36C25025B0013 0001.pdf
PDF 114 KB Posted
- Solicitation number
- 36C25025B0013
About this file
This is Amendment 0001 to solicitation 36C25025B0013 for steam vent repairs at the Richard L. Roudebush VA Medical Center, issued by the Department of Veterans Affairs Network Contracting Office 10 in Indianapolis. The amendment extends the bid due date to February 26, 2025 at 1:00 PM EST and includes Q&A responses clarifying key requirements.
Key details from the Q&A include: work must be performed during non-heating season (April-September); the steam system operates continuously with weekend shutdowns available upon request with 2 weeks notice; pipe joints must be welded per specifications (no Vic couplings allowed); payment bonds are required as the project is estimated between $25,000-$100,000; the main steam vault is a permit-required confined space requiring OSHA compliance; and the scope involves replacing three failed steam vent pipes (10-inch, 8-inch, and 6-inch diameter) with new welded pipes. The work falls under NAICS code 238220 for Plumbing, Heating and Air-Conditioning Contractors. A telephone bid opening will be held at 1:00 PM EST on February 26, 2025 via conference line 1-872-701-0185 with conference ID 444222993.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25025B0013 0002.pdf | ||
| Attachment II - Site Differing.pdf | ||
| 36C25025B0013.pdf | ||
| Attachment III - Minimum_Property_Requirement.pdf | ||
| Attachment IV - DBA-IN20230002.pdf | ||
| Attachment V - VHA Directive 1192.01.pdf | ||
| Attachment VI - EMR Form.pdf | ||
| Attachment VII - RFI Form.pdf | ||
| Attachment I - Standards Specification.pdf | ||
| 36C25025B0013_1 Correction.docx | DOCX document | |
| 36C25025B0013_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0001 02-14-2025 583-25-2-650-0009 583-25-517
36C250
Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 325 Indianapolis IN 46240
36C250
Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 325 Indianapolis IN 46240
To all Offerors/Bidders
36C25025B0013
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-26-2025 13:00 EST
583-3650162-650-854200-3220 23NRNR000
X 1 Orginal
The purpose of this amendment is to do the follow actions:
1) Add Questions and Answers
2) Change HOUR & DATE for Receipt of Offers is EXTENDED to: February 26, 2025 at 1 PM EST
3) Call in line for bid opening
4) Delivery address for the Bid
All other terms and conditions remain unchanged.
Jeffrey Hairston Contracting Officer
CONTINUATION PAGE
REPAIR STEAM VENTS
RICHARD L. ROUDEBUSH VA MEDICAL CENTER
PROJECT NUMBER- 583-25-517
QUESTION AND ANSWER (RFI)
CORRECTION AND CLARIFICATION
Question #1:
Please clarify when the project will be started and if all three steam systems will be shut down for summer or if there will be weekend shutdowns.
Answer #1:
All work shall be completed during the non-heating season to avoid or minimize medical center operational disruptions. The non-heating season is from April to September. The steam system is never down, not even during the summer. The contractor can request weekend shutdowns. The contractor shall submit utility shutdown permits at least two (2) weeks in advance.
Question #2:
This is from the NBBI. National Board of Boiler and Pressure Vessels. Please review their recommendation for this application Should we base our pricing on the scope of work in the scope of work in the solicitation or what is recommended by the BBBI?
Answer #2
The cross-sectional area of the discharge manifold cannot be less than the sum of the discharge cross-sectional areas of all the devices connected to the discharge manifold. In that situation, the devices would be subjected to pressure on the discharge side of the devices, which could adversely affect their operation.
After additional consideration, specific requirements described in the Scope of Work (SOW) shall be as follows:
2. Objective
The main objective of this project is to remove the three (3) failed steam vent pipes, replace them with three (3) new steam vent pipes, and connect the new pipes to the three existing risers.
4. Scope of Work
k. Deleted paragraph.
l. Complete Non-Destructive Testing (i.e., X-ray inspection) to determine if the metal thickness of the three (3) existing risers is enough to weld on.
m. Replace the three (3) failed sections of steam vent pipes with three (3) new pipe sections matching the existing diameters.
o. The three (3) new steam vent pipe sections shall go through the existing wall penetrations and follow the path of the existing steam vent pipes up to the risers.
p. Connect the three (3) new steam vent pipes to the existing risers of equal diameter.
r. Deleted paragraph.
Additional clarification:
The 6” pipe that comes off the flash tank upsizes to a 10” pipe. Therefore, the three (3) pipes to be replaced are 10-inch, 8-inch, and 6-inch in diameter, respectively.
Question #3:
Will the VA allow us to use 870 Vic couplings in the trench?
Answer #3:
Pipe joints and fittings shall be welded as requested in the SOW. Refer to Section 33 63 00 of the project Specifications.
For clarification, the joints and fittings of the existing steam vent piping system are welded. Additionally, the SOW includes excavating and cleaning debris out of the concrete shallow trench and removing it off-site; this will provide more space for pipe installation.
Question #4:
According to the following statement, bid bonds and performance bonds are not required if under 30k, am I reading this correctly?
Answer #4:
“PERFORMANCE AND PAYMENT BONDS: In accordance with Contract Clause 52.228-15, and FAR 28.102, Contractors are reminded that any amount awarded over $30,000.00 shall require a Payment Bond (SF 25A), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds (SF 25). Payment and Performance bonds are due no later than 10 days after notification of award.
Bonds must be provided with original ‘wet ink’ signatures - no whiteouts or other corrections are allowable. Copies and facsimiles of bonds shall not be accepted”.
The project is estimated above $30,000. Therefore, a payment bond is required.
All other bonding requirements are based on the applicable nature of the bid.
Please see FAR 28.102.
Question 5: What is the price point of this contract?
Answer 5: Magnitude of Construction: Between $25,000 and $100,000. NOTE This project falls under NAICS: 238220 - Plumbing, Heating, and Air-Conditioning Contractors (FAR 52.219-14)
Question #6:
Is FAR 52.229-3 Federal, State, and Local Taxes applicable to this project?
Answer #6:
The Federal Acquisition Regulation clause used in this question does not apply to this project. This regulation applies to contracts expected to exceed the simplified acquisition threshold ($250,000).
Question #7:
Can the contractor insulate the pipe with steam on?
Answer #7
The VA will not dictate means and methods. This is the contractor’s decision.
Most of the steam pipes in the main steam vault are currently insulated; however, the steam vent pipes are not insulated, and they reach high temperatures when the steam release valves open; after a scheduled shutdown, the temperature of the steam vent pipes should not be a safety concern.
Question #8:
Five-hour shutdowns will not be long enough to complete pipe tie-in. What is the absolute maximum shutdown period?
Answer #8:
Shutdowns longer than five hours would need diversion requests to OR. The maximum shutdown period would be a weekend. Multiple weekend shutdowns can be approved as needed. The contractor shall submit utility shutdown permits at least two (2) weeks in advance.
Question #9:
Will the contractor be able to demo the existing vent risers and clean the trench with steam-on? Vent pipes are not intact and if the relief valve opens live steam will vent into the trench.
Answer #9:
The VA will not dictate means and methods. It may not be safe to complete work in the trench with steam on. The COR cannot direct the contractor work; however, it is recommended to complete work in the trench during scheduled shutdowns.
Question #10:
Is the steam vault a considered confide space? There is more than one exit, and the door does not have signs indicating confined space.
Answer #10:
As stated in the Scope of work (SOW), the main steam vault is a permit-required confined space (PRCS) and the contractor must comply with the OSHA confined space regulation and VA PRCS program.
BID OPENING:
Wednesday February 26, 2025 @ 1:00 PM EST
Call in by phone (ONLY)
1 872-701-0185,444222993#
Find a local number
Phone conference ID: 444 222 993#
BID DELIVERY ADDRESS:
Department of Veterans Affairs
Network Contracting Office 10
8888 Keystone Crossing
Suite 325
Indianapolis IN 46240
File details come from the government source that posted it. Updated .