This is Amendment 0007 to a solicitation for Triennial Electrical Inspection services at Columbus Veterans Affairs Medical Center (VAACC) in Columbus, Ohio, issued by the Department of Veterans Affairs Network Contracting Office 10. The solicitation number is 36C25026Q0318, and the amendment extends the proposal due date to June 12, 2026, at 12:00 P.M. EST. Proposals must be submitted to Brian Kish at Brian.Kish@va.gov.
The amendment provides clarifications to the procurement scope through Requests for Information (RFIs) and responses. Key requirements include: full NETA electrical testing on all equipment per NETA standards and NFPA 99; work performed by journeyman electricians qualified for the respective voltage levels in accordance with VHA Directive 1028; testing of circuit breakers rated 400 amps and above via overcurrent injection testing; mechanical exercise of other breakers; testing of dry-type transformers; and circuit breaker adjustments if not previously completed. The VA will provide updated short circuit studies, coordinate with American Electric Power (AEP) for utility switching and bear associated utility costs, provide temporary power for test equipment, and conduct infrared scanning in-house. Contractors must provide additional lighting as needed, propose schedules for equipment outages, and coordinate with VA electricians for shutdowns. All work must be completed prior to the Arc Flash Study deadline in December 2026. The procurement includes attached supporting documentation: the updated Statement of Work, prior maintenance testing report (dated October 24, 2023), Arc Flash Survey documentation, equipment list, single-line drawings, and VHA Directive 1028 on Facility Electrical Power Systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 11
0007 06-02-2026
701 B
Department of Veterans Affairs
Network Contracting Office 10
2780 Airport Drive, Suite 340
Columbus OH 43219-1834
701 B
Department of Veterans Affairs
Network Contracting Office 10
2780 Airport Drive, Suite 340
Columbus OH 43219-1834
To all Offerors/Bidders
36C25026Q0318
03-16-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 06-12-2026 12:00 EDT
X 01
Amendment 0007 is issued to inform all offereors of the Requests For Information (RFIs) and responses for the
Triennial Electrical Inspection Procurement at Columbus VAACC. The RFIs and Responses can be found on the Continuation
Page of Amendment 0007.
Additionally, the updated Performance Work Statement (PWS) for this procurement is attached as part of Amendment 0007.
The new Proposal Due Date is June 12, 2026, 12:00 P.M. EST. Proposals shall be submitted to Brian Kish;
Email: Brian.Kish@va.gov.
All other Terms and Conditions remain unchanged.
Brian Kish
Contracting Officer
VA-VHA-RPOC-2022-96247
CONTINUATION PAGE
REQUESTS FOR INFORMATION (RFIS) AND QUESTIONS FOR
TRIENNIAL ELECTRICAL INSPECTION
VAACC COLUMBUS OH
SOLICITATION NUMBER 36C25026Q0318
1. Who will be performing switch to make equipment available for maintenance?
VA RESPONSE: VA staff will assist with switching
2. Would you please provide a past report?
VA RESPONSE: Refer to the attached reports.
3. What is defined as "full testing" of breakers above 200A? Does it include primary injection or secondary injection?
VA RESPONSE: Refer to VA Directive 1028 / Prior Test Reports.
4. Will lights be provided or does the Contractor need to provide?
VA RESPONSE: Contractor will provide additional lighting as needed.
5. Will toilet facilities be available?
VA RESPONSE: Yes
6. I am asking to see if we can get a full equipment list that is going to be tested?
VA RESPONSE: See attached Equipment list.
7. Can we get single line drawings?
VA RESPONSE: Yes, they are in the ARC Flash Survey and the latest testing report.
8. Can we get how the VA would like all the equipment tested?
VA RESPONSE: Refer to prior test reports and NETA Standards.
9. Can the VA provide a set of current electrical drawings?
report.
10. Can the VA provide a detailed equipment list identifying what is to be inspected? The current scope appears to be vague.
VA RESPONSE: See attached Equipment list.
11. Can the VA provide previous test reports so we can align our scope with prior work performed?
VA RESPONSE: Yes
12. The Arc flash study is due in December of 2026. Will all work on this contract be completed prior to that deadline?
VA RESPONSE: Yes
13. While the solicitation states that all work will be performed from 7:00 PM to 6:00 AM, Monday through Friday, is there an outage schedule available identifying which equipment will be accessible during those times?
VA RESPONSE: Contractor to provide proposed schedule and coordinate with VA electricians for shutdowns.
o How many outages are anticipated, and what equipment will be accessible during each outage?
VA RESPONSE: Contractor to provide proposed schedule and coordinate with VA electricians for shutdowns.
14. Are we responsible for providing generators to operate our test equipment, or will the VA supply them? There was a mention during the site walk that the VA would provide generators, but we would like to confirm.
VA RESPONSE: Temporary power will be available.
15. For infrared (IR) scanning, who will be responsible for removing panel covers—the contractor or the VA?
VA RESPONSE: IR Scanning will be done in-house by VA staff.
16. Section 1.2 (Specific Tasks) states: “The VA will provide an updated short circuit study for all circuit breaker adjustments according to the recommended settings.” Have these breaker adjustments already been completed, or will the adjustment be part of our scope?
VA RESPONSE: If they haven’t been adjusted, it will be part of the scope for this procurement.
17. The solicitation references cleaning of all dry-type transformers; however, during the site walk, it was indicated that no work would be performed in certain electrical closets.
Should we follow the solicitation requirements or the direction provided during the site walk? If the latter, we may not have visibility of all the equipment required for IR scanning, particularly in rooms that were not shown.
VA RESPONSE: There is no requirement for IR scanning, refer to the solicitation requirements.
18. Will the VA provide the single-line diagram.
VA RESPONSE: Yes, they are in the ARC Flash Survey and the latest testing report.
19. Will the VA provide the latest electrical test report. We are referring to the electrical testing report, not the Arc Flash study report.
VA RESPONSE: Yes. The latest electrical testing report has been provided as part of this amendment.
20. Please confirm the exact contract duration in 2026, since the pricing form does not appear to follow the VA’s typical format.
VA RESPONSE: This question requires additional clarification.
21. Will the VA provide a list of equipment to be tested.
VA RESPONSE: The Equipment list to be tested has been provided as part of this amendment.
22. For liquid-filled transformers and dry-type transformers, can the testing scope be limited to oil sampling and visual inspection only or is full NETA electrical test is required?
VA RESPONSE: Full NETA testing is required, no oil filled transformers on our campus.
23. Are there any devices that are excluded from primary injection testing due to operational constraints or risk concerns?
VA RESPONSE: There are none.
24. Please clarify whether coordination with American Electric Power (AEP) will be required, in case we are unable to obtain a quotation from AEP
VA RESPONSE: VA to schedule with AEP.
25. Could you please provide the name, year, awarded value, and awarded contractor for the most recent bid performed at this site? Additionally, please confirm whether the scope of work for that contract is identical to the scope for the current 2025 bid.
VA RESPONSE: Contractors to conduct their own research on System for Award
Management (www.SAM.gov) to obtain this information.
26. Can you confirm that all low-voltage circuit breakers rated below 200A DO NOT require primary current injection testing?
VA RESPONSE: They do not.
27. Do all circuit breakers require secondary current injection testing?
VA RESPONSE: Follow standards set by NETA.
28. Are there any specific site security requirements, background checks, or badging procedures that contractors must follow?
VA RESPONSE: No requirements, Contractor to be escorted by VA staff.
29. Can NETA-certified technicians be used in place of Journeyman-level technicians?
VA RESPONSE: Recommended journeyman level with NETA Certifications.
30. Section 1.0 – Journeyman Electric Requirement
Section 1.0 requires work to be performed by Journeyman electricians. While journeyman licensing is appropriate for installation work, it does not require nor verify training, certification, or competency in electrical testing and maintenance. This qualification fails to ensure that personnel possess the specialized expertise required for diagnostic testing, protective device coordination, and system reliability assessments.
We respectfully request that this section be removed in its entirety and that contractor qualification requirements be revised and consolidated within Section 1.3 to reflect the appropriate testing and maintenance qualifications, as previously proposed.
VA RESPONSE: Work shall be performed by journeyman electricians qualified for the voltage level of the various equipment, in accordance with VHA Directive 1028.
The Journeyman Electrician Requirement is required for the Triennial Electrical http://www.sam.gov/
Inspections in accordance with VHA Directive 1028. VHA Directive 1028 requires
Journeyman level employees that are pertinent and required for Triennial Electrical
Inspections. VHA Directive 1028 covers all electrical systems, maintenance, and repairs and the training certifications and competencies. Additionally, VHA Directive 1028 is the guidelines for Joint Commissioning for performing and completing the Triennial Electrical
Inspections. Section 1.0 cannot be removed since the Triennial Electrical Inspections are in accordance with VHA Directive 1028. This procurement is for Joint Commission.
31. Breaker Testing Requirements – Page 4
Page 4 references both exercising circuit breakers and performing full testing on breakers rated above 200 amps. These requirements should be consolidated into a single, clearly defined specification.
To align with VHA Directive 1028 and industry standards used across multiple VA facilities, we recommend overcurrent testing be performed on all circuit breakers rated
250 amps and above located in main and distribution switchboards.
All other breakers, particularly those located in panelboards, be mechanically exercised to verify proper operation (open/close function). This approach minimizes the impact of required power outages while still providing a reliable assessment of system performance.
VA RESPONSE: The VA’s requirements are in accordance with and outlined in
NFPA 99, TABLE 6.9.4.1 – Overcurrent testing greater or equal to 400 amps. The requirements cannot be consolidated. These are the standards.
32. Section 1.2 – Identification of Hot Spots
Section 1.2 requires identification of hot spots within electrical equipment but does not define the method by which this is to be achieved.
We recommend adding a requirement for a comprehensive thermographic (infrared) inspection of the entire electrical distribution system. This should explicitly include panelboards, as these components historically exhibit the highest frequency of thermographic deficiencies.
Providing this clarification ensures consistency in scope and prevents underperformance or ambiguity in contractor deliverables.
VA RESPONSE: VAACC Columbus does their own infrared testing. VA doesn’t dictate means and methods. It has to be an acceptable solution. The recommendation outlined above is not applicable since VAACC Columbus does their own testing. The Engineering COR will review the Statement of Work (SOW) to make sure this is removed. A revised SOW will be posted to SAM.GOV if this requirement is removed from the SOW since VAACC Columbus does their own testing.
33. Utility Coordination – American Electric Power (AEP)
The final portion of Section 1.2 requires the contractor to coordinate with American
Electric Power (AEP) for disconnection and reconnection of the facility’s main electrical service.
This requirement presents two concerns:
Utility providers often will not coordinate directly with contractors without explicit authorization from the facility owner (VA).
The solicitation does not specify who is responsible for associated utility costs, which can vary significantly depending on the provider and scope of work.
We request that the VA clarify responsibility for coordination and either:
Assume responsibility for utility coordination and costs, or
Provide a defined cost allowance to ensure all bidders carry consistent pricing assumptions.
VA RESPONSE: VAACC Columbus will make the Utility Coordination with AEP and the Contractor. Section 1.2 in the revised SOW that will be posted to
SAM.GOV will reflect this requirement. VAACC Columbus will cover the costs and will be responsible for associated utility costs, which will ensure the awarded
Contractor doesn’t bear responsibility.
34. Section 1.3 – NETA Certification Requirement
Section 1.3 requires the contractor to be NETA certified. This requirement has historically been determined to be unduly restrictive and contrary to the Government’s obligation to promote full and open competition under FAR 6.101, 6.301and
11.002(a)(1).
We request that this requirement be revised to the following widely accepted language:
“The contractor and its employees shall possess NETA, NICET, or equivalent training or experience sufficient to demonstrate competency in electrical testing and inspection services. Documentation of certifications, licenses, relevant experience, and past performance shall be provided to substantiate qualifications.”
This revision maintains quality standards while allowing broader competition among qualified contractors.
VA RESPONSE. VHA Directive 1028 requires NETA Certifications. NETA
Certification is required for the Triennial Electrical Services Procurement. NETA is considered best practice for Triennial Electrical Inspections. VHA Directive
1028, Page 16, Paragraph 6 of Section J – Testing and Maintenance – states NETA
Certification is best practices for Triennial Electrical Inspections.
35. We noticed that the NAICS code on this opportunity was incorrectly labeled for manufacturing. We request that the NAICS is changed from 335311 to the correct
NAICS of 238210.
VA RESPONSE: The NAICS Code 335311 is incorrectly used for this procurement.
However, the corrected NAICS Code for this procurement is 541350 – Building
Inspection Services. Please note, NAICS Code 238210 is for installation and servicing electrical wiring and equipment, not electrical inspection.
36. Our team’s service engineers and technicians are not allowed to be NETA certified.
NETA's bylaws prevent any manufacturer's representatives from belonging to the organization. The industry-wide equivalent alternative to NETA is NICET. NICET's nationally recognized certifications are designed by industry experts and practitioners to ensure a qualified workforce. The NICET certification is the industry qualifier for performing specialized engineering technology work. The NICET designation acknowledges that the individual has attained a higher level of specialized knowledge and professionalism. Our field personnel perform the manufacturer's recommended startup procedures which are in direct alignment with NETA Standards. We request that NICET certification be added into this SOW in addition to NETA.
VA RESPONSE: Per VA Directive 1028 NETA is the requirement.
37. Can the VA provide a set of current electrical drawings?
report.
38. Can the VA provide a detailed equipment list identifying what is to be inspected? The current scope appears to be vague.
VA RESPONSE: Equipment list has been provided in this amendment.
39. Can the VA provide previous test reports so we can align our scope with prior work performed?
40. The Arc flash study is due in December of 2026. Will all work on this contract be completed prior to that deadline?
41. While the solicitation states that all work will be performed from 7:00 PM to 6:00 AM, Monday through Friday, is there an outage schedule available identifying which equipment will be accessible during those times?
VA RESPONSE: Contractor to provide proposed schedule and coordinate with VA electricians for shutdowns.
42. How many outages are anticipated, and what equipment will be accessible during each outage?
VA RESPONSE: Contractor to provide proposed schedule and coordinate with VA electricians for shutdowns.
43. Are we responsible for providing generators to operate our test equipment, or will the VA supply them? There was a mention during the site walk that the VA would provide generators, but we would like to confirm.
VA RESPONSE: Temporary power will be available.
44. For infrared (IR) scanning, who will be responsible for removing panel covers—the contractor or the VA?
VA RESPONSE: IR scanning will be done in house by VA staff.
45. Section 1.2 (Specific Tasks) states: “The VA will provide an updated short circuit study for all circuit breaker adjustments according to the recommended settings.” Have these breaker adjustments already been completed, or will the adjustment be part of our scope?
VA RESPONSE: If they haven’t been adjusted it will be part of the scope. Please see revised updated Statement of Work that has been included as an attachment to this amendment (David Gilliam, please confirm this has been included as part of the
SOW).
46. The solicitation references cleaning of all dry-type transformers; however, during the site walk, it was indicated that no work would be performed in certain electrical closets.
Should we follow the solicitation requirements or the direction provided during the site walk? If the latter, we may not have visibility of all the equipment required for IR scanning, particularly in rooms that were not shown.
VA RESPONSE: There is no requirement for IR scanning, refer to solicitation requirements.
47. I am asking to see if we can get a full equipment list that is going to be tested?
VA RESPONSE: Full equipment list that is going to be tested has been provided as attachment to this amendment.
48. Also, can we get single line drawings?
report.
49. And finally, can we get how the VA would like all the equipment tested?
VA RESPONSE: Refer to the prior test reports and NETA standards.
50. The last time this was out for bid the VA did not answer this question so all bidders could bid on the same work.
VA RESPONSE: Refer to prior test reports and NETA Standards.
51. Will lights be provided or does SterileCo need to provide?
VA RESPONSE: Contractor will provide additional lighting as needed.
52. Could you please provide the name, year, awarded value, and awarded contractor for the most recent bid performed at this site?
VA RESPONSE: Contractors to conduct their own research on System for Award
Management (www.SAM.gov) to obtain this information.
53. Additionally, please confirm whether the scope of work for that contract is identical to the scope for the current 2025 bid.
VA RESPONSE: Scope of work is similar, not identical, additional devices have been added.
54. To prepare an accurate quote, we kindly request any available plans, specifications, or supporting documentation related to this requirement. Any additional information you can provide would be greatly appreciated.
VA RESPONSE: There is no additional documentation that can be provided related to this requirement. The VA has provided the previous inspection report, the Arc
Flash Survey documentation and spreadsheet listing all the devices requiring testing/inspection.
http://www.sam.gov/
55. Can a list of equipment be provided that needs to be tested broken down by
Location/Identity/equipment type AND/OR Can a list be provided with exact numbers of each type of equipment needed to be tested and a one line document be given.
VA RESPONSE: There is no additional documentation that can be provided related to this requirement. The VA has provided the previous inspection report, the Arc
Flash Survey documentation and spreadsheet listing all the devices requiring testing/inspection.
See attached document: Triennial Breaker SOW Updated.
See attached document: 36C25023P0914 Columbus VA Final Report Maint. Testing 10-24-
2023.
See attached document: COLUMBUS VAMC Arc Flash Survey 100 PERCENT REPORT.
See attached document: VHA Directive 1028 Facility Electrical Power Systems.