytical laboratory for asbestos analysis by PLM using stop positive methodology. Paint chip samples were collected and submitted to a certified analytical laboratory for lead content analysis using atomic absorption spectroscopy. The survey efforts yielded the following results and conclusions:

One-hundred and twenty-nine (129) bulk samples for suspect ACM were collected in the building.

Based on laboratory analysis of suspect ACM, seventeen (17) of the materials sampled contained asbestos greater than 1%. The Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) defines ACM as any material that contains greater than one percent (>1%) asbestos.

Ten (10) paint chip samples from building surfaces were collected in the building for laboratory analysis and reporting.

Based on laboratory analysis of paint chips, two (2) of the collected samples revealed concentrations of lead in paint that exceeded the U.S. Department of Housing and Urban Development (HUD) threshold of

0.5 percent by weight.

During Mabbett’s visual inventory of OHMs, thirty-six (36) different types of hazardous or regulated materials and materials / components were identified.

1.2 Purpose and Objectives

This project was designed to accomplish two primary objectives: to collect a representative number of building materials for laboratory analysis and reporting; and to use data from the laboratory analysis efforts to estimate the volume of regulated materials present within the building for Miller Remick’s subsequent use in development

© 2021, Mabbett & Associates, Inc. Page 2 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx of an abatement scope and cost. These two objectives were met through a combination of a site visit and inspection to collect building material samples for laboratory analysis; and interpretation of qualitative data collected in the field; and the quantitative laboratory data generated from analysis of the building materials as summarized in this survey report.

© 2021, Mabbett & Associates, Inc. Page 3 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

2.0 ASBESTOS SURVEY

A visual screening inspection was conducted to identify locations of suspect ACM and conceptualize the sampling program. Only areas that were accessible during the field work phase were inspected, with reasonable efforts made during the field survey work to access areas as necessary to complete the asbestos survey and sampling program.

2.1 Sampling Methodology

Bulk asbestos samples were collected using EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP), 40 CFR Part 763, and Asbestos Hazard Emergency Response Act (AHERA) protocols. Bulk suspect ACM sampling was generally conducted according to the following sampling protocol:

Friable surfacing material:

• At least three (3) bulk samples collected from each homogeneous area that is 1,000 ft2 or less.

• At least five (5) bulk samples collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.

• At least seven (7) bulk samples collected from each homogeneous area that is greater than 5,000 ft2.

Thermal system insulation:

• At least three (3) bulk samples collected from each homogeneous area of thermal system insulation.

• At least one (1) bulk sample collected from each homogeneous area of patched area of thermal system insulation.

• Sufficient samples collected from elbows and fittings to determine if they contain ACM.

• Bulk samples were not collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.

Miscellaneous material:

• At least two (2) bulk sample collected from each homogeneous area that is less than 100 ft2.

• At least three (3) bulk samples collected from each homogeneous area that is greater than 100 ft2.

Areas that were inaccessible, or where the survey was limited to visual observation only, are identified below:

Below grade materials Within walls Within fire doors Enclosed pipe/duct chases Inside mechanical equipment/ductwork Above fixed drywall or plaster ceilings Electrical equipment

2.2 Analytical Methodology

The collected bulk samples were submitted under chain of custody (COC) procedures to Scientific Analytical Institute (SAI) of Greensboro, North Carolina for PLM analysis. SAI is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP).

All bulk sample results from this inspection are summarized in Appendix B, Summary of ACM Sampling Results.

© 2021, Mabbett & Associates, Inc. Page 4 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

The EPA and Occupational Safety and Health Administration (OSHA) define any material that contains greater than one percent (>1%) asbestos as being an ACM. As such, the analytical laboratory identified bulk samples as positive for asbestos that met the regulatory criteria of greater than one percent (>1%) asbestos. The laboratory report and COC documentation are provided in Appendix C of this report.

2.3 Summary of Asbestos Containing Materials Findings

Mabbett identified thirty-nine (39) types of homogenous materials and collected one-hundred and twenty-nine

(129) representative bulk ACM samples. Seventeen (17) materials were determined to be ACM. For the purposes of this report, two (2) of these materials were condensed into one (1) homogenous area. Asbestos sampling locations and results are identified on Figure RBM-1. Estimated quantities of materials identified as ACM or assumed to be ACM are presented in Table 1 below:

TABLE 1

Summary of Identified ACM

Danville VAMC, Boiler Plant (Building 100) Danville, Illinois

Location Description of Material Percent and Type of Asbestos

Estimated Quantity Amount Unit

Entry# 1 Brown Sheet Flooring and Associated Mastic

20% Chrysotile (flooring), 30% Chrysotile (mastic)

120 SF

Entry #1, Lab Area, Locker Room, Main Boiler Room, Pump Room Mezzanine

Pipe Insulation (<6") 20% Amosite, 10% Chrysotile

800 LF

Entry #1, Locker Room, Lab Area, Chemical Storage, Main Boiler Room, Boiler #4 Room, Pump Room

Mezzanine, Basement

Fitting Insulation (<6") 10% Chrysotile 200 EA

Entry #1, Locker Room, Emergency Generator

Room, Transformer Room, Pump Room, Main Boiler

Room

Interior Window Caulk 8% Chrysotile 1,000 LF

Entry #1, Entry #2, Emergency Generator

Room, Transformer Room, Pump Room, Main Boiler

Room

Interior Door Caulk 5% Chrysotile, <1% Anthophyllite

200 LF

Lab Area Black Stone Counter Top 20% Chrysotile 15 SF Pump Room, Pump Room Mezzanine, Main Boiler Room, Boiler Room 4, Basement

Pipe Insulation (>6") 10% Chrysotile, 10% Amosite

600 LF

Pump Room, Pump Room Mezzanine, Main Boiler Fitting Insulation (>6") 30% Chrysotile 100 EA

© 2021, Mabbett & Associates, Inc. Page 5 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

TABLE 1

Summary of Identified ACM

Danville VAMC, Boiler Plant (Building 100) Danville, Illinois

Location Description of Material Percent and Type of Asbestos

Estimated Quantity Amount Unit

Room, Boiler Room 4, Basement

Pump Room Mezzanine Tank Insulation 60% Chrysotile 800 SF

Boilers #1,#2 and #3 Lower Boiler Drum

Insulation 45% Chrysotile 400 SF

Boilers #1,#2 and #3 Upper Boiler Drum

Insulation 35% Chrysotile 400 SF

Boilers #1,#2 and #3 Boiler Gasket 60% Chrysotile 3 EA Boiler #1, #2 and #3

Mezzanines Boiler Breeching

Insulation 40% Chrysotile 500 SF

Exterior Door Frames Door Frame Caulk 2% Chrysotile 8 EA Exterior Black Damp Proofing 15% Chrysotile 100 SF

Notes:

SF = Square Feet LF = Linear Feet EA = Each

© 2021, Mabbett & Associates, Inc. Page 6 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

3.0 LEAD-CONTAINING PAINT SURVEY

A Limited sampling of painted surfaces was conducted on January 6, 2020. The limited LCP survey included the collection of ten (10) paint chips from building materials and surfaces. Paint chip samples were submitted under standard COC procedures to SAI of Greensboro, North Carolina. Analysis was conducted using AA EPA method SW-846 3050B/6010C/7000B. The laboratory analytical report is included in Appendix D of this report. Sample locations are identified on Figure RBM-1.

The results of the limited LCP sampling are summarized in Table 2 below:

Table 2 Summary of Lead Paint Chip Analytical Results

Danville VAMC, Boiler Plant (Building 100) Danville, Illinois

Sample # Location Color Result (% wt.)

Pb-01 Metal Cross Member, Pump Room (North) White 0.22% Pb-02 Metal Duct, Boiler House (Northeast) Silver 0.032% Pb-03 Metal Stairs, Boiler House (Northeast) Green 11% Pb-04 Metal Boiler #1 (West) Silver 0.022% Pb-05 Concrete Block Wall, Boiler House (West) White 0.084% Pb-06 Metal Column, Boiler House (South) White 0.34% Pb-07 Metal Wall Boiler House (South) White 0.16% Pb-08 Metal Railing, Upper Mezzanine (North) Green 8.50% Pb-09 Metal Window Panel Exterior (West) Brown 0.011% Pb-10 Metal Bollard Exterior (Southeast) Yellow BLR (<0.0078) Notes: BLR = Below Reporting Limit

The Occupational Safety & Health Administration (OSHA) does not recognize a “safe” level of lead in paint.

Depending on the method of removal used, even trace amounts of lead in paint may result in airborne concentrations of lead during removal. An employer or contractor who disturbs or removes lead paint must comply with OSHA Standard 29 CFR 1926.62, “Lead Exposure in Construction; Interim Final Rule.”

© 2021, Mabbett & Associates, Inc. Page 7 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

4.0 INVENTORY OF OTHER HAZARDOUS MATERIALS

A visual screening and inventory was conducted by Mabbett staff to identify quantities of other potential hazardous, non-hazardous, or regulated building materials in order to define an inventory of these materials for future relocation or disposal purposes. The survey included a visual estimation of the following suspect materials:

Light Ballasts (associated with fluorescent light tubes) Light Tubes (e.g., Fluorescent light tubes and HID lamps that may contain mercury or lead) Switches (i.e., mercury switches or gauges) Ozone Depleting Substances (e.g., chlorofluorocarbons contained in air conditioning and refrigeration equipment.

Batteries (i.e., lead acid, nickel cadmium and lithium batteries) Containerized Wastes Miscellaneous (e.g., aboveground storage tanks, smoke detectors, fire suppression systems, hydraulic door stops, solids, liquids, and staining from process areas)

A summary of this visual inventory is presented below in Table 3.

Table 3 OHM Inventory

Danville VAMC, Boiler Plant (Building 100) Danville, Illinois

Material Quantity Unit Light Fixtures - 2 Lamp, 4' Tubes 131 EA

High Sodium Light Fixtures 8 EA Gas Heaters 8 EA

Incandescent Light Bulbs 8 EA Fire Alarm Pull Stations 6 EA

Fan Motors 6 EA Exit Lights 5 EA

Pump Motors 5 EA Thermostats 4 EA

Flammable Fire Cabinets 4 EA Emergency Light Fixtures 4 EA

Battery Pack 3 EA ITE Circuit Breaker 3 EA Fire Extinguishers 3 EA

Compressors 3 EA Large Engine Motor Oil Cans 3 EA

Fire Alarm Strobe 2 EA Zone Guard Alarm 2 EA

Hot Water Heater (30 gal.) 2 EA 30 KVA Transformer 2 EA

© 2021, Mabbett & Associates, Inc. Page 8 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

Table 3 OHM Inventory

Danville VAMC, Boiler Plant (Building 100) Danville, Illinois

Material Quantity Unit Emergency Eye Wash / Shower 2 EA

Oil Drums (55 gal.) 2 EA Window Air Conditioning Unit 1 EA

Fire Control Panel 1 EA Electric Heater 1 EA

Diesel Fuel Tank (100 gal.) 1 EA Oxygen Detector 1 EA

Electric Panelboard 1 EA Caterpillar Emergency Generator 1 EA

9" Television 1 EA 20" Television 1 EA

Microwave Oven 1 EA Electronic Gear Panel 1 EA

Switch Gear Panel 1 EA Waste Oil Drum (55 gal.) 1 EA

Used Antifreeze Drum (55 gal.) 1 EA

© 2021, Mabbett & Associates, Inc. Page 9 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

5.0 CONCLUSIONS AND RECOMMENDATIONS

5.1 Asbestos

Identified ACM materials must be removed by a licensed asbestos abatement contractor prior to being disturbed.

Any suspect materials encountered during renovation or demolition activities that were not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise. Suspect ACM that may be present within the walls, below grade, or in other inaccessible locations, should be assumed to contain asbestos if discovered during any renovation or demolition process or until otherwise verified.

5.2 Lead Containing Paint

The purpose of the limited LCP survey was to identify similar areas of LCP. During the on-site survey, representative samples of similar areas of interior and exterior building coatings were collected and analyzed for lead content. The regulations addressing LCP in non-residential buildings are focused on occupational exposures involved with paint-disturbing activities and related waste-disposal activities.

Occupational exposure to lead during construction is regulated by OSHA regulation 29 CFR 1926.62 “Lead in Construction,” as well as other applicable state and local regulations. These regulations involve air monitoring to determine worker exposure levels when disturbing paint containing measurable levels of lead. This LCP survey cannot determine a safe level of lead for the purpose of paint-disturbing activities. However, this report is intended to provide guidance as to the location of LCP so it can be controlled, abated, or disposed of properly during this project’s construction related activities. Information gathered during this LCP survey should be used to determine where worker exposures to airborne lead may occur. Additionally, this information should also be used to assess the potential for exposure to workers, and for determining appropriate controls necessary to limit his or her health risks during this project.

A concentration of lead greater than or equal to 0.5 mg/Kg percent by weight or 1.0 mg/cm2 exceeds EPA and HUD residential standards is considered an indicator of risk. Representative samples of LCP waste to be generated during building renovation, or following demolition but prior to disposal, should be collected and analyzed using toxicity characteristic leaching procedure (TCLP) in accordance with 40 CFR Part 261. Management and disposal of lead containing waste must be done in accordance with all applicable local, state, and federal regulations.

OSHA regulations may require certain procedures for any paint that contains lead, even if it is below these levels.

All LCP identified, regardless of the lead content, should either be sampled and analyzed by TCLP and then handled/disposed of accordingly, or segregated from other large-scale debris and then managed as hazardous waste in accordance with federal, state, and local hazardous waste disposal regulations.

5.3 Other Hazardous Materials

The purpose of the inventory for other hazardous materials as completed by Mabbett was to identify potential hazardous, non-building material substances for special handling consideration prior to any planned building demolition or rehabilitation measures. Mabbett identified items that, if removed, should be disposed of, or recycled in accordance with applicable Federal and State rules for regulated materials. Examples of such materials are light ballasts, fluorescent light tubes, batteries, and refrigerants.

© 2021, Mabbett & Associates, Inc. Page 10 February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

6.0 LIMITATIONS

This survey report is the result of a diligent and thorough inspection for regulated building materials of the areas and materials that may be impacted by the proposed demolition of Building 100. Inaccessible areas were not included in this survey. Although a comprehensive inspection was performed with the majority of the building accessed for evaluation and sampling purposes, Mabbett does not claim to have identified all of the materials that may be present at/in the building. Mabbett has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. Mabbett makes no assurances that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.

© 20211, Mabbett & Associates, Inc. FIGURE February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

FIGURE

Asbestos & Lead Sampling Location Plan, Building 100

DANVILLE VA MEDICAL CENTER

DANVILLE, ILLINOIS

NO. DESCRIPTION DATE

VA FORM 08-6231

N O

R T

H

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned

Small Business

A

S e r v i c e

D i s a b l d

V t e r a n

O w n d

S m a l l

B u s i n e s s

SDVOSB

CVE

MR PROJECT NO: 0499-0121

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseENGINEER OF RECORDCONSULTANTS

Project Director

2021-01-27

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

C

D

E

F

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180

T. 781-275-6050 www.mabbett.com

Mabbett

R

REGULATED BUILDING MATERIALS

SUVEY PLAN

BUILDING-100, BASEMENT

RBM-1

DJAMFD

LEGEND

STOP POSITIVE SAMPLE FOR ASBESTOS

NO ASBESTOS DETECTED (NAD)

SAMPLE POSITIVE FOR ASBESTOS

APPROXIMATE SAMPLE LOCATION

01A*

01A**

01A

01A

(Pb-01) APPROXIMATE LEAD (Pb) SAMPLE LOCATION

15F**

01A*, 01B**, 01C**, 02A*, 02C**, 02B**

03A, 03B, 03C, 04A, 04B, 04C

06F**, 06G**

15D

15E*

16A*, 16B**, 16C**

17C, 18C

17B, 18B

09C, 10C

21A, 21B, 21C

07A*, 08A*

05E**

09A, 10A

06E**

07C**, 08C**

11A, 11B, 11C

20C**

14E**

19C**

19B**

20A*

06C**, 15G**

20B**

14D*, 15C

09B, 10B

17A, 18A

12A, 12B, 12C

13A*, 13B**, 13C**

05A, 05D*, **06D

19A*

07B**

34A, 34B, 34C

32A

27B, 28B

27A, 28A

32B

27C, 28C

29B

36B, 37B

36C, 37C

36A, 37A

38A, 38B, 38C

33A* 33B**

33C**

32C*

30C29C

31B

35C

31A

35B

30B

22A, 23A, 24A*

29A

25A*

31C

22B, 23B, 24B**

22C, 23C, 24C**

25C**

25B**

35A

30A

NOTE;

SAMPLES 39A, 39B*, 39C* COLLECTED FROM ROOF

(Pb-08)

(Pb-01)

(Pb-02), (Pb-03)

(Pb-04)

(Pb-06)

(Pb-07)

(Pb-10)

(Pb-05)

(Pb-09)

BOILER PLANT HAZARDOUS

MATERIALS SURVEY

550-20-121

08B*

05C

14C

14B, 15B

05B, 06B**

14A, 15A

06A*

26A, 26B, 26C

AutoCAD SHX Text

SECOND FLOOR PLAN

AutoCAD SHX Text

BASEMENT FLOOR PLAN

AutoCAD SHX Text

NEW COOLING TOWER

AutoCAD SHX Text

NEW COOLING TOWER PUMPS

AutoCAD SHX Text

SCRUBBER SYSTEM

AutoCAD SHX Text

OFFICE/MAINT. AREA ENTRY 2

AutoCAD SHX Text

ELECTRICAL ROOM

AutoCAD SHX Text

WASTE HEAT BOILER

AutoCAD SHX Text

INCINERATOR BOILER ROOM

AutoCAD SHX Text

RAM FEEDER AREA (UNDERNEATH)

AutoCAD SHX Text

CRAWFORD INCINERATOR

AutoCAD SHX Text

ASH PIT

AutoCAD SHX Text

ASH HOE

AutoCAD SHX Text

MAINTENANCE AREA

AutoCAD SHX Text

WASTE HEAT BOILER

AutoCAD SHX Text

ASH CART DUMPER

AutoCAD SHX Text

ASH ROLL-OFF CONTAINER

AutoCAD SHX Text

STEAM BOILER

AutoCAD SHX Text

BREAK AREA

AutoCAD SHX Text

LOCKER ROOM

AutoCAD SHX Text

ENTRY 1

AutoCAD SHX Text

GENERATOR ROOM

AutoCAD SHX Text

TRANSFORMER ROOM

AutoCAD SHX Text

STEAM BOILER

AutoCAD SHX Text

STEAM BOILER

AutoCAD SHX Text

CHEMICAL STORAGE

AutoCAD SHX Text

BOILER ROOM

AutoCAD SHX Text

PUMP ROOM

AutoCAD SHX Text

LAB AREA

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

STACK

© 20211, Mabbett & Associates, Inc. APPENDIX A February 8, 2021 Project No.2020058.000.001 S:\ADMINA\2020058 Danville VAMC\001\RBM Survey Report\Demolish Boiler Plant V1 - Final.docx

APPENDIX A

Accreditation Certificates

© 2021, Mabbett & Associates, Inc. APPENDIX B February 8, 2021 Project No. 2020058.000.001 Demolish Boiler Plant V1 - Final

APPENDIX B

Summary of ACM Sampling Results

© 2021, Mabbett & Associates, Inc. Appendix B February 8, 2021

Summary of ACM Sampling Results

Danville VAMC Boiler Plant (Building 100) Danville, Illinois

Sample No. Sample Location Description of Material Percent and Type of

Asbestos

01A Entry #1 Brown Sheet Flooring 20% Chrysotile 01B Entry #1 Brown Sheet Flooring NA/PS 01C Entry #1 Brown Sheet Flooring NA/PS 02A Entry #1 Brown Sheet Flooring Adhesive 30% Chrysotile 02B Entry #1 Brown Sheet Flooring Adhesive NA/PS 02C Entry #1 Brown Sheet Flooring Adhesive NA/PS 03A Entry #1 4" Brown Cove Base NAD 03B Entry #1 4" Brown Cove Base NAD 03C Entry #1 4" Brown Cove Base NAD 04A Entry #1 4" Brown Cove Base Adhesive NAD 04B Entry #1 4" Brown Cove Base Adhesive NAD 04C Entry #1 4" Brown Cove Base Adhesive NAD 05A Basement Pipe Insulation (<6") NAD 05B Basement Pipe Insulation (<6") NAD 05C Boiler Room Pipe Insulation (<6") NAD

05D Lab Area Pipe Insulation (<6") 20% Amosite, 10% Chrysotile

05E Locker Room Pipe Insulation (<6") NA/PS 06A Basement Fitting Insulation (<6") 10% Chrysotile 06B Basement Fitting Insulation (<6") NA/PS 06C Boiler Room Fitting Insulation (<6") NA/PS 06D Lab Area Fitting Insulation (<6") NA/PS 06E Locker Room Fitting Insulation (<6") NA/PS 06F Entry #1 Fitting Insulation (<6") NA/PS 06G Entry #1 Fitting Insulation (<6") NA/PS 07A Entry #1 Interior Window Caulk 8% Chrysotile 07B Pump Room Interior Window Caulk NA/PS 07C Emergency Generator Room Interior Window Caulk NA/PS 08A Entry 1 Interior Door Caulk <1% Anthophyllite

08B Pump Room Interior Door Caulk 5% Chrysotile, <1% Anthophyllite

08C Emergency Generator Room Interior Door Caulk NA/PS 09A Locker Room 12"x12" Beige Floor Tile NAD 09B Boiler Room 12"x12" Beige Floor Tile NAD 09C Boiler Room 12"x12" Beige Floor Tile NAD

Summary of ACM Sampling Results Danville VAMC Boiler Plant (Building 100)

Danville, Illinois

Sample No. Sample Location Description of Material Percent and Type of

Asbestos 10A Locker Room 12"x12" Beige Floor Tile Mastic NAD 10B Boiler Room 12"x12" Beige Floor Tile Mastic NAD 10C Boiler Room 12"x12" Beige Floor Tile Mastic NAD 11A Emergency Generator Room Emergency Generator Exhaust NAD 11B Emergency Generator Room Emergency Generator Exhaust NAD 11C Emergency Generator Room Emergency Generator Exhaust NAD 12A Lab Area Black Sink Coat NAD 12B Lab Area Black Sink Coat NAD 12C Lab Area Black Sink Coat NAD 13A Lab Area Black Stone Counter Top 20% Chrysotile 13B Lab Area Black Stone Counter Top NA/PS 13C Lab Area Black Stone Counter Top NA/PS 14A Basement Pipe Insulation (>6") NAD 14B Basement Pipe Insulation (>6") NAD 14C Basement Pipe Insulation (>6") NAD

14D Pump Room Pipe Insulation (>6") 10% Chrysotile, 10% Amosite

14E Pump Room Pipe Insulation (>6") NA/PS 15A Room B03 Fitting Insulation (>6") NAD 15B Room B03 Fitting Insulation (>6") NAD 15C Pump Room Fitting Insulation (>6") NAD 15D Pump Room Mezzanine Fitting Insulation (>6") NAD 15E Mezzanine Fitting Insulation (>6") 30% Chrysotile 15F Mezzanine Fitting Insulation (>6") NA/PS 15G Boiler Room Fitting Insulation (>6") NA/PS 16A Pump Room Mezzanine Tank Insulation 60% Chrysotile 16B Pump Room Mezzanine Tank Insulation NA/PS 16C Pump Room Mezzanine Tank Insulation NA/PS 17A Boiler Room 12"x12" Black Floor Tile NAD 17B Boiler Room 12"x12" Black Floor Tile NAD 17C Boiler #4 12"x12" Black Floor Tile NAD 18A Boiler Room 12"x12" Black Floor Tile Mastic NAD 18B Boiler Room 12"x12" Black Floor Tile Mastic NAD 18C Boiler #4 12"x12" Black Floor Tile Mastic NAD 19A Boiler #1 Lower Boiler Drum Insulation 45% Chrysotile 19B Boiler #2 Lower Boiler Drum Insulation NA/PS 19C Boiler #3 Lower Boiler Drum Insulation NA/PS

Summary of ACM Sampling Results Danville VAMC Boiler Plant (Building 100)

Danville, Illinois

Sample No. Sample Location Description of Material Percent and Type of

Asbestos 20A Boiler #1 Upper Boiler Drum Insulation 35% Chrysotile 20B Boiler #2 Upper Boiler Drum Insulation NA/PS 20C Boiler #3 Upper Boiler Drum Insulation NA/PS 21A Boiler Room Mezzanine Fitting Insulation (Yellow) NAD 21B Boiler Room Mezzanine Fitting Insulation (Yellow) NAD 21C Boiler Room Mezzanine Fitting Insulation (Yellow) NAD 22A Boiler #1 Yellow Boiler Fire Brick NAD 22B Boiler #2 Yellow Boiler Fire Brick NAD 22C Boiler #3 Yellow Boiler Fire Brick NAD 23A Boiler #1 Boiler Mortar NAD 23B Boiler #2 Boiler Mortar NAD 23C Boiler #3 Boiler Mortar NAD 24A Boiler #1 Boiler Gasket 60% Chrysotile 24B Boiler #2 Boiler Gasket NA/PS 24C Boiler #3 Boiler Gasket NA/PS 25A Boiler #1 Mezzanine Boiler Breeching Insulation 40% Chrysotile 25B Boiler #2 Mezzanine Boiler Breeching Insulation NA/PS 25C Boiler #3 Mezzanine Boiler Breeching Insulation NA/PS 26A Basement Tank Insulation NAD 26B Basement Tank Insulation NAD 26C Basement Tank Insulation NAD 27A Entry #2 Gypsum Wallboard NAD 27B Entry #2 Gypsum Wallboard NAD 27C Storage Room Gypsum Wallboard NAD 28A Entry #2 Joint Compound NAD 28B Entry #2 Joint Compound NAD 28C Storage Room Joint Compound NAD 29A Exterior East Brick Mortar NAD 29B Exterior North Brick Mortar NAD 29C Exterior West Brick Mortar NAD 30A Exterior East Window Frame Caulk NAD 30B Exterior East Window Frame Caulk NAD 30C Exterior West Window Frame Caulk NAD 31A Exterior West Window Sill Caulk NAD 31B Exterior West Window Sill Caulk NAD 31C Exterior East Window Sill Caulk NAD 32A Exterior Southeast Door Frame Caulk NAD

Summary of ACM Sampling Results Danville VAMC Boiler Plant (Building 100)

Danville, Illinois

Sample No. Sample Location Description of Material Percent and Type of

Asbestos 32B Exterior Southwest Door Frame Caulk NAD 32C Exterior Northwest Door Frame Caulk 2% Chrysotile 33A Exterior Metal Connector Building Black Damp Proofing 15% Chrysotile 33B Exterior Metal Connector Building Black Damp Proofing NA/PS 33C Exterior Metal Connector Building Black Damp Proofing NA/PS 34A Exterior Southwest Area Chiller Caulk NAD 34B Exterior Southwest Area Chiller Caulk NAD 34C Exterior Southwest Area Chiller Caulk NAD 35A Exterior East Window Glazing NAD 35B Exterior East Window Glazing NAD 35C Exterior West Window Glazing NAD 36A Stack, North Black Mortar NAD 36B Stack, West Black Mortar NAD 36C Stack, South Black Mortar NAD 37A Stack, North Stack Grout NAD 37B Stack, West Stack Grout NAD 37C Stack, South Stack Grout NAD 38A Stack, North Clean Out Gasket NAD 38B Stack, North Clean Out Gasket NAD 38C Stack, North Clean Out Gasket NAD 39A Roof, Northeast Roof Flashing Caulk NAD 39B Roof, Northwest Roof Flashing Caulk <1% Chrysotile 39C Roof, Northwest Roof Flashing Caulk 2% Chrysotile

Notes:

NA = Not Analyzed NAD = No Asbestos Detected

© 2021, Mabbett & Associates, Inc. Appendix C February 8, 2021

APPENDIX C

Asbestos Laboratory Reports and Chain of Custody

Bulk Asbestos Analysis By Polarized Light Microscopy

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

Date Received: 1/8/2021

Lab Order ID: 71957413

20% Chrysotile

01A Brown Sheet Flooring - Entry #1 vinyl sheet flooring

Brown, Beige Non Fibrous Homogeneous

Teased, Crushed71957413PLM_1

Other 80%

Not Analyzed 01B

Brown Sheet Flooring - Entry #1

71957413PLM_2

Not Analyzed 01C

Brown Sheet Flooring - Entry #1

71957413PLM_3

30% Chrysotile

02A Brown Sheet Flooring Adhesive - Entry #1 inseparable from vinyl sheet flooring backing

Brown, Black Non Fibrous Homogeneous

Teased, Dissolved71957413PLM_4

Other 70%

Not Analyzed 02B

Brown Sheet Flooring Adhesive - Entry #1

71957413PLM_5

Not Analyzed 02C

Brown Sheet Flooring Adhesive - Entry #1

71957413PLM_6

None Detected 03A

4" Brown Cove Base - Entry #1

Brown Non Fibrous Homogeneous

Crushed, Ashed71957413PLM_7

Other 100%

None Detected 03B

4" Brown Cove Base - Entry #1

Brown Non Fibrous Homogeneous

Crushed, Ashed71957413PLM_8

Other 100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Heather Davide (129)

P-F-002 r15 1/16/2021

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

Date Received: 1/8/2021

Lab Order ID: 71957413

None Detected 03C

4" Brown Cove Base - Entry #1

Brown Non Fibrous Homogeneous

Crushed, Ashed71957413PLM_9

Other 100%

None Detected 04A

4" Brown Cove Base Adhesive

- Entry #1

Brown Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_10

Other 100%

None Detected 04B

4" Brown Cove Base Adhesive

- Entry #1

Brown Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_11

Other 100%

None Detected 04C

4" Brown Cove Base Adhesive

- Entry #1

Brown Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_12

Other 100%

None Detected 05A

Pipe Insulation < 6" - Basement

Gray Fibrous Heterogeneous

Teased, Crushed71957413PLM_13

Fiber Glass Other 30% 70%

None Detected 05B

Pipe Insulation < 6" - Basement

Gray Fibrous Heterogeneous

Teased, Crushed71957413PLM_14

Fiber Glass Other 35% 65%

None Detected 05C

Pipe Insulation < 6" - Boiler Room

Gray Fibrous Heterogeneous

Teased, Crushed71957413PLM_15

Fiber Glass Other 30% 70%

20% Amosite 10% Chrysotile

05D Pipe Insulation < 6" - Lab Area

White Fibrous Heterogeneous

Teased, Crushed71957413PLM_16

Other 70%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

Date Received: 1/8/2021

Lab Order ID: 71957413

Not Analyzed 05E

Pipe Insulation < 6" - Locker Room

71957413PLM_17

06A Fitting Insulation < 6" - Basement wrap/insulation inseparable

White, Gray Fibrous Heterogeneous

Teased, Dissolved71957413PLM_18

Cellulose Other 30% 60%

Not Analyzed 06B

Fitting Insulation < 6" - Basement

71957413PLM_19

Not Analyzed 06C

Fitting Insulation < 6" - Boiler Room

71957413PLM_20

Not Analyzed 06D

Fitting Insulation < 6" - Lab Area

71957413PLM_21

Not Analyzed 06E

Fitting Insulation < 6" - Locker Room

71957413PLM_22

Not Analyzed 06F

Fitting Insulation < 6" - Entry

71957413PLM_23

Not Analyzed 06G

Fitting Insulation < 6" - Entry

71957413PLM_24

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

8% Chrysotile

07A Interview Window Caulk - Entry 1

Gray Non Fibrous Homogeneous

Crushed, Ashed71957413PLM_25

Other 92%

Not Analyzed 07B

Interview Window Caulk - Pump Room

71957413PLM_26

Not Analyzed 07C

Interview Window Caulk - Emergency Generator Room

71957413PLM_27

< 1% Anthophyllite

08A Interior Door Caulk - Entry 1

Tan Non Fibrous Homogeneous

Crushed, Ashed71957413PLM_28

Other Other 3% 97%

5% Chrysotile

< 1% Anthophyllite 08B

Interior Door Caulk - Pump Room grey/tan caulk inseparable

Gray, Tan Non Fibrous Homogeneous

Crushed71957413PLM_29

Other Other 3% 92%

Not Analyzed 08C

Interior Door Caulk - Emergency Generator Room

71957413PLM_30

None Detected 09A

12x12 Beige Floor Tile - Locker Room

Beige Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_31

Other 100%

None Detected 09B

12x12 Beige Floor Tile - Boiler Room

Beige Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_32

Other 100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

Date Received: 1/8/2021

Lab Order ID: 71957413

None Detected 09C

12x12 Beige Floor Tile - Boiler Room

Beige Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_33

Other 100%

None Detected 10A

12x12 Beige Floor Tile Mastic

- Locker Room

Yellow, Brown Non Fibrous Homogeneous

Dissolved71957413PLM_34

Other 100%

None Detected 10B

12x12 Beige Floor Tile Mastic

- Boiler Room

Yellow, Brown Non Fibrous Homogeneous

Dissolved71957413PLM_35

Other 100%

None Detected 10C

12x12 Beige Floor Tile Mastic

- Boiler Room

Yellow, Brown Non Fibrous Homogeneous

Dissolved71957413PLM_36

Other 100%

None Detected 11A

Emergency Generator Exhaust

- Emergency Generator Room

Tan, Gray Fibrous Heterogeneous

Teased, Crushed71957413PLM_37

Fiber Glass Synthetic Fibers

Other 30% 5%

65%

None Detected 11B

Emergency Generator Exhaust

- Emergency Generator Room

Tan, Gray Fibrous Heterogeneous

Teased, Crushed71957413PLM_38

Fiber Glass Synthetic Fibers

Other 30% 5%

65%

None Detected 11C

Emergency Generator Exhaust

- Emergency Generator Room

Tan, Gray Fibrous Heterogeneous

Teased, Crushed71957413PLM_39

Fiber Glass Synthetic Fibers

Other 30% 5%

65%

None Detected 12A

Black Sink Coat - Lab Area Black Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_40

Other 100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

Date Received: 1/8/2021

Lab Order ID: 71957413

None Detected 12B

Black Sink Coat - Lab Area Black Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_41

Other 100%

None Detected 12C

Black Sink Coat - Lab Area Black Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_42

Other 100%

20% Chrysotile

13A Black Stone Counter Top - Lab Area

Black Non Fibrous Homogeneous

Teased, Crushed71957413PLM_43

Other 80%

Not Analyzed 13B

Black Stone Counter Top - Lab Area

71957413PLM_44

Not Analyzed 13C

Black Stone Counter Top - Lab Area

71957413PLM_45

None Detected 14A

Pipe Insulation >6" - Basement

Beige, White Fibrous Heterogeneous

Teased, Crushed71957413PLM_46

Cellulose Fiber Glass

Other 15% 5%

80%

None Detected 14B

Pipe Insulation >6" - Basement

Beige, White Fibrous Heterogeneous

Teased, Crushed71957413PLM_47

Cellulose Fiber Glass

Other 15% 10%

75%

None Detected 14C

Pipe Insulation >6" - Basement

Beige, White Fibrous Heterogeneous

Teased, Crushed71957413PLM_48

Cellulose Fiber Glass

Other 15% 5%

80%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

10% Amosite

14D Pipe Insulation >6" - Pump Room

Gray, Beige Fibrous Heterogeneous

Teased, Crushed71957413PLM_49

Cellulose Other 20% 60%

Not Analyzed 14E

Pipe Insulation >6" - Boiler Room

71957413PLM_50

None Detected 15A

Fitting Insulation >6" - Basement

Gray, Beige Fibrous Heterogeneous

Teased, Crushed71957413PLM_51

Fiber Glass Cellulose

Other 20% 10%

70%

None Detected 15B

Fitting Insulation >6" - Basement

Gray, Beige Fibrous Heterogeneous

Teased, Crushed71957413PLM_52

Fiber Glass Cellulose

Other 20% 10%

70%

None Detected 15C

Fitting Insulation >6" - Pump Room

Gray, Beige Fibrous Heterogeneous

Teased, Crushed71957413PLM_53

Fiber Glass Cellulose

Other 20% 10%

70%

None Detected 15D

Fitting Insulation >6" - Pump Room Mezz

Gray, Beige Fibrous Heterogeneous

Teased, Crushed71957413PLM_54

Fiber Glass Cellulose

Other 20% 10%

70%

30% Chrysotile

15E Fitting Insulation >6" - Mezz

White, Beige Fibrous Heterogeneous

Teased, Crushed71957413PLM_55

Cellulose Other 10% 60%

Not Analyzed 15F

Fitting Insulation >6" - Mezz

71957413PLM_56

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

Date Received: 1/8/2021

Lab Order ID: 71957413

Not Analyzed 15G

Fitting Insulation >6" - Boiler Room

71957413PLM_57

60% Chrysotile

16A Tank Insulation - Mezz

Gray Fibrous Heterogeneous

Teased, Crushed71957413PLM_58

Other 40%

Not Analyzed 16B

Tank Insulation - Mezz

71957413PLM_59

Not Analyzed 16C

Tank Insulation - Mezz

71957413PLM_60

None Detected 17A

12x12 Black Floor Tile - Boiler Room

Black Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_61

Other 100%

None Detected 17B

12x12 Black Floor Tile - Boiler Room

Black Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_62

Other 100%

None Detected 17C

12x12 Black Floor Tile - Boiler #4

Black Non Fibrous Homogeneous

Crushed, Dissolved71957413PLM_63

Other 100%

None Detected 18A

12x12 Black Floor Tile Mastic

- Boiler Room

Yellow Non Fibrous Homogeneous

Dissolved71957413PLM_64

Other 100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Boiler Plant - #R2020058.000 Bldg #100Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael DelaneyAttn:Customer: Mabbett & Associates, Inc.

105 Central Street, Suite 4100 Stoneham, MA 02180

Analysis ID: 71957413_PLM

Date Reported: 1/11/2021

Date Received: 1/8/2021

Lab Order ID: 71957413

None Detected 18B

12x12 Black Floor Tile Mastic

- Boiler Room

Yellow Non Fibrous Homogeneous

Dissolved71957413PLM_65

Other 100%

None Detected 18C

12x12 Black Floor Tile Mastic

- Boiler #4

Yellow Non Fibrous Homogeneous

Dissolved71957413PLM_66

45% Chrysotile

19A Lower Boiler Drum Insulation

-…