About this file

36C25218B1083 A00002 S06 - A00002 - Att - BidForm Rev.1 - 10.31.18.docx

View the file

Other files

File Type Posted
36C25219C0031-000.docx DOCX document
36C25218B1083-A00003001.pdf PDF
36C25218B1083-A00003000.docx DOCX document
36C25218B1083-A00002004.pdf PDF
36C25218B1083-A00002001.docx DOCX document
36C25218B1083-A00002002.pdf PDF
36C25218B1083-A00002005.pdf PDF
36C25218B1083-A00002007.pdf PDF
36C25218B1083-A00002000.docx DOCX document
36C25218B1083-A00002006.pdf PDF
36C25218B1083-A00002003.pdf PDF
36C25218B1083-A00001000.docx DOCX document
36C25218B1083-A00001001.pdf PDF
36C25218B1083-003.pdf PDF
36C25218B1083-001.docx DOCX document
36C25218B1083-005.pdf PDF
36C25218B1083-002.pdf PDF
36C25218B1083-004.pdf PDF
36C25218B1083-000.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 36C25218B1083

BID SCHEDULE – ADDENDUM #1

VA Project Number: 585-17-105 – Install Perimeter Heat in Imaging and 4 East

Price Range: Between $500,000 and $1,000,000

BASE BID

Contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract to complete Project #585-17-105: Install Perimeter Heat to Imaging, 4-East Construction project at the Oscar G Johnson VA Medical Center, 325 East H Street, Iron Mountain, MI 49801. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work in accordance with the specifications and drawings

All work shall be completed within 200 calendar days after receiving Notice to Proceed.

Base Bid LUMP SUM: $_______________________

End of Section Northern Design Works 00000 – Blank Section Page 1 of 1