This file contains two technical specifications sections (23 10 00 and 26 32 13) for a VA Medical Center project in Tomah, WI to replace electrical switchgear (Project #676-22-122).
Section 23 10 00 details requirements for facility fuel oil systems, including diesel fuel oil tanks, piping, accessories, tank fluid level monitoring, leak detection systems, and fuel quality maintenance systems. Key requirements include double-wall steel construction for tanks, UL 142 compliance, secondary containment for underground piping, digital monitoring systems for leak detection and fluid levels, and a fuel quality maintenance system with filtration and dewatering capabilities. Section 26 32 13 specifies requirements for engine generators, including a 400kW/500kVA emergency standby diesel generator operating at 277/480V. The generator system must include automatic transfer switches, digital controls interfacing with existing building systems, remote monitoring capabilities, and comprehensive testing requirements including a 6-hour load test. Both sections include detailed installation, testing, and commissioning requirements as well as specifications for all associated components and subsystems.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA MEDICAL CENTER DEPARTMENT OF VETERAN AFFAIRS
TOMAH, WI
REPLACE ELECTRICAL SWITCHGEAR B415
VA PROJECT: 676-22-122 04-01-20
23 10 00 - 1
SECTION 23 10 00
FACILITY FUEL OIL SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Diesel fuel oil tank, piping, and accessories located outside, aboveground as shown on contract drawings. Refer to contract drawings for type of fuel and for tank capacities.
B. Tank fluid level monitoring and alarm systems.
C. Leak detection system for tanks and underground piping.
D. Fuel oil quality maintenance system (water and particulate removal).
E. A complete listing of common acronyms and abbreviations are included in
Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
D. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
E. Section 03 30 00, CAST-IN-PLACE CONCRETE.
F. Section 05 50 00, METAL FABRICATIONS.
G. Section 09 91 00, PAINTING.
H. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
I. Section 23 07 11, HVAC AND BOILER PLANT INSULATION.
J. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
K. Section 26 05 41, UNDERGROUND ELECTRICAL CONSTRUCTION.
L. Section 31 20 00, EARTHWORK.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. Where conflicts occur these specifications and the VHA standard will govern.
B. American Petroleum Institute (API):
RP 1631-2001............Interior Lining and Periodic Inspection of
Underground Storage Tanks
C. American Society of Mechanical Engineers (ASME):
B16.5-2017..............Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24 Metric/Inch Standard.
23 10 00 - 2
B16.9-2018..............Factory Made Wrought Buttwelding Fittings
B16.11-2016.............Forged Fittings, Socket-Welding and Threaded
B31.1-2018..............Power Piping
D. American Society for Testing and Materials (ASTM):
A36/A36M-2017...........Standard Specification for Carbon Structural
Steel
A53/A53M-2018...........Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and
Seamless
A105/A105M-2014.........Standard Specification for Carbon Steel
Forgings for Piping Applications
A106/A106M-2015.........Standard Specification for Seamless Carbon
Steel Pipe for High-Temperature Service
A126-04(R2019)..........Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings
A234/A234M-/015.........Standard Specification for Piping Fittings of
Wrought Carbon Steel and Alloy Steel for
Moderate and High Temperature Service
B62-2017................Standard Specification for Composition Bronze or Ounce Metal Castings
E. Federal Specifications (Fed. Spec.):
A-A-60005-1998..........Frames, Covers, Grating, Steps, Sump and Catch
Basin, Manhole
F. National Electrical Manufacturers Association (NEMA):
250-2014................Enclosures for Electrical Equipment (1000 Volts
Maximum)
G. National Fire Protection Association (NFPA):
30-2018.................Flammable and Combustible Liquids Code
70-2017.................National Electrical Code (NEC)
H. Steel Tank Institute (STI):
F961-2017...............ACT-100U Specification for External Corrosion
Protection of Composite Steel Underground
Storage Tanks
I. Underwriters Laboratories Inc. (UL):
142-2019................Standard for Steel Aboveground Tanks for
Flammable and Combustible Liquids
23 10 00 - 3
971-2019................Standard for Nonmetallic Underground Piping for
Flammable Liquids
2085-2019...............Standard for Protected Aboveground Tanks for
Flammable and Combustible Liquids
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Information and material submitted under this section shall be marked
“SUBMITTED UNDER SECTION 23 10 00, FACILITY FUEL OIL SYSTEMS”, with applicable paragraph identification.
C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity.
D. Aboveground Steel Tanks, Including Vault-type Tanks:
1. Drawings of tanks, supports, ladders, platforms, heating coils, tank manholes, emergency relief vents and all accessories. Include overall dimensions and dimensional locations and sizes of pipe connections, and access openings.
2. Recommended tank support locations.
3. Weight of entire tank assembly, empty and flooded.
4. Design and construction of primary tanks, insulation, secondary containment, supports, pipe connections, platforms.
5. Application and performance data on coatings from manufacturer of coatings.
6. Data certifying tanks are designed for surcharge loads of platforms shown.
7. Certification of compliance with specified standards.
8. Certification that steel tank manufacturer participates in Steel
Tank Institute (STI) Quality Assurance Program.
9. Design, construction, performance, dimensions of emergency relief vents.
E. Fuel Piping:
1. ASTM and UL compliance.
2. Grade, class or type, schedule number.
3. Manufacturer.
23 10 00 - 4
F. Pipe Fittings, Unions, Flanges:
1. ASTM and UL compliance.
2. ASTM standards number.
3. Catalog cuts.
4. Pressure and temperature rating.
G. Foot Valves, Check Valves, Overfill Prevention Valves:
1. Catalog cuts showing design and construction.
2. Pressure and temperature ratings.
3. Pressure loss and flow rate data.
4. Materials of construction.
5. Accessories.
H. Secondary Containment System for Fuel Piping:
1. Sizes, materials, construction of containment system including end seals, sumps, coatings and pipe supports.
2. Layout of system.
3. Installation instructions.
4. Design of cathodic protection system (steel casing).
I. Leak Detection System:
1. Drawings, description and performance data on sensors, control units.
2. Description of operation.
3. Layout of system.
4. Installation and operating instructions.
5. Data on interconnecting wiring systems to be furnished.
J. Tank Fluid Level Monitoring Instrumentation System:
1. Drawings showing instruments and in-tank sensing units, with dimensions.
2. Design and construction of all elements of system.
3. Installation instructions.
K. Tank and Piping Accessories: Design, construction, and dimensions of vent caps, fill boxes, fill caps, spill containers and other accessories.
L. Fuel Quality Maintenance System:
1. Drawings and description of all components and arrangement of system.
2. Design and performance of pumps, filters.
3. Catalog data and operation of control system.
23 10 00 - 5
4. Installation instructions.
M. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide:
1. Include complete list indicating all components of the systems.
2. Include complete diagrams of the internal wiring for each item of equipment.
3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.
N. Completed System Readiness Checklist provided by the Commissioning
Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
O. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
1.5 QUALITY ASSURANCE
A. Approval by Contracting Officer is required of products or services of proposed manufacturers, suppliers and installers, and will be based on
Contractor’s certification that:
1. Manufacturers regularly and currently manufacture tanks, tank and piping accessories, tank fluid level monitoring and leak detection systems, and fuel quality management systems.
2. Manufacturers of steel tanks participate in the Quality Assurance
Program of the Steel Tank Institute (STI).
3. The design and size of each item of equipment provided for this project is of current production and has been in satisfactory operation on at least three installations for approximately three years. Current models of fluid level and leak detection systems with less than three years’ service experience are acceptable if similar previous models from the same manufacturer have at least three years’ service experience.
B. Apply and install materials, equipment and specialties in accordance with manufacturer’s written instructions. Conflicts between the manufacturer’s instructions and the contract drawings and specifications shall be referred to the COR for resolution. Provide copies of installation instructions to the COR two weeks prior to commencing installation of any item.
23 10 00 - 6
C. All equipment shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components or overall assembly.
D. Tanks, Secondary Containment Systems for Piping, Plastic Piping and
Containment Systems, Tank Level Monitoring Systems, Leak Detection
Systems, Fuel Quality Management Systems, Cathodic Protection Systems:
Authorized manufacturer’s representatives shall provide onsite training of installers and supervision of the installation and testing of the equipment and systems to assure conformance to written instructions of manufacturers.
E. Tank and piping installation contractor shall be certified as acceptable by local and state pollution control authorities.
F. Entire installation shall conform to requirements of local and state pollution control authorities.
G. Pipe Welding: Conform to requirements of ASME B31.1. Welders shall show evidence of qualification. Welders shall utilize a stamp to identify their work. Unqualified personnel will be rejected.
H. Assembly of Glass Fiber Reinforced Plastic Piping: Installation personnel shall have been trained, tested and certified under a procedure approved by the manufacturer of the piping. Proof of certification, in writing, shall be provided to the COR.
I. Where specified codes or standards conflict, consult the COR.
J. Label of Conformance (definition): Labels of accredited testing laboratories showing conformance to the standards specified.
K. Equipment and materials installed shall be compatible in all respects with other items being furnished and with existing items so that the result will be a safe, complete and fully operational system which conforms to contract requirements and in which no item is subject to conditions beyond its design capabilities.
L. Aboveground tank system installers.
1. General: No person may install an aboveground tank system that is regulated under Chapter ATCP 93 unless the person complies with one of the following:
a. The person holds a certification issued by the department as a certified aboveground tank system installer.
b. The person holds a Wisconsin registration as a professional engineer and is competent in the engineering methods and
23 10 00 - 7 requirements in Wisconsin for designing and installing storage tank systems for flammable, combustible or hazardous liquids.
c. The person is under the direct supervision of another person who holds a certification or registration as noted in b. above and who is responsible for the installation.
2. Tank installers must be licensed/certified by the State of Wisconsin as licensed installers.
a. Submit the contractors State of Wisconsin tank installation license/certificate.
1.6 AS-BUILT DOCUMENTATION
A. Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.
B. Submit operation and maintenance data updated to include submittal review comments, VA approved substitutions and construction revisions shall be in electronic version on CD or DVD inserted into a three-ring binder. All aspects of system operation and maintenance procedures, including applicable piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations.
Notes on all special systems or devices shall be included. A List of recommended spare parts (manufacturer, model number, and quantity) shall be furnished. Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the
As-Built documentation.
C. The installing contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement. Provide record drawings as follows:
1. Red-lined, hand-marked drawings are to be provided, with one paper copy and a scanned PDF version of the hand-marked drawings provided on CD or DVD.
23 10 00 - 8
D. The as-built drawings shall indicate the location and type of all lockout/tagout points for all energy sources for all equipment and pumps to include breaker location and numbers, valve tag numbers, etc.
Coordinate lockout/tagout procedures and practices with local VA requirements.
E. Certification documentation shall be provided to COR 21 working days prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and provide documentation/certification that all results of tests were within limits specified. Test results shall contain written sequence of test procedure with written test results annotated at each step along with the expected outcome or setpoint. The results shall include all readings, including but not limited to data on device (make, model and performance characteristics), normal pressures, switch ranges, trip points, amp readings, and calibration data to include equipment serial numbers or individual identifications, etc.
1.7 PERMITS
A. Contractor shall obtain and complete all tank permit and registration forms required by governmental authorities.
1.8 WARRANTY
A. All factory-fabricated storage tanks must come with a manufacturer's warranty of a minimum period of 30 years. All warranty paperwork will be completed and submitted by Contractor for both the tank and system component manufacturers, to the COR. This includes all applicable completed manufacturers' equipment installation checklists.
PART 2 - PRODUCTS
2.1 ABOVEGROUND STEEL TANKS (DOUBLE WALL STEEL)
A. Provide a factory-assembled unit that includes a factory-fabricated primary storage tank and an integral secondary containment. Tank assembly must be in accordance with NFPA 30 and be designed and manufactured for a horizontal cylindrical installation. Primary storage tank must be factory-welded, steel that conforms to UL 142. Tank assembly must be mounted on support saddles a maximum of 12 inches.
Tank assembly must have lifting lugs that allow tank relocation.
Provide tank assembly with the manufacturer's standard platform
23 10 00 - 9 assembly, except as modified herein. The ladder and platform assembly must be constructed of structural steel and must allow personal access to the top of the tank system. Provide ladder and platform as indicated on the drawings. Provide a minimal 5 gal spill container on the tank fill line. The container must be lockable and must contain any spillage encountered at the tank during tank filling operations.
B. The secondary containment (outer) tank must be a factory-fabricated, steel type that fully-encloses the primary storage (inner) tank. The entire tank assembly must conform to UL 142 and bear the UL 142 label.
The interstitial space between the primary tank and the secondary containment tank must be both pressure testable and verifiable. The primary storage tank must be supported within the secondary containment tank reservoir with steel tank saddles, or other similar supports, fabricated and installed by the tank manufacturer.
C. Provide materials and system components that are standard products of a manufacturer regularly engaged in the manufacturing of such products, that are of a similar material, design and workmanship. Provide materials and system components that have been in satisfactory commercial or industrial use for a minimum 3 years prior to bid opening. The 3 year period must include applications of the system components and materials under similar circumstances and of similar size. Provide materials and system components that have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 3 year period. Internal parts and components of system components, piping, piping components, and valves that could be exposed to fuel during system operation must not be constructed of zinc coated (galvanized) metal. Do not install cast iron bodied valves in piping systems that could be exposed to fuel during system operation.
D. Construction:
1. ASTM A36/A36M steel, conform to UL 142. Inner and outer tanks of double wall tanks shall both conform. Provide label of conformance.
2. Conform to NFPA 30.
3. Design for surcharge load produced by tank-mounted platforms and platform loadings shown. Design tanks for saddle supports furnished by tank manufacturer.
23 10 00 - 10
4. Leaks and abrasions are prohibited. Maximum permissible out-of-roundness of cylindrical shells is one percent of the diameter.
5. Provide lifting lugs for rigging tanks.
6. Make provisions for leak detectors to be installed at lowest part of interstitial space between walls of double-wall tanks.
E. Platforms, Stairs, Ladders and Handrails: Provide welded steel assemblies as shown, conforming to OSHA requirements. Provide welded steel tank attachments designed to support platform framing, stairs, ladders and live and dead loadings. Clean and coat all surfaces as specified for tank and steel dike exterior. Galvanizing is an acceptable alternative.
F. Factory Cleaning: Clean interior and exterior of tanks. Remove mill scale, dirt, rust, oil, welding debris, loose coatings and coatings incompatible with fuel stored or protective coating. Sandblast exterior in accordance with NACE 3.
G. Factory Coating: Provide tanks with exterior coat of rust resistant metal primer, specified under Section 09 91 00, PAINTING. Coat interior from bottom of tank to 1 m (3 feet) above bottom in compliance with API
RP 1631.
H. Field Painting: Clean and coat all surfaces as specified in Section 09
91 00, PAINTING.
I. Pipe Connections to Tanks:
1. Conform to UL 142.
2. Pipe sizes 50 mm (2 inches) and smaller, threaded. Pipe sizes 65 mm
(2-1/2 inches) and larger, flanged, 1034 kPa (150 psig) ASME rating.
3. Welded joints required on steel piping located inside tanks.
4. Provide and coordinate tank connection quantities, sizes and types with requirements of tank level gauge unit; sounding rod; vent, fill, supply and return pipes; and other pipes as shown.
5. On double-wall tanks, provide valved drain of interstitial space.
J. Tank Manholes: Provide quantity shown. Bolted cover type, gasketed.
K. Wear (Striker) Plates: Provide 300 mm (12 inch) square, 6 mm (1/4 inch) thick steel plates welded to tank bottom directly under the sounding opening, the fuel return discharge, and the fill discharge.
L. Lifting Lugs: Provide for rigging tanks.
23 10 00 - 11
M. Emergency Relief Vents for Fire Exposure: Venting capacity shall conform to NFPA 30. Standard product of a manufacturer, designed to automatically open at tank pressure of 17 kPa (2.5 psig) gauge.
Aluminum construction with Teflon seating surface. Provide separate vents for primary and secondary tanks.
2.2 ELECTRICAL WORK
A. Provide fittings for grounding per NFPA 70.
B. Provide controllers, integral disconnects, contactors, controls, and control wiring with their respective pieces of system components.
Provide electrical system components, including motors and wiring, as specified. Any wiring required for the operation specified herein, but not shown on the electrical plans, must be provided under this section.
C. Grounding and bonding must be in accordance with NFPA 70, NFPA 77, NFPA
407, NFPA 780, API RP 540, API RP 2003, IEEE 142, and IEEE 1100.
Provide jumpers to overcome the insulating effects of gaskets, paints, or nonmetallic components.
2.3 TANK AND PIPING ACCESSORIES
A. Vent Caps: Galvanized cast iron or cast aluminum with brass or bronze screens, arranged to permit full venting and to prevent entry of foreign material into the vent line. Same pipe size as vent pipe.
B. Fill Boxes:
1. Spill-container type enclosing a fill cap assembly with camlock hose connector with closure coordinated with fittings used by fuel supplier.
2. Provide a 5 gallon capacity watertight assembly, corrosion resistant sealable cover at the fill point with spill containment. Integral drain valve with discharge to fill pipe.
3. Fill cap shall be lockable, tight-fill design with provision for padlock on the top of the cap. Fill cap shall screw onto threaded adapter that can be removed without removing fill box. Entire assembly shall seal tight with no leakage during filling and when cap is in place.
4. Provide special tools necessary for opening fill boxes and fill caps.
C. Refer to Section 05 50 00, METAL FABRICATIONS, for access platforms shown for aboveground tanks.
23 10 00 - 12
D. Support horizontal portion of pipes located inside tank every 2100 mm
(7 feet) maximum.
E. Furnish gauging chart, liters versus mm and gallons versus inches depth.
F. Furnish sounding rod for each tank size. Mark rods in increments representing five percent of tank capacity. Provide length of rod suitable for tank burial depth (if applicable). Rods shall be graduated in gallons.
G. Fill Point Identification:
1. Fill Boxes at Grade Level: Aluminum, brass or bronze plate, anchored to concrete fill box pad with stamped or engraved letters 20 mm (3/4 inch) high.
2. Fill Caps above Grade: Aluminum, brass or bronze plate, clamped to fill pipe, with stamped or engraved letters 20 mm (3/4 inch) high.
3. Legend: "BURNER FUEL OIL FILL" "DIESEL FUEL FILL” or "SOUNDING" as appropriate.
2.4 PIPING, VALVES, FITTINGS
A. Fuel supply and return, tank fill, vents, sounding, and pump out.
B. Steel Pipe and Fittings:
1. Piping: Steel, seamless or electric resistance welded (ERW), ASTM
A53/A53M Grade B or ASTM A106/A106M Grade B, Schedule 40.
Aboveground piping shall be painted. Refer to Section 09 91 00, PAINTING.
2. Joints: Socket or butt-welded. Threaded joints are prohibited except at valves, unions and tank connections.
3. Fittings:
a. Butt-welded joints: Steel, ASTM A234/A234M, Grade B, ASME B16.9, same schedule as adjoining pipe.
b. Socket-welded joints: Forged steel, ASME B16.11, 13,790 kPa (2000 psig) class.
4. Unions: Malleable iron, 2070 kPa (300 psig) class.
5. Companion flanges: Flanges and bolting, ASME B16.5.
6. Welding flanges: Weld neck, ASME B16.5, forged steel ASTM
A105/A105M, 1034 kPa (150 psig).
23 10 00 - 13
C. Check Valves - Fuel Pump Suction.
1. Pipe Sizes 50 mm (2 inches) and under: Rated for 1375 kPa (200 psig) water-oil-gas, swing-type, threaded ends, ASTM B62 bronze body.
Provide union adjacent to valve.
2. Pipe Sizes 65 mm (2-1/2 inches) and above: Rated for 1380 kPa (200 psig) water-oil-gas, swing-type, 861 kPa (125 pounds) ASME flanged ends, ASTM A126 class B cast iron body.
D. Foot Valves - Fuel Pump Suction: Double poppet, lapped-in metal-to-metal seats, double-guided stems, 20 mesh inlet screen, same size as fuel suction piping. Foot valve shall be removable to above grade through the tank manhole enclosure or through extractor fitting.
E. Extractor Fittings: Arranged to permit removal of foot valves, overfill prevention valves, and other devices that are located below grade.
Access point shall be through a cast iron fill box-type manhole located at grade. Provide extractor wrench.
F. Overfill Prevention Valve: Aluminum automatic valve designed for underground or aboveground tanks, as applicable. Removable through the extractor fitting on underground tanks. Locate valve near the top of the tank in the fill pipe. On underground tanks with gravity fill, provide two stage automatic float-operated valve. First stage operation at 92 percent tank capacity shall reduce flow to 0.3 L/s (5 gpm) or less. Second stage operation shall stop flow completely when tank is no more than 95 percent full. On aboveground tanks, or tanks pressure-filled, provide single stage valve, rated for fill flow and pressure, which stops flow completely at 95 percent of tank capacity. Valve shall include method for draining oil trapped above the valve into the tank.
2.5 SECONDARY CONTAINMENT FOR UNDERGROUND FUEL PIPING SYSTEMS
A. Enclose the fuel supply, return and fill pipes in factory-engineered and fabricated secondary containment conduit systems. The systems shall be complete with end seals, with 25 mm (1 inches) minimum continuous annular space, 40 mm (1-1/2 inches) between carrier pipes, which shall contain all leakage and which has provisions for leak detection system as specified.
B. Steel Conduit with Fusion-Bonded Epoxy Coating and Cathodic Protection:
1. Galvanized carbon steel pipe, ASTM A53/A53M, Grade B, Schedule 40 for diameters through 125 mm (5 inches), 3.4 mm (0.134 inch) thick
23 10 00 - 14 for diameters greater than 125 mm (5 inches) up through 660 mm (26 inches). All welded construction.
2. Sand blast exterior per NACE 3.
3. Coat exterior with 0.5 mm (20 mils) thick fusion-bonded epoxy.
4. Provide cathodic protection designed by corrosion specialist and consisting of galvanic anodes, test stations, interconnecting wiring in conformance with UL 1746 and NACE SP0169. Electrical isolation required between all connecting systems in manholes and buildings.
C. Pipe Supports: Provide supports within conduit for fuel carrier pipes spaced 2100 mm (7 feet) apart except 3000 mm (10 feet) apart for carrier pipe size 50 mm (2 inches) through 100 mm (4 inches). Support design shall permit differential movement of pipes, allow drainage of leakage to sumps, and maintain alignment of carrier pipes.
D. Conduit End Seals: Same material and coating as conduit; leak tight.
E. Leak Detector Sensor Locations: On each piping system, provide sumps at the low points with water-tight openings above grade for access to leak detector sensors. Design sumps to intercept all potential leakage.
Maximum spacing between sumps, 3000 mm (10 feet).
2.6 LEAK DETECTION SYSTEMS
A. Automatic digital continuous monitoring systems responsive to the presence of water and hydrocarbons in the interstitial space of the double-wall tanks, in the tank manhole access enclosures, and in the secondary containment of fuel piping systems. System shall distinguish between hydrocarbon and water and identify location of leak as to individual tank and piping system. System may be combined with tank fluid level monitor and alarm system specified in paragraph, TANK FLUID
LEVEL MONITOR AND ALARM SYSTEM.
B. Functions and Arrangement:
1. Single control station to monitor all sensing probes.
2. Visual indicator to monitor and identify leaks as water or hydrocarbon and location.
3. Indicators showing system status including faults and alarms.
4. On board printer that provides complete reports of all system functions upon command.
5. Panel circuit test button.
6. 95 dB audible alarm with silencing control to sound when leak is detected.
23 10 00 - 15
7. Eight-hour memory backup system with battery.
8. NEMA 250 Type 4 cabinet.
9. UL or other accredited testing laboratory listing.
10. RS232 Modbus communications with engineering control system and the boiler plant operator’s computer workstation desktop to indicate system in service and alarm conditions.
C. Sensors:
1. Designed for required locations including: Insertion between walls of double-wall tanks, in sumps in double-wall piping systems and in tank manhole enclosures. Sensing points shall be at lowest point of each tank or sump. Intrinsically safe design.
2. Sensing units shall detect presence of water and a minimum 3.2 mm
(1/8 inch) thick layer of hydrocarbon on surface of water and minimum 50 mm (2 inch) thickness of hydrocarbon in area that has no water present.
3. Sensors shall be arranged to allow replacement of individual sensors without disturbing other portions of leak detection system or fuel storage and piping system. Underground sensors shall be accessed through caps as grade.
4. Materials of construction shall be non-corroding.
5. Transmit status signal to control unit.
D. Components:
1. Provide manholes at grade for each sensor cap similar in construction to fill boxes. Manholes shall be cast iron, quick-opening cover, watertight, minimum size necessary to accommodate sensor caps. Provide identification plates, similar to those specified for fill points, labeled “MONITORING/OBSERVATION WELL-DO
NOT FILL”. Provide special tools if necessary for opening covers.
2. Sensor housings from tank and piping to grade shall be Schedule 40
PVC, or stainless steel.
3. Underground wiring between probes and control unit: Place in water-tight corrosion-resistant conduit system conforming to Section 26 05
41, UNDERGROUND ELECTRICAL CONSTRUCTION.
2.7 TANK FLUID LEVEL MONITOR AND ALARM SYSTEMS
A. Digital systems for central monitoring of fuel and water levels in all fuel oil storage tanks in the project. High and low level visual and audible alarms. Volumetric tank-tightness testing. Complete with all
23 10 00 - 16 transducing, transmitting, and receiving devices. On board printer to provide complete report of all system functions upon command. System may be combined with leak detection system specified in paragraph, LEAK
DETECTION SYSTEMS.
B. Fluid Level Monitor:
1. Digital continuous readout, showing tank oil and water levels in gallons, smallest reading one gallon. Provide identification of product measured, measuring units, and the tank number.
2. Tank and fuel characteristics contained in preprogrammed non-volatile field-replaceable databases. Protected power supply.
C. High and Low Fluid Level Alarm System:
1. Automatic continuous on-line monitoring of all tanks.
2. Visual and audible indicators combined with fluid level monitor.
Identify the tank that is in alarm condition.
3. Manual alarm test and silencing controls.
4. Low level alarm actuation adjustable 0-25 percent of tank capacity.
High level alarm actuation adjustable 75-100 percent of tank capacity.
D. Locate all indicators, selector switches, alarms on face of wall-mounted NEMA 250, Type 4 panel.
E. Remote Alarm Annunciator:
1. Visual and audible high-level alarms adjacent to tank fill box locations. Locate in NEMA 250 Type 4X weatherproof exterior wall or pole-mounted panels.
2. Alarm shall include flashing red light with 180-degree visibility for each tank and 95 dB horn or 100 mm (4 inch) diameter bell.
Provide alarm silence control.
3. Provide identification sign: "WHEN ALARM SOUNDS - FUEL TANK FILLED
TO CAPACITY - DO NOT OVERFILL".
F. Modbus communication to engineering control system in boiler plant computer workstation to indicate tank fluid level and alarm conditions.
Telephone modem communication capability.
G. System Performance: Accuracy plus or minus 2.5 mm (0.10 inch) of fluid height in inventory mode and 0.25 mm (0.01 inch) in leak detection mode. Automatic compensation for fluid temperature changes. Volumetric tank tightness sensitivity of 0.4 lph (0.1 gph).
23 10 00 - 17
H. Sensors:
1. Provide sensor types such as magnetostrictive, capacitance, float, hydrostatic and other types as necessary for the applications.
2. Apply in accordance with manufacturer’s instructions with provisions for easy future replacement without need for excavation.
3. Provide for each hydrostatic sensor a constant flow differential pressure regulator and transmitter protected from fuel contamination. Air supply shall include filter and over-pressure protection. Provide desiccant-type dryer on air supply designed for removal of water vapor. Dryer rating, minimum 4.6 L/s (10 SCFM).
Provide moisture indicator. Dryer may be deleted if air supply source has a refrigerated dryer.
4. Float-type units shall be designed for installation and removal through a 100 mm (4 inch) diameter vertical pipe mounted in the top of the tank.
I. Underground Wiring and Piping: Enclose in water-tight corrosion-resistant conduit system sized and arranged as recommended by system manufacturer and conforming to Section 26 05 41, UNDERGROUND ELECTRICAL
CONSTRUCTION.
J. Code Conformance: NFPA 70.
2.8 FUEL OIL QUALITY MAINTENANCE SYSTEMS
A. Complete factory-assembled automatic particulate filtration and dewatering and fuel additive injection system to maintain the purity of
No. 2 fuel oil in storage. The system shall circulate the oil from the storage tank, through the system at the bellow tank of the generator, and back to the storage tank. Provide quantity and capacity of systems to serve tanks as shown, connected to the tank suction and return pipes. Smaller systems without large water storage tanks and without fuel additive injection shall be wall-mounted. Units with water storage tanks and/or additive injection shall be floor-mounted on steel skids on concrete foundations. Digital controls.
B. Performance: Design for nearly 100 percent water removal. Provide 2-micron particulate filtration. Each system shall have capacity to turn over the largest connected full tank one time within 24 hours maximum.
System shall be designed to allow continuous operation with brief interruptions to manually change filters and clean strainers.
23 10 00 - 18
C. Components:
1. Strainer: 100 mesh perforated stainless steel basket. Clamped covers. 861 kPa (125 psig) design pressure.
2. Water Separation Unit: Two stage, designed to reduce water content of fuel to less than 10 ppm. Centrifugal separator for removal of large droplets and renewable resin-impregnated cellulose water coalescing elements. Water removed shall flow to water holding sump in the unit. Water sensing probe to alert the operator when water level in bowl has reached capacity.
3. Filter: 2-micron filtration with 96 percent removal efficiency, valved manual drain. Replaceable elements.
4. Filtration Pump: Positive displacement base-mounted pump with cast iron or bronze housing, for circulating the oil from the storage tank, through the water separation and filter units and back to the storage tank. Pump shall have carbon bushings, stainless steel shaft and Teflon mechanical seal, ODP motor.
5. Controls:
a. Digital PLC electronic controls for all system control and alarm functions. Relay logic not acceptable.
b. Control panel with selector for modes of operation, indicators to show system status, and visual and audible alarms to signal the need for operator intervention. Operator interface shall be 2 x
20 LCD and keypad.
c. Controls shall include:
1) Control power “on-off”.
2) “Cycle Start”.
3) “Cycle Cancel”.
4) “Hand-off-Auto” for filtration pump.
5) Pump cycle timer set function.
6) Cycle duration selector.
7) “Auto-Off” for chemical additive pump.
d. Indications shall include:
1) “Control Power On”.
2) “Pump Run”.
3) “Pump Failure”.
4) “Excess Water in Fuel”.
5) “Filter Water Level High”.
23 10 00 - 19
6) “Rupture Basin Leak” alarm.
7) “High Pressure Drop in Strainer” alarm.
8) “High Pressure Drop in Filters” alarm.
9) “High Pressure” alarm and automatic shutdown.
10) “High Water Level” in water storage tank.
e. Filter and strainer differential pressure gauges, differential pressure switches and control. Provide indication when filters should be changed.
f. Over pressure switch and control to shut down pump if filter inlet pressure exceeds limits.
g. All primary wiring exiting the enclosure shall be encased in conduit.
h. Magnetic motor starters with overload protection.
i. Circuit breakers.
j. Control enclosure shall be NEMA 4, fully gasketed doors with 3-point lockable latching. Interior shall have white gloss finish;
exterior shall be chemical-resistant gray enamel. All controls and indicating devices shall be mounted on front of enclosure and labeled with black Phenolic labels with white lettering.
k. Ethernet communication to engineering control center system, boiler plant computer workstation, and Fire Department, for alarms and system status of the fuel oil storage tank.
D. Enclosure – Wall Mounted Units: 14-gauge steel, NEMA Type 4 enclosure, continuously welded, framed cabinet. Provide doors for complete access to all equipment. Doors shall have a turned edge, piano hinges, three-point locking mechanisms. Corrosion-resistant prime and finish coatings on all interior and exterior surfaces.
E. Water Drainage System: Sealed bowl (bottle) with high level alarm system. Water collected in filters shall drain to a sealed bowl that can be easily removed and emptied.
F. Chemical Additive System: Provide welded steel chemical storage tank and chemical pump that shall automatically add chemical to the fuel being circulated. Tank shall be sized to hold five years supply of additive as recommended by additive supplier. Pump shall be positive displacement metering type with totally enclosed 250-watt (1/3 hp) motor, cast iron pump body, stainless steel trim and Teflon diaphragm.
Output of pump shall be adjustable for 0 to 100 percent of capacity.
23 10 00 - 20
Control system shall automatically operate the pump for an adjustable time period during each filtration cycle.
G. Piping: Refer to Section 23 21 11, BOILER PLANT PIPING SYSTEMS.
H. Pressure Gauges: Refer to Section 23 09 11, INSTRUMENTATION AND CONTROL
FOR BOILER PLANT.
2.9 CONCRETE FOUNDATIONS – SEE 03 30 00
2.10 BURIED UTILITY WARNING TRACING TAPE
A. Tape shall be 0.1 mm (0.004 inch) thick, 150 mm (6 inches) wide, yellow polyethylene with a metallic core, acid and alkali-resistant and shall have a minimum strength of 12,000 kPa (1740 psig) lengthwise and 10,342 kPa (1500 psig) crosswise with an elongation factor of 350 percent.
Provide bold black letters on the tape identifying the type of system.
Insulating and labeling shall be unaffected by moisture and other substances contained in the backfill material.
PART 3 - EXECUTION
3.1 GENERAL
A. If an installation is unsatisfactory to the COR, the Contractor shall correct the installation at no additional cost or time to the
Government.
3.2 INSTALLATION AND TESTING, ABOVEGROUND TANKS
A. Conform to NFPA 30.
B. Support tanks on steel saddles welded to the tanks. Anchor to concrete foundation pad. Provide molded neoprene isolation pads between the steel supports and the concrete foundation.
C. After tanks are installed, test steel tanks with air pressure of 21 kPa to 34 kPa (3 to 5 psig), using soapsuds to locate leaks. Repair leaks by chipping to bare metal and rewelding. Retest until all leaks are repaired. Repair all damaged areas of prime coat on tanks and steel dikes (if furnished). Test interstitial area between steel tank walls with air at pressure recommended by tank manufacturer. Tests shall be witnessed by the COR.
D. For steel tanks storing heated oil, field-applied insulation requirements are specified under Section 23 07 11, HVAC AND BOILER
PLANT INSULATION.
E. Surface finish coating for tanks and steel dikes (if furnished) is specified under Section 09 91 00, PAINTING.
F. Provide electrical grounding in accordance with NFPA 70.
23 10 00 - 21
3.3 INSTALLATION AND TESTING, UNDERGROUND PIPING SYSTEMS
A. Leak Detection System: Arrange fuel and tracing media (if required for heated oil) carrier piping, enclosed in secondary containment piping, to accommodate leak detection system. Slope piping down toward tanks and leak detectors at 25 mm in 12 m (1 inch in 40 feet).
B. Steel Fuel and Tracing Media Carrier Piping: All joints butt or socket welding. Threaded piping is prohibited. Piping ends shall be accurately cut, true, and beveled for welding.
C. Glass Fiber Reinforced Plastic (FRP) Fuel Carrier Piping and Secondary
Containment Piping: Install in accordance with printed instructions of pipe manufacturer. Installation personnel trained in accordance with paragraph, QUALITY ASSURANCE. Plastic piping is prohibited in the same secondary containment system with steam or condensate piping.
D. Secondary Containment Piping:
1. Provide sand bedding and backfill material for steel piping and pea gravel for FRP piping.
2. Top of system 450 mm (18 inches) minimum below grade.
3. Design and locate leak detector sumps to intercept all potential leakage. Maximum spacing along each system, 3000 mm (10 feet).
4. Seal all building and manhole wall penetrations with a modular, watertight flexible penetration seal system. The modular penetration seal shall have a nitrile rubber seal, or if a fire separation is required, a high temperature silicone fire seal.
5. After placing system, prior to backfill, repair all damage, including coatings, as recommended in printed instructions of system manufacturer. Perform 10,000-volt holiday test on coated steel systems.
6. Fuel oil piping is prohibited in the same secondary containment system as steam or condensate piping.
7. On steel systems that do not have FRP cladding, install cathodic protection system.
E. Anchorage of System: When heated oil system is provided, anchor systems and provide expansion loops and bends as shown and as recommended by manufacturer of system. Pipe stress due to thermal expansion shall not exceed the limits in ASME B31.1.
F. Leak Test: Test carrier pipes with air pressure at 690 kPa (100 psig), and test the containment piping with air pressure at 55 kPa (8 psig).
23 10 00 - 22
Systems shall hold the pressure for 30 minutes. Repair all leaks and retest.
G. Coatings for Steel Piping not in Secondary Containment System: Provide urethane coating and cathodic protection.
3.4 INSTALLATION, FILL BOXES AND ACCESS MANHOLES AT GRADE
A. Provide for tank fill, tank sounding, leak detector sensors, and extractor fittings. Set at grade in concrete pads. Refer to fill box detail. Provide identification plate set into the concrete pad that identifies the purpose of the device and type of fuel in the tank.
3.5 INSTALLATION AND TESTING, LEAK DETECTOR SYSTEMS FOR TANKS AND PIPING
A. Wiring shall conform to NFPA 70.
B. Locate control monitor panels 1500 mm (5 feet) above the floor on inside wall of boiler room, generator room or garage, depending on type of fuel tank served, unless shown otherwise.
C. Test operation of each probe, and monitoring system with fuel and water. If type of probe utilized is damaged by exposure to fuel, provide temporary probe for testing monitoring system.
3.6 INSTALLATION, TANK FLUID LEVEL INDICATOR AND ALARM SYSTEM
A. Wiring shall conform to NFPA 70.
B. Locate level indicator and alarm panel 1500 mm (5 feet) above the floor on inside wall of boiler room, generator room or garage, depending on type of fuel tank served, unless shown otherwise.
C. Locate remote high-level alarm on exterior wall or pole in view of tank fill point, 2400 mm (8 feet) above grade.
3.7 INSTALLATION, BURIED UTILITY WARNING TRACING TAPE
A. Install tracer wire in the trench approximately 457 mm (18 inches) above the non-metallic pipe. The tracer wire shall be taped approximately every 3 m (10 feet) to the pipe, where practical. The tracer wire shall be installed so that electrical continuity is maintained throughout the pipe system. As few connections as possible shall be made in the tracer wire. The wire shall be contiguous except at test stations, valve boxes, and where splicing is required. All splices shall be encased. Connections will be made by stripping the insulation back one inch and joining the two ends using an approved mechanical connector and a split bolt connector. Twisting of copper wire is prohibited. To complete this connection, wrap all exposed wire thoroughly with electrical tape. A minimum 1.5 m (5 foot) of additional
23 10 00 - 23 tracer wire will be coiled, buried and terminate aboveground at the ends of the pipeline.
3.8 INSTALLATION, FUEL OIL QUALITY MAINTENANCE SYSTEMS
A. Locate systems within easy reach of persons standing on floor, with sufficient elevation to allow gravity flow of water from system to water storage tank sitting on the floor.
B. Connect to tank suction and return piping systems with isolation valves. Provide compound pressure gauges at suction and discharge piping connections. Refer to Section 23 09 11, INSTRUMENTATION AND
CONTROL FOR BOILER PLANT for gauge requirements.
3.9 TANK MANHOLE ENCLOSURES
A. All pipe penetrations shall be leak tight permitting no groundwater into enclosure.
3.10 STARTUP AND TESTING
A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.
B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.
C. The Commissioning Agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with COR and Commissioning Agent. Provide a minimum notice of
10 working days prior to startup and testing.
3.11 INSTALLATION, CATHODIC PROTECTION TEST STATIONS
A. Provide separate station for each tank and each piping system, anchor firmly, locate so that terminal board is 600 mm (2 feet) minimum above grade. Connect wiring from all anodes and protected structures to the test stations.
3.12 TESTING, CATHODIC PROTECTION
A. Testing performed by NACE-certified corrosion specialist; witnessed by
COR.
B. Test Instruments:
1. Volt-Ammeter.
2. Saturated copper-copper sulfate reference electrode.
3. Other instruments as required.
23 10 00 - 24
C. Procedures: Conform to NACE SP0169.
D. Test Results Required for Acceptance:
1. Potential of minus 0.85 volt between protected structure and reference electrode.
2. Minimum shift of minus 300 millivolts upon application of protective current. Voltage measured between protected structure and reference electrode.
3. Minimum shift of minus 100 millivolts upon interruption of protective current. Voltage measured between protected structure and reference electrode.
E. Test Report: Provide complete report to COR showing all test measurements, calculations, list of instruments used.
3.13 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
B. Components provided under this section of the specification will be tested as part of a larger system.
3.14 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for 4 hours to instruct each VA personnel responsible in operation and maintenance of the system.
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
- - - E N D - - -
VA PROJECT: 676-22-122 01-01-18
26 32 13 - 1
SECTION 26 32 13
ENGINE GENERATORS
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the furnishing, installation, connection, and testing of the low-voltage engine generators.
1.2 RELATED WORK
A. SECTION 01 00 00, GENERAL REQUIREMENTS: Instructions for training.
B. Section 03 30 00, CAST-IN-PLACE CONCRETE: Requirements for concrete equipment pads.
C. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS:
Requirements that apply to all sections of Division 26.
D. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES:
Low-voltage conductors.
E. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS:
Requirements for personnel safety and to provide a low impedance path for possible ground fault currents.
F. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND
EQUIPMENT: Requirements for pipe and equipment support and noise control.
G. Section 26 05 73, OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY:
Short circuit and coordination study, and requirements for a coordinated electrical system.
H. Section 23 07 11, HVAC, PLUMBING, AND BOILER PLANT INSULATION:
Requirements for hot piping and equipment insulation.
I. Section 25 10 10, ADVANCED UTILITY METERING: Requirements for electrical metering.
J. Section 26 24 13, DISTRIBUTION SWITCHBOARDS: Requirements for secondary distribution switchboards.
K. Section 26 36 23, AUTOMATIC TRANSFER SWITCHES: Requirements for automatic transfer switches for use with engine generators.
1.3 QUALITY ASSURANCE
A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS
(PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS.
Daphne Wilson
ADDENDUM 1
26 32 13 - 2
B. A factory-authorized representative shall be capable of providing emergency maintenance and repairs at the project site within 4 hours maximum of notification.
1.4 FACTORY TESTS
A. Factory Tests shall be required.
B. Factory Tests shall be in accordance with Paragraph, MANUFACTURED
PRODUCTS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS, and the following requirement:
1. Load Test: Shall include two hours while the engine generator is delivering 100% of the specified kW, and four hours while the engine generator is delivering 80% of the specified kW. During this test, record the following data at 20-minute intervals:
Time Engine RPM Oil Temperature Out kW Water Temperature In Fuel Pressure
Voltage Water Temperature Out Oil Pressure
Amperes Oil Temperature In Ambient Temperature
2. Cold Start Test: Record time required for the engine generator to develop specified voltage, frequency, and kW load from a standstill condition with engine at ambient temperature.
3. The manufacturer shall furnish fuel, load banks, testing instruments, and all other equipment necessary to perform these tests.
1.5…