Page | 1
Basis of Design
Edward Hines Jr. VA Hospital
5000 S. 5 th
Ave. Hines, Illinois 60141
Legionella Suppression Design Task Order #1:
Building 228
VA Contract No. VA69D-17-D-0069
VA Project No. 578-17-005
Bancroft-AE Project No. 17-107
100% Issue for Bid
February 15, 2019
Page | 2
700 Nicholas Blvd. | Suite 300 | Elk Grove Village, Illinois 60007
Tel: 847-952-9362 | www.bancroft-ae.com
Basis of Design
Edward Hines Jr. VA Hospital
Legionells Suppression Design
Task Order #1: Building 228
VA Contract Number: VA69D-17-D-0069
VA Project Number: 578-17-005
Bancroft Project Number: 17-107
Issued For: VA Approval
By:
Bancroft Architects + Engineers
700 Nicholas Blvd, Suite 300
Elk Grove Village, Illinois 60007
847.952.9362 | www.bancroft-ae.com http://www.bancroft-ae.com/
Page | 3
TABLE OF CONTENTS
1. Executive Summary
2. Architectural Basis of Design
3. MEP Basis of Design
4. Appendix A – Equipment Cut Sheets
Page | 4
Executive Summary Introduction and overview of the project
Page | 5
Mission o Provide the best patient care by ensuring an effective, reliable and maintainable
Legionella suppression system for the Hines VA Hospital.
Study Approach o Reviewed existing building drawings.
o Performed field investigations to confirm existing infrastructure conditions and discover areas of potential Legionella growth.
o Reviewed Hines VA Legionella testing results.
What We Learned o Identified low-use and unused plumbing fixtures and equipment.
o Identified plumbing dead legs (pipes that no longer distribute water).
o Obtained a list of hot spots (areas that tested positive for Legionella).
Perform Building Hazard Analysis o Assess Water Usage and impact on Water Age and Hazard Control o Assess Water Flow, and potential for enhanced Water Balance and Hazard Control
Decision Criteria and System Evaluation Review
We evaluated all commercially available Legionella suppression strategies and selected three strategies to study more extensively. (chlorine, chlorine dioxide and copper silver ionization). These are the criteria that were used to evaluate the Legionella suppression strategies.
o System effectiveness in Managing Legionella
Peer Review Studies o Practical Implementation
Capital investment and life cycle costs
Health impacts
Maintenance Requirements
Constructability
Water quality (appearance, odor, taste)
Water condition (corrosion, need for corrosion inhibitors)
Federal Safe Drinking Water Act / Illinois EPA Compliance
System Cost – dependent upon individual building hazard analysis
System Management Cost - dependent upon individual building hazard analysis
Page | 6
Recommendations o Remove dead legs.
o Remove low-use and unused plumbing fixtures and equipment.
o Install real-time water quality monitoring devices (probes and panels) with BAS compatibility.
o Analyze data for a period of 90 days after installation of monitors and determine if secondary suppression remedies are required.
o Install a chlorine (sodium hypochlorite) based secondary disinfectant system at the supply to the domestic hot water loop located in the basement mechanical room of building 228.
o Provide a mobile chlorine (sodium hypocholorite) based secondary disinfection cart for rapid response to positive Legionella testing.
o Develop flushing program based on data collected from real-time water quality monitoring.
o Perform scheduled maintenance and resupply of consumable items.
o Perform regular Legionella testing.
Page | 7
Architectural
Basis Of Design
Page | 8
General
The architectural scope of this project is to provide for the removal of minimally used plumbing fixtures and identified dead legs of piping within plumbing system. After these fixtures are removed, the existing walls will need to be repaired and refinished.
After further investigation and design, it was found that removal of the unused plumbing fixtures would fascilitate the need for major renovation of the associated office spaces to improved the quality of patient care on the 3rd and 4th floors of building 228. Originally building 228 was designed as an inpatient mental health fascility where individual paitient rooms and bathrooms were a necessity. As the use of the bulding has changed to primarily outpatient care, many of the rooms were changed it to offices for doctor consultations and therapy. The required square footage for offices based on the VA
Design manual is 120 sqft. It as found that by decreasing the square footage of existing offices, it would allow for the addition of several right sized office to provide better patient care. This addition not only fascilitates improved patient care, but also mitigates the risk of legionella developing within unused fixtures within the building. The remote monitoring stations on the fourth floor will be placed in utility rooms that replace the existing unused toilet rooms, however, it is necessary to construct new utility closets to house the monitoring stations where it was not feasible to locate in renovated utility rooms.
These closets will be constructed of cold-formed steel studs and gypsum wall board. The closets will also have a three foot wide single door directly infront of monitoring equipment to minimize footprint and allow for required maintenance clearances. The closets will be located so as to have minimal impact on the daily operations of the hospital and staff, while minimizing the distance to plumbing risers that are being monitored.
Design Criteria
International Building Code (IBC) 2015
NFPA 101 Life Safety Code (LSC) 2015
Architectural Barriers Act Accessibility Standards (ABAAS)
Occupational, Safety and Health Administration (OSHA) Standards.
PG-18-1 Master Construction Specifications
PG-18-3 Design and Construction Procedures
PG-18-4 Standard Details and CAD Standards
PG-18-5 Equipment Guide List
PG-18-9 Space Planning Criteria
PG-18-10 VA Design Manuals by Discipline
H-18-8 VA Seismic Design Requirements
PG-18-13 Barrier Free Design Guide
PG-18-14 Room Finishes, Door and Hardware Schedules
PG-18-15 Minimum Requirements for A/E Submissions
Page | 9
MENTAL HEALTH DESIGN PRINCIPLES
Principle #1: Mental health services should be recovery-oriented
Patient and family-centered
Rehabilitation/recovery-focused
Evidence-based
Emphasis on community reintegration
Principle #2: Mental health services should be provided in a therapeutically enriching environment
Home-like
Familiarity
Visual and physical access to nature to promote healing
Patient autonomy, respect, and privacy
Principle #3: Mental health services should be provided in a safe and secure environment
Minimize potential physical hazards
Enhance staff visibility and engagement with patients
Use of abuse-resistant materials, furnishings, and fixtures
Incorporate safety-promoting technologies (e.g., personal duress alarms, pressure sensitive door head alarms)
Principle #4: Mental health services should be integrated and coordinated
Promote collaboration among care providers
To the largest extent practical, treat the patient for multiple diagnosis in the same setting
Use of technologies to promote continuity of care
Principle #5: Mental health services should be provided in settings that respect and can accommodate a diverse range of patient populations and care needs
Provide appropriate accommodations for specific patient groups
Promote safety, privacy, and dignity of female Veterans
Provide separation within inpatient units or provide distinct units, where necessary
TRENDS IN MENTAL HEALTH DESIGN
Bring the services to the patients and maximize therapeutic opportunities
Create Non-Institutional Treatment Environment (home-like)
Private Patient Rooms and Bathrooms
Flexible Census Units (“flex rooms”)
Mall Treatment and Neighborhood Concepts (normalizing patient experience)
On Stage and Off Stage Design (public vs. private- minimize patient distraction)
Use of Technology (tele-mental health stations)
Demolition
Removal of all existing unused toilet fixtures (i.e. toilets, lavatories, showers, bathtubs).
Removal of existing finishes in bathrooms indicated.
Removal existing ceilings and floor finishes in corridors.
Page | 10
Removal of indicated interior partitions and finishes.
Removal and storage of existing radiant panels to be reinstalled in newly constructed office spaces.
Removal of existing light fixtures in corridors and offices.
Removal of existing window sills.
Interior Building Systems
Interior partitions will be of metal stud and gypsum board construction. Thickness will be dependent of necessity to fascilitate plumbing risers within walls.
Sound Attenuation: specify acoustical insulation in walls between offices and attenuating panels in ceiling.
Finishes o Ceiling:
acoustical tile – 1” gauge with higher NRC, 2’x2' format size
Linear Metal suspended ceiling system o Walls:
Paint o Flooring:
Vinyl LVT Flooring throughout renovated areas
Sprinkler System:
o Primary: Modify existing standard wet pipe system to allow for coverage of new offices and support spaces.
Phasing
24 hour operation of building 228 deemed it necessary to provide phasing as to have minimal impact on patient care. By renovating two offices at a time and creating four offices, this provides for the relocation of staff during construction by creating swing spaces. The rooms will be constructed in an order as to fascilitate the installation of updated MEP systems as well to minimize construction time and downtime to the building’s systems.
Page | 11
MEP Basis of Design
Page | 12
General
The scope of this project is to develop a domestic water management plan to minimize the bacteria levels in the domestic water system at Building 228.
1. Locate and remove unused lengths of domestic hot and cold water pipe (dead legs) and infrequently used plumbing fixtures.
2. Install UV light water purification on the incoming cold water service. The UV light will disable the
DNA of pathogens present in the incoming domestic water, leaving them unable to reproduce.
3. Install a hot water monitoring system for Building 228 to monitor acidity, temperature, conductivity, pressure, and oxidant residual. Either an automated hot water flushing system will be utilized in conjunction with the monitoring system.
4. After three months of monitoring without secondary disinfection, Hines VA decides whether to incorporate secondary disinfection into its water treatment plan and if additional monitoring points are needed. Provide a permanent chlorine injection system in the basement mechanical room.
5. A portable chlorine based injection cart will be used for shock treatment of the system if legionella is detected.
Mechanical
1.0 DESIGN METHODS, TECHNIQUES AND SOFTWARE USED IN DESIGN
A. Carrier HAPS – Used for Load Calculations.
B. Microsoft Excel – Used for ASHRAE 62.1 analysis, ASHRAE 55 analysis, and IMC 2012 code compliance.
2.0 CODES, STANDARDS AND GUIDELINES
International Building Code, 2012 edition.
International Mechanical Code, 2012 edition.
International Energy Conservation Code, 2012 edition
International Plumbing Code, 2012 edition
Illinois Plumbing Code, 2004 Edition.
International Fire Code, 2012 Edition.
National Electrical Code (NEC), 2012
National Standard Plumbing Code, 2012
VA Directives, Design Manuals, Master Construction Specifications, VA National CAD
Standard Application Guide, A/E Submission Instructions for Minor and NRM Construction
Program PG-18-15 Volume C, VA Design & Construction Procedures PG-18-3, and other
Guidance on the Technical Information Library (TIL)
VA H18-8 Seismic Design Requirement
National Fire Protection Association (NFPA) Codes, with the exception of NFPA 5000 and
NFPA 900
ASME Boiler and Pressure Vessel Code, 2007
ASME Code for Pressure Piping
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1, 2007
Safety Standard for Refrigeration Systems – ASHRAE Standard 15, 2007
ASHRAE Standard 90.1, 2007
Page | 13
US national CAD Standard
SMACNA - Sheet Metal and Contractor's National Association
UL - Underwriter's Laboratories.
ANSI - American National Standards Institute.
OSHA - Occupational Safety and Health Administration, Conflicts between nationally recognized standards and VA Requirements: Should a conflict exist between VA requirements VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency system wide.
3.0 OUTDOOR DESIGN CONDITION
A. Following conditions will be used for calculating the cooling and heating loads:
1. Summer: 92.1°F db, 74.9°F wb (0.4% Dry-Bulb and Wet-bulb Temperatures)
2. Winter: -6°F db (99% Dry-bulb Temperatures)
4.0 INDOOR PERFORMANCE CRITERIA
4.1 Room Data Sheet - Based on VA HVAC Design Manual
Function Criteria Design Operating Range Alarm Limits
Space Summer Winter Summer Winter Summer Winter
MULTIPURPOS
E ROOM
Temperature
(deg. F) 75 70 ±2.0 ±2.0
Humidity (%) 60 20 ±5% RH ±5%
RH
Noise Criteria 40 40 <40 <40
ACH
(Total & OA) 4 & 2
ADMISSION
WAITING ROOM
Temperature
Humidity (%) 60 20 ±5% RH ±5% RH
6 & 2 http://en.wikipedia.org/wiki/Occupational_Safety_and_Health_Administration
Page | 14
CORRIDOR
Temperature
Humidity (%) 60 20 ±5% RH ±5%
RH
OFFICE PRIVATE
Temperature
OFFICE OPEN
Temperature
TOILET
Temperature
77 70 ±2.0 ±2.0
Humidity (%) NA NA ±5% RH ±5% RH
ACH 10 & NA
Page | 15
VESTIBULES
Temperature
- 50 - -
Humidity (%) - -
Noise Criteria 45 45 <45 <45
NA
5.0 MECHANICAL SYSTEMS
A. Existing HVAC Systems:
1. A centralized chilled water system provides space cooling for the entire Building 228, which includes cooling coils of air handler units and radiant ceiling panels. Two 250-Ton chillers are located in the basement of Building 228. Three primary chilled water pumps, two secondary chilled water pumps, and three condensate water pumps are located in the basement of Building 228 as well. Cooling towers are located on the ground. Two pumps for chilled water radiant panels are located in the penthouse mechanical room.
Existing chillers are running almost full load in hot summer days.
2. High pressure steam from the campus heating plant is the heating source for this building. 180 O
F space heating hot water is generated from steam to hot water converters. Two converters and two hot water heating pumps are located in basement mechanical room. Another two converters and two hot water heating pumps for radiant heating panels are located in penthouse mechanical room. Each heating coil of AHU has a local circulating pump.
3. There are four Air Handler Units for this Building. Each one has hot water heating coil(s), chilled water cooling coil(s), and low pressure steam humidifier.
AHU TAG # LOCATION AREA SERVED SA CFM
AHU-1 Basement Basement Floor 17,500
AHU-2 Basement 1 st
Floor 35,910
AHU-3 Penthouse 5 th
Floor 24,000
AHU-4 Penthouse nd
Floor rd
Floor th
Floor
Total 50,560
16,855
16,850
16,855
4. 1 st floor is served by AHU-2. 55 O
F supply air is distributed down to each area via VAV boxes. Hot water reheat coil of VAV boxes provide zone temperature controls.
Baseboard heaters are for perimeter heating.
Page | 16
5. 2 nd
, 3 rd
, and 4 th floors are served by AHU-4. 55 O
F supply air is distributed to each floor.
In each floor constant volume boxes with reheat coils provide tempered air to each area. 4-pipe radiant ceiling panels provide supplement cooling and cooling for each patient room. Heating only ceiling panels are for some common areas such as corridors.
6. Currently HVAC systems in Building 228 are controlled pneumatically except the new chillers.
7. The existing patient rooms are currently being exhausted via their associated bathroom rooms by transferring the air under the door.
8. The existing building automation system is by American Auto-Matrix.
B. New HVAC Systems:
1. Existing AHU-4 will be reused for 3 rd and 4 th floors. Existing supply and return ducts in the renovated areas will be modified and enlarged to accommodate new or existing air flow rates. Existing constant volume boxes with hot water re-heat coils will be replaced with new units based on the new floor layout and zones. New 4-pipe Fan Coil Units will be used for the area that require high volume air flow or have extra internal loads, such as large conference rooms, waiting areas, and break rooms, etc. Existing 4-pipe radiant ceiling panels will be reused and rearranged, along with associated piping, for new floor layout.
2. HVAC system will be zoned to meet the client requirement. Typically two to four offices with the similar schedule and exterior envelope load will be zoned together and controlled via a local wall mounted T-stat.
3. In renovated areas all existing pneumatic devices such as control valves, thermostats and terminal units will be upgraded to electronic control.
4. Existing rest room exhaust systems will be modified if necessary per new floor layout.
5. Because some existing restrooms have been converted to storage rooms the doors have been relocated to open into the corridors instead of the patient room. Therefore new air transfer grilles will be provided on the storage room wall to transfer the exhaust air from the office/exam room space to the existing exhaust located in the storage room. In order to maintain patient privacy the grilles on the office side of the wall will be offset from the grille on the storage room side of the wall by locating one grille near the floor and one grille near the ceiling. Doing this makes it so there is no direct line of sight or sound through the grilles so if someone is in the storage room they will not be able to hear any conversations in the exam room.
6. All new equipment will operate off of a new control system which will be installed and run in conjunction with the existing Building Automation System.
Plumbing
I. Design Criteria
Page | 17
The design of the plumbing system will be in accordance with the latest editions of the following codes and standards:
International Plumbing Code
Underwriters Laboratory, Inc.
American National Standards Institute (ANSI)
American Society for Testing Materials (ASTM)
American Water Works Association (AWWA)
Cast-Iron Soil Pipe Institute (CISPI)
VA Plumbing Design Manual Dated April 2010
VA Master Specifications (H-08-1)
VA Standard Details (H-08-4)
II. Plumbing Systems Descriptions
1. Identified unused lengths of hot and cold water distribution piping (dead legs) and infrequently used plumbing fixtures will be removed to reduce the water age and the potential for bacterial growth in low flow sections of pipe.
2. A new UV light water purification system will be installed on the incoming domestic cold water service.. The UV light system will be installed with a UV lamp tube and a monitoring system that shows lamp status, lamp run time, unit power on time, high water temperature shut off, cabinet high temperature, alarm history, lamp remote on/off, lamp out alert and UV intensity and temperature.
3. Six hot water monitors will be installed throughout the hot water distribution system to monitor temperature, pressure, and oxidant residual. The first monitor will be located in the lower level mechanical room downstream of the chemical injection point, downstream of the heat exchanger. The second monitor will be located in the lower level mechanical room on the hot water return, upstream of the heat exchanger, upstream of the hot water circulation pumps. The last four monitors will be located in service closets on the fifth floor. The four remaining monitors will be installed at distal points on risers throughout the building. The Potable Water Analytics
(PWA) will be used to send the monitored data to a cloud based software platform. The hot water monitors will control either a hot water system flushing solenoid valve or the chemical injection system. Each monitor will require a floor drain and piping to tie into existing building hot water loop.
4. The chlorine injection point will be installed in the lower level mechanical room on the hot water supply, downstream of the heat exchanger.
5. Per the VA Standard 1061 the cold water incoming water service will be monitored for temperature, pressure, acidity, conductivity and oxidant residual. The cold water incoming service will be monitored only; the collected data will not control any elements of the system.
III. Plumbing Equipment Specification
1. Phigenics WME1625 PWA Advanced Secondary Disinfection System 2.0
Skid mounted system for automatic monitoring of free or total chlorine residuals, pH, temperature, pressure, and dissolved solids (conductivity), and automatic control of chlorine residuals based on ORP.
Page | 18
The ORP sensor must include an integrated feed and control system for automatic addition of supplemental disinfectant. The system must continuously monitor these sensors and make the data available securely using any Internet connected device. The total system must be pre-wired and pre-plumbed on a rugged single skid to ensure high quality and a simple installation.
The chlorine monitor must meet the following minimum requirements:
Measure free residual oxidant (FRO) or total residual oxidant (TRO) in potable water systems using the EPA accepted DPD colorimetric test method for measuring chlorine.
Measure chlorine residuals at configurable frequencies as short as 110 seconds.
Support water sample temperatures directly of up to 131°F, and up to 150°F using a sample cooler (sample cooler available for additional cost).
Support ambient temperatures of up to 104°F
Comply with US EPA regulation 40 CFR 140.74, Standard Method 4500-CLG, and US EPA
Method 334.0 “Determination of Residual Chlorine in Drinking Water Using an Online
Chlorine Analyzer.”
Support a Modbus interface.
4-20mA output that is proportional to the Chlorine measurement.
2 Alarm Relays that are configurable to activate based on the Chlorine measurement
The pH sensors must meet the following minimum criteria:
Range: 0-14 pH
Response: 95% in less than 5 seconds
Operating Pressure: 100 PSI
Temperature Range: 50 - 212°F o Electrode life is reduced when used at temperatures above 122°F. Sample cooler recommended under these conditions.
The pressure sensors must meet the following minimum criteria:
Programmable pressure sensor with analog and switching output
¼” NPT male or female connection size
Measurement Range: -14.6 – 145 PSI
Temperature Range: -13 – 176°F
M12 connector with pre-cut cord lengths for hard wiring to PWA system
LED Display
Body must be stainless steel AISI 316L with IP 65 & 67 protection
Accuracy range: ± 0.4%
The dissolved solids (conductivity)/temperature sensors must meet the following minimum criteria:
Conductivity Range: 0 – 30,000 μS/cm
Temperature Range: 32 – 140°F
Maximum Pressure: 150 PSI (@ 70 degrees F)
Cell Constant: 1.0
Thermsistor: 10k ohm
The ORP feed and control system must meet the following minimum requirements:
Support either an on/off or proportional feed and control strategy
Include an NSF/ANSI Standard 61 certified pump with a degassing head, a maximum output of
0.6GPH, and a turndown ratio of 360:1.
NSF/ANSI Standard 61 certified fluorinated ethylene propylene (FEP) tubing used for all pressurized chlorine lines
Include a kynar corporation stop injector which is serviceable for maintenance without disrupting operation of the water line.
Page | 19
Include an ORP sensor with the following minimum requirements:
o Range: ± 1,999 mV o Response: 95% in less than 5 seconds o Operating Pressure: 100 PSI o Temperature Range: 50 - 212°F
Electrode life is reduced when used at temperatures above 122°F. Sample cooler recommended under these conditions.
The data logging device must meet the following minimum criteria:
Automatically collect and log data at user selected intervals.
Log device data date/time stamps and store in non-volatile memory.
Store interval data locally until the next scheduled upload.
Support a Modbus interface plus eight additional analog or pulse input signals.
Capable of transporting data securely to servers owned and operated by the equipment supplier over a cellular, Ethernet Wide Area Network (WAN), or WiFi connection, as required.
Capable of providing secure data access and analysis using any Internet connected device.
NEMA 4X rating
Install Parameters
Dimensions: 44"W X 46"H X 20"D
Weight: 130 lb
Must be placed on a flat surface
Installation requirements
One water tap to provide a sample point from the water supply line.
One water drain for the sample line
One 110V electrical outlet
2. Phigenics WME-1525 PWA Base Secondary Disinfection System 2.0
Skid mounted system for automatic monitoring of free or total chlorine residuals and automatic control of chlorine residuals based on ORP. The ORP sensor must include an integrated feed and control system for automatic addition of supplemental disinfectant. The system must continuously monitor these sensors and make the data available securely using any Internet connected device. The total system must be pre-wired and pre-plumbed on a rugged single skid to ensure high quality and a simple installation.
using the EPA accepted DPD colorimetric test method for measuring chlorine.
Measure chlorine residuals at configurable frequencies as short as 110 seconds.
Support water sample temperatures directly of up to 131°F, and up to 150°F using a sample cooler (sample cooler available for additional cost).
Support ambient temperatures of up to 104°F
Comply with US EPA regulation 40 CFR 140.74, Standard Method 4500-CLG, and US EPA
Method 334.0 “Determination of Residual Chlorine in Drinking Water Using an Online
Chlorine Analyzer.”
Support a Modbus interface.
The ORP feed and control system must meet the following minimum requirements:
Support either an on/off or proportional feed and control strategy
Page | 20
Include an NSF/ANSI Standard 61 certified pump with a degasifying head, a maximum output of
0.6GPH, and a turndown ratio of 360:1.
NSF/ANSI Standard 61 certified fluorinated ethylene propylene (FEP) tubing used for all pressurized chlorine lines
Include a kynar corporation stop injector which is serviceable for maintenance without disrupting operation of the water line.
Include an ORP sensor with the following minimum requirements:
o Range: ± 1,999 mV o Response: 95% in less than 5 seconds o Operating Pressure: 100 PSI o Temperature Range: 50 - 212°F
Electrode life is reduced when used at temperatures above 122°F. Sample cooler recommended under these conditions.
Log device data date/time stamps and store in non-volatile memory.
Store interval data locally until the next scheduled upload.
Support a Modbus interface plus eight additional analog or pulse input signals.
Capable of transporting data securely to servers owned and operated by the equipment supplier over a cellular, Ethernet Wide Area Network (WAN), or WiFi connection, as required.
Dimensions: 44"W X 46"H X 20"D
Weight: 122 lb
Must be placed on a flat surface
3. Phigenics WME-3750 30-Gal Tank + Secondary Containment Package (for WME-1525 and 1625)
The NSF-approved sodium hypochlorite (“liquid chlorine”) must be fed to the chemical pump correctly to ensure reliable system operation and performance.
The tank must have the following characteristics:
Appropriate size based upon the water system application, (i.e., 30 gallon container)
The tank system must be installed so that the chlorine liquid level is above the chlorine pump to ensure gravity feed. This is a critical requirement to prevent chlorine off-gassing and/or pump priming issues.
The tank must be NSF/ANSI Standard 61 certified and compatible with 12.5% sodium hypochlorite.
The tank system must be installed with secondary containment to avoid a chlorine chemical spill in the mechanical room space. The secondary containment will collect the chlorine product in the event of a valve or tube malfunction.
4. Phigenics WME-1175 PWA Advanced Monitoring System 2.0
Panel mounted system for automatic monitoring of free or total chlorine residuals, pH, temperature, pressure, and dissolved solids (conductivity). The system must continuously monitor these sensors and
Page | 21 make the data available securely using any Internet connected device. The total system must be pre-wired and pre-plumbed on a single panel to ensure high quality and a simple installation.
using the EPA accepted DPD colorimetric test method for measuring chlorine.
Measure chlorine residuals at configurable frequencies as short as 110 seconds.
Support water sample temperatures directly of up to 131°F, and up to 150°F using a sample cooler (sample cooler available for additional cost).
Support ambient temperatures of up to 104°F
Comply with US EPA regulation 40 CFR 140.74, Standard Method 4500-CLG, and US EPA
Method 334.0 “Determination of Residual Chlorine in Drinking Water Using an Online
Chlorine Analyzer.”
Support a Modbus interface.
The pH sensors must meet the following minimum criteria:
Range: 0-14 pH
Response: 95% in less than 5 seconds
Operating Pressure: 100 PSI
Temperature Range: 50 - 212°F o Electrode life is reduced when used at temperatures above 122°F. Sample cooler recommended under these conditions.
The pressure sensors must meet the following minimum criteria:
Programmable pressure sensor with analog and switching output
¼” NPT male or female connection size
Measurement Range: -14.6 – 145 PSI
Temperature Range: -13 – 176°F
M12 connector with pre-cut cord lengths for hard wiring to PWA system
LED Display
Body must be stainless steel AISI 316L with IP 65 & 67 protection
Accuracy range: ± 0.4%
The dissolved solids (conductivity)/temperature sensors must meet the following minimum criteria:
Conductivity Range: 0 – 30,000 μS/cm
Temperature Range: 32 – 140°F
Pressure Rating: 0 – 150 PSI
Cell Constant: 1.0
Thermsistor: 10k ohm
Log device data date/time stamps and store in non-volatile memory.
Store interval data locally until the next scheduled upload.
Support a Modbus interface plus eight additional analog or pulse input signals.
Capable of transporting data securely to servers owned and operated by the equipment supplier over a cellular, Ethernet Wide Area Network (WAN), or WiFi connection, as required.
Page | 22
Dimensions: 43"W X 40"H X 9"D
Weight: 75 lb
Must be mounted to a flat surface
5. Phigenics WME-1075 PWA Base Monitoring System 2.0
Panel mounted system for automatic monitoring of free or total chlorine residuals. The system must continuously monitor these sensors and make the data available securely using any Internet connected device. The total system must be pre-wired and pre-plumbed on a single panel to ensure high quality and a simple installation.
using the EPA accepted DPD colorimetric test method for measuring chlorine.
Measure chlorine residuals at configurable frequencies as short as 110 seconds.
Support water sample temperatures directly of up to 131°F, and up to 150°F using a sample cooler (sample cooler available for additional cost).
Support ambient temperatures of up to 104°F
Comply with US EPA regulation 40 CFR 140.74, Standard Method 4500-CLG, and US EPA
Method 334.0 “Determination of Residual Chlorine in Drinking Water Using an Online
Chlorine Analyzer.”
Support a Modbus interface.
Log device data date/time stamps and store in non-volatile memory.
Store interval data locally until the next scheduled upload.
Support a Modbus interface plus eight additional analog or pulse input signals.
Capable of transporting data securely to servers owned and operated by the equipment supplier over a cellular, Ethernet Wide Area Network (WAN), or WiFi connection, as required.
Dimensions: 24"W X 51"H X 9"D
Panel Unistrut size: 1.5" x 1.5" x 1/8"
Weight: 50 lb
Must be mounted to a flat surface
6. Automated Water Age Module
Page | 23
The automated water age monitoring (Auto-WAM) will systematically flush water within a building’s hot water system loop to maintain minimum chlorine levels and improve oxidant water levels to reduce the need for supplemental disinfection. Its components shall meet the following minimum requirements.
The motorized ball valve or slow closing solenoid valve associated with the water age module shall meet the following minimum requirements:
o Normally closed position o 2-way valve o Pipe-size 1/2-inch o 120 VAC powered o Temperature and pressure specifications to exceed that of the associated water system
The water meter associated with the water age module shall meet the following minimum requirements:
o NSF 61 - Low Lead Brass o Pulse Output - 10 gallons per pulse o Sized appropriately to connect inline on the makeup water line to the domestic hot water loop o Temperature, pressure, and flow specifications to exceed that of the associated water system
The throttling valve associated with the water age module shall meet the following minimum requirements:
o Materials – NSF 61 CPVC construction, PTFE Seals o 1/2" FNPT End Connections o 24 Pitch Metering Thread o Working pressure – 0-250 PSI @ 70 degrees F
7. Phigenics WME-2910 Water temperature sensor with 4 - 20mA and thermowell
The water temperature sensor(s) will be used to monitor temperature at designated locations throughout the water system and connected to the PDXs on the PWAs for recording data. It must meet the following minimum requirements:
Compact temperature sensor with built-in transmitter
Signal output: 4 to 20 mA
Probe length: 30, 50, 100 or 150-mm
Connection: ¼” or ½” NPT male
Body must be stainless steel AISI 316L
Temperature range: -58 to 302°F
Pressure rating: 300 PSI
M12 connector with pre-cut cord lengths for hard wiring to PWA system
Sensor accuracy class A
8. Phigenics WME-3800 Water Sample Cooler
The water sample cooler will reduce temperatures over 120 o
F to 120 o
F or lower to protect the PWA’s sensors from damage at higher temperatures. It must meet the following minimum requirements:
Material Type: 316 Stainless Steel
Sample Water Connection: 1/4" MNTP
Cooling Water Connection: 3/8" MNTP
Heat Exchange Area: 1 sq. ft.
9. Phigenics WME-215 PWA Cellular Connectivity Bridge with Enclosure
Page | 24
The Cellular Connectivity Bridge will provide associated PWAs with enhanced cellular signals in areas of poor cellular reception, allowing the PWAs to transfer collected data effectively via the cellular network. It must meet the following minimum requirements:
NEMA 4X rated enclosure
Uses XBee wireless radios for data transmission
Frequency: 900 MHz
Data Rate: 200 kbps
Power Output: 24dBm
Operating Temperature: -40 o
F to 185 o
F
10. Phigenics WME-9999 Mobile Chlorine Remediation Cart
The mobile chlorine remediation cart will allow for injection of liquid chlorine into hot and cold water, potable water systems. It is intended for use for remediation efforts, not continuous chlorine dioxide injection. It shall meet the following minimum requirements:
2 level cart, 500 lb load capacity, 4 wheeled
Include a mounted NSF/ANSI Standard 61 certified pump with a degassing head, a maximum output of 0.6GPH, a 105 PSI output, and a turndown ratio of 360:1
Include a 1/2-inch Kynar corporation stop injector which is serviceable for maintenance without disrupting the operation of the water line.
Kynar check valve will be connected to corporation stop injector with a 232 maximum pressure rating and Hastelloy C valve spring
11. Installation Services for Potable Water Analytics Systems
All PWA System Installation Requirements
General Requirements
Surge protection
12-ft power cord with a standard 3-prong plug
Single 110V outlet
Power consumption is less than 2A
Minimum spacing of 1 ft on either side and above the PWA for connections
Water System Requirements o Requires at least 5 PSI to operate o Water temperatures greater than 130°F at 30 PSI MUST have a sample cooler o Water pressures greater than 100 PSI at 70°F MUST have a pressure regulator o Minimum flow rate to the PWA is 0.25 GPM
Sample Line Installation o Sample line should be 3/8” Outside Diameter (OD) flexible copper tubing, copper pipe, or CPVC pipe.
The shortest run possible is preferred from the sample valve to the PWA to minimize the water sample delay to the system
Drain Line Installation o There are 2 drain lines, both with ½” NPT female connection o Drain line should be copper or PVC, ½” inch size or larger to facilitate water flow to drain o Drain line must be sloped down to drain with an air gap
Supplemental Disinfection System Installation
Chemical Injection Line Installation o Chemical suction and injection lines should use NSF/ANSI Standard 61 certified fluorinated ethylene propylene (FEP) tubing
Page | 25 o Injection point must be at least 10 pipe diameters UPSTREAM from the sample point
Increased distances between injection and sample allow for more uniform chlorine mixing
Chemical Tank Set Up o Tank must be bottom fed and have an opening for the pump’s auto-degas line o Tank must be NSF/ANSI Standard 61 certified and compatible with 12.5% sodium hypochlorite o Flooded suction is required (tank must be elevated above the pump) o Standard containment is 40"L X 40"W X 12"H
12. Phigenics WMS-9950 Technical Support/Startup of Equipment
The contractor will provide technical support from the manufacturer during installation and conduct system startup.
Provide input for location of PWA
Provide input for location of chlorine injection (if applicable) and water sample tap
Provide technical guidance to installer during installation
Conduct system startup
Verify that all applicable parameters are recording correctly and being transferred to the web-based data management system
13. Phigenics WMS-1625/1525/1175/1075 PWA System Monthly Service 2.0
The PWA systems must be properly calibrated and maintained to ensure accurate and reliable performance on an ongoing basis. The Flat Monthly Fee for each system must include:
Monthly refreshment of test reagents for the chlorine analyzer
Consumable parts for system components to include:
o Chlorine Analyzer – reagents, tubing/cuvette kits, replacement cuvettes, check valve sets and check valve flushing kits o Replacement ORP (yearly) o Replacement pH cartridges (yearly)
Cellular data connection service
Training
14. Phigenics WMS-500 phiMetrics - Web-based Smart Water Management Service
The software platform must meet the following minimum criteria:
Software-as-a-Service (SaaS) enterprise-class platform specialized for building water systems.
Capable of monitoring all sensor data from the potable water quality monitoring system.
Tables and graphs that can be plotted based on user selected time intervals and system parameters
Supports manual data entry via computer and mobile devices, automatic uploading of all water and microbiological test results, documentation of water management plans and activities, and automated sensor monitoring, as specified in VA directive 1061
Administrative functionality to control user access rights, and automated alert notifications
Data storage for a minimum of five years.
Exportable data to excel and other formats
The software platform must meet the following Infrastructure Reliability and Information Security
Management requirements:
The web application host will provide a service level agreement (“SLA”) with a service commitment to a monthly uptime percentage of at least 99.95%. Provide Host Documentation.
Page | 26
The web application will be hosted at a datacenter compliant with FedRAMP requirements at the moderate impact level and in accordance with the Federal Cloud Computing Strategy. Provide
Host Documentation.
The database will be securely backed up hourly for disaster recovery purposes and provide a minimum durability of 99.999999999% and uptime of 99.999%. Provide Host Documentation.
The web applications will be hosted as a Software-as-a-Service (SaaS) data delivery model. This will enable easy access to all data in a highly secure environment via the Internet using any internet connected device including personal computers and mobile devices.
The web application will employ at a minimum TLS 1.2 with 128-bit AES encryption and authentication.
The web application will be delivered by way of a secure login-protected environment with registered HTTPS security provisions.
The software platform must meet the following minimum Application-Level Security requirements:
A user account and password of adequate complexity will be required for each individual user who accesses the system. New user accounts may only be created by administrators with the appropriate level of authorization.
Administrators shall have the ability to easily remove access from users no longer authorized to use the application.
All edits, deletions, or changes to existing data will be logged with the date and time, user committing the change, and all original data will be preserved. This audit trail will be available to users with the appropriate level of access.
The web application shall have varying levels of access for data collectors, operators, site managers, water management team members, and administrators.
Users can be restricted by region or facility. A user restricted to a specific facility shall only be able to view data and information pertaining to that facility.
The software platform must meet the following minimum Data Collection requirements:
Administrators will be able to add, edit, or remove sample points in the system as needed.
A web page will be available in the application for data collectors to enter test results.
The required testing frequency of each sample point can be configured as daily, weekly, or monthly. Alerts can be issued if required sample is missing.
The system will allow data to easily be exported to a suitable format for offline use.
Time-series charts will be provided in real-time for all data recorded in the system. Charts will show alert limits and can be easily customized based on predefined specifications.
A daily summary report will be generated in real-time by the web application, indicating total number of samples tested by region and facility, total number of samples out of specification for chlorine and temperature, as well as chlorine range and average temperature for each facility.
The web application will allow for the storage of electronic documents online. The storage capability will include automated document versioning and all versions of all documents will be retained.
The web application data will be time-stamped with the time it was entered as well as the time the user records it. Edits or changes to the data are logged so the original values can always be recovered.
The web application will have the ability to track customer service requests. Requests can be entered by plant personnel or by authorized contractors/vendors and tracked through the system until they are completed which makes it easy to marry equipment operations with equipment repair and maintenance.
Viewer rights will be determined based on the direction set forth by the client so those who have access can only see or do what they are authorized to see or do, and no one will have a view into areas that are outside the scope of their roles and responsibilities.
The client may reclassify any properties, as and when required, from high risk to low risk or vice versa.
Page | 27
The software platform must meet the following minimum Mobile requirements:
A mobile application will be available for data entry on modern smartphones, including Apple
IOS, Google Android, and Windows Phone operating systems.
Data can be entered, viewed, and edited on the mobile application by users with the appropriate level of access.
To enable resilient operation in the field, the mobile application will operate with or without an active internet connection. In the absence of an internet connection, data will be stored on the local device and synchronized with the remote server upon restoration of internet access.
The mobile application will be capable of reading QR codes (barcoding) affixed to sample points to identify the sample and minimize data input errors. The web application will be capable of printing QR codes for the associated sample points.
The software platform must meet the following minimum Alerts requirements:
Alert levels can be set for each individual parameter at every sample point in the system. Alert levels can be easily adjusted at any time by users with the appropriate authorization.
Alerts shall be issued electronically, by email, upon entry of any data exceeding predefined alert limits.
Each user account can be configured to receive alert emails by region or facility.
Alerts will be clearly indicated when viewing data in the web application.
The web application will incorporate a work order system that will allow alerts to be prioritized and corrective actions to be logged. Users will be able to view the alert and work order history by region or facility for which they are authorized, down to the individual sample points.
The software platform must meet the following minimum Remote Data Acquisition requirements:
A system will be provided to allow rapid deployment of remote sensors throughout the facility.
The sensors will upload data at regular intervals to the remote servers and the data will be easily accessible in the web application.
The system will be capable of acquiring data from sensors with the following outputs types;
current, voltage, resistance, and pulse.
The data acquisition system will be capable of both Ethernet and 3G cellular connectivity.
The data acquisition system will issue alerts electronically, by email, when a sensor reading exceeds predefined alert limits.
The software platform must meet the following minimum Laboratory Integration requirements
All Legionella and water chemistry test results will be available online immediately upon completion of the test.
An executive summary dashboard will be provided in the web application to graphically display
Legionella test results and trends.
The software platform must meet the minimum water age module requirements:
Real-time and continuously updated water age determination of the domestic hot water loop
Programmable alerts based on setting threshold control limits of water age setpoints; when control limits are exceeded system automatically flushes
Graphing/trending of water age data including threshold control limits
Ability to control the flushing solenoid via water age variable and oxidant residual in the hot water loop
Electrical
I. Design Criteria
1. Power distribution normal, emergency (life safety) and standby power for new loads.
2. Lighting and lighting controls to provide adequate levels of illumination and assure high quality.
Page | 28
3. Life safety emergency lighting.
II. Codes and Regulations
National Electric Code (2006)
NFPA 101 (Life Safety Code) (2000)
NFPA 72 (National Fire Alarm Code) (2002)
NRPA 110 (Emergency Power System) (2000)
III. Power and Lighting
Utilization Voltages
Load Type Voltage / Phase Remarks
Receptacles 120/1 2 w plus ground
Incandescent Lighting 120/1 2 w plus ground
Fluorescent Lighting, General
Illumination
120/1 2 w plus ground
Motors less than 1/2 HP 120/1 2 w plus ground
Motors 1/2 HP and larger 208/3 3 w plus ground
Load Densities
Load Type VA/Sq. Ft. Lighting VA/Sq. Ft. Power
Office 1.5 3.0
Lounge/Break Room 1.5 2.0 + actual VA of Break Room
Equipment
Toilet Room 0.8 0.5
Reception Area / Waiting 1.5 1.0
Storage 0.5 0.25
Corridor 0.8 0.5
Equipment 1.5 1.0 + actual VA of equipment
Branch Circuit Loading Criteria
Type VA per duplex outlet
Quantity of
Receptacle s per cct
120 volts
VA
208/1 volts
VA
208/3 volts VA
Receptacles (20A Circuit) –
General Maintenance
180 Up to 6 1080
Computer Receptacles (20A
Circuit)
300 3-4 1200
Interior Lighting (20A Circuit) 1800
Demand and Growth Factors
Load Type Branch Circuit Panels Distribution Panels Switchboard or Riser
Lighting 1.25 1.25 1.25
Receptacles 1.0 1.0 of 1 st
10 kVA installed plus 50% of balance
1.0
Page | 29
Dedicated Receptacle 1.0 1.0 1.0
Computers 1.25 1.25 1.25
Motors 1.0 1.0 1.0
Equipment 1.0 1.0 1.0
Growth/Expansion 1.2 1.2 1.1
Lighting Illumination Levels and Controls
Area Average
Maintained
Footcandles
Control Type Preferred Lighting Remarks
Offices, Lounge, Conference
Rooms
30-50 On-off switch split switching low voltage control
Fluor 4100° K
Waiting Areas
General Local for reading
20-50 On-off switch split switching low voltage control
Fluor 3500° K
General
Corridors, Toilet
Rooms
20-30 On-off switch low voltage control
Fluor 3500° K
Storage 30 On-off switch Fluor 3500° K
Labs 70 On-off switch Fluor 3500° K
IV. Electrical Distribution
New circuiting for new equipment will come from existing panels near the new equipment. Utilize existing spare circuit breakers. If inadequate circuit breakers are available, new circuit breakers are to be provided in existing panel space.
V. Emergency Standby Power
Emergency power will be provided for code required life safety systems. Life safety systems include:
Exit signs
Egress lighting
Fire alarm
Elevator cab lights
Select 25% tenant receptacles
Strobic exhaust fans
Fume hoods
VI. Receptacle Requirements
1. Only heavy duty grade wiring devices will be used
2. Convenience outlets will be provided in common spaces for general purpose. They will be connected to normal power.
3. Tenant power and lighting will be provided by the tenant architect/engineer.
Page | 30
4. One (1) duplex weather-proof GFCI receptacles will be provided on each AHU and strobic fan.
5. One (1) duplex GFCI receptacle in corridors, 20’-0” on center will be provided for cleaning purposes with dedicated circuits.
6. Duplex and special receptacles for equipment, such as refrigerators, freezers, warming cabinets, etc.
7. Equipment such as refrigerators and freezers could be connected to dedicated circuits. Tenant refrigerators may be provided with the remote alarm indication (power OFF) at 24/7 location.
8. Receptacles in common offices, general support rooms, etc., (depending on room layout) will be provided with a minimum of four (4) outlets with one (1) outlet on each wall.
9. Dedicated outlets will be provided to serve miscellaneous office equipment like copiers, fax machines and printers.
10. Ground fault protection will be provided for outlets within 6’-0” of a sink edge and other wet locations. Electrical outlets will be individually ground fault (GFCI) protected. No GFCI circuit breakers will be used for circuit protection.
VII. Grounding
1. Equipment grounding conductors will be specified in all power conduits including feeders, branch circuits and switch legs.
2. Each receptacle will be grounded by means of an insulated copper conductor.
3. An equipotential grounding system will be provided at tenant…