This Excel file is a detailed cost estimate report for Project 655-25-706, focusing on electrical and data infrastructure installation for the Department of Veterans Affairs Veterans Health Administration. The comprehensive estimate, dated 04/29/2025, covers materials and labor for installing network and electrical components in Saginaw, Michigan, with a total estimated cost of $33,977.85. Key line items include Category 6 UTP cable, patch panels, cable supports, electrical metallic tubing, RJ45 jacks, duplex receptacles, outlet boxes, and associated installation labor, with a predictive implementation year of 2027 Quarter 3. The cost breakdown includes material costs of $4,944.11, labor costs of $16,144.85, and overhead and profit margins, with the estimate prepared using the MasterFormat 2018 standard and utilizing the Michigan/Saginaw cost index.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

COST ESTIMATE REPORT
DATE: 04/29/2025

Estimate Name: EHRM DDPO

ESTIMATE INFORMATION

Client Name:Type:UnitNotes:
Estimate Address:Saginaw, MIMeasurement System:US Standard

COST DATA

Estimate Summary:Catalog:.....Facilities Construction
MaterialLaborEquipmentTotal*Format:MasterFormat 2018
Base Total$ 8,551.43$ 15,813.70$ - 0$ 24,365.13Release:Predictive Year 2027 Quarter 3 as of Year 2025 Quarter 1
Total O&P$ 9,383.00$ 16,144.85$ - 0$ 33,977.85Labor Type:Repair & Remodeling
*"Total" column values include the cost of Exception lines that may not be included in the Material, Labor and Equipment totals.City Cost Index:MICHIGAN / SAGINAW (486)

LEGEND

Line Source:U - User defined line item
A - Adjustment/Modifier
E - Exception lines

ESTIMATE

QuantityLineNumberLine SourceSubContracted Ind.DescriptionCrewDaily OutputLabor HoursUnitMaterialLaborEquipmentTotalExt. Mat.Ext. LaborExt. Equip.Ext. TotalMat. O&PLabor O&PEquip. O&PTotal O&PExt. Mat. O&PExt. Labor O&PExt. Equip. O&PExt. Total O&PLabor TypeNotes
50271513137240Unshielded twisted pair (UTP) cable, solid, PVC jacket, #24, 4 pair, category 61 Elec71.143C.L.F.$ 75.58$ 60.11$ - 0$ 135.69$ 3,779.00$ 3,005.50$ - 0$ 6,784.50$ 82.85$ 92.36$ - 0$ 175.21$ 4,142.50$ 4,618.00$ - 0$ 8,760.50RR0
20271119103100Patch panel, punch down termination per port1 Elec1070.075Ea.$ - 0$ 3.92$ - 0$ 3.92$ - 0$ 78.40$ - 0$ 78.40$ - 0$ 6.01$ - 0$ 6.01$ - 0$ 120.20$ - 0$ 120.20RR1
20270529100110Cable support, J-hook, single tier, single sided, 1" diameter1 Elec68.570.117Ea.$ 3.48$ 6.12$ - 0$ 9.60$ 69.60$ 122.40$ - 0$ 192.00$ 3.83$ 9.38$ - 0$ 13.21$ 76.60$ 187.60$ - 0$ 264.20RR2
15260519900940Wire, copper, solid, 600 volt, #12, type THWN-THHN, normal installation conditions in wireway, conduit, cable tray1 Elec110.727C.L.F.$ 21.80$ 38.12$ - 0$ 59.92$ 327.00$ 571.80$ - 0$ 898.80$ 24.23$ 58.64$ - 0$ 82.87$ 363.45$ 879.60$ - 0$ 1,243.05RR3
1500260533135020Electric metallic tubing (EMT), 3/4" diameter, to 10' high, incl 2 terminations, 2 field bend elbows, 11 beam clamps, and 11 couplings per 100 LF1 Elec1300.062L.F.$ 1.99$ 3.23$ - 0$ 5.22$ 2,985.00$ 4,845.00$ - 0$ 7,830.00$ 2.18$ 4.95$ - 0$ 7.13$ 3,270.00$ 7,425.00$ - 0$ 10,695.00RR4
25271513137326Shielded twisted pair (UTP) jack, RJ45, category 61 Elec600.133Ea.$ 11.34$ 7.00$ - 0$ 18.34$ 283.50$ 175.00$ - 0$ 458.50$ 12.45$ 10.74$ - 0$ 23.19$ 311.25$ 268.50$ - 0$ 579.75RR5
22262726202470Duplex receptacle, grounded, 120 volt, 20 amp1 Elec270.296Ea.$ 14.73$ 15.39$ - 0$ 30.12$ 324.06$ 338.58$ - 0$ 662.64$ 16.18$ 23.82$ - 0$ 40.00$ 355.96$ 524.04$ - 0$ 880.00RR6
25260533160350Outlet boxes, pressed steel, 4-11/16" square1 Elec200.4Ea.$ 7.51$ 20.89$ - 0$ 28.40$ 187.75$ 522.25$ - 0$ 710.00$ 8.28$ 32.25$ - 0$ 40.53$ 207.00$ 806.25$ - 0$ 1,013.25RR7
25260533160500Outlet boxes, pressed steel, plaster rings, 4-11/16" square1 Elec530.151Ea.$ 5.43$ 7.92$ - 0$ 13.35$ 135.75$ 198.00$ - 0$ 333.75$ 5.96$ 12.17$ - 0$ 18.13$ 149.00$ 304.25$ - 0$ 453.25RR8
25260533160450Outlet boxes, pressed steel, covers, blank, 4-11/16" square1 Elec530.151Ea.$ 2.71$ 7.92$ - 0$ 10.63$ 67.75$ 198.00$ - 0$ 265.75$ 2.98$ 12.17$ - 0$ 15.15$ 74.50$ 304.25$ - 0$ 378.75RR9
3260533160700Outlet boxes, pressed steel, masonry, 1 gang, 2-1/2" deep1 Elec270.296Ea.$ 9.79$ 15.39$ - 0$ 25.18$ 29.37$ 46.17$ - 0$ 75.54$ 10.76$ 23.82$ - 0$ 34.58$ 32.28$ 71.46$ - 0$ 103.74RR10
10260533160750Outlet boxes, pressed steel, masonry, 2 gang, 2-1/2" deep1 Elec200.4Ea.$ 18.36$ 20.89$ - 0$ 39.25$ 183.60$ 208.90$ - 0$ 392.50$ 20.35$ 32.25$ - 0$ 52.60$ 203.50$ 322.50$ - 0$ 526.00RR11
3260533161530Outlet boxes, cast, duplex receptacle cover, 1 gang, FS1 Elec640.125Ea.$ 9.45$ 6.56$ - 0$ 16.01$ 28.35$ 19.68$ - 0$ 48.03$ 10.42$ 10.08$ - 0$ 20.50$ 31.26$ 30.24$ - 0$ 61.50RR12
10260533161540Outlet boxes, cast, duplex receptacle cover, 2 gang, FS1 Elec530.151Ea.$ 15.07$ 7.92$ - 0$ 22.99$ 150.70$ 79.20$ - 0$ 229.90$ 16.57$ 12.17$ - 0$ 28.74$ 165.70$ 121.70$ - 0$ 287.40RR13
1260533169000Outlet boxes, minimum labor/equipment charge1 Elec42Job$ - 0$ 104.82$ - 0$ 104.82$ - 0$ 104.82$ - 0$ 104.82$ - 0$ 161.26$ - 0$ 161.26$ - 0$ 161.26$ - 0$ 161.26RR14
2013113200280EField personnel, superintendent, maximum00Week$ - 0$ 2,650.00$ - 0$ 2,650.00$ - 0$ 5,300.00$ - 0$ 5,300.00$ - 0$ - 0$ - 0$ 4,225.00$ - 0$ - 0$ - 0$ 8,450.00RR15

Grand Total $ 3,173.44 $ 8,551.43 $ 15,813.70 $ - 0 $ 24,365.13 $ 4,944.11 $ 9,383.00 $ 16,144.85 $ - 0 $ 33,977.85 image1.png