36C25218B1083-003.pdf
PDF 8 MB Posted
- Solicitation number
- 36C25218B1083
About this file
36C25218B1083 S02 - Att - Plans - Architect - 6.22.18.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0031-000.docx | DOCX document | |
| 36C25218B1083-A00003001.pdf | ||
| 36C25218B1083-A00003000.docx | DOCX document | |
| 36C25218B1083-A00002004.pdf | ||
| 36C25218B1083-A00002001.docx | DOCX document | |
| 36C25218B1083-A00002002.pdf | ||
| 36C25218B1083-A00002005.pdf | ||
| 36C25218B1083-A00002007.pdf | ||
| 36C25218B1083-A00002008.docx | DOCX document | |
| 36C25218B1083-A00002000.docx | DOCX document | |
| 36C25218B1083-A00002006.pdf | ||
| 36C25218B1083-A00002003.pdf | ||
| 36C25218B1083-A00001000.docx | DOCX document | |
| 36C25218B1083-A00001001.pdf | ||
| 36C25218B1083-001.docx | DOCX document | |
| 36C25218B1083-005.pdf | ||
| 36C25218B1083-002.pdf | ||
| 36C25218B1083-004.pdf | ||
| 36C25218B1083-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Not Used.
1. Fourth floor project area is a Healthcare occupancy per NFPA 101 - 2015.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
8. Corridor work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and 10:00 PM.
9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.
PA
RT
A
PA
RT
A
PA
RT
B
PART B
PA
RT
C
PART C
PHASE 2 - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION AT THE
COMPLETION OF PHASE 1.
PHASE 4 - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION AT THE
COMPLETION OF PHASE 3.
PHASE 3 - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION AT THE
COMPLETION OF PHASE 2.
PHASE 1 - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION AT THE
COMPLETION OF PHASE 0.
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEED
AND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASE 5 - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION AT THE
COMPLETION OF PHASE 4.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAY
BE OUT OF USE AT ANY TIME.
PERIMETER HEAT DOES NOT NEED
TO BE OPERATIONAL BUT ALL
PRESSURE TESTING, FINISHES AND
CLEANING NEED TO BE COMPLETED
BEFORE TURNING ROOMS BACK TO
OWNER.
Keynotes
General Notes
SCALE:
Fourth Floor Phasing Plan
1/8" = 1'-0"
N
MEP PROJECT NO.: G29.17.04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1722
FOURTH FLOOR PHASING
PLAN
2 23
100% REVIEW 1/30/2018
Key Plan
BID SET 6/18/2018
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
UP
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
INSTALL PERIMETER HEAT IN
AutoCAD SHX Text
IMAGING AND 4 EAST
AutoCAD SHX Text 585-17-105
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text June 18, 2018
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text A001
1. Remove existing convector cover and infill opening to fit new convector per detail 1/A100.
2. Remove existing gypsum board below window stool and on adjacent wall as required to install new piping.
Notch rigid insulation on exterior wall minimum amount required to install piping. Replace with 5/8" gypsum board attached to existing framing or furring. Provide PNT-1 finish to match existing paint.
3. Remove existing gypsum board and rigid insulation below window stool and on adjacent wall as required to install new piping. Notch rigid insulation on exterior wall minimum amount required to install piping. Replace with 5/8" gypsum board attached to existing framing or furring. Provide PNT-2 finish to match existing paint.
4. Remove and reinstall existing casework and countertop as required to install new convector.
1. Second floor project area is a Healthcare occupancy per NFPA 101 - 2015.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
1 1
2 5/8"
2" XPS INSULATION
NEW CONVECTOR
2" FOIL FACED
POLYISOCYANURATE
INSULATION ENTIRE
HEIGHT OF CAVITY
EXISTING WALL
CONSTRUCTION
16 GA. 2" COLD ROLLED
CHANNEL
"J" BEAD
5/8" GYPSUM BOARD 3 5/8" METAL STUD
FRAMING SIZED TO
MATCH NEW
CONVECTOR ROUGH
OPENING
EXISTING STEEL BOX
6"
5/8" GYPSUM BOARD
6" METAL STUD
FRAMING SIZED TO
FIT CONVECTOR
ROUGH OPENING
"J" BEAD
EXISTING WALL FURRING
AND GYPSUM BOARD
PACS
VIEWING
CLEAN
SUPPLY
STERILE
CLEAN SUPPLY
ULTRASOUND
PATIENT
TOILET
ULTRASOUND
SUPERVISOR
RADIOLOGY
FLUOROSCOPY
STAFF LOUNGE
LOCKERS
PATIENT
TOILET
2242B
EQUIP
ALCOVE
2230B
HALLWAY
2230P
STRESS
TEST
PACS
VIEWING
TECH WORK
ROOM
UNISEX
TOILET
LAUNDRY
CHUTE
SOILED
HOLDING
2251 CT SCAN
CONTROL
CT SCAN
HALLWAY
2240P
CONTROL
ROOM
2242ASTAFF
CHANGING
2245A
22 2 2
Keynotes
General Notes
SCALE:
Second Floor Plan
1/4" = 1'-0"
N
MEP PROJECT NO.: G29.17.04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1722
SECOND FLOOR PLAN -
PART A
3 23
50% REVIEW 12/6/2017
SCALE:
Convector Detail
3" = 1'-0"
A100
Key Plan
100% REVIEW 1/30/2018
BID SET 6/18/2018
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
MECH CHASE
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text K-4330
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text K-4330
AutoCAD SHX Text
INSTALL PERIMETER HEAT IN
AutoCAD SHX Text
IMAGING AND 4 EAST
AutoCAD SHX Text 585-17-105
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
JUNE 18, 2018
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
A100
1. Remove vinyl wall covering and vinyl wall base from exterior wall. Repair drywall indicated to remain to receive new paint finish.
2. Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
3. Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A101. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing floor back to new wall face. Remove existing plastic laminate window stool and provide new per detail 2/A101.
4. Provide PNT-3 finish and vinyl wall base at modified walls.
5. Extend existing wall with 3 5/8" light gage framing and 5/8" drywall to conceal new pipes.
6. Radiant ceiling panel in existing acoustical tile ceiling.
7. Stop wall furring clear of existing casework door swing. Step back new window stool edge 2 5/8" at end of wall furring.
8. Remove gypsum board from infill framing to soffit above for routing pipes down to convector. Replace with
5/8" gypsum board and finish to match existing surface. Remove gypsum board at new convector location and modify lightgage infill framing to create opening for new convector. Repair gypsum board to match existing wall.
9. Remove and reinstall existing corner guard and wall mounted computer cabinet.
10.Remove and reinstall existing wall mounted computer cabinet.
11.Remove and reinstall casework and countertop as required to install new convector. Modify countertop to fit furred out wall.
1. Fourth floor project area is a Healthcare occupancy per NFPA 101 - 2015.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
MENS
TOILET
TOILET
FAMILY
BREAK AREA
4107A
MED / SURG (4E)
WAITING ROOM
ISOLATION
ROOM
PATIENT
TOILET
4205A
ANTE
ROOM
SEMI-PRIVATE
OBSERVATION
TOILET
4211A
TOILET
4211A
MED / SURG
#2
CORRIDOR
4212C
MED / SURG
#3
TOILET
4216A
EQUIPMENT
DRESSING
ROOM
4282A
LOCKER
MOD
EDUCATION /
CHART ROOM
POLYSOMNOGRAPHER
PULMONARY
FUNCTION
PASSAGE
4280P
TOILET
STERILE
SUPPLY
HSKPG
CLOSET
BLOOD
GAS
CARDIO-P
WAITING
ELEVATOR
LOBBY
PA
RT
A
PA
RT
C
PA
RT
A
PA
RT
B
PART B
PART C
3 3
2 5/8"
2" XPS INSULATION w/
Z FURRING AT 24" O.C.
NEW CONVECTOR
2" FOIL FACED
POLYISOCYANURATE
INSULATION ENTIRE
HEIGHT OF CAVITY
EXISTING WALL
CONSTRUCTION
16 GA. 2" COLD ROLLED
CHANNEL
"J" BEAD
5/8" GYPSUM BOARD 3 5/8" METAL STUD
FRAMING SIZED TO
MATCH NEW
CONVECTOR ROUGH
OPENING
EXISTING STEEL BOX
6"
5/8" GYPSUM BOARD
6" METAL STUD
FRAMING SIZED TO
FIT CONVECTOR
ROUGH OPENING
"J" BEAD
2"
2" XPS w/ Z FURRING
5/8" GYPSUM BOARD
258"
PLASTIC LAMINATE STOOL
SEALANT AND BACKER ROD
EXISTING STRUCTURAL CLAY
TILE AND PLASTER WALL
ALUMINUM WINDOW
FIELD VERIFY
4 4
3 4
3 4 4 3
4 3
15454 3 4 7
34 7 34
Keynotes
General Notes
SCALE:
Fourth Floor Plan Part A
1/4" = 1'-0"
N
MEP PROJECT NO.: G29.17.04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1722
FOURTH FLOOR PLAN -
PART A
4 23
50% REVIEW 12/6/2017
SCALE:
Convector Detail
3" = 1'-0"
A101
SCALE:
Window Stool Detail
1 1/2" = 1'-0"
A101
PHASING NOTE:
REFER TO A001 - FOURTH
FLOOR PHASING PLAN FOR
ALL PROJECT PHASING.
Key Plan
100% REVIEW 1/30/2018
BID SET 6/18/2018
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
INSTALL PERIMETER HEAT IN
AutoCAD SHX Text
IMAGING AND 4 EAST
AutoCAD SHX Text 585-17-105
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
JUNE 18, 2018
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
A101
5/8" gypsum board and finish to match existing surface. Remove gypsum board at new convector location and
At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet
SEMI-PRIVATE
OBSERVATION
TOILET
4211A
MED / SURG #2
PHYS CHART
OFFICE
SOCIAL
WORKER
STAFF
TOILET
CLEAN
LINEN
NURSE
MANAGER
TUB
ROOM
BARIATRIC
M/S #4
TOILET
4233A
TOILET
4237A
BARIATRIC
M/S #5
NURSE
STATION
MED / SURG
#6
TOILET
4236A
TOILET
4234A
MED / SURG
#7
TOILET
4230A
MED / SURG
#8
CLEAN
LINEN
STORAGE
SOILED
LAUNDRY
CORRIDOR
4212C
TOILET
4215A
MED / SURG
#9
TOILET
4245A TOILET
4251A
MED / SURG
#10
PASSAGE
4242P NURSE
STATION
PA
RT
A
PA
RT
B
PART B
PART C
3 4
3 42
3 4
3 4
1. Remove vinyl wall covering and vinyl wall base from exterior wall. Repair drywall indicated to remain to receive new paint finish.
2. Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
3. Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A101. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing floor back to new wall face. Remove existing plastic laminate window stool and provide new per detail 2/A101.
4. Provide PNT-3 finish and vinyl wall base at modified walls.
5. Extend existing wall with 3 5/8" light gage framing and 5/8" drywall to conceal new pipes.
6. Radiant ceiling panel in existing acoustical tile ceiling.
7. Stop wall furring clear of existing casework door swing. Step back new window stool edge 2 5/8" at end of wall furring.
8. Remove gypsum board from infill framing to soffit above for routing pipes down to convector. Replace with
5/8" gypsum board and finish to match existing surface. Remove gypsum board at new convector location and modify lightgage infill framing to create opening for new convector. Repair gypsum board to match existing wall.
9. Remove and reinstall existing corner guard and wall mounted computer cabinet.
10.Remove and reinstall existing wall mounted computer cabinet.
11.Remove and reinstall casework and countertop as required to install new convector. Modify countertop to fit furred out wall.
1. Fourth floor project area is a Healthcare occupancy per NFPA 101 - 2015.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
Keynotes
General Notes
SCALE:
Fourth Floor Plan Part B
1/4" = 1'-0"
N
MEP PROJECT NO.: G29.17.04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1722
FOURTH FLOOR PLAN -
PART B
5 23
50% REVIEW 12/6/2017
PHASING NOTE:
REFER TO A001 - FOURTH
FLOOR PHASING PLAN FOR
ALL PROJECT PHASING.
Key Plan
100% REVIEW 1/30/2018
BID SET 6/18/2018
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text
INSTALL PERIMETER HEAT IN
AutoCAD SHX Text
IMAGING AND 4 EAST
AutoCAD SHX Text 585-17-105
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
JUNE 18, 2018
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
A102
EQUIPMENT
CORRIDOR
4212C
NURSE
STATION
TOILET
4216A
MED / SURG
#3
DATA
PHONE
NOURISH
COMMUNICATOR
MEDS
MED / SURG
BED
MED / SURG
BED
ANTEROOM
4271A
SUPPLY
MED / SURG
BED
TRAINING
ROOM
CART
CLOSET
SUPPLY
NURSE
STATION
MED / SURG
BED
TOILET
4270A
TOILET
4268A
MED / SURG
BED
CORRIDOR
4260C
NURSE
STATION
CART
ALCOVE
MED / SURG
BED
CONSULT
ROOM
HOUSEKEEPING
TOILET
4262A
EQUIP.
STORAGE
MED / SURG
#11
TOILET
4250A
NURSE
STATION
PASSAGE
4242P
ELEVATOR
LOBBY
PA
RT
A
PA
RT
C
PART B
PART C
3 4
1. Remove vinyl wall covering and vinyl wall base from exterior wall. Repair drywall indicated to remain to receive new paint finish.
2. Cut existing gypsum board as required to install new piping. Patch with 5/8" gypsum board to match existing.
3. Remove existing gypsum board, insulation and studs at former convector opening. Frame opening for new convector per detail 1/A101. Provide furring, insulation and new gypsum board on exterior wall with new piping concealed within furring. Cut existing floor back to new wall face. Remove existing plastic laminate window stool and provide new per detail 2/A101.
4. Provide PNT-3 finish and vinyl wall base at modified walls.
5. Extend existing wall with 3 5/8" light gage framing and 5/8" drywall to conceal new pipes.
6. Radiant ceiling panel in existing acoustical tile ceiling.
7. Stop wall furring clear of existing casework door swing. Step back new window stool edge 2 5/8" at end of wall furring.
8. Remove gypsum board from infill framing to soffit above for routing pipes down to convector. Replace with
5/8" gypsum board and finish to match existing surface. Remove gypsum board at new convector location and modify lightgage infill framing to create opening for new convector. Repair gypsum board to match existing wall.
9. Remove and reinstall existing corner guard and wall mounted computer cabinet.
10.Remove and reinstall existing wall mounted computer cabinet.
11.Remove and reinstall casework and countertop as required to install new convector. Modify countertop to fit furred out wall.
1. Fourth floor project area is a Healthcare occupancy per NFPA 101 - 2015.
2. Light lines indicate existing work to remain, dark lines indicate new work.
3. Field verify all dimensions and clearances before beginning construction.
4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.
5. Patch all abandoned holes in floors with concrete to match existing construction.
6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.
7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match existing.
Keynotes
General Notes
SCALE:
Fourth Floor Plan Part C
1/4" = 1'-0"
N
MEP PROJECT NO.: G29.17.04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREET
NEGAUNEE, MI 49866
PHONE: 906-475-6616
NDW PROJECT NUMBER: 1722
FOURTH FLOOR PLAN -
PART C
6 23
50% REVIEW 12/6/2017
PHASING NOTE:
REFER TO A001 - FOURTH
FLOOR PHASING PLAN FOR
ALL PROJECT PHASING.
Key Plan
100% REVIEW 1/30/2018
BID SET 6/18/2018
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
UP
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL
AutoCAD SHX Text
SMOKE/ FIRE/ RATED PARTITION TYPES
AutoCAD SHX Text
INSTALL PERIMETER HEAT IN
AutoCAD SHX Text
IMAGING AND 4 EAST
AutoCAD SHX Text 585-17-105
AutoCAD SHX Text No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
JUNE 18, 2018
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
A103
File details come from the government source that posted it.