S07 - Bid Abstract 36C252-20-B-0025 Replace Boilers.pdf

PDF 142 KB Posted

Attached to
Z2DZ--676-14-105 Replace Boilers B415 Tomah, Wisconsin 54660
Solicitation number
36C25220B0025
Issued by

About this file

This abstract of offers summarizes bids received for a project to replace three boilers, associated equipment and piping at the Tomah VA Medical Center in Tomah, Wisconsin.

The project includes the complete removal and replacement of the three existing high-pressure steam boilers, boiler utility connections, selected boiler associated equipment and selected boiler support piping. It also involves abatement of lead paint and asbestos within Building 415 and replacement of boiler control devices and programming. The government estimate for the project ranged from $10 million to $20 million.

Seven bids were received in response to Solicitation Number 36C25220B0025. Bid amounts for the base bid ranged from $1,181,734 to $2,247,670. All bids included the required 20% bid bond and acknowledged Addendum 1. The apparent low bidder was Hired Labor Services at $1,181,734. Completion is required within 490 calendar days of the notice to proceed.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

36C252-20-B-0025

2. DATE ISSUED

8/24/2020

3. DATE OPENED

10/6/2020

PAGE

OF

4. ISSUING OFFICE

DEPARTMENT OF VETERANS AFFAIRS

GREAT LAKES ACQUISITION CENTER

115 SOUTH 84TH STREET, SUITE 101

MILWAUKEE, WISCONSIN 53214-1476

I CERTIFY that I have opened, read, and recorded on this abstract all Offers received in response to this solicitation.

SIGNATURE

)46 1 0 1

DATE

)0 / b i 2.0 -,t9

5. PROJECT TITLE

Replace Boilers, Building 415

PROJECT NUMBER 676-14-105,

at the Tomah VA Medical Center, Tomah, Wisconsin

8. GOVERNMENT ESTIMATE

(Check A, B, or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR A. OFFEROR

A. HIRED LABOR S er3en+ Con$4. Serii c.c.s

Oxnard i cA Amer i` c-a_ in First Co nfirCI-C-4-03

L I V.-GT-Dye_ VI Ilage , x-i—

-) 0 i /VT V.Z NT La_ 0.-E

B. REASONABLE CONTRACT

(WITHOUT PROFIT)

B. BID SECURITY (TYPE AND AMOVNT)

20% Bid Bond NI Af,›

B. BID SECURITY (TYPE AND AMOUNT)

20% Bid Bond / " .J e

6. NUMBER OF ADDENDA ISSUED

X

C. REASONABLE CONTRACT

(INCLUDING PROFIT)

C. ADDENDA ACKNOWLEDGED

'1 02,6X, - \I E

C. ADDENDA ACKNOWLEDGED

ITEM

NO.

7B. DESCRIPTION OF OFFERED

ITEM

7C. EST.

QUANTITY

D. UNIT UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT PRICE E. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT

1 BASE BID

1 JOB

L5 6.1

)4// L181, 734 Ls Ot, 1 I, 772 , two

2 Deductive Bid Alternate # 1

1 JOB

1.--cm L__.

tot -0 2 /000

12--/1121 ) -Nq — aiwitt, 7/ 770-44fw /247-6

AUTOMATED -1419 (4/99

121* )o

No. 3 No. 4 No. 5 No. 6 No. 7 A. Offeror A. Offeror A. Offeror A. Offeror A. Offeror ik 0, r , ( 1-i c..

t,v e-s-r k-t-pv w LAI-- 1

?izt.--Fre---12-e 0 t_L“t-cetc._ eat /Ally-EFT° L...1 5 M A) , PAD /44 Con.)5-1-e-vcnoi-) ii/E 5.--f FA.12. 0 1 A/ E:›

B. Bid Security (Type & Amt.)

20% Bid Bond 10 B. Bid Security (Type & Amt.)

20% Bid Bond .1__.5 B. Bid Security (Type & Amt.)

20% Bid Bond -JE5 B. Bid Security (Type & Amt.)

20% Bid Bond B. Bid Security (Type & Amt.)

20% Bid Bond C. Addenda Acknowledged

7 e_cu - 'i ET ---7 D. Unit i

C. Addenda Acknowledged

..e. _a_ `IE. 5 C. Addenda Acknowledged

"7 . pxx , C. Addenda Acknowledged C.Addenda Acknowledged

ITEM NO. D.Unit Price

E.Estimated Amount Price

E./Estimated Amount

D. Unit Price

E. Estimated Amount

D. Unit Price

E. Estimated Amount

D. Unit Price

E. Estimated Amount

1 - Base Bid

LS.

JOB

I 0- i 2- 0 '1- , 26a, L5

)5 ( 32 V5C ° , L-3 e 0

1( 1 97 1 5 LizO

2- Deduct Bid Alt JOB

Ot ..._ i 4- 7 m, I -) , )

L., 5

I , 2..t) 3 , ov 0 --S

CV

t 0 L-1-? 3 , o 30 i

AUTOMATED OF-1419 (4/99)

arvnt`l'.Vd244-evt 4 0/ z°u) F(-7 2-c9r'

Page 1
Page 2

File details come from the government source that posted it. Updated .