Project 655-25-706 - DRAWINGS.pdf
PDF 2 MB Posted
- Attached to
- 655-25-706 EHRM Installation of DDPo2
- Solicitation number
- 36C25025R0098
About this file
These are electrical design drawings for the EHRM Installation of DDPO project at the Aleda E. Lutz VA Medical Center in Saginaw, Michigan (Project No. 655-25-706). The comprehensive set of drawings includes electrical floor plans for Buildings 1, 9, and 22, spanning from the basement to the 5th floor, with a detailed focus on electrical infrastructure modifications.
The drawings specifically outline electrical work involving the installation of new receptacles, data drops using CAT 6A cabling, and electrical system updates across multiple building floors. Each floor plan meticulously documents existing and proposed electrical modifications, including new quad receptacles, data cable additions, and routing through existing conduits and cable trays. The plans adhere to current International Building Code, NFPA codes, and National Electrical Code (NEC) standards, with specific instructions for conductor identification, equipment grounding, and panel schedule updates. The project involves precise electrical system enhancements across various medical facility spaces such as offices, patient rooms, laboratories, and utility areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEISS STREET
EC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
G1.1
COVER SHEET
SAGINAW, MICHIGAN
Department of Veterans Affairs
SAGINAW, MICHIGAN
NORTH
L O C A T I O N M A P
Aleda E. Lutz VA Medical Center Project No. 655-25-706 EHRM INSTALLATION OF DDPO:
PROJECT LOCATION
CAMPUS AREA MAP
DRAWING INDEX
Sheet Number Sheet Title Sheet Description
1 G1.1 COVER SHEET
2 1-E1.1 BUILDING 1 - BASEMENT ELECTRICAL PLAN
3 1-E1.2 BUILDING 1 - 1ST FLOOR ELECTRICAL PLAN
4 1-E1.3 BUILDING 1 - 2ND FLOOR ELECTRICAL PLAN
5 1-E1.4 BUILDING 1 - 3RD FLOOR ELECTRICAL PLAN
6 1-E1.5 BUILDING 1 - 4TH FLOOR ELECTRICAL PLAN
7 1-E1.6 BUILDING 1 - 5TH FLOOR ELECTRICAL PLAN
8 9-E1.1 BUILDING 9 - 1ST FLOOR ELECTRICAL PLAN
9 22-E1.1 BUILDING 22 - BASEMENT ELECTRICAL PLAN
10 22-E1.2 BUILDING 22 - 1ST FLOOR ELECTRICAL PLAN
11 E2.1 DETAILS & SCHEDULES
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
(3) XFMRS STACKED
HAC
1-B262
SWITCHGEAR
ROOM
1-B260C
MACHINE
SHOP
1-B260A
LOCKSMITH
1-B260D
SWITCHGEAR
ROOM
1-B255
LOUNGE
1-B250
SOILED
LINEN
1-B240
BATH
1-B220H
WAITING
1-B220G
MEDICAL
RECORDS
1-B220
OFFICE
1-B220E
MEDICAL
RECORDS
1-B220E
OFFICE
1-B220D
OFFICE
1-B220C
OFFICE
1-B220B
OFFICE
1-B220A
CREDIT
UNION
1-B210
DATA
1-B200
WOMENS
LOCKER
1-B150
TOILET
1-B150A
FIRE
ALARM
1-B140
CANTEEN
1-B134
HVAC
SHOP
1-B132
MECH
1-B132A
BIOMED
1-B130
BIOMED
1-B130A
HAC
1-B124
LINEN
1-B122 SOILED
LINEN
1-B120 OFFICE
1-B112
OFFICE
1-B110
ENGINEERING
LIBRARY
1-B108
OFFICE
1-B106
OFFICE
1-B104
MECH
1-B103
PLUMBING
SHOP
1-B100
STORAGE
1-B103A
OFFICE
1-B105
OFFICE
1-B115C
OFFICE
1-B115B
FMS
1-B115
STAIR #3
B-S3
CORRIDOR
1-B119
MORGUE
1-B125
MORGUE
1-B125A
OFFICE /
STORAGE
1-B127
OFFICE
1-B128
STORAGE
1-B129
CHARGING
ROOM
1-B141
ELEVATOR
ELEV-A
ELEVATOR
ELEV-B
ELEVATOR
ELEV-C
IT CLOSET
1-B300OFFICE /
LOUNGE
1-B201
ELEC
1-B203SHOWER
1-B215B
MEN'S
BATHROOM
1-B215A
MEN'S
LOCKER
1-B215
OFFICE
1-B241
KEY ROOM
1-B301
GIP SHOP
1-B315 OFFICE
1-B305
OFFICE
1-B305A
STORAGE
1-BXXX
STORAGE
1-BXXX
STAIR #2
B-S2
LINEN
STORAGE
1-B320
LAUNDRY
1-B321
BIO MED
1-B324
OFFICES
1-B325
CANTEEN
STORAGE
1-B326
CANTEEN
STORAGE
1-B326
ELECTRICAL
SHOP
1-B330
PAINT
SHOP
1-B332
CARPENTRY
SHOP
1-B340
CARPENTRY
OFFICE
1-B340A
STAIR #5
B-S5
OFFICE
SAFETY TECH
1-B339
OFFICE
SAFETY
1-B338BULK
STORAGE
1-B349
RECEIVING
1-B350
ELEC
1-B353
HAC
1-B352
STERILE
STORAGE
1-B351
MENS
BATHROOM
1-B355AMENS
LOCKERROOM
1-B355
WOMENS
LOCKERROOM
1-B354 WOMENS
BATHROOM
1-B354A
CORRIDOR
1-BC6
CORRIDOR
1-BC7
STAIR #4
B-S4
WATER
TREATMENT
1-B328
VESTIBULE
1-B357A
HAC
1-B329
DECON
ROOM
1-B357
STERILE
PROCESSING
1-B359
EQUIPMENT
1-B358
OPEN
OFFICE
1-B360
OFFICE
1-B361
OFFICE
1-B362
MECHANICAL
1-B380
MECHANICAL
1-B381
EMH-106
FOT-2
FOT-1BFOT-1A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
ELECTRICAL GENERAL NOTES:
1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING
CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING
CONDUIT AND CABLE TRAY.
1-E1.1
BASEMENT ELECTRICAL PLAN
EX. DATA CONDUITS
FROM 1ST FLOOR
SYSTEMS CABLING MATRIX
MDF/IDF LOCATION FINAL TERMINATION LOCATIONS
DATA 1-B200
BASEMENT
1ST FLOOR
DATA 1-2300
2ND FLOOR
3RD FLOOR
DATA 1-4309
4TH FLOOR
5TH FLOOR
PENTHOUSES
BUILDING 1 - BASEMENT ELECTRICAL FLOOR PLAN
SCALE: 1/16"=1'-0"
UP UP
UP
UP
UP
UP
UP
UP
UP
UPUP
UP
UP
UP
UP
UP
UP
UP
UPUP
UP
UP
UP
AMBULANCE
BAY
1-1273
OFFICE
1-1270
OFFICE
1-1268
OFFICE
1-1266
OFFICE
1-1264
OFFICE
1-1262
OFFICE
1-1260
TRIAGE
ACOS
1-1250
SOILED
1-1234
TREAMENT
1-1238
EXAM
1-1240
EXAM
1-1242
EXAM
1-1244
PT BATH
1-1243
BATH
1-1241A
TREAMENT/
GYN
1-1241
TREAMENT
1-1239
EXAM
1-1237
TREATMENT/
OBSERVATION
1-1235
NURSE
WORK
1-1233
TREATMENT/
OBSERVATION
1-1231
SWITCHBOARD
1-1212
OFFICE
1-1208
LOBBY
1-1200
LOBBY
1-1203
ELEV
F
LOBBY
1-1201
VESTIBULE
1-1201A
ELEV. MECH.
ROOM
1-1202A
ANTE ROOM
1-1202
WOMEN'S
1-1276
MEN'S
1-1277
WAITING
ROOM
1-1275
OFFICE
ACOS
1-1263
OFFICE
ACOS
1-1261
ELEC.
1-1259
TEAM ROOM
ACOS
1-1257
STAIR #1
1-S1
OFFICE
1-1227
OFFICE
1-1226
WAITING
1-1225
AGENT
CASHIER
1-1224
OFFICE
1-1209
OFFICE
1-1305B
OFFICE
1-1305A
ELEC.
1-1207
H.A.C 1-1205
ELEV
C ELEV
B
ELEV
A
DATA
1-1301
CLOSET
1-1305C
WAITING
1-1305
RECEP.
1-1305D
KITCHEN
1-1324
STORAGE
1-1324A
CAFETERIA
1-1325
MEN'S
TOILET
1-1355
MECH.
1-1361
H.A.C.
1-1363
AUDITORIUM
1-1370
STAGE
1-1373
STORAGE
1-1372
TV ROOM
1-1373E
STORAGE
1-1373D
BATH
1-1373B
STAIR #4
1-S4
KITCHEN
1-1375
STORAGE
1-1373C
STORAGE
1-1373A
STORAGE
1-1364
VOLUNTEER
SERVICE
1-1360
ELEC.
1-1356
CHIEF
1-1360A
CHAPEL
1-1380
CHAPEL
1-1383
CHAPEL
1-1385
CHAPLIN
1-1384
WOMEN'S
1-1352A
WOMEN'S
LACT
1-1352
STORAGE
1-1351
STORAGE
1-1350
OFFICE
1-1349
OFFICE
1-1348
OFFICE
1-1347
OFFICE
1-1346
OFFICE
1-1345
OFFICE
1-1344
STAIR #5
1-S5
OFFICE
1-1343
CASHIER
1-1341
CANTEEN
OFFICE
1-1340A
CANTEEN
RETAIL STORE
1-1340
OFFICE
1-1332
OFFICE
1-1331
OFFICE
1-1330
INPATIENT
PHARMACY
1-1314
PHARMACY
PICK UP
1-1310
STAIR #2
1-S2
MEN'S
1-1155 WAITING
1-1125
OFFICE
1-1150
STAIR #3
1-S3
EXAM
1-1117
EXAM
1-1115
EXAM 2
1-1111
ELEC.
1-1113
OFFICE
1-1109
EXAM 4
1-1107
OFFICE
1-1105
OFFICE
1-1103
OFFICE
1-1101
STAIR #6
1-S6
PATIENT
EDU.
1-1100
EXAM 8
1-1102
EXAM 8
1-1104
EXAM 10
1-1106
EXAM 11
1-1108
EXAM 11
1-1110
STORAGE
1-1110A
MEDS
1-1114A
OFFICE
1-1116MECHANICAL
1-1118
SOILED
1-1127
LINEN
CHUTE
1-1127A
WOMEN'S
TOILET
1-1129
EXAM 13
1-1131
EXAM 14
1-1133
EXAM 15
1-1135
EXAM 16
1-1137
EXAM 17
1-1139
PATIENT
EDU.
1-1141
BATH
1-1141A
EXAM 18
1-1142
EXAM 19
1-1140
EXAM 20
1-1138
EXAM 21
1-1136
EXAM 22
1-1134
EXAM
1-1132
OFFICE
1-1146
NURSE
STATION
1-1149
MED/
NOURISH
1-1230
EX. SUPPLY CABINET EX. MED. FRIDGE
EX. ICE MAKER
NEW BLANKET WARMER
EX. PC
C1B-2
C1B-2
C1A-27
RECEPTION
ACOS
1-1256
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
1-E1.2
1ST FLOOR ELECTRICAL PLAN
EX. CIRCUIT & NEW
RECEPTACLE (EX. CKT
LOCATED IN 1-1305A) -
C1B-2
NEW CIRCUIT &
RECEPTACLE - C1A-27
1-1-5
EX. LOCATION ADD
1 X DATA CABLE
EX. CIRCUIT & NEW
RECEPTACLE (EX. CKT
LOCATED IN 1-1256) -
C1B-25
EX. DUPLEX RECEPTACLE
TO BE SWAPPED W/ QUAD
(EX. CKT LOCATED IN
1-1256) - C1B-25
1-1-3
EX. LOCATION ADD
1 X DATA CABLE
1-1-2
EX. LOCATION CLNG
DROP (PLUG MOLD) ADD
2 X DATA CABLE
1-1-4
EX. LOCATION ADD
1 X DATA CABLE
1-1-1
EX. LOCATION ADD
1 X DATA CABLE
EX. DATA CONDUITS TO
BASEMENT
SYSTEMS CABLING MATRIX
MDF/IDF LOCATION FINAL TERMINATION LOCATIONS
DATA 1-B200
BASEMENT
1ST FLOOR
DATA 1-2300
2ND FLOOR
3RD FLOOR
DATA 1-4309
4TH FLOOR
5TH FLOOR
PENTHOUSES
BUILDING 1 - 1ST FLOOR ELECTRICAL FLOOR PLAN
SCALE: 1/16"=1'-0"
ELECTRICAL GENERAL NOTES:
1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING
CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING
CONDUIT AND CABLE TRAY.
PANEL C1A
UP
UPUP
UP
UP
UP
DENTISTRY
DENTAL
1-2243
DENTISTRY
1-2241
X-RAY
1-2239
SUPPLY
1-2239A
DENTISTRY
1-2237
DENTISTRY
1-2235
OFFICE
1-2233
OFFICE
1-2231
DENTISTRY
LAB
1-2242
DENTISTRY
1-2240
XRAY
DENTAL
1-2238
DARK
ROOM
1-2238A
SOILED
UTILITY
1-2236
MECH.
1-2234
OFFICE
1-2232
WAITING
1-2230
H.A.C.
1-2228
LINEN
1-2250
STORAGE
1-2230B
LAB
1-2230A
IMAGING
ROOM
1-2260
WAITING
1-2264
ECHO
1-2268
ECHO
1-2270
ULTRASOUND
1-2272
ECHO
1-2271
ULTRASOUND
1-2269
BATH
1-2266
VEST.
1-2267
BATH
1-2265
OFFICE
DIAG. SERVICE
1-2263
OFFICE
DIAG. SERVICE
1-2263A
ELEC.
1-2261
SCAN
1-2257
STAIR #1
2-S1
LOCKERS
1-2224
OFFICE
1-2223
OFFICE
1-2222
RECEPTION
1-2221
ELEC.
1-2211
WAITING
1-2219
RESPIRATORY
STORAGE
1-2219
CPAP CLINIC
1-2319
SLEEP
OFFICE
1-2322
CPAP
STORAGE
1-2320
HOME OXYGEN
CLINIC
1-2323
HOME OXYGEN
CLINIC
1-2321
STORAGE
1-2315A
PULMONARY
FUNCTION LAB
1-2324
PATIENT EDU.
1-2325
STAIR #4
2-S4
STORAGE
1-2359
BATH
1-2361A
MEN'S
LOCKER ROOM
1-2361
STORAGE
1-2362
WOMEN'S
LOCKER ROOM
1-2360
BATH
1-2360A
STORAGE
1-2358 ELEC.
1-2356
OFFICE
1-2355
BREAK ROOM
1-2343
PREP ROOM
1-2343
VEG.
REFRIG.
1-2343A
THAW BOX
1-2343BFRIDGE
1-2341
FREEZER 1
1-2343C
FREEZER 2
1-2343D
STORAGE
1-2349
KITCHEN
1-2341
DRY
STORAGE
1-2348
POT WASH
1-2346
H.A.C.
1-2340
KITCHEN
1-2330
OFFICE
1-2330A
STORAGE
1-2330C
STORAGE
1-2330B
STORAGE
1-2330D
CUBICAL
OFFICE
1-2305
OFFICE
1-2304
OFFICE
1-2302
NUTRITION
KITCHEN
1-2303
STORAGE
1-2303B
STORAGE
1-2303A
STAIR #5
2-S5
STAIR #2
2-S2
DATA
1-2300
ELEV
C ELEV
B
ELEV
A
OFFICE LAB
1-2123
SECURITY
LAB
1-2121
STORAGE
1-2119A
PHLEBOTOMY
LAB
1-2119
STAIR #3
2-S3 TOILET
1-2100H
LAB
BREAKROOM
1-2100FPATHOLOGY
LOCKERS
1-2100G
TECH. LAB
1-2122
ELEC.
1-2100E LAB
1-2100
MICROBIOLOGY
LAB
1-2100D
BLOOD BANK
1-2100A
STORAGE
1-2100B STAIR #6
2-S6
TOILET
1-2124
TOILET
1-2133A
DATA
1-2130
DRESSING RM.
1-2133
X-RAY
1-2135
BREAK RM.
1-2139
BREAK RM.
1-2141
CAT SCAN
1-2145
CONTROL RM.
1-2147MECH
1-2148
CHIEF RAD.
SERV.
1-2146
CLOSET
1-2146A
X-RAY
1-2142
BATH
1-2142A
WORKROOM
1-2140
DEXA
SCANNER
1-2138
RECEPT.
1-2136
OFFICE
IMAGING
1-2132
GFI
GFI
WOMENS
1-2216
MENS
1-2214 OFFICE DIAGNOSTIC
SERVICE
1-2212 WAITING
1-2200
RECEPTION
1-2208
OPEN
OFFICE
1-2134
MECH
1-2359A
J
CENTAUR XP
CENTAUR CP
CENTAUR CPCENTAUR CP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
1-E1.3
2ND FLOOR ELECTRICAL PLAN
1-2-1
EX. LOCATION ADD
1 X DATA CABLE
1-2-2
EX. LOCATION ADD
1 X DATA CABLE
1-2-3
EX. LOCATION ADD
1 X DATA CABLE
1-2-4
EX. LOCATION ADD
1 X DATA CABLE
EX. DATA CONDUITS
FROM 3RD FLOOR
SYSTEMS CABLING MATRIX
MDF/IDF LOCATION FINAL TERMINATION LOCATIONS
DATA 1-B200
BASEMENT
1ST FLOOR
DATA 1-2300
2ND FLOOR
3RD FLOOR
DATA 1-4309
4TH FLOOR
5TH FLOOR
PENTHOUSES
BUILDING 1 - 2ND FLOOR ELECTRICAL FLOOR PLAN
SCALE: 1/16"=1'-0"
ELECTRICAL GENERAL NOTES:
1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING
CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING
UPUP
UPUP
LS3-3
EXAM
1-3265
BATH
1-3265A
PATIENT RM.
1-3263
BATH
1-3263A BATH
1-3261A
PATIENT RM.
1-3261
EXAM
1-3257
BATH
1-3257A
STORAGE
1-3253
SOILED
1-3251
STAIR #1
3-S1
EXAM
1-3241
RECEPTION
1-3220
WAITING
ROOM
1-3217
MENS
TOILET
1-3213
MENS
TOILET
1-3211
SLIDE
1-3209
DATA
1-3303
STORAGE
1-3304
CHECK-IN
1-3305B
CHECK-IN
1-3305C
PRE-OP
1-3305D
PRE-OP
1-3305E
PRE-OP
1-3305F
PRE-OP
1-3305G
RESTROOM
1-3306
PRE-OP
1-3305H
PRE-OP
1-3305J
ENDOSCOPY 2
1-3325
STORAGE
1-3327
BATH
1-3325A
ENDO 2
1-3329
MEDIVATOR
1-3319
SCOPE
CLEANING
1-3316
STAIR #4
3-S4
STORAGE
1-3328A
BATH
1-3315A
ENDO 1
1-3328
ENDOSCOPY 1
1-3315
ELECT.
1-3343
ANESTHESIA
1-3342
MECH.
1-3342A
STERILE
SUPPLY
1-3340
OPERATION
RM. 1
1-3355
STERILE RM
1-3363
MECH. RM
1-3359A
SCRUB RM
1-3359
OPERATION
RM. 2
1-3362
OPERATION
RM. 3
1-3360
DIRTY RM
1-3358
STERILE RM
1-3357
CYSTO
1-3356
ELECT.
1-3356A
NURSING
STATION
1-3354
H.A.C 1-3330
CORRIDOR
C-307
STAFF LOUNGE/
WORK ROOM
1-3332
CORRIDOR
C-306
MENS
TOILET
1-3326
WOMENS
TOILET
1-3318
PRE-OP
1-3305K
CORRIDOR
C-305
PRE-OP
1-3305L
PRE-OP
1-3305M
PRE-OP
1-3305N
STAIR #2
3-S2
NURSE STATION
1-3305A
CORRIDOR
C-304
BATH
1-3325A
STAIR #4
3-S4
STORAGE
1-3316
ELEC
1-3259
CORR
C-301
PATIENT RM.
1-3266
BATH
1-3266A
EXAM
1-3264 BATH
1-3264A
OFFICE
1-3262A
PATIENT RM.
1-3262
PATIENT RM.
1-3256
BATH
1-3256A MECH
1-3250
SUPPLY
1-3226
DATA
1-3240 UNIT SUPPLY
1-3224
PATIENT RM.
1-3230
BATH
1-3230A
OFFICE
1-3232
EXAM
1-3234
BATH
1-3234A
PATIENT RM.
1-3236
PATIENT RM.
1-3235
BATH
1-3233A
PATIENT RM.
1-3233
CORRIDOR
C-302
OFFICE
1-3231
BATH
1-3229A
OFFICE
1-3229
OFFICE
1-3228
KITCHEN
1-3225
BATH
1-3216A
OFFICE
1-3223
HAC
1-3218
OFFICE
1-3216
OFFICE
1-3212
OFFICE
1-3210
OFFICE
1-3206
DATA
1-3208 OFFICE
1-3200
WAITING
1-3170
EXAM
1-3160
EXAM
1-3158
HAC
1-3252
BATH
1-3148A
KITCHEN
1-3149
MED ROOM
1-3150
EXAM RM 11
1-3148
EXAM RM 10
1-3146
EXAM RM 9
1-3144
SOILED
HOLD
1-3142
EXAM RM 8
1-3140
EXAM RM 7
1-3138
EXAM RM 6
1-3136
TOILET
1-3134
EXAM RM 1
1-3135
EXAM RM 2
1-3137
EXAM RM 3
1-3139
EXAM RM 4
1-3141
EXAM RM 5
1-3143
NURSE
WORK
1-3147
UNIT SUPPLY
1-3133
CLEAN LINEN
1-3131
MECH
1-3120
BATH
1-3114A
EXAM
1-3114
EXAM
1-3112
STORAGE
1-3112A
EXAM
1-3106
EXAM
1-3104
BATH
1-3104A
EXAM
1-3100
EXAM
1-3101
BATH
1-3101A
STORAGE
1-3103
STORAGE
1-3105
BATH
1-3107A
EXAM
1-3107
EXAM
1-3111BATH
1-3111A
ELECT.
1-3113
EXAM
1-3115
EXAM
1-3117
BATH
1-3117A
HAC
1-3119
STAIR #6
3-S6
STAIR #3
3-S3
WAITING RM.
1-3132
RECEPTION
1-3125
HEAD NURSE
1-3161
STAIR #5
3-S5
C3D1-37
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
1-E1.4
3RD FLOOR ELECTRICAL PLAN
1-3-1
EX. BOOM ADD
2 X DATA CABLE
1-3-4
1 X DATA CABLE
1-3-2
EX. BOOM ADD
1 X DATA CABLE
NEW QUAD RECEPTACLE
FED FROM EX. CIRCUIT
C3D1-37
1-3-3
EX. LOCATION ADD
2 X DATA CABLE
PANEL C3D1
EX. DATA CONDUITS TO
2ND FLOOR
SYSTEMS CABLING MATRIX
MDF/IDF LOCATION FINAL TERMINATION LOCATIONS
DATA 1-B200
BASEMENT
1ST FLOOR
DATA 1-2300
2ND FLOOR
3RD FLOOR
DATA 1-4309
4TH FLOOR
5TH FLOOR
PENTHOUSES
BUILDING 1 - 3RD FLOOR ELECTRICAL FLOOR PLAN
SCALE: 1/16"=1'-0"
ELECTRICAL GENERAL NOTES:
1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING
CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
UP
UP
UPUP
CORRIDOR
DATA
1-4309
EXAM
1-4270C
EXAM
1-4270B
EXAM
1-4270A
STORAGE
1-4270E
OFFICE
1-4270D
EXAM
1-4265
STORAGE
1-4265A
EXAM
1-4263
OFFICE
1-4260
ELECT
1-4259
MENS
TOILET
1-4257
OFFICE
1-4255
OFFICE
1-4254
STAIR #1
4-S1
RECEPTION
1-4226 WAITING
1-4225
HAC
1-4250
STORAGE
1-4228
STORAGE
1-4227
OFFICE
1-4230
OFFICE
1-4231
CONSULT
1-4232
EXAM
1-4234
EXAM
1-4236
OFFICE
1-4238
EXAM
1-4240
EXAM
1-4242
OFFICE
1-4244 BATH
1-4245
OFFICE
1-4243
EXAM
1-4241
EXAM
1-4239
EXAM
1-4237
CORRIDOR
C-402
EXAM
1-4235
EXAM
1-4233
HAC
1-4220
STORAGE
1-4218A
OFFICE
1-4218
RECEPTION
1-4217
TELEHEALTH
1-4213
OFFICE
1-4208A
OFFICE
1-4208
EXAM
1-4211
OFFICE
1-4206
OFFICE
1-4200
CORRIDOR
C-403
CORRIDOR
C-404
OFFICE
1-4305
BATH
1-4310
STAIR #2
4-S2
OFFICE
1-4172
OFFICE
1-4170
OFFICE
1-4160
OFFICE
1-4161
OFFICE
1-4154
HAC
1-4152 MED
1-4150
KITCHEN
1-4132
OFFICE
1-4136
EXAM
1-4138
OFFICE
1-4140
BATH
1-4140A
OFFICE
1-4142
BATH
1-4144A
OFFICE
1-4144
LACTATION
1-4146
BATH
1-4146A
MECH
1-4148
EXAM
1-4147
EXAM
1-4145BATH
1-4147A
EXAM
1-4143
BATH
1-4143A
EXAM
1-4141
EXAM
1-4139
CORRIDOR 6
C-406
BATH
1-4139A
UTILITY
1-4137
BATH
1-4135A
EXAM
1-4135
STORAGE
1-4133
STORAGE
1-4131
STORAGE
1-4120
TOILET
1-4124
RECP.
1-4123
EXAM
1-4118
EXAM
1-4116
EXAM
1-4114
EXAM
1-4112
EXAM
1-4108
EXAM
1-4106
EXAM
1-4104
EXAM
1-4102
CONSULT
1-4100
CONSULT
1-4100A
STAIR #3
4-S3
CONSULT
1-4115
WOMENS
TOILET
1-4113 OFFICE
1-4109
EXAM
1-4107 OFFICE
1-4105
OFFICE
1-4103
OFFICE
1-4101
STAIR #6
4-S6
PENTHOUSE D
4-PHD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
1-E1.5
4TH FLOOR ELECTRICAL PLAN
1-4-4
EX. LOCATION ADD
1 X DATA CABLE 1-4-3
EX. LOCATION ADD
1 X DATA CABLE
1-4-1
EX. LOCATION ADD
1 X DATA CABLE
1-4-2
EX. LOCATION ADD
1 X DATA CABLE
EX. DATA CONDUITS
FROM 5TH FLOOR
SYSTEMS CABLING MATRIX
MDF/IDF LOCATION FINAL TERMINATION LOCATIONS
DATA 1-B200
BASEMENT
1ST FLOOR
DATA 1-2300
2ND FLOOR
3RD FLOOR
DATA 1-4309
4TH FLOOR
5TH FLOOR
PENTHOUSES
BUILDING 1 - 4TH FLOOR ELECTRICAL FLOOR PLAN
SCALE: 1/16"=1'-0"
ELECTRICAL GENERAL NOTES:
1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING
CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
UPUP
UPEXAM
1-5248
EYE EXAM 4
1-5246
EYE EXAM 5
1-5244
EYE EXAM 6
1-5242
EXAM
1-5238 MENS
TOILET
1-5234
STORAGE
1-5236
CORRIODR
C-501
STORAGE
1-5221
CONFERENCE
1-5230
WAITING
1-5222 RECEPT.
1-5210
CHIEF OF
OPTOMETRY
1-5204
OFFICE
1-5202
OFFICE
1-5200
WOMENS
TOILET
1-5160
ELEC
1-5207 CORRIODR
C-503
C&P 1-5156
C&P 1-5150
CONFERENCE
1-5142
MECH
1-5141
CONFERENCE
1-5140
CORRIODR
C-505
CORRIODR
C-506
STORAGE
1-5126
HAC
1-5128
CLOSET
1-5126A
ELEC
1-5131 STORAGE
1-5120
DATA
1-5127
CONSULT
1-5129
NCCPAC
BILLING
1-5133
C&P 1-5145
STORAGE
1-5143
C&P 1-5155
STAIR #2
5-S2TOILET
1-5310
CORRIODR
C-504
OFFICE
1-5305
OFFICE
1-5306B
TEL
1-5306
STORAGE
1-5205A
MECH
1-5240
HAC
1-5203
OFFICE
1-5205
EXAM
1-5211
OFFICE
1-5213
EXAM
1-5215
OPTICAL
1-5223
EXAM
1-5231
EXAM
1-5233STAIR #1
5-S1
STORAGE
1-5239
OFFICE/
PROVIDERS
1-5243
ELEC
1-5245
EYE EXAM
1-5247
EYE EXAM 1
1-5249
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
1-E1.6
5TH FLOOR ELECTRICAL PLAN
1-5-1
NEW SURFACE MOUNT
SINGLE-GANG BOX
2 X DATA CABLES
NEW QUAD RECPT.
NEW CONDUIT & WIRE
EQ5A-2
1-5-2
EX. LOCATION ADD
1 X DATA CABLE
EX. RECPT
NEW QUAD RECEPTACLE
NEW CONDUIT & WIRE
C5C-2
PANEL C5C
PANEL EQ5A
NEW QUAD RECPT.
NEW CONDUIT & WIRE
EQ5A-2
EX. DATA CONDUITS TO
4TH FLOOR
SYSTEMS CABLING MATRIX
MDF/IDF LOCATION FINAL TERMINATION LOCATIONS
DATA 1-B200
BASEMENT
1ST FLOOR
DATA 1-2300
2ND FLOOR
3RD FLOOR
DATA 1-4309
4TH FLOOR
5TH FLOOR
PENTHOUSES
BUILDING 1 - 5TH FLOOR ELECTRICAL FLOOR PLAN
SCALE: 1/16"=1'-0"
ELECTRICAL GENERAL NOTES:
1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CURRENT INTERNATIONAL BUILDING
CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
UP
OFFICE
9-101
BATH
9-102
OFFICE
9-103
DATA
9-104
RECEIVING
9-100A
STORAGE
9-100
OFFICE
9-105
OFFICE
9-106
COPY
9-107
120 / 208V
150A MLO
PB-E-13-09
120 / 208V
100A MLO
PB-E-12-09
PBE1209-28
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
ELECTRICAL GENERAL NOTES:
1. INSTALLATION ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT INTERNATIONAL
BUILDING CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING
CONDUIT AND CABLE TRAY.
9-E1.1
1ST FLOOR ELECTRICAL PLAN
NEW RECEPTACLE FED
FROM EXISTING
BREAKER PB-E-12-09 CKT
28. PROVIDE NEW
CONDUIT AND WIRE.
LSB#10
MECHANICAL
22-B450
DATA
22-B700
DATA
22-B702
STORAGE
22-B712A
STORAGE/OFFICE
PHARMACY
22-B712
OFFICE/STORAGE
22-B711
LOUNGE
22-B713
VAULT
22-B714
I.V. DRUGS
22-B716
MED.
22-B715B
STORAGE
22-B715A CLOSET
22-B716
CLOSET
22-B717
STAIR #4
22-S4
PHARMACY
22-B710
CHIEF
OFFICE
22-B708
PHARMACY
SECRETARY
22-B705
OFFICE
22-B707
OFFICE
22-B706
MAIL ROOM
22-B701
STORAGE
22-B600D
STORAGE
22-B600D
PROSTHETICS
PM&R
22-B600
ELEC.
22-B500
LSB#10
PANEL RPB2
FED FROM: MDP-2
PANEL CB-B1
FED FROM: CBD-2
PANEL LSB
FED FROM: LSD-1
PANEL RPB1
FED FROM: MDP-2
PANEL RPB3
FED FROM: MDP-2
LCP-BEC2ELEC.
22-B500
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
ELECTRICAL GENERAL NOTES:
1. INSTALLATION ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT INTERNATIONAL
BUILDING CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING
CONDUIT AND CABLE TRAY.
22-E1.1
BASEMENT ELECTRICAL PLAN
BUILDING 22 - PARTIAL BASEMENT ELECTRICAL PLAN
SCALE: 3/16"=1'-0"
22-B-5
EX. LOCATION ADD
1 X DATA CABLE
22-B-6
EX. LOCATION ADD
1 X DATA CABLE
22-B-1
EX. LOCATION ADD
1 X DATA CABLE
22-B-2
EX. LOCATION ADD
1 X DATA CABLE
22-B-3
EX. LOCATION ADD
1 X DATA CABLE
NEW RECEPTACLE EX.
CIRCUIT
CONVERT EXISTING
DUPLEX RECEPTACLE TO
A QUAD RECEPTACLE.
PROVIDE NEW DOUBLE
GANG BACK BOX.
NEW RECEPTACLE EX.
CIRCUIT
NEW RECEPTACLE EX.
CIRCUIT. CEILING DROP
PLUG MOLD
DATA CABLES TO BE
PULLED AND
TERMINATED IN 22-B702
BUILDING 22 - ENLARGED ELECTRICAL CLOSET 22-B500
SCALE: 1/4"=1'-0"
UPUP
UP
UP
UP
CB12-23
OFFICE
22-1437
REPORT
BREAK RM.
22-1439
LOUNGE
22-1438
WOMENS
LOCKER RM.
22-1438A
CART WASH
22-1501B
PANTRY
22-1441
BATH
22-1501A
CONGREGATE
BATH
22-1501SHOWERS
22-1501C
SHOWERS
22-1501DSOILED
22-1505
BATH
22-1507A
PATIENT
ROOM
22-1507
PATIENT
ROOM
22-1509
BATH
22-1509A
PATIENT
ROOM
22-1511
PATIENT
ROOM
22-1513
CLEAN
EQUIP. ROOM
22-1515
BATH
22-1515A
STAIR #2
22-S2
PATIENT
ROOM
22-1516
PATIENT
ROOM
22-1514
BATH
22-1516A
PATIENT
ROOM
22-1512
BATH
22-1510A
CORRIDOR
PATIENT
ROOM
22-1510
PATIENT
ROOM
22-1508
PATIENT
ROOM
22-1506
BATH
22-1506A
MED.
22-1504
ELEC.
22-1502
LOUNGE
22-1500
LAUNDRY
ROOM
22-1601
PATIENT
ROOM
22-1603
PATIENT
ROOM
22-1605
BATH
22-1603A
PATIENT
ROOM
22-1607
BATH
22-1607A
CLEAN
EQUIP. ROOM
22-1609
OFFICE
22-1611
BATH
22-1611A
MOD
22-1613
PATIENT
ROOM
22-1602
PATIENT
ROOM
22-1604
PATIENT
ROOM
22-1606
PATIENT
ROOM
22-1608
PATIENT
ROOM
22-1610
SOCIAL
WORKER
22-1612
BATH
22-1602A
BATH
22-1606A
BATH
22-1610A
BATH
22-1600
LOUNGE
22-1701
CLEAN UTIL.
22-1703
SOILED UTIL.
22-1707
OFFICE
22-1709
PATIENT
ROOM
22-1711
BATH
22-1711A
PATIENT
ROOM
22-1713
PATIENT
ROOM
22-1715
PATIENT
ROOM
22-1717
PATIENT
ROOM
22-1719
STAIR #4
22-S4
BATH
22-1713A
BATH
22-1717A
TEMP.
STORAGE
22-1718
TEMP.
STORAGE
22-1716
BATH
22-1716A
PATIENT
ROOM
22-1714
BATH
22-1712A
CORRIDOR
PATIENT
ROOM
22-1712
BATH
22-1710A
PATIENT
ROOM
22-1710
NURSE
MNGR
22-1706
TOILET
22-1708
OFFICE
22-1705
H.A.C.
22-1704
DATA
22-1702
STAFF
WORKROOM
22-1448
NURSE
STATION
22-1450
SUPPLY
ROOM
22-1442
MENS
LOCKER RM.
22-1438B
STAIR #3
22-S3
PANEL RP12
FED FROM: MDP-2
PANEL LS12
FED FROM: LSD-1
PANEL RP13
FED FROM: MDP-2
PANEL RP14
FED FROM: MDP-2
PANEL CB-12
FED FROM: LSD-1
ELEC.
22-1502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
ELECTRICAL GENERAL NOTES:
1. INSTALLATION ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT INTERNATIONAL
BUILDING CODE, NFPA CODES, AND NATIONAL ELECTRICAL CODE NFPA 70 (NEC).
2. FINAL LOCATIONS OF ELECTRICAL EQUIPMENT SHALL BE COORDINATED IN THE FIELD
ACCORDING TO EQUIPMENT BEING SERVED.
3. ALL CONDUCTORS SHALL BE IDENTIFIED.
4. ALL EQUIPMENT SHALL BE UL LISTED.
5. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER NEC 250.
6. PROVIDE ALL WIRE NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
7. ALL EXISTING AND NEW PANELS IMPACTED BY THE PROJECT SHALL BE PROVIDED WITH
UPDATED TYPEWRITTEN PANEL SCHEDULES INDICATING ROOM NUMBER & EQUIPMENT OR
DEVICES SERVED BY THE CIRCUIT.
8. INSTALLATION OF EQUIPMENT, COMPONENTS AND WIRING FOR ELECTRICAL SYSTEMS SHALL
BE IN ACCORDANCE OF MANUFACTURER'S RECOMMENDATIONS.
9. ALL SYSTEM CABLING SHALL BE CAT6A. NEW CABLES SHALL BE ROUTED THROUGH EXISTING
CONDUIT AND CABLE TRAY.
22-E1.2
BASEMENT ELECTRICAL PLAN
BUILDING 22 - PARTIAL BASEMENT ELECTRICAL PLAN
SCALE: 1/8"=1'-0"
BUILDING 22 - ENLARGED ELEC. CLOSET 22-1502
SCALE: 1/4"=1'-0"
NEW RECEPTACLE FED
FROM EXISTING CIRCUIT
CB12-23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
EHRM INSTALLATION OF DDPO
ALEDA E. LUTZ MEDICAL CTR.
655-25-706
Project Director
Issue date Chkd By JAJ
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
E2.1
DETAILS & SCHEDULES
| Sheets and Views |
| 1 G1.1 |
| 2 1-E1.1 |
| 3 1-E1.2 |
| 4 1-E1.3 |
| 5 1-E1.4 |
| 6 1-E1.5 |
| 7 1-E1.6 |
| 8 9-E1.1 |
| 9 22-E1.1 |
| 10 22-E1.2 |
| 11 E2.1 |
File details come from the government source that posted it. Updated .