Project 655-25-706 - DRAWINGS.pdf

PDF 2 MB Posted

Attached to
655-25-706 EHRM Installation of DDPo2
Solicitation number
36C25025R0098
Issued by

About this file

These are electrical design drawings for the EHRM Installation of DDPO project at the Aleda E. Lutz VA Medical Center in Saginaw, Michigan (Project No. 655-25-706). The comprehensive set of drawings includes electrical floor plans for Buildings 1, 9, and 22, spanning from the basement to the 5th floor, with a detailed focus on electrical infrastructure modifications.

The drawings specifically outline electrical work involving the installation of new receptacles, data drops using CAT 6A cabling, and electrical system updates across multiple building floors. Each floor plan meticulously documents existing and proposed electrical modifications, including new quad receptacles, data cable additions, and routing through existing conduits and cable trays. The plans adhere to current International Building Code, NFPA codes, and National Electrical Code (NEC) standards, with specific instructions for conductor identification, equipment grounding, and panel schedule updates. The project involves precise electrical system enhancements across various medical facility spaces such as offices, patient rooms, laboratories, and utility areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEISS STREET

EC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

G1.1

COVER SHEET

SAGINAW, MICHIGAN

Department of Veterans Affairs

SAGINAW, MICHIGAN

NORTH

L O C A T I O N M A P

Aleda E. Lutz VA Medical Center Project No. 655-25-706 EHRM INSTALLATION OF DDPO:

PROJECT LOCATION

CAMPUS AREA MAP

DRAWING INDEX

Sheet Number Sheet Title Sheet Description

1 G1.1 COVER SHEET

2 1-E1.1 BUILDING 1 - BASEMENT ELECTRICAL PLAN

3 1-E1.2 BUILDING 1 - 1ST FLOOR ELECTRICAL PLAN

4 1-E1.3 BUILDING 1 - 2ND FLOOR ELECTRICAL PLAN

5 1-E1.4 BUILDING 1 - 3RD FLOOR ELECTRICAL PLAN

6 1-E1.5 BUILDING 1 - 4TH FLOOR ELECTRICAL PLAN

7 1-E1.6 BUILDING 1 - 5TH FLOOR ELECTRICAL PLAN

8 9-E1.1 BUILDING 9 - 1ST FLOOR ELECTRICAL PLAN

9 22-E1.1 BUILDING 22 - BASEMENT ELECTRICAL PLAN

10 22-E1.2 BUILDING 22 - 1ST FLOOR ELECTRICAL PLAN

11 E2.1 DETAILS & SCHEDULES

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

(3) XFMRS STACKED

HAC

1-B262

SWITCHGEAR

ROOM

1-B260C

MACHINE

SHOP

1-B260A

LOCKSMITH

1-B260D

SWITCHGEAR

ROOM

1-B255

LOUNGE

1-B250

SOILED

LINEN

1-B240

BATH

1-B220H

WAITING

1-B220G

MEDICAL

RECORDS

1-B220

OFFICE

1-B220E

MEDICAL

RECORDS

1-B220E

OFFICE

1-B220D

OFFICE

1-B220C

OFFICE

1-B220B

OFFICE

1-B220A

CREDIT

UNION

1-B210

DATA

1-B200

WOMENS

LOCKER

1-B150

TOILET

1-B150A

FIRE

ALARM

1-B140

CANTEEN

1-B134

HVAC

SHOP

1-B132

MECH

1-B132A

BIOMED

1-B130

BIOMED

1-B130A

HAC

1-B124

LINEN

1-B122 SOILED

LINEN

1-B120 OFFICE

1-B112

OFFICE

1-B110

ENGINEERING

LIBRARY

1-B108

OFFICE

1-B106

OFFICE

1-B104

MECH

1-B103

PLUMBING

SHOP

1-B100

STORAGE

1-B103A

OFFICE

1-B105

OFFICE

1-B115C

OFFICE

1-B115B

FMS

1-B115

STAIR #3

B-S3

CORRIDOR

1-B119

MORGUE

1-B125

MORGUE

1-B125A

OFFICE /

STORAGE

1-B127

OFFICE

1-B128

STORAGE

1-B129

CHARGING

ROOM

1-B141

ELEVATOR

ELEV-A

ELEVATOR

ELEV-B

ELEVATOR

ELEV-C

IT CLOSET

1-B300OFFICE /

LOUNGE

1-B201

ELEC

1-B203SHOWER

1-B215B

MEN'S

BATHROOM

1-B215A

MEN'S

LOCKER

1-B215

OFFICE

1-B241

KEY ROOM

1-B301

GIP SHOP

1-B315 OFFICE

1-B305

OFFICE

1-B305A

STORAGE

1-BXXX

STORAGE

1-BXXX

STAIR #2

B-S2

LINEN

STORAGE

1-B320

LAUNDRY

1-B321

BIO MED

1-B324

OFFICES

1-B325

CANTEEN

STORAGE

1-B326

CANTEEN

STORAGE

1-B326

ELECTRICAL

SHOP

1-B330

PAINT

SHOP

1-B332

CARPENTRY

SHOP

1-B340

CARPENTRY

OFFICE

1-B340A

STAIR #5

B-S5

OFFICE

SAFETY TECH

1-B339

OFFICE

SAFETY

1-B338BULK

STORAGE

1-B349

RECEIVING

1-B350

ELEC

1-B353

HAC

1-B352

STERILE

STORAGE

1-B351

MENS

BATHROOM

1-B355AMENS

LOCKERROOM

1-B355

WOMENS

LOCKERROOM

1-B354 WOMENS

BATHROOM

1-B354A

CORRIDOR

1-BC6

CORRIDOR

1-BC7

STAIR #4

B-S4

WATER

TREATMENT

1-B328

VESTIBULE

1-B357A

HAC

1-B329

DECON

ROOM

1-B357

STERILE

PROCESSING

1-B359

EQUIPMENT

1-B358

OPEN

OFFICE

1-B360

OFFICE

1-B361

OFFICE

1-B362

MECHANICAL

1-B380

MECHANICAL

1-B381

EMH-106

FOT-2

FOT-1BFOT-1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

ELECTRICAL GENERAL NOTES:

1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING

CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING

CONDUIT AND CABLE TRAY.

1-E1.1

BASEMENT ELECTRICAL PLAN

EX. DATA CONDUITS

FROM 1ST FLOOR

SYSTEMS CABLING MATRIX

MDF/IDF LOCATION FINAL TERMINATION LOCATIONS

DATA 1-B200

BASEMENT

1ST FLOOR

DATA 1-2300

2ND FLOOR

3RD FLOOR

DATA 1-4309

4TH FLOOR

5TH FLOOR

PENTHOUSES

BUILDING 1 - BASEMENT ELECTRICAL FLOOR PLAN

SCALE: 1/16"=1'-0"

UP UP

UP

UP

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

AMBULANCE

BAY

1-1273

OFFICE

1-1270

OFFICE

1-1268

OFFICE

1-1266

OFFICE

1-1264

OFFICE

1-1262

OFFICE

1-1260

TRIAGE

ACOS

1-1250

SOILED

1-1234

TREAMENT

1-1238

EXAM

1-1240

EXAM

1-1242

EXAM

1-1244

PT BATH

1-1243

BATH

1-1241A

TREAMENT/

GYN

1-1241

TREAMENT

1-1239

EXAM

1-1237

TREATMENT/

OBSERVATION

1-1235

NURSE

WORK

1-1233

TREATMENT/

OBSERVATION

1-1231

SWITCHBOARD

1-1212

OFFICE

1-1208

LOBBY

1-1200

LOBBY

1-1203

ELEV

F

LOBBY

1-1201

VESTIBULE

1-1201A

ELEV. MECH.

ROOM

1-1202A

ANTE ROOM

1-1202

WOMEN'S

1-1276

MEN'S

1-1277

WAITING

ROOM

1-1275

OFFICE

ACOS

1-1263

OFFICE

ACOS

1-1261

ELEC.

1-1259

TEAM ROOM

ACOS

1-1257

STAIR #1

1-S1

OFFICE

1-1227

OFFICE

1-1226

WAITING

1-1225

AGENT

CASHIER

1-1224

OFFICE

1-1209

OFFICE

1-1305B

OFFICE

1-1305A

ELEC.

1-1207

H.A.C 1-1205

ELEV

C ELEV

B

ELEV

A

DATA

1-1301

CLOSET

1-1305C

WAITING

1-1305

RECEP.

1-1305D

KITCHEN

1-1324

STORAGE

1-1324A

CAFETERIA

1-1325

MEN'S

TOILET

1-1355

MECH.

1-1361

H.A.C.

1-1363

AUDITORIUM

1-1370

STAGE

1-1373

STORAGE

1-1372

TV ROOM

1-1373E

STORAGE

1-1373D

BATH

1-1373B

STAIR #4

1-S4

KITCHEN

1-1375

STORAGE

1-1373C

STORAGE

1-1373A

STORAGE

1-1364

VOLUNTEER

SERVICE

1-1360

ELEC.

1-1356

CHIEF

1-1360A

CHAPEL

1-1380

CHAPEL

1-1383

CHAPEL

1-1385

CHAPLIN

1-1384

WOMEN'S

1-1352A

WOMEN'S

LACT

1-1352

STORAGE

1-1351

STORAGE

1-1350

OFFICE

1-1349

OFFICE

1-1348

OFFICE

1-1347

OFFICE

1-1346

OFFICE

1-1345

OFFICE

1-1344

STAIR #5

1-S5

OFFICE

1-1343

CASHIER

1-1341

CANTEEN

OFFICE

1-1340A

CANTEEN

RETAIL STORE

1-1340

OFFICE

1-1332

OFFICE

1-1331

OFFICE

1-1330

INPATIENT

PHARMACY

1-1314

PHARMACY

PICK UP

1-1310

STAIR #2

1-S2

MEN'S

1-1155 WAITING

1-1125

OFFICE

1-1150

STAIR #3

1-S3

EXAM

1-1117

EXAM

1-1115

EXAM 2

1-1111

ELEC.

1-1113

OFFICE

1-1109

EXAM 4

1-1107

OFFICE

1-1105

OFFICE

1-1103

OFFICE

1-1101

STAIR #6

1-S6

PATIENT

EDU.

1-1100

EXAM 8

1-1102

EXAM 8

1-1104

EXAM 10

1-1106

EXAM 11

1-1108

EXAM 11

1-1110

STORAGE

1-1110A

MEDS

1-1114A

OFFICE

1-1116MECHANICAL

1-1118

SOILED

1-1127

LINEN

CHUTE

1-1127A

WOMEN'S

TOILET

1-1129

EXAM 13

1-1131

EXAM 14

1-1133

EXAM 15

1-1135

EXAM 16

1-1137

EXAM 17

1-1139

PATIENT

EDU.

1-1141

BATH

1-1141A

EXAM 18

1-1142

EXAM 19

1-1140

EXAM 20

1-1138

EXAM 21

1-1136

EXAM 22

1-1134

EXAM

1-1132

OFFICE

1-1146

NURSE

STATION

1-1149

MED/

NOURISH

1-1230

EX. SUPPLY CABINET EX. MED. FRIDGE

EX. ICE MAKER

NEW BLANKET WARMER

EX. PC

C1B-2

C1B-2

C1A-27

RECEPTION

ACOS

1-1256

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

1-E1.2

1ST FLOOR ELECTRICAL PLAN

EX. CIRCUIT & NEW

RECEPTACLE (EX. CKT

LOCATED IN 1-1305A) -

C1B-2

NEW CIRCUIT &

RECEPTACLE - C1A-27

1-1-5

EX. LOCATION ADD

1 X DATA CABLE

EX. CIRCUIT & NEW

RECEPTACLE (EX. CKT

LOCATED IN 1-1256) -

C1B-25

EX. DUPLEX RECEPTACLE

TO BE SWAPPED W/ QUAD

(EX. CKT LOCATED IN

1-1256) - C1B-25

1-1-3

EX. LOCATION ADD

1 X DATA CABLE

1-1-2

EX. LOCATION CLNG

DROP (PLUG MOLD) ADD

2 X DATA CABLE

1-1-4

EX. LOCATION ADD

1 X DATA CABLE

1-1-1

EX. LOCATION ADD

1 X DATA CABLE

EX. DATA CONDUITS TO

BASEMENT

SYSTEMS CABLING MATRIX

MDF/IDF LOCATION FINAL TERMINATION LOCATIONS

DATA 1-B200

BASEMENT

1ST FLOOR

DATA 1-2300

2ND FLOOR

3RD FLOOR

DATA 1-4309

4TH FLOOR

5TH FLOOR

PENTHOUSES

BUILDING 1 - 1ST FLOOR ELECTRICAL FLOOR PLAN

SCALE: 1/16"=1'-0"

ELECTRICAL GENERAL NOTES:

1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING

CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING

CONDUIT AND CABLE TRAY.

PANEL C1A

UP

UPUP

UP

UP

UP

DENTISTRY

DENTAL

1-2243

DENTISTRY

1-2241

X-RAY

1-2239

SUPPLY

1-2239A

DENTISTRY

1-2237

DENTISTRY

1-2235

OFFICE

1-2233

OFFICE

1-2231

DENTISTRY

LAB

1-2242

DENTISTRY

1-2240

XRAY

DENTAL

1-2238

DARK

ROOM

1-2238A

SOILED

UTILITY

1-2236

MECH.

1-2234

OFFICE

1-2232

WAITING

1-2230

H.A.C.

1-2228

LINEN

1-2250

STORAGE

1-2230B

LAB

1-2230A

IMAGING

ROOM

1-2260

WAITING

1-2264

ECHO

1-2268

ECHO

1-2270

ULTRASOUND

1-2272

ECHO

1-2271

ULTRASOUND

1-2269

BATH

1-2266

VEST.

1-2267

BATH

1-2265

OFFICE

DIAG. SERVICE

1-2263

OFFICE

DIAG. SERVICE

1-2263A

ELEC.

1-2261

SCAN

1-2257

STAIR #1

2-S1

LOCKERS

1-2224

OFFICE

1-2223

OFFICE

1-2222

RECEPTION

1-2221

ELEC.

1-2211

WAITING

1-2219

RESPIRATORY

STORAGE

1-2219

CPAP CLINIC

1-2319

SLEEP

OFFICE

1-2322

CPAP

STORAGE

1-2320

HOME OXYGEN

CLINIC

1-2323

HOME OXYGEN

CLINIC

1-2321

STORAGE

1-2315A

PULMONARY

FUNCTION LAB

1-2324

PATIENT EDU.

1-2325

STAIR #4

2-S4

STORAGE

1-2359

BATH

1-2361A

MEN'S

LOCKER ROOM

1-2361

STORAGE

1-2362

WOMEN'S

LOCKER ROOM

1-2360

BATH

1-2360A

STORAGE

1-2358 ELEC.

1-2356

OFFICE

1-2355

BREAK ROOM

1-2343

PREP ROOM

1-2343

VEG.

REFRIG.

1-2343A

THAW BOX

1-2343BFRIDGE

1-2341

FREEZER 1

1-2343C

FREEZER 2

1-2343D

STORAGE

1-2349

KITCHEN

1-2341

DRY

STORAGE

1-2348

POT WASH

1-2346

H.A.C.

1-2340

KITCHEN

1-2330

OFFICE

1-2330A

STORAGE

1-2330C

STORAGE

1-2330B

STORAGE

1-2330D

CUBICAL

OFFICE

1-2305

OFFICE

1-2304

OFFICE

1-2302

NUTRITION

KITCHEN

1-2303

STORAGE

1-2303B

STORAGE

1-2303A

STAIR #5

2-S5

STAIR #2

2-S2

DATA

1-2300

ELEV

C ELEV

B

ELEV

A

OFFICE LAB

1-2123

SECURITY

LAB

1-2121

STORAGE

1-2119A

PHLEBOTOMY

LAB

1-2119

STAIR #3

2-S3 TOILET

1-2100H

LAB

BREAKROOM

1-2100FPATHOLOGY

LOCKERS

1-2100G

TECH. LAB

1-2122

ELEC.

1-2100E LAB

1-2100

MICROBIOLOGY

LAB

1-2100D

BLOOD BANK

1-2100A

STORAGE

1-2100B STAIR #6

2-S6

TOILET

1-2124

TOILET

1-2133A

DATA

1-2130

DRESSING RM.

1-2133

X-RAY

1-2135

BREAK RM.

1-2139

BREAK RM.

1-2141

CAT SCAN

1-2145

CONTROL RM.

1-2147MECH

1-2148

CHIEF RAD.

SERV.

1-2146

CLOSET

1-2146A

X-RAY

1-2142

BATH

1-2142A

WORKROOM

1-2140

DEXA

SCANNER

1-2138

RECEPT.

1-2136

OFFICE

IMAGING

1-2132

GFI

GFI

WOMENS

1-2216

MENS

1-2214 OFFICE DIAGNOSTIC

SERVICE

1-2212 WAITING

1-2200

RECEPTION

1-2208

OPEN

OFFICE

1-2134

MECH

1-2359A

J

CENTAUR XP

CENTAUR CP

CENTAUR CPCENTAUR CP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

1-E1.3

2ND FLOOR ELECTRICAL PLAN

1-2-1

EX. LOCATION ADD

1 X DATA CABLE

1-2-2

EX. LOCATION ADD

1 X DATA CABLE

1-2-3

EX. LOCATION ADD

1 X DATA CABLE

1-2-4

EX. LOCATION ADD

1 X DATA CABLE

EX. DATA CONDUITS

FROM 3RD FLOOR

SYSTEMS CABLING MATRIX

MDF/IDF LOCATION FINAL TERMINATION LOCATIONS

DATA 1-B200

BASEMENT

1ST FLOOR

DATA 1-2300

2ND FLOOR

3RD FLOOR

DATA 1-4309

4TH FLOOR

5TH FLOOR

PENTHOUSES

BUILDING 1 - 2ND FLOOR ELECTRICAL FLOOR PLAN

SCALE: 1/16"=1'-0"

ELECTRICAL GENERAL NOTES:

1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING

CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING

UPUP

UPUP

LS3-3

EXAM

1-3265

BATH

1-3265A

PATIENT RM.

1-3263

BATH

1-3263A BATH

1-3261A

PATIENT RM.

1-3261

EXAM

1-3257

BATH

1-3257A

STORAGE

1-3253

SOILED

1-3251

STAIR #1

3-S1

EXAM

1-3241

RECEPTION

1-3220

WAITING

ROOM

1-3217

MENS

TOILET

1-3213

MENS

TOILET

1-3211

SLIDE

1-3209

DATA

1-3303

STORAGE

1-3304

CHECK-IN

1-3305B

CHECK-IN

1-3305C

PRE-OP

1-3305D

PRE-OP

1-3305E

PRE-OP

1-3305F

PRE-OP

1-3305G

RESTROOM

1-3306

PRE-OP

1-3305H

PRE-OP

1-3305J

ENDOSCOPY 2

1-3325

STORAGE

1-3327

BATH

1-3325A

ENDO 2

1-3329

MEDIVATOR

1-3319

SCOPE

CLEANING

1-3316

STAIR #4

3-S4

STORAGE

1-3328A

BATH

1-3315A

ENDO 1

1-3328

ENDOSCOPY 1

1-3315

ELECT.

1-3343

ANESTHESIA

1-3342

MECH.

1-3342A

STERILE

SUPPLY

1-3340

OPERATION

RM. 1

1-3355

STERILE RM

1-3363

MECH. RM

1-3359A

SCRUB RM

1-3359

OPERATION

RM. 2

1-3362

OPERATION

RM. 3

1-3360

DIRTY RM

1-3358

STERILE RM

1-3357

CYSTO

1-3356

ELECT.

1-3356A

NURSING

STATION

1-3354

H.A.C 1-3330

CORRIDOR

C-307

STAFF LOUNGE/

WORK ROOM

1-3332

CORRIDOR

C-306

MENS

TOILET

1-3326

WOMENS

TOILET

1-3318

PRE-OP

1-3305K

CORRIDOR

C-305

PRE-OP

1-3305L

PRE-OP

1-3305M

PRE-OP

1-3305N

STAIR #2

3-S2

NURSE STATION

1-3305A

CORRIDOR

C-304

BATH

1-3325A

STAIR #4

3-S4

STORAGE

1-3316

ELEC

1-3259

CORR

C-301

PATIENT RM.

1-3266

BATH

1-3266A

EXAM

1-3264 BATH

1-3264A

OFFICE

1-3262A

PATIENT RM.

1-3262

PATIENT RM.

1-3256

BATH

1-3256A MECH

1-3250

SUPPLY

1-3226

DATA

1-3240 UNIT SUPPLY

1-3224

PATIENT RM.

1-3230

BATH

1-3230A

OFFICE

1-3232

EXAM

1-3234

BATH

1-3234A

PATIENT RM.

1-3236

PATIENT RM.

1-3235

BATH

1-3233A

PATIENT RM.

1-3233

CORRIDOR

C-302

OFFICE

1-3231

BATH

1-3229A

OFFICE

1-3229

OFFICE

1-3228

KITCHEN

1-3225

BATH

1-3216A

OFFICE

1-3223

HAC

1-3218

OFFICE

1-3216

OFFICE

1-3212

OFFICE

1-3210

OFFICE

1-3206

DATA

1-3208 OFFICE

1-3200

WAITING

1-3170

EXAM

1-3160

EXAM

1-3158

HAC

1-3252

BATH

1-3148A

KITCHEN

1-3149

MED ROOM

1-3150

EXAM RM 11

1-3148

EXAM RM 10

1-3146

EXAM RM 9

1-3144

SOILED

HOLD

1-3142

EXAM RM 8

1-3140

EXAM RM 7

1-3138

EXAM RM 6

1-3136

TOILET

1-3134

EXAM RM 1

1-3135

EXAM RM 2

1-3137

EXAM RM 3

1-3139

EXAM RM 4

1-3141

EXAM RM 5

1-3143

NURSE

WORK

1-3147

UNIT SUPPLY

1-3133

CLEAN LINEN

1-3131

MECH

1-3120

BATH

1-3114A

EXAM

1-3114

EXAM

1-3112

STORAGE

1-3112A

EXAM

1-3106

EXAM

1-3104

BATH

1-3104A

EXAM

1-3100

EXAM

1-3101

BATH

1-3101A

STORAGE

1-3103

STORAGE

1-3105

BATH

1-3107A

EXAM

1-3107

EXAM

1-3111BATH

1-3111A

ELECT.

1-3113

EXAM

1-3115

EXAM

1-3117

BATH

1-3117A

HAC

1-3119

STAIR #6

3-S6

STAIR #3

3-S3

WAITING RM.

1-3132

RECEPTION

1-3125

HEAD NURSE

1-3161

STAIR #5

3-S5

C3D1-37

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

1-E1.4

3RD FLOOR ELECTRICAL PLAN

1-3-1

EX. BOOM ADD

2 X DATA CABLE

1-3-4

1 X DATA CABLE

1-3-2

EX. BOOM ADD

1 X DATA CABLE

NEW QUAD RECEPTACLE

FED FROM EX. CIRCUIT

C3D1-37

1-3-3

EX. LOCATION ADD

2 X DATA CABLE

PANEL C3D1

EX. DATA CONDUITS TO

2ND FLOOR

SYSTEMS CABLING MATRIX

MDF/IDF LOCATION FINAL TERMINATION LOCATIONS

DATA 1-B200

BASEMENT

1ST FLOOR

DATA 1-2300

2ND FLOOR

3RD FLOOR

DATA 1-4309

4TH FLOOR

5TH FLOOR

PENTHOUSES

BUILDING 1 - 3RD FLOOR ELECTRICAL FLOOR PLAN

SCALE: 1/16"=1'-0"

ELECTRICAL GENERAL NOTES:

1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING

CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

UP

UP

UPUP

CORRIDOR

DATA

1-4309

EXAM

1-4270C

EXAM

1-4270B

EXAM

1-4270A

STORAGE

1-4270E

OFFICE

1-4270D

EXAM

1-4265

STORAGE

1-4265A

EXAM

1-4263

OFFICE

1-4260

ELECT

1-4259

MENS

TOILET

1-4257

OFFICE

1-4255

OFFICE

1-4254

STAIR #1

4-S1

RECEPTION

1-4226 WAITING

1-4225

HAC

1-4250

STORAGE

1-4228

STORAGE

1-4227

OFFICE

1-4230

OFFICE

1-4231

CONSULT

1-4232

EXAM

1-4234

EXAM

1-4236

OFFICE

1-4238

EXAM

1-4240

EXAM

1-4242

OFFICE

1-4244 BATH

1-4245

OFFICE

1-4243

EXAM

1-4241

EXAM

1-4239

EXAM

1-4237

CORRIDOR

C-402

EXAM

1-4235

EXAM

1-4233

HAC

1-4220

STORAGE

1-4218A

OFFICE

1-4218

RECEPTION

1-4217

TELEHEALTH

1-4213

OFFICE

1-4208A

OFFICE

1-4208

EXAM

1-4211

OFFICE

1-4206

OFFICE

1-4200

CORRIDOR

C-403

CORRIDOR

C-404

OFFICE

1-4305

BATH

1-4310

STAIR #2

4-S2

OFFICE

1-4172

OFFICE

1-4170

OFFICE

1-4160

OFFICE

1-4161

OFFICE

1-4154

HAC

1-4152 MED

1-4150

KITCHEN

1-4132

OFFICE

1-4136

EXAM

1-4138

OFFICE

1-4140

BATH

1-4140A

OFFICE

1-4142

BATH

1-4144A

OFFICE

1-4144

LACTATION

1-4146

BATH

1-4146A

MECH

1-4148

EXAM

1-4147

EXAM

1-4145BATH

1-4147A

EXAM

1-4143

BATH

1-4143A

EXAM

1-4141

EXAM

1-4139

CORRIDOR 6

C-406

BATH

1-4139A

UTILITY

1-4137

BATH

1-4135A

EXAM

1-4135

STORAGE

1-4133

STORAGE

1-4131

STORAGE

1-4120

TOILET

1-4124

RECP.

1-4123

EXAM

1-4118

EXAM

1-4116

EXAM

1-4114

EXAM

1-4112

EXAM

1-4108

EXAM

1-4106

EXAM

1-4104

EXAM

1-4102

CONSULT

1-4100

CONSULT

1-4100A

STAIR #3

4-S3

CONSULT

1-4115

WOMENS

TOILET

1-4113 OFFICE

1-4109

EXAM

1-4107 OFFICE

1-4105

OFFICE

1-4103

OFFICE

1-4101

STAIR #6

4-S6

PENTHOUSE D

4-PHD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

1-E1.5

4TH FLOOR ELECTRICAL PLAN

1-4-4

EX. LOCATION ADD

1 X DATA CABLE 1-4-3

EX. LOCATION ADD

1 X DATA CABLE

1-4-1

EX. LOCATION ADD

1 X DATA CABLE

1-4-2

EX. LOCATION ADD

1 X DATA CABLE

EX. DATA CONDUITS

FROM 5TH FLOOR

SYSTEMS CABLING MATRIX

MDF/IDF LOCATION FINAL TERMINATION LOCATIONS

DATA 1-B200

BASEMENT

1ST FLOOR

DATA 1-2300

2ND FLOOR

3RD FLOOR

DATA 1-4309

4TH FLOOR

5TH FLOOR

PENTHOUSES

BUILDING 1 - 4TH FLOOR ELECTRICAL FLOOR PLAN

SCALE: 1/16"=1'-0"

ELECTRICAL GENERAL NOTES:

1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING

CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

UPUP

UPEXAM

1-5248

EYE EXAM 4

1-5246

EYE EXAM 5

1-5244

EYE EXAM 6

1-5242

EXAM

1-5238 MENS

TOILET

1-5234

STORAGE

1-5236

CORRIODR

C-501

STORAGE

1-5221

CONFERENCE

1-5230

WAITING

1-5222 RECEPT.

1-5210

CHIEF OF

OPTOMETRY

1-5204

OFFICE

1-5202

OFFICE

1-5200

WOMENS

TOILET

1-5160

ELEC

1-5207 CORRIODR

C-503

C&P 1-5156

C&P 1-5150

CONFERENCE

1-5142

MECH

1-5141

CONFERENCE

1-5140

CORRIODR

C-505

CORRIODR

C-506

STORAGE

1-5126

HAC

1-5128

CLOSET

1-5126A

ELEC

1-5131 STORAGE

1-5120

DATA

1-5127

CONSULT

1-5129

NCCPAC

BILLING

1-5133

C&P 1-5145

STORAGE

1-5143

C&P 1-5155

STAIR #2

5-S2TOILET

1-5310

CORRIODR

C-504

OFFICE

1-5305

OFFICE

1-5306B

TEL

1-5306

STORAGE

1-5205A

MECH

1-5240

HAC

1-5203

OFFICE

1-5205

EXAM

1-5211

OFFICE

1-5213

EXAM

1-5215

OPTICAL

1-5223

EXAM

1-5231

EXAM

1-5233STAIR #1

5-S1

STORAGE

1-5239

OFFICE/

PROVIDERS

1-5243

ELEC

1-5245

EYE EXAM

1-5247

EYE EXAM 1

1-5249

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

1-E1.6

5TH FLOOR ELECTRICAL PLAN

1-5-1

NEW SURFACE MOUNT

SINGLE-GANG BOX

2 X DATA CABLES

NEW QUAD RECPT.

NEW CONDUIT & WIRE

EQ5A-2

1-5-2

EX. LOCATION ADD

1 X DATA CABLE

EX. RECPT

NEW QUAD RECEPTACLE

NEW CONDUIT & WIRE

C5C-2

PANEL C5C

PANEL EQ5A

NEW QUAD RECPT.

NEW CONDUIT & WIRE

EQ5A-2

EX. DATA CONDUITS TO

4TH FLOOR

SYSTEMS CABLING MATRIX

MDF/IDF LOCATION FINAL TERMINATION LOCATIONS

DATA 1-B200

BASEMENT

1ST FLOOR

DATA 1-2300

2ND FLOOR

3RD FLOOR

DATA 1-4309

4TH FLOOR

5TH FLOOR

PENTHOUSES

BUILDING 1 - 5TH FLOOR ELECTRICAL FLOOR PLAN

SCALE: 1/16"=1'-0"

ELECTRICAL GENERAL NOTES:

1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING

CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

UP

OFFICE

9-101

BATH

9-102

OFFICE

9-103

DATA

9-104

RECEIVING

9-100A

STORAGE

9-100

OFFICE

9-105

OFFICE

9-106

COPY

9-107

120 / 208V

150A MLO

PB-E-13-09

120 / 208V

100A MLO

PB-E-12-09

PBE1209-28

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

ELECTRICAL GENERAL NOTES:

1. INSTALLATION ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT INTERNATIONAL

BUILDING CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING

CONDUIT AND CABLE TRAY.

9-E1.1

1ST FLOOR ELECTRICAL PLAN

NEW RECEPTACLE FED

FROM EXISTING

BREAKER PB-E-12-09 CKT

28. PROVIDE NEW

CONDUIT AND WIRE.

LSB#10

MECHANICAL

22-B450

DATA

22-B700

DATA

22-B702

STORAGE

22-B712A

STORAGE/OFFICE

PHARMACY

22-B712

OFFICE/STORAGE

22-B711

LOUNGE

22-B713

VAULT

22-B714

I.V. DRUGS

22-B716

MED.

22-B715B

STORAGE

22-B715A CLOSET

22-B716

CLOSET

22-B717

STAIR #4

22-S4

PHARMACY

22-B710

CHIEF

OFFICE

22-B708

PHARMACY

SECRETARY

22-B705

OFFICE

22-B707

OFFICE

22-B706

MAIL ROOM

22-B701

STORAGE

22-B600D

STORAGE

22-B600D

PROSTHETICS

PM&R

22-B600

ELEC.

22-B500

LSB#10

PANEL RPB2

FED FROM: MDP-2

PANEL CB-B1

FED FROM: CBD-2

PANEL LSB

FED FROM: LSD-1

PANEL RPB1

FED FROM: MDP-2

PANEL RPB3

FED FROM: MDP-2

LCP-BEC2ELEC.

22-B500

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

ELECTRICAL GENERAL NOTES:

1. INSTALLATION ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT INTERNATIONAL

BUILDING CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING

CONDUIT AND CABLE TRAY.

22-E1.1

BASEMENT ELECTRICAL PLAN

BUILDING 22 - PARTIAL BASEMENT ELECTRICAL PLAN

SCALE: 3/16"=1'-0"

22-B-5

EX. LOCATION ADD

1 X DATA CABLE

22-B-6

EX. LOCATION ADD

1 X DATA CABLE

22-B-1

EX. LOCATION ADD

1 X DATA CABLE

22-B-2

EX. LOCATION ADD

1 X DATA CABLE

22-B-3

EX. LOCATION ADD

1 X DATA CABLE

NEW RECEPTACLE EX.

CIRCUIT

CONVERT EXISTING

DUPLEX RECEPTACLE TO

A QUAD RECEPTACLE.

PROVIDE NEW DOUBLE

GANG BACK BOX.

NEW RECEPTACLE EX.

CIRCUIT

NEW RECEPTACLE EX.

CIRCUIT. CEILING DROP

PLUG MOLD

DATA CABLES TO BE

PULLED AND

TERMINATED IN 22-B702

BUILDING 22 - ENLARGED ELECTRICAL CLOSET 22-B500

SCALE: 1/4"=1'-0"

UPUP

UP

UP

UP

CB12-23

OFFICE

22-1437

REPORT

BREAK RM.

22-1439

LOUNGE

22-1438

WOMENS

LOCKER RM.

22-1438A

CART WASH

22-1501B

PANTRY

22-1441

BATH

22-1501A

CONGREGATE

BATH

22-1501SHOWERS

22-1501C

SHOWERS

22-1501DSOILED

22-1505

BATH

22-1507A

PATIENT

ROOM

22-1507

PATIENT

ROOM

22-1509

BATH

22-1509A

PATIENT

ROOM

22-1511

PATIENT

ROOM

22-1513

CLEAN

EQUIP. ROOM

22-1515

BATH

22-1515A

STAIR #2

22-S2

PATIENT

ROOM

22-1516

PATIENT

ROOM

22-1514

BATH

22-1516A

PATIENT

ROOM

22-1512

BATH

22-1510A

CORRIDOR

PATIENT

ROOM

22-1510

PATIENT

ROOM

22-1508

PATIENT

ROOM

22-1506

BATH

22-1506A

MED.

22-1504

ELEC.

22-1502

LOUNGE

22-1500

LAUNDRY

ROOM

22-1601

PATIENT

ROOM

22-1603

PATIENT

ROOM

22-1605

BATH

22-1603A

PATIENT

ROOM

22-1607

BATH

22-1607A

CLEAN

EQUIP. ROOM

22-1609

OFFICE

22-1611

BATH

22-1611A

MOD

22-1613

PATIENT

ROOM

22-1602

PATIENT

ROOM

22-1604

PATIENT

ROOM

22-1606

PATIENT

ROOM

22-1608

PATIENT

ROOM

22-1610

SOCIAL

WORKER

22-1612

BATH

22-1602A

BATH

22-1606A

BATH

22-1610A

BATH

22-1600

LOUNGE

22-1701

CLEAN UTIL.

22-1703

SOILED UTIL.

22-1707

OFFICE

22-1709

PATIENT

ROOM

22-1711

BATH

22-1711A

PATIENT

ROOM

22-1713

PATIENT

ROOM

22-1715

PATIENT

ROOM

22-1717

PATIENT

ROOM

22-1719

STAIR #4

22-S4

BATH

22-1713A

BATH

22-1717A

TEMP.

STORAGE

22-1718

TEMP.

STORAGE

22-1716

BATH

22-1716A

PATIENT

ROOM

22-1714

BATH

22-1712A

CORRIDOR

PATIENT

ROOM

22-1712

BATH

22-1710A

PATIENT

ROOM

22-1710

NURSE

MNGR

22-1706

TOILET

22-1708

OFFICE

22-1705

H.A.C.

22-1704

DATA

22-1702

STAFF

WORKROOM

22-1448

NURSE

STATION

22-1450

SUPPLY

ROOM

22-1442

MENS

LOCKER RM.

22-1438B

STAIR #3

22-S3

PANEL RP12

FED FROM: MDP-2

PANEL LS12

FED FROM: LSD-1

PANEL RP13

FED FROM: MDP-2

PANEL RP14

FED FROM: MDP-2

PANEL CB-12

FED FROM: LSD-1

ELEC.

22-1502

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

ELECTRICAL GENERAL NOTES:

1. INSTALLATION ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT INTERNATIONAL

BUILDING CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).

2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD

ACCORDING TO EQUIPMENT BEING SERVED.

3. ALL CONDUCTORS SHALL BE IDENTIFIED.

4. ALL EQUIPMENT SHALL BE UL LISTED.

5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.

6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.

7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH

UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR

DEVICES SERVED BY THE CIRCUIT.

8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL

BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.

9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING

CONDUIT AND CABLE TRAY.

22-E1.2

BASEMENT ELECTRICAL PLAN

BUILDING 22 - PARTIAL BASEMENT ELECTRICAL PLAN

SCALE: 1/8"=1'-0"

BUILDING 22 - ENLARGED ELEC. CLOSET 22-1502

SCALE: 1/4"=1'-0"

NEW RECEPTACLE FED

FROM EXISTING CIRCUIT

CB12-23

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

EHRM INSTALLATION OF DDPO

ALEDA E. LUTZ MEDICAL CTR.

655-25-706

Project Director

Issue date Chkd By JAJ

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

CONSTRUCTION

DOCUMENTS

E2.1

DETAILS & SCHEDULES

Sheets and Views
1 G1.1
2 1-E1.1
3 1-E1.2
4 1-E1.3
5 1-E1.4
6 1-E1.5
7 1-E1.6
8 9-E1.1
9 22-E1.1
10 22-E1.2
11 E2.1

File details come from the government source that posted it. Updated .