This is Amendment A0001 to Solicitation 36C25226B0005, issued by the Department of Veterans Affairs Great Lakes Acquisition Center for a construction project at the Oscar G Johnson VAMC Hospital. The amendment extends the bid opening date from March 23, 2026 to March 26, 2026 at 1:00 p.m. CDT and incorporates six Requests for Information (RFI) responses with corresponding clarifications to the original solicitation package.
The amendment addresses critical technical and procedural matters, including confirmation that no electronic bid submissions will be accepted (physical mail or hand-delivery only), provision of corrected drawing specifications showing 42x30 page sizes rather than 8.5x11, and clarification on material specifications for bolts, nuts, washers, and trap bodies that must meet A193, A194, and F436 standards for high-heat applications with cast iron components explicitly rejected. The VA confirmed that an asbestos survey will be available upon contract start with quantity estimates provided on drawings page MD101, and that site access requirements and coordination points are detailed on pages 1 and 6 of the solicitation. Additionally, the amendment specifies that non-destructive radiographic examination as specified in the contract documents must be performed and upheld rather than substituted with hydrostatic testing. RFI responses were due by March 6, 2026 at 3:00 p.m. All bidders must acknowledge receipt of this amendment and monitor the SAM.gov website for any additional amendments, with inquiries directed to Contracting Officer Donita Grace at Donita.Grace@va.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
02-25-2026
585-21-113
Department of Veterans Affairs 36C252 115 South 84th Street, Suite 101
Milwaukee WI 53214-1476
Department of Veterans Affairs 36C252 Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25226B0005 02-25-2026
X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-26-2026 1:00 pm CDT
Project: 585-21-113 Replace Condensate Lines and Pumps Amendment A0001 hereby incorporates the details listed on page 2 into the solicitation requirements.
See continuation page for additional details.
A. RFI Response B. RFI Response Due Date C. Bid Opening Date Extended D. Att1 Bid Drawings
Donita Grace Contracting Officer
SOLICITATION 36C25226B0005
AMENDMENT A0001
February 24, 2026
Project: Replace Condensate Lines Construction Project Number: 585-21-113 Location: Oscar G Johnson VAMC Hospital
Amendment 0001 hereby incorporates the following clarifications/change(s) into the solicitation package.
A. RFI Question and Responses
| RFI # |
| CONTRACTOR QUESTIONS |
| REFERENCE |
| VA RESPONSE |
| 1 |
| To mitigate any potential complications with submitting a physical bid, either via mail or in person, would you consider changing the submission method to allow for electronic bids via email? Additionally, if this is to remain a mail or hand delivered bid submission, would you consider extending the bid opening to accommodate mailed submissions? With the bid being due on a Monday morning, mail in submissions would need to be sent out on the previous Friday. This leaves open the possibility for last minute changes to develop over the weekend that cannot be taken into consideration by contractors submitting via mail. |
No electronic submittal. Bid date has been extended to 3/26/2026.
| 2 |
| Drawings page size appears as 8.5x11 |
Drawings should be 42x30 - See attached drawings.
| 3 |
| Is there a survey available for the asbestos mentioned in the specifications. Will it be released with the drawings? |
| 221 times with instructions |
| A survey will be available upon start of the contract. An estimate of quantity is listed on the prints page MD101 |
| 4 |
| If there are any site access requirements, preferred site visit windows, or points of contact for field coordination, please advise. |
See pages 1&6 of Solicitation
| 5 |
| 1. On page 346 of the Specification section 2.3-B #3-b A193 Bolt, A194 Nut, F436 Washer are listed in red. Are these A193 B7 bolts with A 194 Grade 2H Nut please? 2. On page 350 of the Specification section 2.7-D #2 States (Trap bodies steel) Would a Armstrong Em series inverted bucket trap meet your requirements? Or Is a Cast Iron Trap body acceptable like a Armstrong 800 series which we have used exclusively on past projects. 3. On Page 354 of the Specification section 3.2-H #1 States (Perform Radiographic Examination). Do you have a Radiographic Performance specification that is required to be meet? Or can we hydro test all work to 1.5 times operating pressure to meet the proof testing requirements as we have typically done on previous Oscar G Johnson projects? |
| Pages 346. 350, and 354 Specification |
| Grade needs to be appropriate for the bolting application. A193, A194, F436 standards specify high heat fasteners and components. Despite precedence cast Iron components will not be accepted during submittals. Non-destructive examination as specified will be performed and upheld. |
| 6 |
| If there is a survey available for the asbestos mentioned in the specifications for IRON MOUNTAIN - 585-21-113 REPLACE CONDENSATE LINES. The topic is referenced 221 times, with instructions regarding both removal and installation prohibitions. Will the survey be released along with the drawings soon? |
| Specification |
| A survey will be available upon start of the contract. An estimate of quantity is listed on the prints page MD101 |
B. Requests for information (RFI’s) Due Date – No Change RFI’s due Friday, 3/6/2026 no later than 3:00 PM
C. Bid Opening Date extended from 3/23/2026 to:
PROPOSAL DUE DATE / TIME: MARCH 26, AT 1:00 P.M. CST.
Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee, WI 53214-1476
D. Drawings S06 – Att1 BD Set Rev2
ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS:
Donita Grace -- Donita.Grace@va.gov
All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: https://sam.gov/content/opportunities
Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
See attached document: S06 - Att1 BD SET REV 2.