This document includes a pre-solicitation notice and project description for the replacement of three high-pressure steam boilers, associated utility connections and support piping at the Tomah VA Medical Center in Tomah, Wisconsin. The project is estimated at $10-20 million and will be conducted in multiple phases over approximately 490 calendar days from notice to proceed. The solicitation will be posted on August 21, 2020 to Beta.SAM with bid opening on September 23, 2020. Two pre-bid conferences will be scheduled. Pursuant to applicable law, this procurement will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses. Bidders must represent SDVOSB status, size standard compliance, and CVE verification at submission. The North American Industry Classification code is 238220 and the size standard is $16.5 million.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NTS
PHASING DIAGRAM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Tomah, Wisconsin
676-14-105
Office of
Facilities
Management
BID SET
July 22, 2020
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UNSPRINKLERED
Replace Boilers B415
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GC108A
JMD
PHASING DIAGRAM
PHASE 3 - PART 1
ALTERNATE 1
HFB
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
2 "FW12"FW
AutoCAD SHX Text
2 "FW12"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
3"FW
AutoCAD SHX Text
2 "FW12"FW
AutoCAD SHX Text
BOILER NO.1
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text P
AutoCAD SHX Text
PHASE 3 - PART 1:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text BOILER 3 AND TEMPORARY BOILER ARE FULLY OPERATIONAL, DE-ENERGIZE BOILER 1 AND BOILER 2, CLOSE ALL FEED VALVES, CLOSE ALL STEAM VALVES, CLOSE ALL CONDENSATE VALVES, CLOSE ALL NATURAL GAS VALVES, CLOSE ALL PROPANE VALVES, AND DEMO ALL FEEDERS & CONTROLS. REMOVE VENT STACK AND ALL CONTROLS, PROVIDE NEW WEATHERPROOF, INSULATED COVER OVER OPENING. REMOVE RELIEF VENTS THROUGH ROOF, PROVIDE NEW WEATHERPROOF, INSULATED COVER OVER OPENINGS. REMOVE ALL PIPING, SUPPORTS, AND HANGERS CONNECTED TO BOILER 1 AND BOILER 2 FROM EXISTING CLOSED VALVES TO BOILER 1 AND BOILER 2. COMPLETELY REMOVE BOILER 2 THROUGH KNOCK-OUT IN THE WEST BUILDING WALL. COMPLETELY REMOVE EXISTING (2) 3" FW PIPING AND SUPPORTS. REMOVE ALL CONTROLS. REMOVE BOILER WATER SAMPLING STATION PIPING AND ACCESSORIES.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FLOW METER, TYP OF 2
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
6"OFL
AutoCAD SHX Text
NC
AutoCAD SHX Text
10"RV-3
AutoCAD SHX Text
2"C FROM LAUNDRY
AutoCAD SHX Text
5"C FROM HOSPITAL
AutoCAD SHX Text
10"MPS TO HOSPITAL
AutoCAD SHX Text
6"OFL TO SUMP PUMP
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
2"SW FROM SOFTENERS
AutoCAD SHX Text
COMBUSTION AIR AHU
AutoCAD SHX Text
3"LPS
AutoCAD SHX Text
3"LPS
AutoCAD SHX Text
6"RV-4
AutoCAD SHX Text 6"V
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
2" BYPASS
AutoCAD SHX Text
4" BYPASS
AutoCAD SHX Text 10"V
AutoCAD SHX Text
PRV-2
AutoCAD SHX Text
PRV-1A
AutoCAD SHX Text
PRV-1
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
3"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
3"MPS
AutoCAD SHX Text
6"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
10"HPS BLIND FLANGE
AutoCAD SHX Text
2"HPS TO STEAM WHISTLE
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
2"CW
AutoCAD SHX Text
2"CW
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
4" EMERGENCY CONNECTION
AutoCAD SHX Text
NC
AutoCAD SHX Text
CONDENSATE SUMP
AutoCAD SHX Text 2"C
AutoCAD SHX Text 5"C
AutoCAD SHX Text
CONDENSATE STORAGE TANK
AutoCAD SHX Text 4"V
AutoCAD SHX Text 4"V
AutoCAD SHX Text 1"
AutoCAD SHX Text
1"CTPD RECIRC
AutoCAD SHX Text
1"CTPD RECIRC
AutoCAD SHX Text
3"CTPD BYPASS
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
4"CTPS
AutoCAD SHX Text
3"CTPS
AutoCAD SHX Text
NC
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
1 "FWPD RECIRC12"FWPD RECIRC
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
1 "FWPD RECIRC12"FWPD RECIRC
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
STEAM MUFFLER
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text 14"V
AutoCAD SHX Text
DEAERATOR TANK
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
4"RV-2
AutoCAD SHX Text 4"V
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
DEAERATOR STACK
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
TO HPR
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
2" FIRE CONNECTION TANK BYPASS
AutoCAD SHX Text
2"CW
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
4"MPS TO LAUNDRY AND SHOPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
GENERAL PLAN NOTES
AutoCAD SHX Text
1. REFER TO PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH THE REFER TO PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. 2. GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, PLUMBING AND GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, PLUMBING AND ARCHITECTURAL PLANS FOR ADDITIONAL NEW WORK. ALL WORK FOR WALL, CEILING AND FLOOR ASSEMBLIES NECESSARY TO FACILITATE COMPLETE MEP SYSTEM IS PART OF THE CONTRACTOR'S SCOPE OF WORK. 3. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL NEW GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL NEW CONSTRUCTION WORK. 4. MAINTAIN CONTINUOUS STEAM AND CONDENSATE SERVICE TO CAMPUS BUILDINGS MAINTAIN CONTINUOUS STEAM AND CONDENSATE SERVICE TO CAMPUS BUILDINGS AND ALL SPACES IN BUILDING 415 NOT AFFECTED BY THIS WORK. COORDINATE WITH VA COR FOR ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM WORK. 5. CONTRACTOR SHALL PROVIDE 3 WEEK WRITTEN NOTICE FOR ALL TOTAL PLANT CONTRACTOR SHALL PROVIDE 3 WEEK WRITTEN NOTICE FOR ALL TOTAL PLANT SHUTDOWNS. 6. PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, CONTROL, POWER PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, CONTROL, POWER AND SYSTEM CONNECTIONS TO BOILERS, PUMPS, FANS, HVAC TERMINAL UNITS, MAU, CONTROL DEVICES AND VALVES. CONTRACTOR SHALL REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND ARCHITECTURAL DEMOLITION AND NEW PLANS, DETAILS, AND DIAGRAMS FOR CONNECTIONS TO EQUIPMENT. 7. ALL PNEUMATIC CONTROLLERS SHALL BE REMOVED AND REPLACED WITH ALL PNEUMATIC CONTROLLERS SHALL BE REMOVED AND REPLACED WITH ELECTRONIC CONTROLLERS.
AutoCAD SHX Text
STACK ECONOMIZER
AutoCAD SHX Text
CHEMICAL POT FEEDER
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
BOILER WATER SAMPLE STATION
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
3"CTPS
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
1"CTPD RECIRC
AutoCAD SHX Text
3"CTPD BYPASS
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"BYPASS
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
4"FWPD
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text M
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
CV-1
AutoCAD SHX Text
CV-2
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text 415-B-3
AutoCAD SHX Text
415-CRP-1
AutoCAD SHX Text
415-CTP-1
AutoCAD SHX Text
415-CTP-2
AutoCAD SHX Text
415-BFP-1
AutoCAD SHX Text
415-BFP-2
AutoCAD SHX Text
415-BFP-3
AutoCAD SHX Text
415-DT-1
AutoCAD SHX Text
415-CT-1
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
PRV-10A
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
4"MPS
AutoCAD SHX Text
4"BYPASS
AutoCAD SHX Text
NC
AutoCAD SHX Text
PRV-10
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
3"CW FROM BLDG REDUCED PRESSURE ZONE ASSEMBLY
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
CV-3
AutoCAD SHX Text
2"SW BYPASS
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
CV-4
AutoCAD SHX Text
3"CTPD BYPASS
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
NC
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text 2"D
AutoCAD SHX Text 2"D
AutoCAD SHX Text
CV-5
AutoCAD SHX Text 2"V
AutoCAD SHX Text 2"V
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
VALVE LOCKED OPEN
AutoCAD SHX Text
6"OFL
AutoCAD SHX Text
3/4" HPR/MPR
AutoCAD SHX Text
NC
AutoCAD SHX Text
6" PC TANK BYPASS
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
6" PC TANK BYPASS
AutoCAD SHX Text M
AutoCAD SHX Text
HD
AutoCAD SHX Text
NC
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
6"OFL
AutoCAD SHX Text
NC
AutoCAD SHX Text
VACUUM BREAKER
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
LPS TO B415
AutoCAD SHX Text
LPR
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text M
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
2 "FW12"FW
AutoCAD SHX Text
2 "FW12"FW
AutoCAD SHX Text
2 "FW12"FW
AutoCAD SHX Text
BOILER NO.2
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text P
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" NG
AutoCAD SHX Text
2" FW
AutoCAD SHX Text
2" DA TRAP DRAIN
AutoCAD SHX Text
1-1/4" MPR
AutoCAD SHX Text
2" DA DRAIN
AutoCAD SHX Text
1" WS DRAIN
AutoCAD SHX Text
TEMPORARY BOILER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
6" HPS CONN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2" FW
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
3/4"BWS
AutoCAD SHX Text
1"TC
AutoCAD SHX Text
1"TC
AutoCAD SHX Text
1. PHASE 3 BEGINS WHEN BOILER 3 AND TEMPORARY BOILER ARE FULLY OPERATIONAL PHASE 3 BEGINS WHEN BOILER 3 AND TEMPORARY BOILER ARE FULLY OPERATIONAL AS WELL AS ALL BOILER FEED PUMPS AND CONDENSATE PUMPS. 2. ONCE PHASE 3 IS FULLY COMPLETE THE TEMPORARY BOILER TRAILER MAY BE ONCE PHASE 3 IS FULLY COMPLETE THE TEMPORARY BOILER TRAILER MAY BE DE-ENERGIZED AND COMPLETELY REMOVED. 3. COMMISSIONING AGENT MUST CONFIRM THAT ALL EQUIPMENT IS OPERATING AS COMMISSIONING AGENT MUST CONFIRM THAT ALL EQUIPMENT IS OPERATING AS NECESSARY FOR A FULLY FUNCTIONING BOILER PLANT.
AutoCAD SHX Text
PHASE 3 - PART 1 NOTES:
AutoCAD SHX Text REMOVE 4"NG AND ALONG EAST EXTERIOR ELEVATION AND CAP. REMOVE NEW 2"FW. CLOSE 4"FW VALVE AND LEAVE IN PLACE. REMOVE 1-1/4"MPR. CLOSE 2" VALVE AND LEAVE IN PLACE. REMOVE BLOW DOWN PIPING AND CAP AT TANK. REMOVE DRAIN PIPING. REMOVE HPS PIPING AND CAP CONNECTION POINT. REMOVE TEMPORARY BOILER AT END OF PHASE 2.
AutoCAD SHX Text
KEYED PHASE 3 - PART 1 NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
| Sheets and Views |
| GC108A |
File details come from the government source that posted it. Updated .