This is a Statement of Work (SOW) for facility management services issued by VA Illiana Health Care System dated May 20, 2026.
The contractor shall provide all labor, materials, supplies, equipment, management, and supervision to reseal, resurface, and restripe approximately 856,900 total square feet of road surfaces and parking lots at the VA facility. The base bid comprises four primary tasks: (1) sealing and crack-filling approximately 243,700 square feet of road surfaces using approved asphalt sealant; (2) painting road markings and parking lot stripes using approved asphalt paint with colors to be determined before construction commences; (3) milling and resurfacing approximately 288,400 square feet of designated parking lots to 2 inches depth with new asphalt layer laid level to surrounding surfaces with proper drainage away from buildings; and (4) sealing and crack-filling approximately 324,800 square feet of parking lots with repainted stripes and markings to match existing conditions unless otherwise directed. The contractor is responsible for traffic direction during road work. The period of performance is 210 calendar days after issuance of Notice to Proceed. Prior to work commencement, direct coordination with VA Illiana Health Care System Facility Management Service is required, with Andrew Butts at (447) 792-8493 serving as the primary point of contact. Certification and accreditation requirements do not apply, and a Security Accreditation Package is not required. The SOW includes extensive requirements regarding records management, federal records compliance, data ownership, information security, subcontractor flow-down obligations, and mandatory records management training for all contractor employees.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Pre-Bid RFI 550-26-205 answered final.xlsx | XLSX spreadsheet | |
| Attachment 3 - 550-26-205 VA Danville Parking Map.pdf | ||
| 36C25226B0021 0004.docx | DOCX document | |
| 36C25226B0021 0003.docx | DOCX document | |
| 36C25226B0021 0002.docx | DOCX document | |
| S06 Attachment 1 VA DAN Master Site-Parking-Map View.pdf | ||
| S06 Attachment 2 Site visit sign in.pdf | ||
| 36C25226B0021 0001.docx | DOCX document | |
| Attachment 2 - 550-26-205 Specification.pdf | ||
| 36C25226B0021_1.docx | DOCX document | |
| Attachment 3 - 550-26-205 Wage Determination.pdf | ||
| Attachment 1 - 550-26-205 SOW.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Illiana Health Care System May 20, 2026 Facility Management Service
Butts
STATEMENT OF WORK
A. STATEMENT OF WORK
The contractor shall provide all labor, material, supplies, equipment, management and supervision to reseal, resurface, and restripe as necessary for safe travel and safe pedestrian crossing. While road work is occurring, the contractor is responsible for directing traffic. Work included is listed below under individual tasks for the base bid.
Prior to work commencing, direct coordination with Veterans Affairs Illiana Health Care System (VAIHCS) Facility Management Service is required. Primary point of contact is Andrew Butts at (447) 792-8493.
NOTE: The Certification and Accreditation requirements do not apply, and a Security Accreditation Package is not required.
SCOPE OF WORK TASKS
B. BASE BID – The Contractor shall provide all Management and Supervision, Labor, Material, Supplies, and Equipment, to perform the following Tasks in accordance with the accompanying plans and specifications.
Task #1: All road surfaces (approximately 243,700 square feet) shall be sealed and have all cracks, and small defects filled using an approved asphalt sealant and crack sealer. Road surfaces included in project are indicated in the drawings.
Task #2: All road markings shall be painted on roads and parking lots using approved asphalt paint. Markings shall be applied after sealant has dried. Stripe colors to be determined before start of construction.
Task #3: Approximately 288,400 Square feet of Parking lots are to be resurfaced. See drawing for designated parking lots. Designated parking lots shall be milled 2 inches and a new asphalt layer shall be laid and be level with surrounding asphalt with appropriate slope. Asphalt shall drain onto the gutters. Asphalt shall not create puddles. Asphalt shall drain away from buildings when applicable. Parking lot stripes and markings shall be painted to match existing markings unless otherwise directed by COR or drawings.
Task #4: Approximately 324,800 square feet of parking lots shall be sealed and have all cracks, and small defects filled using an approved asphalt sealant and crack sealer. Parking lot stripes and markings shall be painted to match existing markings unless otherwise directed by COR or drawings.
Period of Performance shall be 210 Calendar Days after issuance of Notice to Proceed.
Butts
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act
(FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for
Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. VA Illiana and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VA Illiana or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C.
2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to VA Illiana. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from
Government facilities or systems, or facilities or systems operated or maintained on the
Government's behalf, without the express written permission of the Head of the
Butts
Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VA Illiana control or the
Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the
Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by
Government and VA Illiana guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VA policy.
8. The Contractor shall not create or maintain any records containing any non-public VA
Illiana information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. VA Illiana owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VA
Illiana shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
11. Training. All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VA Illiana-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]
D. Flow down of requirements to subcontractors
1. The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
Butts
File details come from the government source that posted it. Updated .