This Statement of Work outlines a construction project at the Ann Arbor VA Medical Center to correct the SPS (Sterile Processing Service) ceiling system. The project involves demolishing the existing acoustical lay-in ceiling system in room DB34 and replacing it with a suspended gypsum board ceiling, including all required labor and materials.

The work schedule operates on two shifts Monday through Friday (6 AM to midnight) and one shift on weekends (6 AM to 5 PM). The project must be completed within 9 consecutive work weeks, with 4 weeks allocated for each of two phases, plus one week for activation between phases. A 4-day period between Phase 1 and Phase 2 is reserved for VA personnel to move and sterilize furniture and equipment. Due to the sterile environment, the pre-bid walkthrough is limited to two employees per general contractor.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work 506-25-502 Correct SPS Ceiling System Findings

Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Ann Arbor VA Medical Center to Correct SPS Ceiling System Finding, Project No. 506-25- 502 as required by drawings and specifications.

Provide all labor and materials required to execute the subject project per specifications and drawings.

Work to include but not be limited to the following: Removal of the existing Acoustical Lay-in ceiling system in SPS room DB34 and replace with a suspended gypsum board ceiling.

Period of Performance - The Contractor shall follow the work periods noted below:

(2) Shifts - Monday thru Friday: 6 AM thru Midnight
(1) Shift - Saturday & Sunday: 6 am thru 5 PM

Allow (4) working days (weekdays) between Phase 1 & Phase 2 for the VA to move and sterilize the furniture and equipment.

Construction of both Phases is to be completed within a period of no more than (9) consecutive work weeks. (4) weeks per Phases (including punch list) then one week for activation between.

The Prebid walk thru will be limited to (2) employees per each General contractor due the Sterilize environment of the Sterile Process room.