This document is a Questions and Answers record for federal contract opportunity 36C25027Q0108 regarding radioactive waste removal and disposal services for the Ann Arbor VA Medical Center and its Toledo community-based outreach clinic. The solicitation is a firm, fixed-price commercial services acquisition using simplified acquisition procedures. The contract requires removal and disposal of multiple radioactive waste streams including sealed sources (Co-57, Lu-177m, Ba-133, Cs-137, Eu-152, and other isotopes), patient treatment waste (sharps and biological materials from therapy isotopes including Lu-177 Pluvicto with carrier Lu-177M, I-131, Y-90 beginning 2027, and Ra-223), liquid scintillation vials (H-3 mixed waste with ECONO-SAFE cocktail), and H-3 tritium-contaminated gun sights from police equipment (1.4 Ci on-hand). Services are priced by contract line items with not-to-exceed weight limits per CLIN; additional waste beyond NTE amounts would be priced using the awarded contract rate. The contractor must furnish disposal containers, package radioactive materials, and provide DOT-compliant labeling; the VA's Radiation Safety Officer will escort the contractor and provide access to loading docks. Custody and liability transfer upon signing of NRC Form 540. The contractor must hold a valid NRC or Agreement State Radioactive Materials License, DOT hazmat registration, state permit, and EPA ID submitted with the bid; subcontractors may hold these licenses provided they perform all regulated possession, transportation, and disposal activities.

The solicitation establishes separate CLINs for Ann Arbor and Toledo locations for administrative clarity, with each CLIN representing one job per contract year (increased to two jobs per year with second-year funding to be deobligated if unused). Award will be made on a best-value basis considering stated evaluation factors including technical capability and past performance; no specific insurance minimums or coverage types are mandated. Invoicing occurs after material possession transfer and removal from site, though final disposal certificates are still required per NRC regulation. The question period is closed. Key uncertainties acknowledged in responses include future research needs affecting isotope types and quantities, potential for decay-in-storage on-site for waste with half-lives under 120 days, and the possibility of infection-waste permits for certain therapy waste streams.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25027Q0108 – Radioactive Waste Removal & Disposal – Questions & Answers

The question and answer period is closed. No further questions will be accepted, reviewed or answered.

1. For the liquid mixed waste described as containing EPA characteristic and/or listed hazardous material, what chemicals and RCRA waste codes are anticipated?

ANSWER: Liqued Scintillation Cocktail; SDS is attached. Not sure what RCRA code that falls under. That is the only mixed-waste at the moment. This is subject to change based upon future research needs / demands. At the time of answer, research is not actively using radioactive material.

2. May the patient-treatment waste include any DEA-regulated controlled substances, or is it limited to the radioactive unit-dose vials, biological waste, sharps, and contaminated general refuse described in the SOW?

ANSWER: Currently we do not have DEA-regulated controlled substances. In the past, Research used radioactivity used for drug studies. At the time of answer, research is not actively using radioactive material.

This is subject to change based upon future research needs / demands.

3. Sealed Sources could comprise an almost unlimited number of combinations and are based on the Isotope, physical size and the activity. There is no information that would allow someone to provide an accurate price.

ANSWER: Current Sealed Sources inventory has been attached for estimating purposes. Please note that not all sealed sources are disposed of each year. List has been included to give an idea of what could be anticipated but is by no means limiting. We are a broad scope permit holder with an active clinical and research department. See attached permit.

4. Patient Wastes are typically exempt and disposed directly by the VA hospital. The items that are described could be from the treatment Isotope but liquids and Sharps are two distinct waste categories. There is no mention of which

Radionuclide(s) and the activities which is needed to formulate a disposal cost.

ANSWER: While some wastes can be decayed in storage, our permit will not allow waste to be disposed if half-life is greater than 120 days. The contract line items (CLINs) are generic purposefully to allow program flexibility. However, current examples would include Pluvicto with Carrier, Lu-177m. Future examples include, but are not limited to, Y-90 medical waste. Depending on the situation / scenario, the waste could come in either form. Also, our permit allows for Research. At the time of answer, research is not actively using radioactive material. This is subject to change based upon future research needs / demands.

5. Scintillation Vials vary in cost based on the Isotope and the Activity and if the liquid is a RCRA hazardous waste. None of this information is listed.

ANSWER: Liqued Scintillation Cocktail; SDS is attached. Not sure what RCRA code that falls under. At the current moment, the only mixed-waste is with H-3. This is subject to change based upon future clinical or research needs / demands. At the time of answer, research is not actively using radioactive material.

6. Liquid Mixed Wastes are typically priced on request as the type of liquid, usually Acid or Flammables, volume and along with the Isotopes and activities factor into the disposal costs.”

ANSWER: SOW was written to allow program flexibility. Because we are a broad-scope research license holder, it is impossible to know exactly what isotopes may be used in the future. At the time of answer, research is not actively using radioactive material. This is subject to change based upon future research needs / demands.

7. I believe there is a one-time waste stream of Gun Sights containing H3 at Ann Arbor. If you have this specified it will be easier to obtain accurate pricing.

ANSWER: There is currently H-3 waste at the Ann Arbor facility. These items would be bound by G.1: Any byproduct material with Atomic Number 1-83 radioactive sealed sources or radioactive waste not to exceed 200 pounds.

Radiation Safety anticipates Tritium waste on-hand (total amount of Tritium (H-3) activity on the gun-sights destroyed was 252 mCi (not considering natural decay), Tritium waste in the form of contaminated gun sights

(Trijicon for Sig Sauer) (28 front sites, 28 back sites) 1.4 Ci (1400 mCi), and a few liquid scintillation (LSC) samples with Tritium contamination (mixed waste).

While the facility does not anticipate future occurrences of large numbers of damaged gun sights, the police service uses tritium (H-3) gun sights. These could become damaged at any time and therefore G.1 was written to allow for H-3 waste disposals should they occur. Also, national guidance is to properly dispose of unwanted gun sights. See attached 2026-03 Scattering (Tritium Gun Sites).

8. [We generally know what waste is produced] but what if you came to me with something that was out of the ordinary and the cost for disposal was so high we just could not honor the prices we submitted? What if we overestimate the costs for disposal to include possible unknowns and by doing so are not offering the VA the best price we can provide?

ANSWER: The contract will be a Firm, Fixed-Price (FFP) agreement for the specific radioactive waste types and maximum quantities identified in the Statement of Work (SOW) and Price Schedule.

▪ Scope Boundaries: The SOW clearly defines the covered materials (e.g., byproducts within the specified atomic number ranges). If a material falls within the defined SOW and remains at or below the established maximum poundage per CLIN, the fixed price applies.

▪ Out-of-Scope Items: If the VA presents a material that is genuinely outside the scope of the SOW/Price

Schedule it would have to be captured under an entirely separate contract.

Offerors should price based on the clear parameters, maximum quantities, and waste classifications provided in the solicitation. The maximum poundage caps the contractor's requirement per CLIN; volumes exceeding the maximum cap would also require a modification to adjust quantity.

9. Typically you have Nuclear Medicine Sources which are low level and we can usually do at a minimum price, however sometimes VA hospitals generate larger multi millicurie Sources and some could cost $2,500 each. Have the

RSO define what he has in the way of sources.

ANSWER: Current Sealed Sources inventory has been attached for estimating purposes. Please note that not all sealed sources are disposed of each year. List has been included to give an idea of what could be anticipated but is by no means limiting. We are a broad scope permit holder.

Therapy Isotopes currently in use and planned:

▪ Lu-177 Pluvicto (expect waste from carrier added doses Lu-177M).

▪ I-131(VAAAHS has been able to Decay In Storage) all of this waste.

▪ Y-90 (program start beginning in 2027).

▪ Ra-223

Police Gunsights:

▪ H-3 tritium gun sights

▪ Radiation Safety anticipates Tritium waste on-hand (total amount of Tritium (H-3) activity on the gun-sights destroyed was 252 mCi (not considering natural decay), Tritium waste in the form of contaminated gun sights

(Trijicon for Sig Sauer) (28 front sites, 28 back sites) 1.4 Ci (1400 mCi).

▪ Tritium waste may vary in future years.

10. Break out the stuff from the Gun Sights, that a one off thing.

ANSWER: Gun sights are not a “one-off thing.” Gun sights will be treated as waste when Police Services phases out their equipment. Although Original Equipment Manufacturers (OEMs) can take back the sights, they do not take them back if they are damaged. See attached 2026-03 Scattering (Tritium Gun Sites).

11. I don’t know of any waste processing facility that can handle patient waste as that often requires incineration.

The only radioactive incinerator in the country bans patient waste. The Sharps you create come from a therapy as does the liquid portion. These should not be Biological. The sharp is used to administer the solution into an IV not directly into a patients.

ANSWER: Most of the waste from patients falls under the half-life threshold that our permit allows; this includes sharps. They Decay in Storage and then are disposed of via a Biohazard waste broker. However, there are scenarios that do occur with active waste contracts. For example, if there is a Pluvicto with carrier (Lu-

177M) administration, this would have to be treated as waste because the half-life is greater than 120 days. (We had one of these last year). Also, any Y-90 patient waste generated.

12. The Scintillation Vials you produce are typically lowest cost.

ANSWER: Correct. Liqued Scintillation Cocktail; SDS is attached. Not sure what RCRA code that falls under.

At the current moment, the only mixed-waste is with H-3; which is a LSC-vials (three of them). This is subject to change based upon future clinical or research needs / demands. At the time of answer, research is not actively using radioactive material.

13. Liquid Mixed Waste pricing can be double from one waste stream to another. A description of the anticipated Waste

Stream would be appropriate.

ANSWER: At the current moment, the only mixed-waste is with H-3; which is a LSC-vials (three of them). This is subject to change based upon future clinical or research needs / demands. At the time of answer, research is not actively using radioactive material.

14. Can you please let us know if daily pick up trash cans inside the facility is needed, and is this construction debris only do we need to leave only dumpsters how many will you need is this hazardous materials only?

ANSWER: This question does not align with the SOW in any way. This is not a regular trash/waste requirement, nor is this a construction-related requirement and it does not involve dumpsters. This is a requirement for radioactive waste removal and disposal.

15. The place of performance lists Ann Arbor only, while the Statement of Work adds a pickup site at 1200 South Detroit

Avenue, Toledo, OH. Is the Toledo site in scope? If so, does each CLIN price cover both locations, and are the not-to-exceed weights combined totals for both?

ANSWER: Yes, this is for the Ann Arbor VA (AAVA) Medical Center, which has several community-based outreach clinics (CBOCs) under its purview and altogether fall under the Ann Arbor VA Medical Center catchment area. The Toledo CBOC requires only those services under CLIN X006 & X007.

16. Each CLIN is a quantity of 1 job, and the Statement of Work requires removal "no less than once per contract year.”

Please confirm each CLIN price covers one pickup per contract year. How will additional pickups, or waste above a

CLIN's not-to-exceed weight, be ordered and priced?

ANSWER: Yes, each CLIN was listed correctly at 1 job per year. Additional waste isn’t necessarily expected. As with all firm, fixed-price contracts, should additional poundage be required, the contract-rate for that CLIN for whichever year the additional amount is needed in, will be used to calculate the cost for any additional waste that may accumulate (however, as stated, additional waste above the amounts listed isn’t necessarily expected). Using CLIN 0001 for example, the NTE amount is 200 lbs. If it turns out we need an additional 100 lbs of waste disposed, the rate would be half of what the 200 lbs cost under contract. ALSO NOTE: although a

2nd job per year isn’t necessarily expected, the CLINs have been increased to 2 jobs per year. If the 2nd job in a year is not used, the funding for the 2nd job under the purchase order for that contract year will be deobligated.

17. Please provide the radionuclides and approximate activities expected in each waste stream. For sealed sources, please provide the number of sources, isotope and activity.

ANSWER: Current Sealed Sources inventory has been attached for estimating purposes. Please note that not all sealed sources are disposed of each year. List has been included to give an idea of what could be anticipated but is by no means limiting. We are a broad scope permit holder with active clinical and research departments.

The number may fluctuate based upon future research needs / demands.

▪ I-131(VAAAHS has been able to Decay In Storage) all of this waste.

▪ Radiation Safety anticipates Tritium waste on-hand (total amount of Tritium (H-3) activity on the gun-sights destroyed was 252 mCi (not considering natural decay), Tritium waste in the form of contaminated gun sights

18. Please confirm sealed sources will be removed from any devices or equipment by VA staff and presented ready for packaging.

ANSWER: VAAAHS will be present for sealed source pickups. Sealed sources internal to equipment will be removed by an independent contract, that will not be part of this contract. The awardee will not be required to remove sources from any machine. However, the sealed sources removed are part of waste prepared and removed under this contract. At present, VAAAHS only has two Ba-133 internal sources to Liqued Scintillation

Counters.

19. For CLIN 0003, what scintillation cocktail(s) are in use?

ANSWER: Liqued Scintillation Cocktail; SDS is attached. Not sure what RCRA code that falls under. At the current moment, the only mixed-waste is with H-3; which is a LSC-vials (a few of them). This is subject to change based upon future clinical or research needs / demands. At the time of answer, research is not actively

20. For CLIN 0004, what are the EPA waste codes or chemical constituents of the liquid mixed waste?

ANSWER: Liqued Scintillation Cocktail; SDS is attached. Not sure what RCRA code that falls under. At the current moment, the only mixed-waste is with H-3; which is a LSC-vials (a few of them). This is subject to change based upon future clinical or research needs / demands. At the time of answer, research is not actively

21. Please provide the approximate weight or volume and number of containers removed for each waste stream at the most recent pickups.

ANSWER: Co-57 and Lu-177m waste. Combined activity was 6.67 x 10 -1 mCi. 8 pounds total package weight.

Co-57. Total activity was 8.80 x 10-5 mCi. 4 pounds total package weight. Ba-133, Cs-137, Eu-152. Total activity

2.21 x 10-1 mCi. 10 pounds total package weight.

22. Will VA Radiation Safety Staff place the waste into the contractor-furnished containers before the scheduled pickup, and will it be staged at a single ground-level or loading dock location at each site?

ANSWER: No. Contractor will be expected to furnish the containers for disposal, package the radioactive material, and label the containers correctly in preparation for DOT shipment. Location of pickup may be in different parts of the facility, but most commonly in the Radiation Safety Waste Room or Nuclear Medicine department. Contractor should not have an expectation that everything is prepacked and waiting at the loading dock.

23. FAR 52.222-41 is listed, but no wage determination is attached or named. Which wage determination applies?

ANSWER: See attached Wage Determinations.

24. Can the anticipated EPA hazardous waste codes for the identified waste streams be provided?

EPA Hazardous codes would be associated with Liqued Scintillation Cocktail; SDS is attached. At the current moment, the only mixed-waste is with H-3; which is contained in LSC-vials (three of them). This is subject to change based upon future clinical or research needs and demands. At the time of answer, research is not actively using radioactive material.

25. Is this a new effort or was there a previous contractor that performed these requirements in the past? If there were any, could you provide me with the Contract # used for these services?

ANSWER: This is a new acquisition for services under contract.

26. Please confirm that the performing subcontractor's Radioactive Materials License, DOT hazmat registration, and transporter credentials satisfy these requirements, or advise if any of them must be held in the prime contractor's own name.

ANSWER: A prime contractor may generally rely on an identified subcontractor to hold the required

Radioactive Materials License and DOT registration, provided that the subcontractor actually performs ALL regulated possession, transportation, and disposal activities.

27. Can a prime contractor submit a partial bid solely for the expired chemotherapy waste (transported and handled as

Class 6.2 dual waste), or subcontract the Class 7 radioactive sealed sources to an NRC/Agreement State-licensed third party without the prime contractor holding those licenses directly?

ANSWER: No. This RFQ does not include any language allowing partial bidding. This is a firm, fixed-price acquisition requiring quoted pricing for all line items.

28. Can a prime contractor subcontract the Class 7 radioactive sealed sources to an NRC- or Agreement State-licensed third party if the prime contractor does not hold those radioactive material licenses directly?

ANSWER: A prime contractor may generally rely on an identified subcontractor to hold the required

Radioactive Materials License and DOT registration, provided that the subcontractor actually performs ALL regulated possession, transportation, and disposal activities.

29. Will the VA consider a two-week due date extension to 12/15? Most companies will be out of the office with the

Thanksgiving holiday break.

ANSWER: No, the RFQ has been open/available since 11/12/2026 with plenty of time for Q&A and offer preparation.

30. Weight limits differ between SOW and CLINs (SOW II.2g; CLINs x003, x004). The SOW sets no weight limit for scintillation vials or liquid mixed waste; the CLINs cap them at 10 lb. and 20 lb. Which governs? Are the limits per pickup or per contract year? How will waste over a limit be priced?

ANSWER: Weight limits do not differ, they just weren’t added to each bullet point under “g.” Where the SOW falls silent, you must refer to the Price Schedule as indicated on the SF 1449, block 20, which states, “in accordance with the Statement of Work (SOW) and Price Schedule.” Emphasis added. The price schedule identifies 1 job, and the contract term is one year. It is not expected to need more than the NTE CLIN limits, however, should that become the case, the pricing awarded, respective to contract year would be calculated to adjust for additional quantity. For clarity, the weight limit is now added to those lines in the SOW. ALSO

NOTE: although a 2nd job per year isn’t necessarily expected, the AAVA CLINs have been increased to 2 jobs per year. If the 2nd job in a year is not used, the funding for the 2nd job under the purchase order for that contract year will be deobligated.

31. Invoices are to be, "per Price Schedule frequency," but the schedule gives none.

ANSWER: Please refer to the entire section’s information:

The Price Schedule DOES provide the frequency – 1 job – which means 1 job during the one-year contract term.

32. May the contractor invoice after pickup, or only after the final disposal certificate is issued?

ANSWER: Invoicing can occur once material has transferred possession and is removed from site. However, final disposal certificate is still required and must occur per NRC regulation.

33. FAR 52.212-5 (Contract Terms and Conditions Required to Implement Statutes or Executive Orders) does not appear in Section C. Please confirm whether it applies and which paragraphs are checked.

ANSWER: Correct, they aren’t included. Under the streamlined FAR Part 12 and Part 13 framework updates

(Revolutionary FAR Overhaul (RFO), the master blanket clause FAR 52.212-5 (Contract Terms and Conditions

Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services) has been formally eliminated and restructured in many modern commercial procurement templates.

34. Are any specific insurance types or limits required (e.g., pollution, auto, nuclear liability)? None are stated.

ANSWER: Because this is a simplified commercial services acquisition at or below the Simplified Acquisition

Threshold (SAT), the solicitation does not prescribe specific minimum insurance dollar amounts or include

FAR 52.228-5 (Insurance—Work on a Government Installation). In addition, on a firm-fixed-price contract, the contractor assumes responsibility for performance and associated operational risks in accordance with the contract terms and customary commercial practices. While no specific insurance minimums or coverages are mandated in the RFQ, quoters/contractors are expected to maintain any insurance required by applicable federal, state, or local law (such as workers' compensation and auto liability where required), hold all necessary permits and licenses for radioactive waste transport and disposal, and carry coverage they deem appropriate for their business and risk exposure.

35. Is this a best-value tradeoff or lowest-price technically acceptable? What is the relative importance of technical capability, price and past performance?

ANSWER: Any RFQ that does not explicitly state it is LPTA and includes evaluation factors (as this one does, allowing for comparative evaluation), operates on a best-value continuum. This is not a FAR Part 15

“Contracting by Negotiation” acquisition where stating relative importance and whether factors outweigh cost/price is mandatory. Award is intended to be made to the offeror providing the best value to the

Government based on comparative evaluation of the stated factors, and relative weight percentages/rankings are not required or assigned under this simplified acquisition.

36. SDVOSB/VOSB and HUBZone (C.1: 852.215-70, 852.215-71, 52.219-4). These clauses are included in an open-market buy, but the listed evaluation factors do not mention them. Will SDVOSB/VOSB evaluation credit or the

HUBZone price preference apply?

ANSWER: These were mistakenly placed in the document and are not relevant to this acquisition – they have been removed.

37. Past performance (E 1.0 Sec E). Is there a minimum or maximum number of references, or a page limit for this section?

ANSWER: Follow the guidance listed in the RFQ Instructions to Offerors, which, at minimum, states:

38. Two sites, one CLIN (SOW Part I; B.3). Pickups are at Ann Arbor, MI, and Toledo, OH, but the price schedule has no separate CLIN by site, and the cover page lists only Ann Arbor. Should one JB price cover both sites in one trip, or separate trips? Please confirm whether waste is consolidated at Ann Arbor before pickup.

ANSWER: Correct, the requirement was for AAVA and its catchment area Toledo CBOC to receive services under “1 JB”, so yes, the one-job price was to cover both sites in one day. Also note, only CLINs X001 and

X005 apply to Toledo CBOC as therapies and research aren’t completed at Toledo CBOC, nor does Toledo

CBOC have an LSC.

However, this amendment splits the pricing schedule to establish separate CLINs for Ann Arbor and Toledo

CBOC for administrative clarity. Offerors shall submit separate pricing for each CLIN reflecting their total firm, fixed-price approach for performing the work described in the Statement of Work.

39. Scope of CLIN x002. CLIN x002 adds "contaminated general refuse," which the SOW does not mention. Please confirm it is in the scope.

ANSWER: Yes, the price schedule makes it clear this is required. If the CLIN identifies it, then it is included in

(and it is not an addition to) the requirement. For clarity, “contaminated general refuse” is added to that line.

40. Patient waste (CLIN x002). Is patient waste held for decay-in-storage first? Is any of it regulated medical waste requiring infectious-waste permits or treatment in addition to radioactive disposal? How is the waste currently packaged, what are the expected contact dose rates, and is shielding in use for any of the waste?

ANSWER: Most patient waste is held on-site and disposed via DIS. Waste with a half-life at or greater than 120 days is expected to be picked up. Contractor will be expected to furnish the containers for disposal, package the

Radioactive Material, and label the contains correctly in preparation for DOT shipment. Dose rates will vary based on quantity and isotope being disposed. Large majority of medical waste, used sharps free released via

DIS, is disposed of under a separate contract. However, there are scenarios that may occur, i.e. a Lu-177m

(Pluvicto with carrier) waste that may require an infection-waste permit. Also, VAAAHS plans on establishing a Y-90 program in 2027. Expect Y-90 medical waste. VAAAHS has a broad scope permit with active clinical and research departments. This is subject to change based upon future research needs / demands. Facility Permit has been attached for transparency.

41. Liquid scintillation vials (CLIN x003). Are the vials H-3 or C-14 below 0.05 µCi/g (10 CFR 20.2005)? Are short-lived isotopes (< 109 days) segregated into different containers from long-lived isotopes? What is the solvent base

(biodegradable, RCRA hazardous, or provide scintillation fluid SDS documents), and are the vials glass or plastic?

ANSWER: LSC vials and concentration could vary. VAAAHS has a broad scope permit with active clinical and research departments. This is subject to change based upon future research needs / demands. Short-lived isotopes will be decayed in storage. For LSC fluid, see attached SDS. PRODUCT NAME: ECONO-SAFE.

42. Mixed waste (CLIN x004; SOW II.2g). Mixed waste pricing is case-by-case/special quote. Please provide the EPA waste codes and constituents, volume and container type. Are the mixed waste lab pack quantities or drum quantities?

The SOW says the waste "will be packaged" per the contractor's profile; does VA or the contractor do the packaging?

ANSWER: Currently, the only mixed-waste is with H-3; which is a LSC-vials (three of them). This is subject to change based upon future clinical or research needs/demands. At the time of answer, research is not actively using radioactive material. Contractor will be expected to furnish the containers for disposal, package the

Radioactive Material, and label the contains correctly in preparation for DOT shipment.

43. Response time (SOW III.A). Please clarify "on-site for service within three hours of the scheduled date/time." Does this mean arrival within a three-hour window of the agreed appointment?

ANSWER: This sentence/paragraph has been reworded. See attached revised solicitation.

44. Containers (CLIN x005 vs SOW II.2d). Is CLIN x005 a single annual price for all packaging, or per container? Please give expected container count, volume, and container types.

ANSWER: Contractor will determine and provide the amount of packaging needed and will package the waste with the packaging they have provided. Current Sealed Sources inventory has been attached for estimating purposes. Please note that not all sealed sources are disposed of each year. List has been included to give an idea of what could be anticipated but is by no means limiting. We have a broad scope permit with active clinical and research departments. This is subject to change based upon future research needs/demands.

▪ I-131(VAAAHS has been able to Decay In Storage) all of this waste.

▪ Radiation Safety anticipates Tritium waste on-hand (total amount of Tritium (H-3) activity on the gunsights destroyed was 252 mCi (not considering natural decay), Tritium waste in the form of contaminated gun sights

45. SOW III.B labels the contractor license "(MML)," which usually means VA's own Master Materials License; please confirm this refers to the contractor's NRC or Agreement State license.

Contractor must have a valid and current NRC license, and / or Agreement State License, for Radiation Waste acceptance and disposal. Must have a valid license submitted with bid. SOW was updated to “RML”.

46. Required certifications. Which documents must be submitted with the quote (license, DOT registration, CDLs, training records, state permits, EPA ID)? Do these attachments count toward the 10-page technical limit? Jonathan, I will answer about the page limit, but do you need copies of everyone’s certifications, permits, registrations, etc. at the offer, or is that something you would get copies of/verify once award is made but prior to the contractor coming out?

ANSWER: NRC Radioactive License, DOT Registration, State Permit and EPA ID will be submitted with the bid and do not count toward the 10-page limit.

47. Possession and liability (SOW II.2i). When does custody transfer to the contractor: at signing of the NRC Form 540, or at departure from the site?

ANSWER: At the signing of the NRC From 540 possession and liability transfers. Historically, waste contractor has signed the NRC From 540 and loaded the material directly onto their truck.

48. Site access. Are there badging, escort, vehicle inspection or loading-dock requirements at Ann Arbor and Toledo? Is there access to a loading dock or is a vehicle with a lift gate required?

ANSWER: Radiation Safety Officer and / or Radiation Safety Staff will escort contractor to the Radiation

Waste room, Nuclear Medicine department, etc. No additional badging is necessary. There is access to a loading dock at both the Ann Arbor and Toledo locations. A lift gate is preferred but may not be needed for every pickup.