This is a pre-solicitation notice for project 676-18-203 to Correct SPS Deficiencies in Building 452 at the Tomah VA Medical Center in Tomah, Wisconsin. The project magnitude is estimated between $2 million to $5 million and has a performance period of 280 calendar days. It will be issued as a 100% Service Disabled Veteran Owned Small Business set-aside. The solicitation will be posted to FedBizOpps on October 25, 2019 with a bid opening tentatively scheduled for December 3, 2019. The North American Industry Classification code is 236220 with a size standard of $36.5 million. A pre-bid site walkthrough will be conducted to review the requirements.
36C25220B0002 P01 - Drawings CD.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25220B0002-0008001.pdf | ||
| 36C25220B0002-0008000.docx | DOCX document | |
| 36C25220B0002-0007000.docx | DOCX document | |
| 36C25220B0002-0006002.docx | DOCX document | |
| 36C25220B0002-0005004.docx | DOCX document | |
| 36C25220B0002-0004000.docx | DOCX document | |
| 36C25220B0002-0003007.docx | DOCX document | |
| 36C25220B0002-0003008.pdf | ||
| 36C25220B0002-0002000.docx | DOCX document | |
| 36C25220B0002-0001000.docx | DOCX document | |
| 36C25220B0002-0001001.pdf | ||
| 36C25220B0002-0001002.pdf | ||
| 36C25220B0002-0001003.pdf | ||
| 36C25220B0002-001.docx | DOCX document | |
| 36C25220B0002-003.pdf | ||
| 36C25220B0002-002.pdf | ||
| 36C25220B0002-004.pdf | ||
| 36C25220B0002-005.pdf | ||
| 36C25220B0002-005.pdf | ||
| 36C25220B0002-004.pdf | ||
| 36C25220B0002-003.pdf | ||
| 36C25220B0002-001.docx | DOCX document | |
| 36C25220B0002-000.docx | DOCX document | |
| 36C25220B0002-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3770 South Pennsylvania Avenue, Unit 8 St Francis, Wisconsin 53235 PCG project #: P1600103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
Revisions: Date
PROJECT
LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
VETERANS AFFAIRS MEDICAL CENTER
500 E VETERANS ST
TOMAH, WI 54660
Project Number:
CAMPUS MAP
LOCATION MAP
PROJECT TEAM SHEET INDEX
PROJECT LEADER / ARCHITECT
MECHANICAL
PLUMBING
FIRE PROTECTION
ELECTRICAL
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
/2
/2
:3
:2
P
M
CORRECT SPS DEFICIENCIES
BLDG 452
VA MEDICAL CENTER TOMAH, WI
TITLE SHEET
6/21/2019 BAM LDR
GI001
100% CONSTRUCTION DOCUMENTS
GI001
100% CONSTRUCTION DOCUMENTS
676-18-203
CORRECT SPS DEFICIENCIES BLDG 452
676-18-203
PENN CONSTRUCTION GROUP, INC
3770 S. PENNSYLVANIA AVE., UNIT 8
ST FRANCIS, WI 53235
PENN CONSTRUCTION GROUP, INC
3770 S. PENNSYLVANIA AVE., UNIT 8
ST FRANCIS, WI 53235
PENN CONSTRUCTION GROUP, INC
3770 S. PENNSYLVANIA AVE., UNIT 8
ST FRANCIS, WI 53235
PENN CONSTRUCTION GROUP, INC
3770 S. PENNSYLVANIA AVE., UNIT 8
ST FRANCIS, WI 53235
PENN CONSTRUCTION GROUP, INC
3770 S. PENNSYLVANIA AVE., UNIT 8
ST FRANCIS, WI 53235
SHEET
NUMBER SHEET NAME
ISSUED FOR 35% SD
12/17/2018
ISSUED FOR 65% DD
2/25/2019
ISSUED FOR 95% CD
4/24/2019
ISSUED FOR 100% CD
6/21/2019
GENERAL INFORMATION
GI001 TITLE SHEET X X X X
GC101 SITE STAGING & EQUIPMENT LAYOUT X X X X
GC102 SITE DETAILS X X X X
GC103 INFECTION CONTROL PLAN, NOTES AND DETAILS X X X
ARCHITECTURAL
A001 ARCHITECTURAL LEGENDS, ABBREVIATIONS AND WALL TYPES X X X X
AD101 ARCHITECTURAL PLAN - DEMOLITION X X X X
AD102 ARCHITECTURAL PLAN - DEMOLITION X
AD103 ARCHITECTURAL REFLECTED CEILING PLAN - DEMOLITION X X X X
AD104 ARCHITECTURAL ROOF PLAN - DEMOLITION X X
AS101 ARCHITECTURAL PLAN - NEW WORK X X X X
AS102 ARCHITECTURAL STRUCTURAL PLAN - NEW WORK X X X
AS103 ARCHITECTURAL ROOF PLAN - NEW WORK X X
AC101 ARCHITECTURAL REFLECTED CEILING PLAN - NEW WORK X X X X
AE101 ARCHITECTURAL EQUIPMENT PLAN X X X X
AE102 ARCHITECTURAL EQUIPMENT SCHEDULE X X X X
AF101 ARCHITECTURAL FINISHES PLAN X X
A201 ARCHITECTURAL INTERIOR ELEVATIONS X X X X
A202 ARCHITECTURAL INTERIOR ELEVATIONS X X X
A203 ARCHITECTURAL INTERIOR ELEVATIONS X X X
A401 ARCHITECTURAL ENLARGED PLANS X X X X
A501 ARCHITECTURAL DETAILS X X X
A502 ARCHITECTURAL DETAILS X X
A503 ARCHITECTURAL DETAILS X
A601 ARCHITECTURAL DOOR, ROOM FINISH SCHEDULE AND DETAILS X X X X
A701 ARCHITECTURAL SIGNAGE SCHEDULE AND DETAILS X X
FIRE PROTECTION
F001 FIRE PROTECTION LEGEND, ABBREVIATIONS AND DETAILS X X X X
FD101 FIRE PROTECTION SUPPRESSION PLAN - DEMOLITION X X X X
FD102 FIRE PROTECTION DETECTION AND ALARM PLAN - DEMOLITION X X X
FL101 FIRE PROTECTION LIFE SAFETY PLAN X X X X
FX101 FIRE PROTECTION SUPPRESSION PLAN - NEW WORK X X X X
FA101 FIRE PROTECTION DETECTION AND ALARM PLAN - NEW WORK X X X
PLUMBING
P001 PLUMBING LEGEND, ABBREVIATIONS AND SCHEDULES X X X X
PD100 PLUMBING UNDERGROUND PLAN - DEMOLITION X X X X
PD101 PLUMBING PLAN - DEMOLITION X X X
PL100 PLUMBING UNDERGROUND PLAN - NEW WORK X X X X
PL101 PLUMBING PLAN - NEW WORK X X X
P501 PLUMBING DETAILS AND DIAGRAMS X X X
P601 PLUMBING ISOMETRIC DIAGRAMS X X
MECHANICAL
M001 MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES X X X X
MD101 MECHANICAL DUCTWORK PLAN - DEMOLITION X X X X
MD102 MECHANICAL PIPING PLAN - DEMOLITION X X X X
MH101 MECHANICAL DUCTWORK PLAN – NEW WORK X X X X
MH102 MECHANICAL ROOF PLAN – NEW WORK X X
MP101 MECHANICAL PIPING PLAN – NEW WORK X X X X
M301 MECHANICAL SECTIONS X X
M501 MECHANICAL DETAILS AND DIAGRAMS X X X X
M502 MECHANICAL DETAILS AND DIAGRAMS X X X X
M503 MECHANICAL DETAILS AND DIAGRAMS X X
M601 MECHANICAL SCHEDULES X X X X
M701 MECHANICAL CONTROL DIAGRAM X X
M702 MECHANICAL CONTROL DIAGRAMS X X
ELECTRICAL
E001 ELECTRICAL LEGEND, ABBREVIATIONS, AND NOTES X X X X
ED101 ELECTRICAL POWER PLAN - DEMOLITION X X X X
ED102 ELECTRICAL LIGHTING PLAN - DEMOLITION X X X X
ED103 ELECTRICAL SYSTEMS PLAN - DEMOLITION X X X X
EP101 ELECTRICAL POWER PLAN – NEW WORK X X X X
EL101 ELECTRICAL LIGHTING PLAN – NEW WORK X X X X
ES101 ELECTRICAL SYSTEMS PLAN – NEW WORK X X X X
E401 ELECTRICAL ENLARGED PLANS AND RISER DIAGRAMS X X X X
E501 ELECTRICAL DETAILS AND DIAGRAMS X X X X
E502 ELECTRICAL DETAILS AND DIAGRAMS X X X X
E503 ELECTRICAL DETAILS AND DIAGRAMS X
E601 ELECTRICAL SCHEDULES X X X X
E602 ELECTRICAL SCHEDULES X
PROJECT LOCATION - BLDG 452
BUILDING 452
TEMPORARY 12'X60'
CONSTRUCTION TRAILER
EXISTING PARKING AREA
EXISTING COVERED TRAMWAY
EXISTING GRASS
EXISTING
GRASS
AREA
EXISTING GRASS
EXISTING GRASS
EXISTING
GRASS
AREA
TEMPORARY CONSTRUCTION
FENCE REQUIRED, TYP,
SEE DTL 3/GC102
TRAMWAY ACCESS - DO NOT BLOCK,
NO EQUIPMENT OR CONSTRUCTION
OUTSIDE OF EXISTING ENTRANCE,
ACCESS TO TRAMWAY MUST BE
MAINTAINED THROUGHOUT PROJECT.
TEMPORARY CONSTRUCTION
FENCE REQUIRED TYP
BUILDING 424 DUMPSTER
LOCATION, DO NOT BLOCK OR
ALTER LOCATION OF DUMPSTER
MAINTAIN CLEAR PATH FOR
MAINTENANCE OF DUMPSTERS
CONSTRUCTION
DUMPSTER
LOCATION
EXISTING
AIR
COOLED
CHILLER
EMERGENCY EXIT
PATHWAY FOR
OCCUPANTS
CONSTRUCTION
GATE, TYP
SEE DETAIL 4 ON
SHEET GC102
19' - 2" 50' - 8"
BUILDING 455
EXISTING
GRASS
AREA
3'
12'
12'
3'
5'
EXIST LOADING
DOCK
EXIST EXIST STORM SEWER INLET,
WRAP IN FILTER FABRIC,
TYPICAL
PIV, POST INDICATOR VALVE,
FIRE PROTECTION,
PROTECT
BURIED WATER
VALVE,
EXIST FDC
EXIST POST WITH SIGN
EXIST LIGHT POLE
EXIST POSTS WITH SIGNS, TYP
ZERO GAP, TIGHT TO
EXIST BUILDING
ZERO GAP, TIGHT TO
EXIST BUILDING
5'
CONSTRUCTION
C O
N S
T R
U C
T
IO
N
P W th
S t
MOUNT
CONSTRUCTION SIGN,
SEE DETAIL 5 ON
GC102
SEE DETAIL 7 ON
SHEET GC102
CORE HOLE & CAULK
TEMPORARY FUEL/ENERGY PIPE
AT EXTERIOR & INTERIOR WALLS
SEE DETAIL 6 ON
DWG GC102,
TYPICAL ALL
AROUND EVERY
50FT
PORTABLE LPG
TANK FOR HEATING,
PROVIDED BY
CONTRACTOR
CONTRACTOR SHALL PROVIDE
TEMPORARY ELECTRIC POWER
TO TRAILER, 50A CIRCUIT FROM
BUILDING 452.
CONSTRUCTION
ENTRANCE SIGN W/
INFO. SEE DETAIL 5
ON SHEET GC102
MINIMUM 8 TEMPORARY
HEATERS BY GC, SEE GEN.
NOTE 12 THIS SHEET (TYP.)
1. ALL DISTURBED GRASS SHALL BE RE-SODDED AT END OF THE PHASE.
CONTRACTOR SHALL PROVIDE 3" BROWN SIFTED TOPSOIL. GRADE TO
MATCH EXISTING. SLOPE NEW GRADE AWAY FROM BUILDING 404.
CONTRACTOR SHALL. PROVIDE WATERING OF NEW SOD FOR 4 TIMES
PER WEEK FOR 8 WEEKS.
2. CONSTRUCTION STAGING AREA SHALL BE COMPLETELY FENCED IN AND
LOCKED DURING OFF HOURS. ADDITIONAL SPACE IF REQUIRED SHALL
BE COORDINATED WITH THE VA CONSTRUCTION MANAGER.
3. EACH THE CRANE LIFT AREA SHALL BE PROTECTED BY A TEMPORARY
FENCE AND LOCKED DURING OFF HOURS.
4. THE CONTRACTOR SHALL PROVIDE PORTABLE RESTROOM FACILITIES
FOR ALL CONTRACTOR AND SUB-CONTRACTORS USE THROUGHOUT
THE DURATION OF THE PROJECT. FACILITY RESTROOM USE IS NOT
ALLOWED BY ANY CONSTRUCTION PERSONNEL.
5. ALL CONSTRUCTION AREAS SHALL BE CLEANED DAILY.
6. ALL CONTRACTOR AND SUB-CONTRACTOR VEHICLES SHALL PARK IN
THE DESIGNATED AREA OF THE EXISTING PARKING LOT. IF THERE ARE
EXCESS VEHICLES LAST ROW TO THE EAST MAY BE USED AS OVER-
FLOW PARKING.
7. UP TO 2 CONSTRUCTION TRAILERS MAY BE PARKED IN THE DESIGNATED
AREA SHOWN ON THE PLAN. ELECTRICAL HOOK UP SHALL BE THE
CONTRACTORS RESPONSIBILITY AND COORDINATED WITH THE VA
CONSTRUCTION MANAGER. EACH CONNECTION SHALL BE METERED
INDIVIDUALLY.
8. NO SANITARY OR WATER CONNECTIONS ALLOWED.
9. CONSTRUCTION DEBRIS CHUTE SHALL BE COMPLETELY SUPPORTED
INDEPENDENTLY OF THE BUILDING BY ITS OWN SCAFFOLD.
10. CONTRACTOR SHALL REPAIR ALL ROADWAY DAMAGED FROM
CONSTRUCTION TO MATCH EXISTING CONDITIONS.
11. CONTRACTOR TO ENSURE ALL FIRE HYDRANTS AROUND BUILDING 404
ARE NOT BLOCKED OFF OR UNUSABLE.
12. THE GENERAL CONTRACTOR SHALL PROVIDE FUEL/ENERGY TO
OPERATE HEATERS FROM SEPTEMBER 1 THROUGH THE LAST DAY OF
APRIL. THE GC SHALL ALSO PROVIDE HEATERS TO KEEP THE
CONSTRUCTION SPACE TEMPERATURE A MINIMUM OF 68 F TO KEEP
CONSTRUCTION MATERIALS AT THE MANUFACTURERS
GENERAL NOTES
LEGEND
CONSTRUCTION ENTRANCE AND CONSTRUCTION
PAD PROTECTION, SIMILAR TO PRESTO
GEOSYSTEMS GEOTERRA GTO OR EQUAL.
HIGH DENSITY POLYETHYLENE INTERLOCKING
MATS FOR EXISTING SURFACE PROTECTION,
APPROXIMATELY 17.5" x 36.5" x 2" THICK INDIVIDUAL
MATS CAPABLE OF BOLTING TO EACH OTHER TO
FORM A CONTINUOUS PAD.
CONCRETE WALK
ROAD
TREES
CURB AND GUTTER
SITE FENCE
CONSTRUCTION FENCE
STORM WATER INLET
SEWER MANHOLEMH
CONSTRUCTION LIMITS
PROJECT BUILDING IDENTIFICATION
BOLLARD
TREE PROTECTION FENCE
INLET PROTECTION
POST INDICATOR VALVE
W
P
BURIED WATER VALVE
LIGHT POLE
POST WITH SIGN
POST
BLDG
BLDG
BLDG
BLDG
BLDG
P4
CONTRACTOR
STAGING AREA
' - 0
50' - 0"
G St
S t
GC101
BLDG
3770 South Pennsylvania Avenue, Unit 8 St Francis, Wisconsin 53235 PCG project #: P1600103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
Revisions: Date
PROJECT
LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
/2
/2
:3
:1
P
M
CORRECT SPS DEFICIENCIES
BLDG 452
VA MEDICAL CENTER TOMAH, WI
SITE STAGING & EQUIPMENT
LAYOUT
6/21/2019 HFB JMD
GC101
100% CONSTRUCTION DOCUMENTS
GC101
100% CONSTRUCTION DOCUMENTS
676-18-203
1/16" = 1'-0"2 SITE STAGING & EQUIPMENT LAYOUT
N
SCALE: NONE1 OVERALL SITE - VA, TOMAH
NCONTRACTOR PARKING. CONTRACTOR IS
RESPONSIBLE FOR SNOW REMOVAL.
PIPE SPACING, 10FT ON CENTER
2-1/4", 11-1/2 GAUGE
CHAIN LINK FENCE
WIRE TO SECURE CHAIN TO FENCE
POST, SPACE EVERY 15" TYP
84" LONG, 1-5/8" DIA STEEL PIPE ON
SURFACE STAND
FINISHED GRADE
84" LONG, 1-5/8" DIA STEEL
PIPE SET ON STEEL SURFACE
STAND, OR COMPARABLE
SURFACE STAND, TO BE IMPLEMENTED
ON ALL SURFACES. CONTRACTOR TO
COORDINATE WITH VA COR.
NOTES:
1. CHAIN LINK CONSTRUCTION FENCING IS TO BE INSTALLED PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.
2. CHAIN LINK CONSTRUCTION FENCE SHALL BE A MINIMUM OF 84" ABOVE GRADE.
3. FENCE SHALL BE INSPECTED DAILY AFTER CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED FOR THE DAY.
IF DAMAGED, FENCING SHALL BE REPAIRED IMMEDIATELY.
4. CHAIN LINK CONSTRUCTION FENCE IS SHOWN ON IMPERVIOUS SURFACES, SUCH AS THE EXISTING DRIVE AND PARKING AND GRASS AREAS. POST ARE TO BE ANCHORED ON SURFACE STANDS. STEEL PIPE IS NOT TO BE
DRIVEN BELOW GRADE.
PROVIDE 4 SANDBAGS
AT EACH POST
GEOTEXTILE FABRIC,
MONOFILAMENT IN BOTH
DIRECTIONS
WOOD 2" x 4" EXTENDS 8"
BEYOND GRATE WIDTH ON
BOTH SIDES, LENGTH VARIES.
SECURE TO GRATE WITH WIRE
OR PLASTIC TIES.
INSTALLATION AND MAINTENANCE NOTES:
1. TRIM EXCESS FABRIC IN THE FLOW LINE TO WITHIN 3" OF THE GRATE. THE CONTRACTOR SHALL DEMONSTRATE A METHOD OF MAINTENANCE, USING A SEWN FLAP, HAND HOLDS OR OTHER METHOD TO PREVENT ACCUMULATED
SEDIMENT FROM ENTERING THE INLET.
2. WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARE SHALL BE TAKEN SO THAT THE SEDIMENT TRAPPED ON THE GEOTEXTILE FABRIC DOES NOT FALL INTO THE INLET. ANY MATERIAL FALLING INTO THE INLET SHALL BE
REMOVED IMMEDIATELY.
3. FINISHED SIZE, INCLUDING FLAP POCKETS WHERE REQUIRED, SHALL EXTEND A MINIMUM OF 10" AROUND THE
PERIMETER TO FACILITATE MAINTENANCE OR REMOVAL.
4. FOR INLET PROTECTION, CURB TYPE, AN ADDITIONAL 18" OF FABRIC IS WRAPPED AROUND THE WOOD AND SECURED WITH STAPLES. THE WOOD SHALL NOT BLOCK THE ENTIRE HEIGHT OF THE CURB BOX OPENING.
ELEVATION
12" MINIMUM
HORIZONTAL
FABRIC
SANDBAGS ALL AROUND
GEOTEXTILE FABRIC
SUPPORTED BY HEAVY GUAGE
WELDED WIRE FENCE OR 2 OR
3 LAYERS OF 8" CONCRETE
BLOCKS
STORM SEWER INLET, WRAP IN
FILTER FABRIC, TYPICAL
SIM TO DETAIL 2, THIS SHEET
SANDBAGS ALL AROUND
GEOTEXTILE FABRIC
SUPPORTED BY HEAVY GUAGE
WELDED WIRE FENCE OR 2 OR
3 LAYERS OF 8" CONCRETE
BLOCKS
NOTE:
FILTER FABRIC SHALL BE AT LEAST 18" HIGH BUT LESS THAN 36" HIGH.
SURFACE STAND, TYP
ELEVATION
GATE FRAME
STRONG ARM LATCH
CHAIN LINK
GATE POST
Ø2.875"
HINGE, TYP
GRADE
EXIST IMPERVIOUS
SURFACE
12' 0"
3"2" 2"
8" DIA X 2" RUBBER GATE WHEEL WITH 4"
HUB, SPRING SUSPENSION WITH 2"
TRAVEL, AND U-BOLT CLAMPS TO FIT 1-5/8
TO 2" TUBE. TYP. OF 2
ROUND CORNERS
AND EDGES OF
GALV. STEEL SHEET
2X4 WOOD FRAME
PROVIDE GALVANIZED PIPE
CLAMP TO SECURE SIGN TO
CONSTRUCTION FENCE, TYP
TOP & BOTTOM.
CONSTRUCTION FENCE
SUPPORT POST
3' X 3' 24 GAGE GALV. STEEL
SHEET, SECURE TO WOOD
FRAME W/ GALV. NAILS
PRIME & PAINT ALL SURFACES
OF CONSTRUCTION SIGN,
PAINT WITH 2 COATS OF HIGH
GLOSS METAL PAINT, PROVIDE
2" WIDE BLACK BORDER OVER
WHITE PAINT
SIGN CONSTRUCTION & MOUNTING REQUIRED SIGN INFORMATION
CORRECT SPS
DEFICIENCIES BLDG 452
GENERAL CONTRACTORS
NAME
CONTRACTOR'S PHONE
NUMBER
COR'S NAME
COR'S PHONE NUMBER
BLACK BORDER
SIGN WIDTH
3' - 0"
S
IG
N H
E
IG
H T
PROJECT TITLE IN BLUE PAINT,
4" HIGH LETTERS
CONTRACTOR'S NAME &
NUMBER IN BLACK PAINT, 2"
HIGH LETTERS
COR'S NAME & NUMBER, 2"
HIGH BLACK LETTERS
SIGN WIDTH
3' - 0"
S
IG
N H
E
IG
H T
NOTE: SEE 1.29 OF SECTION 01 00 00 GENERAL REQUIREMENTS
CONSTRUCTION SITE
NO TRESSPASSING
AUTHORIZED
PERSONNEL ONLY
0.040" REFLECTIVE ALUMINUM
WITH FOUR 7/32" HOLES ONE
IN EACH CORNER
DANGER
SIGN WIDTH
18"
S
IG
N H
E
IG
H T
" MOUNT TO CONSTRUCTION
FENCE AT 50 LINEAL FEET 5' -
6" AFG
ZERO
IN ON SAFETY
2" HIGH
2" HIGH
2" HIGH
1-1/2" HIGH
4" HIGH
ENLARGED VIEWELEVATION
4"x4" PRESSURE
TREATED POST,
LENGTH AS REQD
BURY POST
3'-0" DEEP
3'x3' EXTERIOR GRADE
PLYWOOD, PRIME ALL
SURFACES WITH 1
COAT AND PAINT ALL
SURFACES WITH 2
COATS HIGH GLOSS
WHITE
'-0
VA DEPARTMENT OF VETERANS AFFAIRS
COLOR CHART:
HIGH GLOSS RED
HIGH GLOSS WHITE
HIGH GLOSS BLUE
HIGH GLOSS BLACK
CORRECT SPS DEFICIENCIES
HAS WORKED 000 DAYS
BUILDING 452
WITHOUT A LOST TIME ACCIDENT
THE LIFE YOU SAVE COULD BE YOUR OWN
CONTRACTOR'S NAME
GRADE
3' HIGH x 1/8" THICK
HARDBOARD PAINTED
HIGH GLOSS WHITE
WITH 2-1/2" HIGH GLOSS
BLACK NUMBERS WITH
STAINLESS STEEL HAT
CHANNEL
3770 South Pennsylvania Avenue, Unit 8 St Francis, Wisconsin 53235 PCG project #: P1600103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
Revisions: Date
PROJECT
LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
/2
/2
:3
:1
P
M
CORRECT SPS DEFICIENCIES
BLDG 452
VA MEDICAL CENTER TOMAH, WI
SITE DETAILS
6/21/2019 HFB JMD
GC102
100% CONSTRUCTION DOCUMENTS
GC102
100% CONSTRUCTION DOCUMENTS
676-18-203
SCALE: NONE3 TEMPORARY CHAIN LINK FENCE DETAIL
SCALE: NONE2 STORM INLET SEDIMENT BARRIER
SCALE: NONE1 STORM INLET PROTECTION DETAIL
SCALE: NONE4 CHAIN LINK FENCE GATE LOCK DETAIL
SCALE: NONE5 CONSTRUCTION SIGN DETAIL
SCALE: NONE6 WARNING SIGN
SCALE: NONE7 SAFETY SIGN
DN
TRAMWAY"WORK" SIDE OF BARRIER
EXIST PRECAST CONC
ROOF W/ GYP BD CLNG
1/8" CONT REMOVABLE
SEALANT AND BACKER
ROD; BOTH SIDES
EXIST CONC FLOOR
SEAL ENTIRE PERIMETER OF
BARRIER W/ CONTINUOUS
REMOVABLE SEALANT
EXISTING TRAMWAY ROOF
3-1/2".
(2) - 1/2" TYPE X GYP BD
6 MIL POLY W/
TAPED SEAMS
2-1/2" CH STUD @ 16"OC W/
FULL BATT SOUND
ATTENUATION INSULATION
1" TYPE X
SHAFT
LINER
WORK SIDE
TRAMWAY SIDE
3-1/2".
1/8" CONT REMOVABLE
SEALANT AND BACKER
ROD; BOTH SIDES
(2) - 1/2" TYPE X GYP BD
6 MIL POLY W/
TAPED SEAMS
2-1/2" CH STUD @ 16"OC W/
FULL BATT SOUND
ATTENUATION INSULATION
1" TYPE X
SHAFT
LINER
WORK SIDE
TRAMWAY SIDE
1. SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL DESIGN REQUIREMENTS.
2. THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS IN THE HOSPITAL
WHO HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION OPERATIONS NEED TO BE
DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION AREA.
3. PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV CONSTRUCTION
OPERATIONS. EACH AREA TO BE UNDER NEGATIVE PRESSURE (0.02"WC) DURING THESE
OPERATIONS. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION
AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA COR
4. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK ISOLATION
MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS
BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF.
CONTRACTOR SHALL PROVIDE EXISTING POWER CONNECTIONS FOR TRIATEK ISOLATION
MONITORS OR PROVIDE TEMPORARY POWER TO TRIATEK ISOLATION MONITORS DURING
CONSTRUCTION.
5. PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT WORK SERVING THE
AFFECTED AREA. TEMPORARILY BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN
CONSTRUCTION ZONE AT ALL TIMES AS INDICATED IN NOTE BELOW. DAMPERS TO REMAIN IN
DUCT AFTER CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN FINAL BALANCING
POSITION PRIOR TO TURNING SYSTEM OVER FOR OCCUPANCY.
6. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY
EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE
COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH
REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT
TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.
PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN
ADJACENT AREA.
7. AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE SPECIFICATION SECTION
013526 "SAFETY REQUIREMENTS") AND THEREON, REQUEST A NEW "INFECTION CONTROL
CONSTRUCTION PERMIT" FROM THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION,
PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH
PERMIT.
8. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO DECK/FLOOR ABOVE. SEE DETAIL 1/GC103 & SPECIFICATION SECTION 013526. EXCEPTION: IF BARRIER IS
ADJACENT TO A SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE
DEMOLISHED AND TERMINATES TO FLOOR OR DECK ABOVE, THEN CONSTRUCT IC BARRIER
FROM FLOOR TO ABOVE CORRIDOR CEILING WITH 6 MIL POLY BEING SEALED ON ALL EDGES:
FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS.
9. MAINTAIN ALL INFECTION CONTROL STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED
AND REMOVED ONLY BEFORE 7:00 A.M. AND AFTER 8:00 P.M. IN OCCUPIED AREAS.
10. EGRESS IS TO BE MAINTAINED TO THE STAIRWELLS AND TRAMWAY AT ALL TIMES.
11. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT NEW SMOKE
BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION
CONTROL BARRIER TO ACT AS SMOKE BARRIER.
12. A PORTION OF THE TRAMWAY MAY BE MADE AVAILABLE TO CREATE AN INFECTION CONTROL
AREA; HOWEVER, A MINIMUM OF 4 FT MUST BE MAINTAINED OPEN FOR THE MOVEMENT OF
PERSONNEL. THE TRAMWAY WILL NOT BE CLOSED OFF.
13. CONTRACTOR ACCESS TO WORK SPACE SHALL BE THROUGH THE EXISTING LOADING DOCK
DOORS AT THE WEST SIDE.
14. ASIDE FROM CONSTRUCTING THE INFECTION CONTROL BARRIER WALLS, NO CONSTRUCTION
TRAFFIC SHALL OCCUR IN THE TRAMWAY.
INFECTION CONTROL GENERAL NOTES:
TYPE A
MINIMAL
FIRE RISK
INSPECTION AND NON-INVASIVE ACTIVITIES.
INCLUDES, BUT IS NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET
• PAINTING (BUT NOT SANDING)
• WALLCOVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
INFECTION CONTROL DESIGN NOTES:
TYPE B
LIMITED
FIRE RISK
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING
• ACCESS TO CHASE SPACES
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
TYPE C
MODERATE
FIRE RISK
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION
OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
INCLUDES, BUT IS NOT LIMITED TO:
• DRY SANDING OF WALLS FOR PAINTING OR WALL COVERING
• REMOVAL OF FLOOR COVERINGS (WITH SANDING), CEILING TILES AND CASEWORK
• NEW CONSTRUCTION OR RENOVATIONS OVER 3 DAYS DURATION
• MAJOR DUCT, PLUMBING, PIPING OR ELECTRICAL WORK
• SOLDERING OR BRAZING OPERATIONS
• ANY ACTIVITY THAT REQUIRES A BURN PERMIT
TYPE D
SIGNIFICANT
FIRE RISK
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFT
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE BUILDING SYSTEM
• NEW CONSTRUCTION OR RENOVATIONS OVER 3 DAYS DURATION
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREAS
• MECHANICAL SPACES
• CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY/MRI/ CT/PET
• RESPIRATORY THERAPY
• CCU
• EMERGENCY ROOM
• LABOR & DELIVERY
• LABORATORIES (SPECIMEN)
• OUTPATIENT SURGERY
• NEWBORN NURSERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE
UNIT
• SURGICAL UNITS
• LINEN
• KITCHEN & CANTEEN
• ANY AREA CARING FOR
IMMUNOCOMPROMISED
PATIENTS
• BURN UNIT
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNITS
• MEDICAL UNITS
• NEGATIVE PRESSURE
ISOLATION ROOMS
• ONCOLOGY
• OPERATING ROOMS
INCLUDING C-SECTION
ROOMS
• DIALYSIS
PATIENT RISK GROUP TYPE A
CONSTRUCTION PROJECT TYPE
TYPE B TYPE C TYPE D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
I1I / IV
II
I1I
I1I / IV
I1I / IV
I1I / IV
IV
IV
IV
DESCRIPTION OF REQUIRED INFECTION PREVENTION PRECAUTIONS BY CLASS
DURING CONSTRUCTION PROJECT
1. EXECUTE WORK TO MINIMIZE THE RISE OF DUST FROMCONSTRUCTION
OPERATION.
2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR INSPECTION.
UPON COMPLETION OF PROJECT
1. CLEAN WORK AREA UPON COMPLETION OF
TASK.
C L
A S
S I
1. PROVIDES ACTIVE MEANS TO PREVENT AIR-BORNE DUST FROM
DISPERSING INTO ATMOSPHERE (SURROUNDING ENVIRONMENT.)
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL DUCT VENTS.
5. WIPE SURFACES WITH DISINFECTANT.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE
LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
9. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING PERFORMED.
C L
A S
S I
I
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE
METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS.
5. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING
PERFORMED.
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL COMPLETE AND
PROJECT IS THOROUGHLY CLEANED BY EMS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP WITH DISINFECTANT.
9. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF
DUST AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
11. COVER TRANSPORT RECEPTACLES OR CART AND TAPE COVERING IN
PLACE.
C L
A S
S I
II
1. DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER’S SAFETY
DEPARTMENT AND INFECTION
PREVENTION COORDINATOR AND
THOROUGHLY CLEANED BY (EMS)
ENVIRONMENTAL MANAGEMENT
SERVICES.
2. REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH
CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA
FILTERED VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING
PERFORMED.
1. *REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING
DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD,
PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUMMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THE CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS AT IC (INFECTION CONTROL) DISCRETION. SHOE COVERS MUST
BE CHANGED EACH TIME THE WORKER EXITS WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND
INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEARED BY THE
OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
C L
A S
S I
V
1. REMOVE BARRIER MATERIAL CAREFULLY
TO MINIMZE SPREADING OF DURT AND
DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID
LID.
4. VACUUM WORK AREA WITH HEPA
FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHER WORK IS BEING
PERFORMED.
A A
B
C C
D
E E
MECHANICAL
08A
CLOSET
C A
R T
S
C L E
A N
L
IN
E N
OFFICE
OFFICE
TRAINING
BREAKOUT &
RECEIVING
ELEC
OFFICE 1
OFFICE 2
H A
C
A N
T E
R O
O M
T O
IL
E
T
A
CART WASH
15B
PASSAGE
CARTS
15A
STERILE
MEETING /
BREAKROOM
W O
M E
N L O
C K
E R
CORRIDOR
CORRIDOR
MEN
LOCKER
TOWEL &
WRAP
BULK
STORAGE
STERILE
STORAGE
STERILE &
PREP
DECONTAMINATION
LOADING
DOCK
24A
1 INFECTION
PREVENTION
CLASS IV
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
C O
N S
T R
U C
T
IO
N L
IM
IT
S
TRAMWAY
T123
ICB-2
ICB-2ICB-2
M
IN
M
IN
T
ICB-2ICB-2
MIN
4' - 0" 4' - 0"
MIN
4' - 0" 4' - 0"
MAINTAIN A MINIMUM OF 4'-0" CLEAR IN TRAMWAY
TEMPORARY DOOR FOR CONSTRUCTION EMERGENCY EGRESS ONLY, SEE DOOR SCHEDULE
KEYED NOTES
3770 South Pennsylvania Avenue, Unit 8 St Francis, Wisconsin 53235 PCG project #: P1600103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
Revisions: Date
PROJECT
LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
BLDG 452
BLDG 424
BLDG 455
B L D
G
KEY PLAN
T R
A M
W A
Y
N
/2
/2
:3
:2
P
M
CORRECT SPS DEFICIENCIES
BLDG 452
VA MEDICAL CENTER TOMAH, WI
INFECTION CONTROL PLAN,
NOTES AND DETAILS
6/21/2019 BAM KAB
GC103
100% CONSTRUCTION DOCUMENTS
GC103
100% CONSTRUCTION DOCUMENTS
676-18-203
SCALE: NONE1
ICB-2 (UL DESIGN NO U415 - SYSTEM B) 2 HR FIRE RATED &
INFECTION CONTROL BARRIER WALL
1/8" = 1'-0"2 INFECTION CONTROL PLAN
OS
H
1. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO SUBMITTING PROPOSAL.
FAILURE TO DO SO SHALL NOT RELIEVE THIS CONTRACTOR FROM PERFORMING THE WORK
REQUIRED UNDER THIS CONTRACT.
2. WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT IN THE EXISTING AREA HAS
BEEN INDICATED ON THE DRAWINGS AS ACCURATELY AS POSSIBLE, CONTRACTOR
SHALL ADJUST HIS WORK AS REQUIRED TO AVOID EXISTING UTILITIES, FIRE ALARM, ROOF
DRAINS, ACCESS COVERS, AND OTHER STRUCTURES NOT PARTICULARLY SHOWN ON PLAN
AT NO EXTRA COST. BEFORE CONSTRUCTION, INSPECT PREMISES AND MAKEA DETAILED
EXAMINATION OF ALL LOCATIONS WHERE NEW WORK IS TO BE INSTALLED. EXAMINE
EXISTING PIPING, CONDUITS, STRUCTURAL SUPPORTING BEAMS, AND OTHER CONDITIONS.
3. ACCESS TO ALL BUILDINGS AND PARKING AREAS MUST BE MAINTAINED THROUGHOUT THE
PROJECT.
4. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE VA'S CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
5. CONTRACTOR SHALL MAINTAIN FULL OPERATION OF EXISTING BUILDING'S MECHANICAL,
ELECTRICAL AND SECURITY SYSTEMS. COORDINATE WITH THE VA COR AND PROVIDE (14) DAY
ADVANCE NOTIFICATION PRIOR TO SHUT DOWN. REQUIRED SHUT DOWNS SHALL BE
SCHEDULED AT THE VA'S CONVENIENCE. PREMIUM OR OVERTIME COSTS REQUIRED SHALL BE
INCLUDED IN THE BASE BID. FAILURE TO PROCEED WITHOUT PROPER PRIOR NOTIFICATION
MAY RESULT IN THE ASSESSMENT OF A CREDIT TO THE CONTRACT.
6. CONTRACTOR SHALL STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) STANDARDS.
7. CONTRACTOR SHALL PARK ONLY IN THE DESIGNATED PARKING AREAS AND ARE NOT TO
PARK ON THE LAWN AREAS.
8. CONTRACTOR SHALL SAFEGUARD THEIR TOOLS AND EQUIPMENT. TOOLS AND EQUIPMENT
SHALL NOT BE LEFT UNATTENDED AND SHALL BE SECURED AT ALL TIMES WHEN THE
CONTRACTOR IS NOT PRESENT.
9. CONTRACTOR SHALL CONTROL DEMOLITION AND CONSTRUCTION DUST FROM FACILITY BY
ERECTING A DUST BARRIER AND VENTILATION WITH HEPA FILTERS. IF VENTING TO
OUTSIDE, THE CONTRACTOR SHALL INSURE NEGATIVE AIR PRESSURE IS MAINTAINED IN
ENCAPSULATED WORK AREA. WHEN TRANSPORTING DEBRIS, WET DOWN SUFFICIENTLY TO
PREVENT DUST SPREADING.
10. IF SCAFFOLDING IS USED, IT SHALL BE USED IN ACCORDANCE WITH (OSHA) REGULATIONS
AND SHALL BE ENCLOSED FOR THE FIRST EIGHT FEET ABOVE GROUND AT END OF EACH
WORKING DAY, UNTIL DISMANTLED. LADDERS SHALL BE REMOVED AND LOCKED UP AT THE
END OF EACH WORKING DAY TO PREVENT UNAUTHORIZED PERSONS FROM HAVING
ACCESS.
11. ALL CRANE LIFT OPERATIONS SHALL HAVE A LIFT PLAN DRAWING AND AN OUTAGE
SCHEDULE TO ALLOW THE VA TO EVACUATE TWO FLOORS BELOW LIFT SWING ARC.
12. PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY DAMAGED SURFACES SHALL BE
REPLACED TO MATCH ORIGINAL ITEM, OR REPAIRED TO MATCH EXISTING OR ADJACENT
MATERIAL AS APPROVED BY THE VA COR.
13. CONTRACTOR SHALL REPAIR AND REPLACE ANY DAMAGED LAWN. THE RESTORATION SHALL
BE SOD AND SHALL BE PERFORMED BY A LANDSCAPE CONTRACTOR. TOPSOIL SHALL BE
TILLED AND GRADED TO A SMOOTH MATCHING GRADE OF UNDAMAGED LAWN. SOD SHALL BE
THOROUGHLY SATURATED WITH WATER UPON PLACEMENT. THE CONTRACTOR SHALL WATER
NEW SOD UNTIL PROJECT ACCEPTANCE BY THE COR.
14. CLEAN AND REMOVE DEBRIS FROM CONSTRUCTION SITE TO THE SATISFACTION OF THE VA
COR.
15. WORK HOURS: DAYTIME - NORMAL WORK THAT DOES NOT CREATE VIBRATION, LOUD
NOISE OR ODORS OR REQUIRE LOADING DOCK / TRUCK SPACE.
8PM-6AM - WORK REQUIRING OUTAGES, TRUCK SPACE / CRANES.
WEEKENDS - WORK THAT CREATES LOUD NOISE, VIBRATIONS, ODORS, OUTAGES AND/OR
TRUCK SPACE / CRANE.
16. CONTRACTOR SHALL PROVIDE "SUBMITTAL EXCHANGE" SECURE ONLINE SYSTEM FOR
EXCHANGING, REVIEWING AND ARCHIVING SUBMITTALS, RFI'S, AND OTHER CONSTRUCTION
COMMUNICATIONS ELECTRONICALLY.
GENERAL NOTESARCHITECTURAL ABBREVIATIONS
A/E ARCHITECT/ENGINEER
A AIR (MEDICAL)
AC ACOUSTICAL CEILING
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTIC CEILING TILE
ADA AMERICAN WITH DISIBILITIES ACT
ADDL ADDITIONAL
ADH ADHESIVE
ADO AUTOMATIC DOOR OPERATOR
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AMT AMOUNT
ANOD ANODIZED
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATELY
ARCH ARCHITECT
ASB ASBESTOS
ATTD ATTACHED
AUTO AUTOMATIC
AUX AUXILIARY
AVG AVERAGE
AWT ACOUSTICAL WALL TREATMENT
B BASE
BD BOARD
BEJ BRICK EXPANSION JOINT
BF BARRIER FREE
BITUM BITUMINOUS
BKG BACKING
BLDG BUILDING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
CAB CABINET
CB CATCH BASIN OR CORNER BEAD
CC CUBICLE CURTAIN
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CG CORNER GUARD
CHK CHECK
CIP CAST IN PLACE
CIR CIRCLE
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLOS CLOSET
CLR CLEAR
CLR HT CLEAR HEIGHT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
COL COLUMN
COMB COMBINATION, COMBINED
COMM COMMUNICATION
CONC CONCRETE
COND CONDITION
CONF CONFERENCE
CONN CONNECT
CONT CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET
CR CARD READER
CRS COURSE
CSG CASING
CSWK CASEWORK
CT CERAMIC TILE
CTR CENTER
CTRL CONTROL
CURT CURTAIN
CYL CYLINDER
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DOC DOCUMENT
DR DOOR
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DWG DRAWING
DWG DOWEL
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
EWS EYE WASH STATION
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WALL HEATER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FESR FIRE EXTINGUISHER, SEMI-RECESSED
FF FINISH FACE, FINISH FLOOR
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FHP FULL HEIGHT PARTITION
FIN FINISH
FIXT FIXTURE
FLASH FLASHING
FLR FLOOR
FO FINISH OPENING
FP FIRE PROTECTION OR FIREPROOF
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FRP FIBER REINFORCED POLYESTER, OR FIBERGLASS
REINFORCED PLASTIC
FT FEET
FTG FOOTING
FURN FURNISH, FURNISHED OR FURNITURE
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL
GL GLASS
GR GROUT
GYP BD GYPSUM BOARD
H HIGH OR HEIGHT
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HD HAND DRYER, HEAD OR HARD
HDWR HARDWARE
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HSKPG HOUSEKEEPING
HPC HIGH PERFORMANCE COATING
HR HOUR
HSS HOLLOW STRUCTURAL SECTION
HT HEIGHT
HVAC HEATING, VENTILATING, AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION
IG INSULATING GLASS
INCL INCLUDED, INCLUDING
INSTL INSTALLED
INSUL INSULATION
INT INTERIOR
IRWC IMPACT RESISTANT WALL COVERING
JAN JANITOR
JT JOINT
KD KNOCKED-DOWN
KO KNOCK(ED)-OUT
L ANGLE
LAB LABORATORY
LAM LAMINATE(D)
LAM GL LAMINATED GLASS
LAV LAVATORY
LD BRG LOAD-BEARING
LED LIGHT EMITTING DIODE
LH LEFT HAND
LIN LINEAR
LKR LOCKER
LKR RM LOCKER ROOM
LL LEAD LINED, LOWER LEVEL
LRG LARGE
LT LIGHT
LTWT LIGHTWEIGHT
LTG LIGHTING
LVR LOUVER
LYR LAYER
MACH MACHINE
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MICRO MICROWAVE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MLWK MILLWORK
MO MASONRY OPENING
MON MONITOR
MR MOISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MTL METAL
MTR METER
N NORTH
NA NOT APPLICABLE
NEG NEGATIVE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NRP NON REMOVABLE
NTS NOT TO SCALE
O OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER, OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
PART PARTIAL
PASS PASSAGE
PB PUSHBUTTON
PE POURED EPOXY
PERF PERFORATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PP PUSH PLATE
PPT PARAPET
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PREFIN PREFINISHED
PREP PREPARATION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PWR POWER
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
R RADIUS OR RISER
RB RESILIENT BASE
RD ROOF DRAIN
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
REF REFRIGERATOR OR REFERENCE
REINF REINFORCED, REINFORCEMENT
REPL REPLACE
REQD REQUIRED
REV REVISION
RF RESILIENT FLOORING
RFG ROOFING
RH RIGHT HAND
RLG RAILING
RM ROOM
RO ROUGH OPENING
RT RESILIENT TILE
RV ROOF VENT
SC SHARPS CONTAINER, SPECIAL COATING
SCHD SCHEDULE
SCONC SEALED CONCRETED
SCWD SOLID CORE WOOD DOOR
SD SOAP DISPENSER
SECT SECTION
SEP SEPARATE
SF SQUARE FOOT (FEET)
SHT SHEET
SGL SINGLE
SHR SHOWER
SHV SHELVING
SIM SIMILAR
SLD SOLID SURFACE
SLNT SEALANT
SM SHEET METAL
SND SANITARY NAPKIN DISPENSER/DISPOSAL
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SST STAINLESS STEEL
SSM SOLID SURFACING MATERIAL
ST STONE
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STN STAIN
STOR STORAGE
STRUCT STRUCTURE OR STRUCTURAL
SURF SURFACE
SUSP SUSPENDED
SV SHEET VINYL
T TREAD
TEL TELEPHONE
TEMP TEMPERED OR TEMPORARY
TH THICK(NESS)
THERM THERMAL
TLT TOILET
TOB TOP OF BEAM
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOS TOP OF SLAB OR TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TRTD TREATED
TS TUBE STEEL
TV TELEVISION OR TV OUTLET
TWC TACKABLE WALL COVERING
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCOUNTER OR CABINET
UL UNDERWRITERS LABORATORIES
UNEXC UNEXCAVATED
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
W WIDE OR WEST
W/ WITH
W/0 WITHOUT
WC WALL COVERING OR WATER CLOSET
WD WOOD
WDW WINDOW
WDWK WOODWORK
WF WIDE FLANGE
WLD WELDED
WM WIRE MESH
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD
YD YARD
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
1. INTERIOR PARTITIONS SHALL BE TYPE "A5" UNLESS OTHERWISE NOTED.
2. GYP BOARD PARTITION DIMENSIONS ARE BASED ON FINISH TO FINISH
FACE OF WALLS.
3. MASONRY WALL WITH FURRING AND GYP BOARD DIMENSIONS ARE
BASED ON FACE OF MASONRY.
4. WHERE STUD WALL TRANSITIONS TO MASONRY W/FURRING, ADJUST
FURRING DEPTH TO ALIGN WITH FACE OF STUDS.
5. REFER TO GYPSUM BOARD SPECIFICATION FOR LOCATIONS & TYPE(S)
OF GYPSUM BOARD MATERIAL REQUIRED.
6. PROVIDE TYPE "X" FIRE RATED GYPSUM BOARD AT ALL PARTITIONS.
7. SEAL WALL PENETRATIONS AT PERIMETER AND PROVIDE UL APPROVED
FIRESTOPPING ASSEMBLY AT PENETRATION THROUGH FIRE RATED
WALL AND FLOOR ASSEMBLIES.
8. EXTEND GYPSUM BOARD PARTITIONS FULL HEIGHT TO UNDERSIDE OF
DECK ABOVE, UNO
WALL TYPE GENERAL NOTES
T
.0
0'-0"
SHT
DTL
SHT
DTL
SHT
DTL
CHR1
EXISTING WALLS TO REMAIN
EXISTING WALLS TO BE REMOVED
EXISTING ITEM TO REMAIN
EXISTING ITEM TO BE REMOVED
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING DOOR AND FRAME TO REMAIN
LEGEND
WALL TYPE / PARTITION TYPE
DETAIL REFERENCE
SECTION REFERENCE
NEW WALL / PARTITION
NEW DOOR AND FRAME
EQUIPMENT TAG
INTERIOR ELEVATION
CARD READER
INTERCOM
DOOR OPERATOR PUSH PLATE (FURNISHED BY
DIVISION 08, INSTALLED AND WIRED BY ELECTRICAL CONTRACTOR)
CONSTRUCTION LIMITS
2'-0" x 2'-0" SUSPENDED EXPOSED GRID ACOUSTIC CEILING TILE SYSTEM
RETURN, TRANSFER, EXHAUST GRILLE
2'-0" x 2'-0" RECESSED TROFFER LIGHT
2'-0" x 4'-0" RECESSED TROFFER LIGHT
SUPPLY GRILLE
1'-0" x 4'-0" RECESSED TROFFER LIGHT
PENDANT LIGHT
RECESSED DOWN LIGHT
INDUSTRIAL STRIP LIGHT
2'-0" x 2'-0" AUDIO SPEAKER
SMOKE DETECTOR
HEAT DETECTOR
KEYED NOTE
CEILING HEIGHT
CEILING RECESSED TV BRACKET
GYPSUM BOARD CEILING OR BULKHEAD
EXIT LIGHT
PP
CR
IC
CORNER GUARD
12 x 12 ACCESS PANEL
HR
CG
HANDRAIL
24 x 24 ACCESS PANEL
S
OCCUPENCY SENSOR
SPRINKLER HEAD
XX
INTERIOR PARTITION WALL
FIRE RESISTANCE: 1A5 - 1 HR FIRE
RESISTANCE UL# U419
3-5/8" METAL STUDS
@ 16" OC
(1) LAYER 5/8" GYP
BD - TAPE ALL JOINTS
INTERIOR FURRING WALL
FIRE RESISTANCE - NA
ANCHOR TOP RUNNER
TO STRUCTURE ABOVE
SEAL TRACK
FULL WIDTH ACOUSTICAL
BATT INSULATION
WALL BASE AS SCHEDULED
STEEL RUNNER ANCHORED
TO FLOOR STRUCTURE
PLAN
PLAN
INTERIOR PARTITION WALL
FIRE RESISTANCE - NA
PLAN
4 1/4"
4 7/8"
3-5/8" METAL STUDS
@ 16" OC
(1) LAYER 5/8" GYP
BD EACH SIDE
TAPE ALL JOINTS
ANCHOR TOP RUNNER
TO STRUCTURE ABOVE
SEAL TRACK
FULL WIDTH ACOUSTICAL
BATT INSULATION
WALL BASE AS SCHEDULED
STEEL RUNNER ANCHORED
TO FLOOR STRUCTURE
7 1/4"
6" METAL STUDS
@ 16" OC
ANCHOR TOP RUNNER
TO STRUCTURE ABOVE
SEAL TRACK
FULL WIDTH ACOUSTICAL
BATT INSULATION
WALL BASE AS SCHEDULED
STEEL RUNNER ANCHORED
TO FLOOR STRUCTURE
(1) LAYER 5/8" GYP
BD EACH SIDE
TAPE ALL JOINTS
A5 A7
F4
SCHEDULED PARTITION TYPE
CONT ACOUSTIC SEALANT
PROVIDE FIRESTOPPING
SEALANT AT FIRE RATED WALL
DEFLECTION TRACK
SCHEDULED BASE
CONT ACOUSTIC SEALANT
PROVIDE FIRESTOPPING
SEALANT AT FIRE RATED WALL
/8
/8
3770 South Pennsylvania Avenue, Unit 8 St Francis, Wisconsin 53235 PCG project #: P1600103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
Revisions: Date
PROJECT
LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
/2
/2
:3
:2
P
M
CORRECT SPS DEFICIENCIES
BLDG 452
VA MEDICAL CENTER TOMAH, WI
ARCHITECTURAL LEGENDS,
ABBREVIATIONS AND WALL TYPES
6/21/2019 BAM LDR
A001
100% CONSTRUCTION DOCUMENTS
A001
100% CONSTRUCTION DOCUMENTS
676-18-203
1" = 1'-0"1 WALL PARTITION TYPES
3" = 1'-0"2 TYPICAL WALL HEAD AND BASE
SEE 2/A001 - TYP HEAD AND BASE DETAIL
A A
B
C C
D
E E
MECHANICAL
15221
16' - 5"
LOADING
DOCK
15211
CLEAN
LINEN
CARTS
OFFICE
OFFICE
TRAINING
BREAKOUT &
RECEIVING
24 E L E
C
MEETING /
BREAKROOM
OFFICE 1
OFFICE 2
TOWEL &
WRAP
HAC
MEN
LOCKER
ANTE
ROOM
WOMEN
LOCKER
16TOILET
16A
CORRIDOR
CORRIDOR
CLOSET
STERILE
STORAGE
STERIL
STERILE &
PREP
DECONTAMINATION
PASSAGE
CARTS
15A
CART WASH
15B
BULK
STORAGE
3 4
5 5 5 5 6 5
5 55
ULTRA
S S
T S
IN
K
W A
S H
E R
STERILIZER
STERILIZER
EYE WASH
DIONIZED
WATER SYSTEM
WATER
SOFTENER
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
C O
N S
T R
U C
T
IO
N L
IM
IT
S
TRAMWAY
T123
91' - 7 7/8" 3
F A
C P
REMOVE EXISTING DIAGONAL BRACING. PROVIDE NEW CROSS BRACING
AT EXTERIOR WALLS PRIOR TO REMOVAL. SEE AS102 FOR NEW WORK.
PROVIDE ENLARGED OPENINGS IN EXISTING TRAMWAY WALL TO
ACCOMMODATE NEW DOOR LOCATIONS.
REMOVE EXISTING DOOR FRAME.
REMOVE EXISTING GYP BD WALL SHEATHING AND BATT INSULATION AT
NEW CROSS BRACING. METAL STUDS TO REMAIN.
REMOVE EXISTING WINDOW STOOLS.
REMOVE EXISTING GLAZING. EXISTING WINDOW FRAME TO REMAIN.
REMOVE EQUIPMENT, SUPPORTS AND RELATED APPURTENANCES.
REFER TO MEP DRAWINGS FOR OTHER RELATED DEMOLITION ITEMS.
KEYED NOTES
1. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF
ALL DEMOLITION WORK WITH NEW CONSTRUCTION WORK.
2. GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL,
PLUMBING, AND FIRE PROTECTION PLANS FOR ADDITIONAL DEMOLITION
WORK. DEMOLITION OF WALL, CEILING, AND FLOOR ASSEMBLIES
NECESSARY TO FACILITATE MEP SYSTEM DEMOLITION IS PART OF
CONTRACTOR'S SCOPE OF WORK.
3. ALL DEMOLISHED MATERIAL BECOMES THE PROPERTY AND
RESPONSIBILITY OF THE CONTRACTOR, WITH THE EXCEPTION OF
SPECIFIED ITEMS DESIGNATED EITHER IN THE PLANS OR VERBALLY
REQUESTED BY THE COR TO BE RETAINED BY THE VA. OFFSITE
DISPOSAL OF THE DEMOLISHED ITEMS IS THE RESPONSIBILITY OF THE
CONTRACTOR.
4. MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE
BUILDING NOT AFFECTED BY THIS WORK. COORDINATE WITH VA COR
ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM WORK.
5. REMOVE EXISTING FINISHES WHERE NEW FINISHES ARE SCHEDULED IN
THE ROOM FINISHED SCHEDULE.
GENERAL NOTES
3770 South Pennsylvania Avenue, Unit 8 St Francis, Wisconsin 53235 PCG project #: P1600103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
Revisions: Date
PROJECT
LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
BLDG 452
BLDG 424
BLDG 455
B L D
G
KEY PLAN
T R
A M
W A
Y
N
/2
/2
:3
:5
P
M
CORRECT SPS DEFICIENCIES
BLDG 452
VA MEDICAL CENTER TOMAH, WI
ARCHITECTURAL PLAN -
DEMOLITION
6/21/2019 BAM LDR
AD101
100% CONSTRUCTION DOCUMENTS
AD101
100% CONSTRUCTION DOCUMENTS
676-18-203
1/4" = 1'-0"1 FLOOR PLAN - DEMOLITION
FINISHED FLOOR EL = 100' - 0"
A A
B
C C
D
E E
MECHANICAL
15221
LOADING
DOCK
15211
2 222
DIONIZED
WATER SYSTEM
WATER
SOFTENER
4' - 6" 10' - 0" 10' - 0" 3' - 9" 13' - 3" 3' - 0" 13' - 0" 7' - 0" 9' - 11" 4' - 5"
4' - 6" 4' - 9"
1' - 5"
2'
0"
45°
8" 4' - 5" 2' - 5"
13' - 2" 7' - 6"
7" 2' - 0"
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
C O
N S
T R
U C
T
IO
N L
IM
IT
S
TRAMWAY
T123
6' - 0"
91' - 7 7/8"
13' - 0"
16' - 5"
3' - 11" 2' - 0" 9' - 3" 2' - 0" 12' - 11"
SAWCUT AND REMOVE CONCRETE FLOOR SLAB. PROTECT COLUMNS
AND EXTERIOR WALLS. EXCAVATE AS REQUIRED FOR PLUMBING
REMOVAL AND INSTALLATION WORK. COORDINATE W/ PLUMBING
CONTRACTOR AND SEE PLUMBING DRAWINGS.
DO NOT SAWCUT OR REMOVE EXISTING COLUMN FOOTING.
SAWCUT AND REMOVE CONCRETE FLOOR SLAB. PROTECT COLUMNS
AND EXTERIOR WALLS. EXCAVATE AS REQUIRED FOR NEW ELECTRICAL
WORK. COORDINATE W/ ELECTRICAL CONTRACTOR AND SEE
ELECTRICAL DRAWINGS.
KEYED NOTES
1. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF
ALL DEMOLITION WORK WITH NEW CONSTRUCTION WORK.
2. GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL,
PLUMBING, AND FIRE PROTECTION PLANS FOR ADDITIONAL DEMOLITION
WORK. DEMOLITION OF WALL, CEILING, AND FLOOR ASSEMBLIES
NECESSARY TO FACILITATE MEP SYSTEM DEMOLITION IS PART OF
CONTRACTOR'S SCOPE OF WORK.
3. ALL DEMOLISHED MATERIAL BECOMES THE PROPERTY AND
RESPONSIBILITY OF THE CONTRACTOR, WITH THE EXCEPTION OF
SPECIFIED ITEMS DESIGNATED EITHER IN THE PLANS OR VERBALLY
REQUESTED BY THE COR TO BE RETAINED BY THE VA. OFFSITE
DISPOSAL OF THE DEMOLISHED ITEMS IS THE RESPONSIBILITY OF THE
CONTRACTOR.
4. MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE
BUILDING NOT AFFECTED BY THIS WORK. COORDINATE WITH VA COR
ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM WORK.
GENERAL NOTES
3770 South Pennsylvania Avenue, Unit 8 St Francis, Wisconsin 53235 PCG project #: P1600103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
Revisions: Date
PROJECT
LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
/2
/2
:3
:5
P
M
CORRECT SPS DEFICIENCIES
BLDG 452
VA MEDICAL CENTER TOMAH, WI
ARCHITECTURAL PLAN -
DEMOLITION
6/21/2019 BAM LDR
AD102
100% CONSTRUCTION DOCUMENTS
AD102
100% CONSTRUCTION DOCUMENTS
676-18-203
FINISHED FLOOR EL = 100' - 0" 1/4" = 1'-0"1 FLOOR PLAN - DEMOLITION CONCRETE
A A
B
C C
D
E E
MECHANICAL
15221
LOADING
DOCK
15211
CLOSET
CARTS
CLEAN LINEN
OFFICE
OFFICE
TRAINING
BREAKOUT &
RECEIVING
24 E L E
C
OFFICE 1
OFFICE 2
HAC
ANTE
ROOM
TOILET
16A
CART WASH
15B
PASSAGE
CARTS
15A
STERILE
MEETING /
BREAKROOM
WOMEN
LOCKER
CORRIDOR
CORRIDOR
MEN
LOCKER
TOWEL &
WRAP
BULK
STORAGE
STERILE
STORAGE
STERILE &
PREP
DECONTAMINATION
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
C O
N S
T R
U C
T
IO
N L
IM
IT
S
TRAMWAY
T123
1. GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH
NEW CONSTRUCTION WORK.
2. CONTRACTOR SHALL REVIEW MECHANICAL, ELECTRICAL,
PLUMBING,AND FIRE PROTECTION PLANS FOR ADDITIONAL DEMOLITION
WORK. DEMOLITION OF WALL, CEILING, AND FLOOR ASSEMBLIES
NECESSARY TO FACILITATE MEP SYSTEM DEMOLITION SHALL BE PART
OF CONTRACTOR'S SCOPE OF WORK.
3. DEMOLISHED MATERIAL BECOMES THE PROPERTY AND RESPONSIBILITY
OF THE CONTRACTOR, WITH THE EXCEPTION OF SPECIFIED ITEMS
DESIGNATED EITHER IN THE PLANS OR VERBALLY REQUESTED BY THE
COR TO BE RETAINED BY THE VA. OFFSITE DISPOSAL OF THE
DEMOLISHED ITEMS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
4. MAINTAIN CONTINUOUS UTILITY SERVICE TO ALL SPACES IN THE
BUILDING NOT AFFECTED BY THIS WORK. COORDINATE WITH VA COR
ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM WORK.
5. CONSTRUCT A DUST-PROOF PARTITION TO SEPARATE AREAS OF
CONSTRUCTION FROM ADJACENT OCCUPIED AREAS OUTSIDE SCOPE OF
CONSTRUCTION. SEE DETAILS ON SHEET GC103.
6. UNLESS NOTED OTHERWISE, ALL DASHED ITEMS SHALL BE REMOVED.
7. REMOVE SUSPENDED CEILINGS AND RELATED HANGERS, OR GYPSUM
BOARD CEILINGS WHERE INDICATED ON SHEET AD102 AND WHERE NEW
CEILINGS ARE INDICATED ON REFLECTED CEILING PLAN OR ROOM
FINISH SCHEDULE.
8. REMOVE ALL INTERIOR AND WALL MOUNTED ITEMS IN AREAS TO BE
REMODELED INCLUDING, BUT NOT LIMITED TO, CABINETRY, EQUIPMENT,
LOCKERS, TOILET PARTIIONS, SHELVING, HOOKSTRIPS, HANDRAILS,
CLOSET POLES, CHALK AND TACK BOARDS, MIRRORS, WALL AND
CEILING TRIM, WALL BASE.
GENERAL NOTES
3770 South Pennsylvania Avenue, Unit 8 St Francis, Wisconsin 53235 PCG project #: P1600103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
Revisions: Date
PROJECT
LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .