S06 - HVAC_BAS_Controls_SingleSourceJustification_MPT-SAT.pdf
PDF 193 KB Posted
- Solicitation number
- 36C25223B0007
About this file
This single source justification document outlines plans for the Department of Veterans Affairs to procure HVAC controls and building automation system equipment from Johnson Controls. The requesting agency is the VA Medical Center in Milwaukee, WI, which seeks to install new HVAC controllers and tie them into the existing campus-wide Johnson Controls Metasys building automation and controls system. The estimated cost for the required Johnson Controls Metasys materials is $50,000. A justification is provided for procuring from the single source of Johnson Controls due to the need for compatibility with the standardized Metasys system already implemented across the entire Milwaukee facility campus. Using an incompatible system would require installation of new front-end workstations, software, and programming, and could impact patient safety. Market research found no other systems are compatible with the VA's standard. The contracting officer certified the single source procurement is in accordance with FAR 13.106-1.
The related federal contract opportunity is a solicitation from the VA's Veterans Health Administration VISN 12 seeking replacement of an air handling unit serving the EP Lab server room at the Zablocki VA Medical Center in Milwaukee.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 - 695-22-111 Amend 0005 Specifications.pdf | ||
| S06 - 695-22-111 Amend 0005 Drawings.pdf | ||
| S06 - Wage Determination_01.27.2023.pdf | ||
| 36C25223B0007 0005.docx | DOCX document | |
| 36C25223B0007 0004.docx | DOCX document | |
| 36C25223B0007 0003.docx | DOCX document | |
| S05 - RFI2 - 36C25223B0007 - 695-22-111.pdf | ||
| S06 - Wage Determination_01_13_23.pdf | ||
| 36C25223B0007 0002.docx | DOCX document | |
| S05 - RFI - 36C25223B0007 - 695-22-111.pdf | ||
| S06 - Site Visit Attendance Sheet_695-22-111.pdf | ||
| S06 - Firestop_SingleSourceJustification_MPT-SAT.pdf | ||
| 36C25223B0007 0001.docx | DOCX document | |
| S02 - 695-22-111 Drawings.pdf | ||
| S02 - Wage Determination_11_11_22.pdf | ||
| S02 - 695-22-111 Specifications.pdf | ||
| 36C25223B0007_4.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAPM Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT
VHAPM Part 813.106 Page 1 of 1 Original Date: 08/30/17 Revision 02 Eff Date: 03/31/2020
DEPARTMENT OF VETERANS AFFAIRS
Justification for Single Source Awards IAW FAR 13.106‐1 For
Over Micro‐Purchase Threshold but Not Exceeding the SAT ($250K)
Acquisition Plan Action ID: 36C252‐23‐AP‐0579
1. Contracting Activity: Department of Veterans Affairs, Great Lakes Acquisition Center, NCO 12, 115 South
84th Street, Milwaukee, WI 53214. Requesting Activity: Department of Veterans Affairs, VISN 12, Clement J.
Zablocki VA Medical Center, 5000 W. National Avenue, Milwaukee WI 53295. Purchase Request (2237) number: 695‐23‐2‐6085‐0002
2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount:
The equipment to be installed will be monitored and controlled by Johnson Controls Metasys Building Automation and HVAC Control System. A new panel and necessary controllers will be installed and tied into the existing system, to be monitored and controlled by VA’s ‘Graphics’ shop.
The estimated expected cost for Johnson Controls Metasys material is $50,000.
3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:
This product, the Johnson Controls Metasys Building Automation and HVAC Control System, is the only product that allows for a single HVAC control system for the Milwaukee facility. Johnson Controls Metasys control system is the campus‐wide building and HVAC control System. An incompatible system may require installation of new “front‐end” and remote workstations as well as new software and programming.
Additionally, installation of components that match the existing building automation system minimizes maintenance costs and bench stock requirements. It is necessary to match the existing system to ensure there are no interface problems, impacts to patient safety and familiarity of the product to the staff and maintenance personnel. This is the only way to ensure complete compatibility and that the campus will not have two HVAC control systems on the Milwaukee campus.
4. Description of market research conducted and results or statement why it was not conducted:
We have conducted research into other Building Automation and HVAC Control systems and have found that they are not compatible with our standard. The other products on the market would require additional cost to maintain within the facility
5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106‐1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.
Ryan McMillin Date Contracting Officer