AUTOMATIC DOOR MAINTENANCE/TESTING BASE + 4 OYS Federal contract opportunity
Solicitation number
36C25219Q0364
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25219Q0364 ATTACHMENT C - Special Notes 20180831 02.pdf

View the file

Other files for this federal contract opportunity

Other files attached to AUTOMATIC DOOR MAINTENANCE/TESTING BASE + 4 OYS, newest first.
File Type Posted
36C25219Q0364-0001000.docx DOCX document
36C25219Q0364-0001001.docx DOCX document
36C25219Q0364-002.docx DOCX document
36C25219Q0364-003.docx DOCX document
36C25219Q0364-006.pdf PDF
36C25219Q0364-004.docx DOCX document
36C25219Q0364-001.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Milwaukee VAMC 8/31/2018

695-1X-XXX PROJECT NAME Bid Set Submission

Milwaukee, WI 53295 (Date of 100% CDs)

01 01 10SN - 1

SECTION 01 01 10 (SN)

SPECIAL NOTES

PART 1 - GENERAL

1.1 DESCRIPTION

This section specifies special requirements, processes, procedures, protocols, practices, prohibitions, protections, personnel matters, provisions for unique characteristics of the Milwaukee VAMC, and practical matters pertinent to construction.

1.2 RELATED WORK

A. Section 01 35 26 SAFETY REQUIREMENTS.

B. Section 01 00 00 GENERAL REQUIREMENTS.

C. Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.

D. Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT.

PART 2 - PRODUCTS (NOT USED)

PART 3 – EXECUTION

3.1 ANTE-ROOM CONSTRUCTION PRACTICES

A. Coordinate construction of the ante-room with NFPA 241 and the

Specification Section 01 35 26 SAFETY REQUIREMENTS.

B. Type “A” and “B” activities are those in which the fire/smoke hazard risks are MINIMAL. Type “C” and “D” activities are those in which the fire/smoke hazard risks are HIGH. The General

Contractor is obligated to consider the specified containment measures with the costs included within the various contract items of work. Refer to the Appendix for the Construction

Barrier and Fire Risk Assessment Matrix of Precautions for more information.

C. Type A (Minimal Fire Risk Activity/Construction): Provide authority to proceed with work in area, includes a ceiling permit as required, when working above ceilings.

D. Type B (Limited Fire Risk Activity/Construction):

1. Coordinate temporary construction partition installation with Specification Section 01 35 26 SAFETY REQUIREMENTS.

2. Provide plastic from floor to ceiling above and seal joints and penetrations. All plastic will be labeled with the VA

ILSM TEMPORARY BARRIER orange tag once installed indicating the start of the three days. At openings, install z-wall overlapping plastic flap barriers or equivalent.

E. Type C (Moderate Fire Risk Activity/Construction): Coordinate temporary construction partition installation with Specification

Section 01 35 26 SAFETY REQUIREMENTS.

01 01 10SN - 2

1. Ante-room construction (as part of 1-hour construction barrier):

a. Ante-room shall be a 1-hour fire-rated smoke-tight temporary construction partition and shall be full height, extending through suspended ceilings to the floor slab or roof deck above.

b. Ante-room shall be constructed from one-hour fire-rated

5/8-in type “X” gypsum board both sides of metal stud wall, mudded and taped in accordance with ASTM C840. “Double” gypsum board installation on one side (exterior) of the ante-room is authorized to achieve the 1-hour fire-rated smoke-tight temporary construction partition requirement with prior COR approval.

c. In this case, the ante-room 1-hour fire-rated smoke-tight temporary construction partition walls will also function as an infection control barrier. Contractor shall add appropriate infection control measures. Refer to 01 35 26

SAFETY REQUIREMENTS for more information.

d. Ante-room gypsum board walls shall be taped to the existing floors utilizing 2-in wide glass foil tape: 7.3 mil aluminum foil laminated glass cloth silver tape with silicone adhesive backing. Where the ante-room walls meet the existing deck or a 1-hour rated existing wall, the seams shall be firecaulked.

e. The ante-room must also have a dedicated heat detector installed. See paragraph below for heat detector requirements.

f. Ante-room outer construction door opening requires a Class

C, 45-minute fire rated door with self-closing and self-latching devices.

g. Ante-room inner door must at least be plastic Z-Type door.

2. Ante-room construction (for infection control purposes only):

a. Ante-room need not be a 1-hour fire-rated smoke-tight temporary construction partition. Its walls do not need to go to the concrete deck above, nor is a hard ceiling required. At a minimum, the contractor must tape the top of the ante-room walls to the underside of the existing acoustical tile ceiling to achieve the smoke tight and infection control requirements.

b. Ante-room shall be constructed from one-hour fire-rated

5/8-in type “X” gypsum board one side of metal stud wall, mudded and taped in accordance with ASTM C840.

01 01 10SN - 3

c. Contractor shall add appropriate infection control measures. Refer to 01 35 26 SAFETY REQUIREMENTS for more information.

d. Ante-room gypsum board walls shall be taped to the existing floors, walls or ceilings utilizing 2-in wide glass foil tape: 7.3 mil aluminum foil laminated glass cloth silver tape with silicone adhesive backing. Where the ante-room walls meet the existing deck or a 1-hour rated existing wall, the seams shall be firecaulked.

e. The ante-room does not require a dedicated heat detector.

f. Ante-room outer construction door opening requires a Class

C, 45-minute fire rated door with self-closing and self-latching devices.

g. Ante-room inner construction door opening requires a Class

C, 45-minute fire rated door with self-closing and self-latching devices.

3. Provide heat detectors and notification devices (i.e., audio-visual devices) tied into the Building Siemens Pyrotronics

System at the rate of one (1) detector per 1000 square foot of clear construction area. Heat detectors to be FTP-11

Addressable, Tri-Color LED, 135°F, Combination Fixed or Rate of Rise. The Contractor shall provide certification documentation once the heat detectors and notification devices

(i.e., audio-visual devices) are installed and/or moved and tested prior to any construction work taking place in the space. Inside the construction space, existing units can be used if they are moved to the floor deck above.

4. Other than ante-room, all other temporary construction partitions shall be full height, extending through suspended ceilings to the floor slab or roof deck above and shall be one-hour fire rated 5/8-in type “X” gypsum board both sides of metal stud wall, mudded and taped in accordance with ASTM

C840. If sprinklers are installed per a hydraulically calculated stamped and certified system and sprinklers are operational on both sides of the temporary partition and ceilings are fully intact and complete, then the partition indicated above may be permitted to terminate at the ceiling in accordance with NFPA 241.

5. Coordinate with Section 01 01 10-SN Section 3.35 for Card

Reader and Physical Access Control System (PACS) requirements at ante-room outer construction door.

D. Type D (Significant Fire Risk Activity/Construction):

1. All requirements for Type C construction activities above are required for Type D construction activities.

01 01 10SN - 4

2. When required by the project, install one-hour fire-rated temporary construction partitions to maintain integrity of existing exit stair enclosures, exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, vertical shafts and openings and other enclosures as required by the current Life Safety Code NFPA

101. This may include new horizontal egress tunnels, exit stairs, etc. Coordinate these activities with the COR.

3.2 ASBESTOS-CONTAINING MATERIALS (ACM)

A. There are both friable and non-friable asbestos-containing materials (ACM) located within hospital complex. Inspection reports are available from Facilities Management.

B. ACM might be unforeseen and potentially discovered during work.

Do not disturb ACM. Refer to Specifications Section 01 00 00 for procedures addressing discovery of ACM.

C. See Specification Sections 02 82 11 or 02 82 13 (series) for

Traditional or Glovebag Asbestos Abatement details.

D. New work: no ACM allowed in new products.

E. Contractor to provide asbestos costs separately in invoices.

3.3 BADGES

A. All contractors working at Milwaukee VAMC shall be fingerprinted prior to being allowed to work on campus. Contractor ID badges can be obtained from PIV office typically 3-5 days after approved

SAC form is received and fingerprints clear. ID badges are required for contractor employees working at VAMC Milwaukee.

B. Contractor

1. Furnish SAC form to each employee and subcontractor employee, regardless of how long they will be on site and even if already badged, and have them fill out the form.

Blank SAC form is included as appendix to this specification.

2. When form is legibly completed by hand, scan each form with file name as above then dash then employee name (e.g., 08

SAC FORM – John Doe).

3. Regarding SSN: last four only.

4. Email form to VA project manager (a.k.a., COR)

C. VA and Requestor

1. VA COR/project manager signs form, then emails

Fingerprinting Office (fingerprinting) and PIV Office

(badging) of pending visit from person named, forwarding form as email attachment.

01 01 10SN - 5

2. Contractor/Requestor visits Fingerprinting/PIV Office, building 70, E-wing south, ground floor.

3. VA Fingerprinting Office will check to ensure proper form was received.

D. VA Processing

1. Fingerprinting begins background check process.

2. Assuming background check allows, then within 3 to 10 business days, VA should send to Contractor/Requestor notice that they may now obtain their Physical Access

Control (PAC) badge.

3. VA PIV Office staff take photo and issue PAC badge.

E. Badge Usage

1. Wear badge, readily visible, above waist level, not on head or hard hat, when on grounds doing work.

2. Lanyards and clips are not included, but may be purchased at Canteen Store.

3. Superintendent shall inspect personnel badge (should be visible).

4. Badges allow keyless entry into restricted areas. Names, dates, and times of access are recorded by VA Police.

5. Badges will be valid for 90 days. The PM will notify PIV office to extend badge access for another 90 days if appropriate.

6. Badge wearer, not anyone else, must get badge issues taken care of. For example, it is not allowed to hand over badge to superintendent to walk them down to FM or PIV for entering code on back of badge, into SAM box system.

Violations may result in suspension or revocation of construction access.

3.4 CONTRACTOR’S IMPACT STATEMENTS

A. These notes will be reviewed at pre-construction meeting and will require signature from Contractor acknowledging responsibilities of contractors working on VAMC campus.

B. All sub-contractors are required to review, acknowledge, sign and submit CONTRACTOR’S IMPACT STATEMENT. It is General Contractor’s responsibility to make this specification available to sub-contractors and for training sub-contractors on VAMC Milwaukee requirements herein.

a. STANDARD POLICY: All outside contractors and sub-contractors will coordinate work within hospital with

Facilities Management before beginning work.

b. PURPOSE: Contractor will ensure that each individual contractor and sub-contractor employee is responsible for

01 01 10SN - 6

complying with established hospital standards, applicable

OSHA Safety Requirements, federal, state and local environmental regulations, wearing prescribed safety equipment, and preventing avoidable accidents.

c. PROCEDURE: Contractor will ensure that each individual contractor and sub-contractor employee review, understand and acknowledge these Special Notes prior to commencement of work scheduled at this facility. Proof of this acknowledgement: CONTRACTOR’S IMPACT STATEMENT. Contractor will forward copies of signed CONTRACTOR’S IMPACT STATEMENT monthly during construction for new contractors and sub-contractors.

3.5 CLEAN-UP

A. All work activity within occupied portions of facility shall be immediately cleaned and restored to its original finished condition upon completion of activity. If activity continues into next workday, area shall be left safe, clean, and presentable.

B. Combustible storage and debris shall be kept to smallest quantity necessary for required daily operations. Construction area shall be kept clean as indicated in general requirements and conditions.

C. Public restrooms are not to be used for cleaning of tools or equipment, i.e., paintbrushes, rollers, finishing tools, etc.

Janitor’s slop sinks are available for this purpose. If janitor’s closets are used, they must be cleaned. The contractor is responsible for any clogs, repairs to drains, and cleaning if their cleaning techniques damage VA property.

D. Trash, combustible waste, and excess construction materials:

Remove daily, dispose regularly to prevent accumulation.

E. All work for area must be confined within that space. Public corridors, stairwells, equipment rooms, and vacant floors are not to be used for storage of materials or as workshop. Tracking of construction dirt into public corridors or stairwells must be prevented. At end of each workday, combustible packaging and crating materials for building products and equipment to be installed shall be removed from occupied building.

F. Provide dampened walk-off mats at entrances and exits from construction area.

G. If smoke detectors are covered during dust-producing activities, they must be uncovered daily.

01 01 10SN - 7

3.6 COMPRESSED GAS CYLINDERS

B. Contractors who work with compressed gas cylinders must have specific training and must ensure that cylinders are secured properly when in use or in storage.

C. When compressed gas cylinders are not in use, caps must be in place.

3.7 CONFINED SPACE

A. Confined Spaces are clearly marked on campus. NO ENTRY is allowed into areas without prior approval by COR. NO ONE will be allowed to enter these areas without proper qualifications, equipment and training as required by OSHA Standards (29 CFR

1910.147)

B. Storm sewers, underground electrical vaults, and other areas that require confined space permits are identified on Drawings.

C. All hospital personnel that would require entry into these spaces must abide by Confined Space Program Procedure.

D. It is sole responsibility of outside Contractor doing work on VA

Medical Center campus to coordinate entry into of these spaces or other marked permit required confined spaces with COR.

E. Anyone entering permit-required confined space must follow

Occupational Safety and Health Administration (OSHA) Regulations, 29 CFR 1910.120.

F. Submit Confined Space Entry program (and CSE Permit if needed) as part of APP (See Safety Specification 01 35 26).

3.8 CONSTRUCTION BARRICADES & TEMPORARY SIGNAGE

A. The Contractor is responsible to post and erect barricades, temporary signage, construction and safety signs, ILSMs, and new egress routes as they apply. barricades will be erected to restrict areas where hazardous operations are performed.

construction and safety signs shall consist of caution signs as determined and approved by VAMC. Egress signs, where egress has been altered for construction, shall be posted and coordinated with approved ILSM and applicable hazardous warning signs. If egress is changed due to construction, provide temporary directional signs for changes as determined by VAMC and for construction of walkways, steps, or overhead protection scaffolding or like as required providing new means of egress.

Emergency egress plan shall be developed by Contractor and submitted for approval by COR before egress routes are altered.

B. Exit signs inside construction space: Contractor to provide luminescent Exit Signs throughout construction space such that

01 01 10SN - 8

while standing in place within construction space, exit sign is visible and path of egress can be followed.

C. Exit signs outside construction space: Contractor will cover or relocate exit signs impacted due to their construction operations as directed by ILSM and COR.

3.9 CONSTRUCTION BARRIERS

A. Refer to paragraph 3.1 of this specification and the appendix table Construction Barrier and Fire Risk Assessment Matrix for more information.

B. The construction barrier consists of both existing walls and new construction (typically the ante-room) walls. The intent of the barrier is to provide a fire-rated and smoke tight 1-hour construction partition around the construction area meeting the requirements of NFPA 241. Contractor must coordinate the erection of any new walls for construction barriers with the

Specification Section 01 35 26 SAFETY REQUIREMENTS and any additional infection control requirements.

C. The construction site must be surrounded by a 1-hour fire-rated gypsum board, smoke tight and fire-stopped construction assembly.

Infection control procedures (as may be also required) shall be initiated prior to any other construction activities.

D. All existing walls surrounding the construction area are to be inspected, repaired, patched and fire-stopped as required to bring them up to current fire-rated and smoke barrier construction requirement per NFPA 241.

E. Penetrations through the construction barriers or any other rated assembly need to be plugged with a fire-resistant mineral wool filling and recorded with an ILSM Firestop Tag (see appendix).

All penetrations are to be made temporarily fire and smoke resistant by the end of the construction day; and all penetrations shall be permanently fire-caulked within 30-days of being made.

3.10 CONSTRUCTION SITE PHONE

A. Contractor to run wiring from telephone closet to construction space for installation of VA phone in constitution space.

Install phone before construction. VA will provide phone.

3.11 CONTRACTOR TRAINING & CERTIFICATES

A. Employees of Contractor and sub-contractor shall be aware of egress routes from construction areas. It is Contractor's responsibility to ensure employees are aware of fire alarm codes

01 01 10SN - 9

for building they are working in and participate in fire alarm drills and actual fire alarms.

B. Project Site Superintendent shall have 30-hour OSHA certified

Construction Safety course. This certificate shall be submitted to COR prior to mobilization.

C. All employees of Contractor and sub-contractors shall have 10-hour OSHA certified Construction Safety course. These certificates shall be submitted to COR prior to mobilization.

3.12 CRANES & HEAVY LIFTING

A. Refer to Specification Section 01 35 26 Safety Requirements for additional details.

B. Hoisting or lifting heavy materials/items requires prior review by COR.

C. Crane operations require workplans for VA approval and cannot commence without approved permit.

3.13 DELIVERIES

A. All material deliveries at Building 111 loading dock must be coordinated with Receiving Department (Logistics Warehouse) in advance.

B. Deliveries to other project sites/buildings on campus require coordination and approval of COR.

3.14 DRESS CODE

A. All contractor personnel must be appropriately dressed for their work. T-shirts or garments with obscene or suggestive messages are not permitted. Personnel found improperly dressed will be asked to leave facility. Contractors may not remove shirts or other clothing. No articles may include offensive statements/graphics.

B. Personal Protective Equipment is responsibility of Contractor.

There are many situations that require specific personal protective equipment for worker safety per OSHA.

C. Contractor to provide four (4) sets of hard hats and safety glasses for each worksite for VA staff use.

3.15 ELEVATOR USAGE

A. Contractors shall not hold or block from use public elevators in building unless authorized by COR.

B. Within Building 111 (Main Hospital), contractors shall use B-bank freight elevators only for delivery and transportation of materials and demolition materials.

01 01 10SN - 10

3.16 EMERGENCIES AND EMERGENCY SERVICES

A. All offerors, if successful, must be able to respond to contract and Contractor created emergency services resulting from

Contractor actions and installations, as determined by VAMC COR, with qualified staff personnel within one (1) hour of verbal notification during construction stages and warranty period.

Bidders must be prepared to show proof, in writing, that they can satisfy this requirement prior to award.

B. First Aid/Medical Aid/Emergency Treatment for workers: Any

Contractor who witnesses medical emergency is to pick up nearest

VA phone and dial “911” or operator and describe condition of emergency. Post emergency phone numbers and treatment facilities if Contractor employees are injured on job, or need medical treatment.

C. Work site injuries must be reported to VA. VA has accident reporting form (form number 2162). Safety or Security and Police

Service will initiate 2162. Once VA has completed supervisor’s portion injured individual will be required to complete narrative portion of report. service chief responsible for contract is also required to sign report and forward original report to Safety

Section.

D. Submit Fire Plan submittal for construction. Within VAMC, note that there is no difference between fire drill and actual fire.

E. Contractor will ensure that each employee on worksite knows where pull stations are in areas of work. VAMC policy for personnel IN

THE AREA OF fire:

(1) Rescue anyone from area if necessary

(2) Activate nearest Pull Station

(3) Contain fire by closing doors in area

(4) Extinguish if possible or Evacuate area immediately

F. When NOT IN THE AREA OF fire:

(1) Contractors are to cease activities, stay in place, and wait for further instructions or cancellation of fire drill.

(2) DO NOT move through hospital. DO NOT use elevators or stairwells.

G. Patients and visitors sometime become anxious or irritated because of their situation. If you are faced with patient or visitor that gets aggressive with you, simply call Ext. 42222 and say “Code Green” and describe situation. Security will respond immediately.

01 01 10SN - 11

3.17 FIRE/SECURITY ALARM SYSTEMS

A. Cover and protect smoke/heat detectors with paper bags when raising dust or creating smoke in short duration (less than 3 days) ancillary work areas. Facilities Management, Graphics and

Fire Marshall shall be notified when bagging smoke detectors.

Remove paper bag upon completion of your work and at end of each workday.

B. Advise Graphic Control Center (Graphics) at extension X41010 and

VA Police Dispatch Desk at extension X42222 prior to work which might result in Fire Alarm System or Security System being activated. This includes but is no limited to: Smoke Detectors, Water Flow Switches, Pull Stations, Sprinkler Heads, Motion

Detectors, Door Contacts, and Security Door Controls. Likewise, have approved outage from Facilities Management.

C. Notification to Graphics/VA Police and having approved outage form does not absolve Contractor from following proper procedures to prevent system from activating. Examples of these best practices include covering smoke heads with paper bags, closing valves, containing dust, monitoring and controlling security devices, etc.

D. If system activates due to Contractor’s failure to notify

Graphics, or Contractor’s failure to follow proper procedures, or

Contractor’s failure to obtain outage form, Modification/Settlement by Determination deduction of $2,500.00 per alarm/event will be issued to Contractor.

E. If you accidentally trip alarm, notify Graphics and Facilities

Management immediately.

F. Fire and/or smoke doors shall not be propped open or prevented from closing and latching. This includes Infection

Control/Construction doors, mechanical equipment rooms and utility closet doors.

3.18 HAZARDOUS, FLAMMABLE MATERIALS AND WASTE

A. Caution must be used with flammable materials, i.e., adhesives, thinners, varnishes, etc.

B. All paints shall be low odor latex paint. Use odor reducing agents in paints and solvents. Ventilation shall be required if toxic or foul-smelling materials must be applied.

C. A listing of hazardous materials that will be used on job and their material safety data sheets (SDS) shall be made available to VAMC/COR upon request before chemicals are used.

D. SDS are available to Contractor for materials used in Medical

Center. Contact COR if you need SDS for VA-owned chemical or material.

01 01 10SN - 12

E. The VA GEMS Coordinator is responsible for this program and will brief Contractor during construction kickoff.

F. The Contractor may subscribe to online SDS service where SDS data sheets are readily available online in lieu of hard copies on job site.

G. Any excess or used chemicals will be removed from hospital promptly and properly disposed of by Contractor in accordance with federal, state and local regulations.

H. Any hazardous waste generated at facility must be properly contained and labeled and stored in accordance with local, state, federal and hospital regulations.

I. Only one-day supply of paints, oils, and gas cylinders is permitted within facility, unless properly stored in flammable liquid storage container. Do not store flammable materials infacility unless stored in approved non-combustible storage cabinet or prior approval by GEMS Coordinator and COR.

J. Coordinate hazardous materials issues and concerns with COR and

GEMS Coordinator.

K. Gasoline powered equipment shall not be used within confines of building on VAMC campus without specific written permission from

Chief, Engineering Services.

3.19 HOT WORK PERMITS

A. Hot work permits are required before cutting, soldering or welding operations begin. Before cutting, soldering or welding is conducted, obtain permission from COR through hot work permit.

B. Gas and oxygen canisters shall be properly chained and protected and two 10-pound fire extinguishers shall be present.

C. A fire watch shall be maintained on worksite during hot work operations, and for 30 minutes after hot work is completed.

D. All burn permits will be completed, signed and scanned within 48 hours and posted to specified file share site. Contractor shall return fire watch portion of hot work permit to COR upon completion of work.

3.20 HOURS OF WORK

A. The usual hours of contract work shall be from 7:00am until

4:30pm, which is normal work shift for hospital employees.

verify shift or shifts required for construction areas with COR.

If Contractor desires to work on “other than normal” or after

(off-shift) hours (including federal holidays), they shall be scheduled with COR three weeks before start. These off-hours will be required to complete project in time allotted for contract at no additional cost to VAMC. Upon approval of VAMC, 01 01 10SN - 13

Contractor will propose scope or extent of off-hour work due to individual Contractor resources available to accomplish this project in time allotted. In addition, these off-hours will be required for utility/service interruptions, and any/other work that may interrupt operation of occupied space, i.e., some road construction, demolition, work in occupied areas, work affecting occupied areas, etc. Some noise producing demolition operations will be required to be scheduled for off work hours as directed by COR and described on drawings.

B. Certain work items, which require off-hour work, have been identified. These items are indicated on drawings or elsewhere in Contract Documents. Refer to Phasing Notes on Drawings. All drawings shall be reviewed for off-hour work requirements and items creating disturbance to hospital staff or patient care must be performed during off-hour working periods as established and approved by COR.

C. In some construction, buildings, floors, or wards may be occupied during performance of work. In other phases, areas of alterations will be vacated. Refer to Drawings and Contract

Documents for details. Take measures and provide material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in Medical Center’s operations will not be hindered. Permit access to VAMC personnel and patients through other construction areas, which serve as routes of access to such affected areas and equipment.

Coordinate alteration work in areas occupied by VA so that

Medical Center operations will continue during construction period. Contractor may be required to construct 7 feet tall by 5 feet wide metal stud and drywall tunnels through occupied space as deemed necessary by VA for access by Medical Center personnel and maintaining construction operations.

3.21 IDENTIFICATION AND LABELING

A. Identify devices located above ceiling.

(1) Provide markers on removable ceiling and ceiling access panels to indicate locations of valves, dampers, smoke detectors and other mechanical items that may need servicing or adjustment.

(2) Use access panel markers (colored stickers or metal tack style) for acoustical tile ceilings.

(3) Color code and annotate markers as follows:

01 01 10SN - 14

Color Notation

Red

D – Fire Damper

V – Valve

(sprinkler shutoff)

S – Smoke Detector

H - Heat Detector

Yellow

V - Valve (steam, radiation, reheat and chilled water)

Gold V - Valve (HVAC)

D - Damper (HVAC)

Blue

(valves only)

O - Oxygen

V - Vacuum

A - Medical Air

N – Nitrogen

NO – Nitrous Oxide

EV – Anesthesia

Evacuation

T – Temperature control air

(4) Where fire protection devices are located inside ductwork, provide additional tag on duct access door identifying device inside with letter size equal to or greater than 1-

1/2 inches high.

3.22 INFECTION CONTROL

A. Refer to Specification Section 01 35 26 SAFETY REQUIREMENTS for additional details.

3.23 INTERIM LIFE SAFETY MEASURES

A. Any life safety code violations incurred during construction or renovation must be resolved and will result in close coordination with COR and VA Safety to implement hospital’s Interim Life

Safety Measures. These measures are required by JCAHO and NFPA.

B. The hospital will document whether and to what extent Interim

Life Safety Measures (ILSMs) will be implemented for each project.

C. VA Safety will ensure what ILSMs are required by Contractor to temporarily compensate for hazards posted by existing Life Safety

Code (LSC) deficiencies or construction activities in areas of

Medical Center.

D. Implementation of ILSMs will be required in or adjacent to construction areas and throughout buildings with existing LSC deficiencies. ILSMs apply to both construction workers and affected hospital employees, and will be implemented upon

01 01 10SN - 15

construction development and continuously enforced through construction completion.

E. Interim Life Safety Measures will require walkthrough inspections by Contractor’s superintendent at daily intervals.

F. Training of workers and affected staff will always be significant part of Interim Life Safety Measures procedures.

G. Fire and/or smoke doors shall not be propped open or prevented from closing and latching. This includes Infection

3.24 INSPECTIONS

A. A list of required inspections by VA personnel is included in

Specification Section 01 32 16.15 Project Schedules.

B. Mechanical, plumbing, and electrical work shall be inspected by

VAMC Facilities Management to include appropriate engineering service shop and COR prior to being put into operation or closing if work will be hidden by walls, ceilings, drop ceilings, cover plates, and access panels. Notify COR minimum of two days prior to inspection date; times and dates shall be scheduled and agreed upon by VA. Installations will be inspected by VA personnel to verify compliance with State, Federal, Local, Veterans Affairs

Codes, regulations and contract requirements. If corrections, alterations, adjustments, or additional new construction are required, VA will be notified within 48 hours of completion of such items. These inspections, corrections, or alterations will be made at no additional time or cost to VA.

3.25 LOCK OUT/TAG OUT

additional details.

B. Lock Out/Tag Out - No contract worker can change status/ position of ANY switch, valve or other energy source without prior approval from COR. All Lock Out/Tag Out activities need approval prior to being implemented. Any activity requiring

Lockout/Tagout process must comply with Safety Requirements specification and VAMC policies.

C. Per OSHA Regulation 29 CFR 1910.147, Contractors must comply with

OSHA’s Safety Lock Out/Tag Out procedures.

D. Coordinate shut downs with Facilities Management and COR.

E. Only VA staff is authorized to shut down utilities unless permission is specifically granted.

01 01 10SN - 16

3.26 NOISE

A. All drilling, chipping, or pneumatic hammering (typical) operations shall be done at time and day determined by occupants on that floor and floors above and below. Coordinate this work via workplan through COR for approval.

B. The patients, visitors, and staff deserve consideration and quiet enjoyment of their premises. Anyone found being loud, rude, or otherwise annoying to patients, their guests, or staff will be asked to leave facility. Use of vulgar language will not be tolerated.

C. All work activity within occupied portions of facility shall be accomplished with minimal disruption to patients, physicians, visitors, and staff.

D. The playing of radios, tapes, and CD players is not permitted in occupied area. Ipod or “Walk-man” radios/tapes/CD players are not permitted anywhere.

E. The playing of radios, tapes, and CD players is permitted in vacant areas but shall not be heard outside vacant area.

F. In inpatient areas, coordinate construction activities and debris removal with Nurse Manager or Charge Nurse to minimize disruption.

3.27 NON-DISCLOSURE AGREEMENT & PRIVACY/INFO SEC TRAINING

A. General Contractor’s employees shall complete necessary Privacy and Information Security training during pre-construction phase.

The COR will provide this training so that VA-sensitive and patient information is safeguarded always and to prevent unlawful disclosure by contract employees.

B. In conjunction with the VA’s ISO and PSO, and depending on the access the contractor may have during construction (data closets, patient records rooms, etc.), the COR shall require the contractor fill out and submit a Non-Disclosure Agreement Form

(VA Form 0752).

C. If contractor requires access to VA computers or to connect to the VA network, contractor will need to ensure that computers meet FIPS 140-2 requirements like standard encryption for VA password protection.

3.28 OSHA COMPLIANCE

A. All Contractors are subject to Occupational Safety and Health

Administration (OSHA) regulations and are expected to enforce these standards in performance of their work.

B. OSHA regulations can be found in chapter 29 of Code of Federal

Regulations (CFR). Failure on part of Contractor to comply with

01 01 10SN - 17

these standards and/or conduct their work in safe fashion will result in interruption in work schedule for which Contractor will be solely responsible.

C. Any Contractor found deviating from regulatory standards or policy will immediately be issued stop work order and will be responsible for contractual conflicts related to work stoppage.

D. Fire and/or smoke doors shall not be propped open or prevented from closing and latching. This includes Infection

3.29 PARKING

A. Contractors may not block fire lanes or other roadways.

Contractors may not park in patient, staff or visitor parking lot or structure. Violators will be ticketed. During large construction projects, staging site may be available for parking to Contractors.

B. All Contractors who need parking must contact Facilities

Management for parking permit.

C. If special parking is required, permission shall be granted and coordinated through Facilities Management. Until then, Contractors shall park in designated Contractor Parking Lot.

Limited loading and unloading will be permitted at loading dock area.

3.30 PATIENT/VISITOR PRIVACY

A. Contractors may not review, acknowledge or move patient information or records.

B. Contractors may not acknowledge patient or visitor unless spoken to - even if individual is known on personal basis.

C. Cell phones are to be used only in designated areas.

3.31 PENETRATIONS

A. All wall, floor and ceiling penetrations created by work on this contract, whether by demolition or new construction, shall be patched by Contractor or as assigned by Contractor. All patching materials shall be of like kind or suitable substitute approved by NFPA or UL. Hilti Firestop products are only approved firestop penetration products at VAMC.

B. Penetrations must be located, marked, and sealed by Contractor responsible for penetration. As penetrations are sealed, COR must be contacted to inspect penetrations for proper sealing.

Only one (1) type of fire sealant is permissible per penetration.

01 01 10SN - 18

C. To ensure that penetrations are sealed, Contractors must obtain

Ceiling Access Permit from COR prior to work commencing. Permit shall be in this person’s possession during work.

D. When penetration work and fire sealant work is complete, sign and return permit to COR for subsequent inspection and verification.

E. Photo-documentation in lieu of interim inspections can be performed to validate work.

F. At end of each work day and prior to leaving work site, replace ceiling tiles temporarily removed to do work above finished ceilings in corridors.

G. If it is not practical to replace ceiling tiles daily, Contractor is to construct 7 feet tall by 5 feet wide metal stud and drywall tunnels through occupied spaces as deemed necessary by COR for access by VAMC personnel and maintaining construction operations.

Upon first incident of Contractor not replacing ceiling tiles, this tunnel construction must commence immediately prior to further construction on project.

3.32 PROTECTION OF WORK & ADJACENT AREAS

A. Refer to Specification Section 01 00 00 GENERAL REQUIREMENTS for additional details.

B. Contractor to provide drop cloths, hard board, plastic, etc. when working in occupied areas to avoid staining or damaging existing carpets or vinyl tile floors.

C. The Contractor is required to preserve and protect structures, equipment, and vegetation on or adjacent to work site, which are not to be removed and which do not unreasonably interfere with work required under contract. Contractor will be required to repair damage to facilities resulting from failure to exercise reasonable care in performing work.

D. Any damage caused by Contractor’s employees is to be reported to

COR or Facilities Management Project Section immediately.

3.33 RESTROOM USAGE

A. Contractors are to use public restrooms unless otherwise instructed to specific restrooms or portable facilities.

B. Portable facilities are responsibility of Contractor.

3.34 SCHEDULING OF WORK

A. Refer to Specification Section 01 32 16.15 PROJECT SCHEDULES for additional details.

B. Schedule work areas with COR not less than three weeks in advance of commencement of work.

01 01 10SN - 19

C. The VA will require detailed workplans from Contractor for evolutions that require review/approval from other entities in VA

(i.e., VA Police, Grounds, Logistics, etc.).

D. Notification does not guarantee date of scheduled outage or service interruption however COR will schedule such dates and inform Contractor. Date will be scheduled with medical center personnel when service interruption will minimize affect to hospital patients and operations. Contractor to submit VA System

Outage Request form to COR not less than three weeks in advance of intended commencement of outage work. Contractor shall attend two (2) weekly pre-outage meetings with Engineering and staff to coordinate actual date of outage, duration, time of outage, phasing, and affected services. In addition, Contractor shall attend pre-outage meeting one hour prior to outage to coordinate communications, readiness, pre-outage checklist, document requirements, temporary measures, lock out tag out and other outage requirements and procedures.

E. Contractor shall attend weekly construction meetings.

3.35 SECURITY OF CONSTRUCTION SITES

A. Refer to 01 00 00 Article 1.5 for additional Security details.

B. All construction sites must be secured to prevent inappropriate access by patients, visitors, and employees. While such security fences, doors, and barricades are temporary, they must be substantially installed to control access to site. Existing security system (Pegasys/P2000 by Johnson Controls) must be extended to each construction access door. Each construction door must be provided with Card Reader and electric strike lock programmed to existing VA security system. Construction sites and security measures must be monitored daily to ensure that security is maintained. COR will alert VA Police about construction project & site. At close of activity daily, before securing site or portions of site, ensure that there are no patients, visitors, or staff in area. If construction site problems arise, Contracting Officer and COR will take appropriate action to correct safety and security conditions up to and including Modification/Settlement by Determination deduction of

$2,500.00 per each event (or notice from Police) that construction area was left unsecured.

C. Keys for access to construction/work areas may be issued to

Contractor at discretion of COR. All keys will be assigned through SAM box and Contractor will be given access based on their VA ID Card. Upon completion of work, failure to return issued keys to COR will result in issuance of Settlement by

01 01 10SN - 20

Determination in amount of $100.00 for each outstanding key. In addition, $50.00 fee will be paid to VA for each outstanding key.

Keys are to be picked up and returned daily. If keys are not returned by end of day, modification of $50.00/key per day will be assessed against Contractor.

D. VA engineering, safety/fire department, and police staff must have right to access construction site always to perform their assigned responsibilities.

E. Lock up worksite always to prevent patients and other unauthorized people from entering site. Contractors may lock up their tools etc., with personal locks.

F. Materials: Secure on job site, or in separate COR-authorized storage space. Hallways shall not be used for storage.

Contractors shall manage their storage areas and assure sites are kept clean and safe (OSHA standards apply).

G. Any shared space(s) shall be accessible by Facilities Management.

Do not block access to electric panels or fire protection equipment.

H. The need for job site security is much greater when work is being conducted in psychiatric areas to protect safety of patients.

All job boxes, tools, etc., shall be locked up even when workers are on site unless there’s enough activity to assure that patients cannot access tools or site. Verify that no one is in construction area upon locking up site for evening.

I. Two evacuation routes from worksite shall be maintained always.

J. Access is limited to areas such as critical care and surgical units, as well as mechanical/electrical rooms, etc. Access can be obtained through Facilities Management.

K. VA Police reserve right to refuse access to anyone without prior authorization and identification.

3.36 SMOKING

A. The smoking policy at VAMC Milwaukee is changing effective

January 1, 2019. On that date, smoking WILL NO LONGER BE

PERMITTED ANYWHERE ON CAMPUS by contractor employees. A copy of hospital smoking policy will be supplied upon request.

B. Violation of the VAMC Milwaukee smoking policy may result in worker being removed from worksite for duration of project.

C. The General Contractor is responsible for the enforcement of this no smoking policy.

3.37 STOP WORK

01 01 10SN - 21

A. VA Safety and COR have Director’s permission and authority to stop work whenever conditions pose imminent threat to life and health or threaten damage to equipment or buildings.

3.38 SUB-CONTRACTORS

A. The Contractor has responsibility to assure that all sub-contractors and their workers are properly trained and follow these specifications. Assistance from VA staff may be provided on case by case basis on technical issues.

B. The VA reserves right to approve of sub-contractor being used to complete project. A full list of sub-contractors working on contract to include names, phone numbers, email address and address shall be provided prior to mobilization.

C. Every sub-contractor is required to be fingerprinted and badged.

3.39 SUBMITTALS & SOLE SOURCE ITEMS

A. Refer to Specification Section 01 33 23 Shop Drawings, Product

Data & Samples for additional details.

B. Start of Construction: Contractor’s submittals shall be forwarded in sufficient time to permit proper consideration and approval by government and be timed to permit adequate lead time for procurement of contract required items. Delivery of submittals to COR or verbal acknowledgement of receipt by COR does not constitute approval. Pay attention to fact that pre-construction activities (submittals) are distinct from construction and close-out activities with regards to overall period of performance.

B. Sole Source Items: There will be no substitutions for products and services listed below. Sole source items to be in accordance with VAAR 852.236-90 Restriction on submission and use of equal products. This clause applies to following items:

<see next page>

01 01 10SN - 22

System / Equipment Manufacturer and Model

Fire Alarm System Siemens Cerberus Pyrotronics System

Security System & Code

Blue Johnson Controls Pegasys/P2000 System

Pneumatic Tube System Swiss Translogic

Medical Gas Alarms Puritan Bennett Medical Gas alarms

Nurse Call Jeron Health Care Call System Provider 790 Nurse

Call System

Isolation Room Controls Critical Room Control Systems

Doors, Hardware, Locks and Keying

Sargent Patented cylindrical and mortise sets with

Medeco 7-pin interchangeable cylindrical cores, LCN

Closers (Mechanical, Electronic Hold-Open, Electromagnetic), Sargent or Von Duprin Exit

Devices, Hager Hinges

Automatic Door Operator Tormax 1301 Super HD Automatic Door Operator (Low

Energy) & Tormax TX9300AC Sliding Door Systems

Building Automation and

HVAC Controls Johnson Controls METASYS control system

Refrigerator Temperature

Controls

Cooper Atkins Temp Trak Refrigeration Temperature

Control System

Wander Guard Accutech ES2200 Patient Wandering Prevention System

Modular Furniture Herman Miller Products

Patient Ceiling Lifts Guldmann GH3+ Ceiling

Modular Brick Belden Brick (County Materials) Seal Brown Velour

A, Modular Brick

Automatic Transfer

Switches Eaton Magnum Transfer Switches

Electrical Metering Eaton/Cutler Hammer PowerXpert system

Interiors Reference Interior Schedule

Tile Grout Sealant Microguard Inorganic Protective Barrier

Firestop Systems HILTI Firestop Systems

Prefabricated Modular

Wall/Partition Systems and Enclosures

DIRTT Environmental Solutions

Stone Flex Aggregate

Panels

CEP Panels, Inc., Bermuda White SN 100, Fine Grade

Aggregate Finish

Curtain Track Rail

Support System (CTRSS) Barrier Free Lift RX-6001/Architex Speed Fabric

Interior Signage 2/90 Sign Systems

HOPTEL Card Reader

System Dorma-Kaba

01 01 10SN - 23

3.40 TRAFFIC CONTROL

A. Contractors shall provide trained personnel and/or equipment, signage, barricades etc., to regulate traffic whenever construction operations affect traffic patterns.

3.41 TRENCHING

additional details.

B. OSHA regulations and VA permits/inspections shall be followed and requested during trenching operations.

3.42 UNUSUALLY SEVERE WEATHER CONDITIONS

A. Refer to VAAR clause 852.236-91 regarding claims by the contractor for delays attributed to unusually severe weather. Normal weather conditions in this region typically include freezing temperatures, snowstorms, rainfall, and other weather events that could delay certain exterior construction activities. Normal weather conditions are to be considered when bidding and preparing schedules.

3.43 WASTE MANAGEMENT

A. Refer to Specification Section 01 74 19 CONSTRUCTION WASTE

MANAGEMENT for additional details.

B. Other specifications have requirements for waste, debris, discarded materials, unsuitable materials, and contaminated soil.

3.44 WORK SITE REQUIREMENTS

A. Provide list of emergency contacts at entrance to construction site. This list shall include COR, Superintendent and VA Police contact information. See construction door sign template.

B. Contractors are to maintain their work area as clean as possible while working and cleanup thoroughly daily.

C. Prior to utilities or critical systems being interrupted, submit outage request in writing (via outage request form) at least two weeks prior to expected outage date. Submit outage request to

COR. Only Facilities Management personnel may shut off utilities.

D. All Contractors are expected to use courtesy. Loud, vulgar, abusive language, sexual harassment and aggressive behavior will not be tolerated.

E. Contractors working above ceiling are required to replace disturbed ceiling tile by end of each day.

01 01 10SN - 24

F. Prior to making penetrations in walls, floors or ceilings, it is

Contractor’s responsibility to identify affected rated wall systems.

G. All repaired penetrations on rated wall systems must be completed using fire-rated material matching rating of wall system and must inspected by COR before ceiling tiles are replaced or area is concealed.

H. Temporary construction partitions of non-combustible materials shall be installed as required to provide fire rated and smoke tight separation between areas undergoing renovation and/or construction and adjoining areas that are occupied by facility.

I. Exits for occupied areas of building including rooms, suites, corridors and floors shall not be blocked by construction or by construction materials. Exit may be blocked temporarily if it is unavoidable and adequate alternative measures are provided, such as signage, instructions to occupants and approved in advance by

COR and VA Safety via ILSM process. ILSMs, if active, require daily inspections by Contractor to COR.

J. Existing fire protection systems including fire alarm systems, smoke detection systems, and sprinkler systems shall not be altered except as required for alteration and/or renovation project. Any alteration to system shall be coordinated with COR.

When sprinkler or fire and smoke detector systems are out of service for more than eight hours be responsible to institute

Fire Watch till systems are operational.

K. Fire and/or smoke doors shall not be propped open or prevented from closing and latching. This includes Infection

Control/Construction doors, mechanical equipment rooms and utility closet doors.

L. Locate existing fire extinguishers and pull stations in areas of work.

M. Fire hazard inspections shall be conducted daily by Contractor once construction starts and until work is turned back over to facility.

N. All temporary electrical wiring and equipment used for construction shall be installed and used in…