36C25218B0884-009.pdf
PDF 65 KB Posted
- Attached to
- Food and Nutrition Site Preparation, 537-18-145
- Solicitation number
- 36C25218B0884
About this file
36C25218B0884 Exhibit 8 - Sequential Work Activities.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25218C0211-000.docx | DOCX document | |
| 36C25218B0884-007.pdf | ||
| 36C25218B0884-005.pdf | ||
| 36C25218B0884-001.docx | DOCX document | |
| 36C25218B0884-008.pdf | ||
| 36C25218B0884-002.docx | DOCX document | |
| 36C25218B0884-006.pdf | ||
| 36C25218B0884-004.pdf | ||
| 36C25218B0884-003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 8 – SEQUENTIAL WORK ACTIVITIES
NUTRITION & FOOD SERVICES KITCHEN
DISH MACHINE REPLACEMENT
1. Delivery date of Dish Machine is confirmed
2. Site Prep schedule is confirmed with Site Prep Contractor (Contractor)
3. Contractor tasks:
a. Installs (3) Construction Barriers
b. Installs Vinyl Strip Barrier
i. VA relocates Cart Washer System
ii. VA deactivates utilities serving existing Tray Conveyor and Dish Machine
c. Disconnects services from existing Tray Conveyor
d. Disassembles, removes, and discards existing Tray Conveyor
e. Removes ceiling in Work Area
4. Dish Machine supplier task:
a. Disassembles, removes, and discards existing Dish Machine
5. Contractor tasks:
a. Perform floor repairs/sealing work in Work Area
b. Modifies utility feeds to Tray Conveyor and Dish Machine as required
c. Installs electrical feeds for Plate Warmers
d. Installs Roof Exhauster
6. Dish Machine supplier tasks:
a. Installs new Dish Machine
b. Connects new Dish Machine to new utility feeds
c. Connects new Dish Machine to Roof Exhauster
i. VA deactivates utilities serving new Dish Machine
d. Starts up new Dish Machine (1 time only)
7. Contractor tasks:
a. Installs new ceiling and lighting in Work Area
i. VA returns Cart Washer System to original area
b. Relocates east Construction Barrier
c. Removes south and west Construction Barriers
8. Dish Machine supplier tasks:
a. Complete testing of new Dish Machine
b. Provide training for N&FS staff and Maintenance staff
c. New Dish Machine is now operational
d. Dish Machine supplier tasks are completed
9. Contractor tasks:
a. Performs floor repairs/sealing work at Triple Basin Sink area
b. Installs new ceiling and lighting at Triple Basin Sink area
c. Removes east Construction Barrier
d. Contractor tasks are completed
TRAY CONVEYOR REPLACEMENT
1. Tray Conveyor supplier tasks:
a. Installs new Tray Conveyor
b. Connects new Tray Conveyor to new utility feeds
c. Starts up new Tray Conveyor
d. Provide training for N&FS staff and Maintenance staff
e. New Tray Conveyor is now operational
f. Tray Conveyor supplier tasks are completed