This document is an Amendment (0001) to a solicitation for Milwaukee Snow Removal services issued by the Department of Veterans Affairs' Great Lakes Acquisition Center. The amendment provides answers to seven vendor questions, including clarifications about snow removal procedures, emergency conditions, and contract specifications. Key details include: the VA will not consider tiered pricing for snowfall, temporary snow piling is allowed for snow over 5 inches within 24 hours (a rare event historically occurring once every 3-5 years), and Defensive Driving Certificates can be submitted upon award. Vendors are directed to review the previous contract (36C25222P0005) on FPDS.gov for incumbent and period of performance information. The solicitation due date remains unchanged, and contractors must acknowledge this amendment when submitting their quote.

View the file

Other files

File Type Posted
S05 - Vendor Questions with Answers - Compiled.pdf PDF
S02-36C25225Q0670 RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0001 08-26-2025

36C252

Department of Veterans Affairs 36C252 115 South 84th Street, Suite 101

Milwaukee WI 53214-1476

36C252

Department of Veterans Affairs 36C252 Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476

To all Offerors/Bidders

36C25225Q0670

X

X X

See CONTINUATION Page

X One

Amendment 0001 provides answers to vendor questions received by the Contracting Officer.

The solicitation due date has not been extended.

Acknowledgement of this amendment must be signed and returned with the quote and other required documents.

Amendment 0001 36C25225Q0670

Vendor Questions & Answers

Milwaukee Snow Removal

Q1) Is this a brand-new contract OR if there is (was) an incumbent performing these services? What is the current Contracts period of performance?

Answer: View contract 36C25222P0005 information via FPDS (https://www.fpds.gov) for incumbent, POP, and other relevant information.

Q2) Would the VA consider offering annual tiered pricing in incremental inches of snowfall rather than a monthly fixed price?

Answer: No

Q3) Would you allow the successful contractor to submit the Defensive Driving Certificates upon award, or must they be submitted with the proposal?

Answer: Yes

Q4) What amount of snow is considered an emergency condition to where temporary piling is allowed?

Answer: Anything over 5 inches within a 24-hour period or at the CORs discretion.

Q5) How often is temporary piling approved?

Answer: Historically – once every 3-5 years. This is an extremely rare event and is ultimately at the CORs discretion.

Q6) Is the standard expectation that snow will be plowed into temporary piles and hauled off-site as it is actively snowing?

Answer: Designated piling areas are listed in the RFQ. Removal shall occur once the designated snow storage areas are deemed full by the COR.

Q7) Is the standard expectation that snow will be plowed into temporary piles and hauled off-site immediately after the snow has stopped falling?

Answer: Hauling off-site shall occur once the designated snow storage areas are deemed full by the COR.

End of Amendment 0001