506-25-502 Correct SPS Ceiling System Finding - Bid drawings.pdf

PDF 5 MB Posted

Attached to
Z1DA--Correct SPS Ceiling System Finding 506-25-502 Federal contract opportunity
Solicitation number
36C25025B0012
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This is a complete set of bid drawings for a renovation project at the Ann Arbor VA Medical Center in Michigan to correct the ceiling system in the Sterile Processing Service (SPS) area. The project involves installing gypsum board ceiling in the SPS area of Building 1E, with work concentrated in the basement level Clean Prep Assembly & Sterilization room (DB34) and adjacent support spaces.

The drawings detail a two-phase construction approach requiring infection control risk assessment (ICRA) measures and temporary barriers to maintain operations. Key components include: removing existing acoustical ceiling and installing new gypsum board ceiling; relocating and reinstalling ceiling-mounted equipment including lighting, diffusers, speakers, cameras and other systems; maintaining critical pressure relationships and air flow during construction; and protecting existing equipment and sterile storage areas from construction debris. The work must maintain required smoke compartmentation and fire ratings. The drawings are dated November 15, 2024 and include architectural, mechanical, electrical, and fire protection plans along with phasing and ICRA requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Correct SPS Ceiling System Finding 506-25-502, newest first.
File Type Posted
36C25025B0012 0004.docx DOCX document
506-25-502 VA Ann Arbor site plan - Exhibit A 1.pdf PDF
36C25025B0012 0003.docx DOCX document
ATTACHMENT VAAR 852.219-75 DEVIATION Jan 2023 LIMITATIONS OF SUBCONTRACTING COMPLIANCE CERTIFICATION.docx DOCX document
S04 506-25-502 SPS Ceiling - Pre Bid sign in sheet 2025 02 25.pdf PDF
S04 Pre-Bid Site Visit Agenda 506-25-502 - complete.pdf PDF
36C25025B0012 0002.docx DOCX document
36C25025B0012 0001.docx DOCX document
P09 - SOW 506-25-502 R2 Final.docx DOCX document
Wage Determination MI20240100 01292025.pdf PDF
Spec- Bid Documents.pdf PDF
RFI Form - 506-25-502.doc DOC document
Contractor EMR Certification Form - 506-25-502.docx DOCX document
36C25025B0012_1.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 EAST1 WEST

BUILDINGBUILDING

BUILDING 1 BUILDING 28

WEST

SD38

SD

SD

SD

SD40

AB15A

AB11

AB10A AB10

AB09E

AB08

AB01

AB03A

AB03

C1

A8B

AB23

AB09Z

AB33J

AB16 AB33I

CB33

AB17

AB15AB09

AB09H

AB09F

AB09A

AB09I

AB09K

AB09L

CB30

CB36AB09N

AB09D

AB09C

AB09B

AB09A

C1 C1 C1 C1 C1 C1

AB09Y AB09X AB09W AB14

AB09M

CB29

AB09A AB09B

AB12

AB12A AB12B

CB31

AB13

AB09Q

AB09R

AB09S

AB09T

AB09U

AB09V

AB15A

AB18

AB20

AB22

AB24

AB30

AB32

CB32

AB26

AB33B

AB28

AB29

AB33F

AB33A

AB33

AB80

AB79

AB95

AB78AB95A

AB65AB66

AB33E

AB33DAB33C

CB35A

ST10

ST10E

AB36B

ST10E-A

AB56

AB90

AB53

AB59

AB91

AB64

AB63

AB61 AB63A

AB68AB66

AB70 AB71

AB74

AB75

AB92 AB73

AB76

AB96

AB77

AB69

AB94

AB67

AB58

AB34

AB51

AB32

AB38

AB72

AB67

AB45

AB27

AB29AB25

C2

AB92

AB92C

AB94A

AB92A

AB94

C2

C3

BB49A

BB49

BB49B

BB49C

AB36

AB36A

AB19

AB33A

CB34

AB119A

CB35

CB37

AB54

AB52

AB50

AB49

BB86

BB87

C3

C3

C3

BB43

C4

A12G

AB55

AB57

AB93

AB60

AB62

AB41

AB40

AB31 AB33

AB37 AB37A

AB39

AB37B

CB28

BB46

BB50

BB54

BB58

BB56

BB57BB55BB53

BB45

C4 C4

EB11

EB01EB02

EB03

EB04

EB05

EB06

EB07

EB09

EB10

DB11

DB13

DB14

DB19 DB20

DB21 DB22

DB23

DB37

DB34

DB47

DB32A

DB35 DB36 DB49

DB48B DB48A DB48 DB48C

DB48D

DB24

DB25B

DB25A

CB20

DB25

DB25C

DB25D

DB40

DB41

DB42

DB43

CB22B

CB-3

S-1

S-2

CB-12

CB12B

CB12D

CB12C

CB07

CB08B

CB06A

CB04

CB05

CB06

CB-7CB-2

CB-6

DB12

CB07A

DB23

DB12A

DB12

DB21B

DB21C

DB12

DB35

DB21A

DB12 DB21D

DB12DB12

FG62

FG64

FG66 FG68 FG70 FG72 FG74

FG76

FG78

FG80

FG82

FG84

FG88

FG86

FG88A

FG34

FG38 FG40 FG42 FG44 FG46

FG47FG45FG43

FG41

FG39FG37FG35

FG33FG31

FG29FG27

FG25

FG23

FG52

FG54

FG56

FG58

FG60

FG36

FG63

FG63A

FG71

FG49

FG51

FG53

FG55

FG85FG57

FG59

FG83

FG81FG61

FG65

FG67 FG69

BB89

BB88

BB80

BB78

BB74

BB72

BB24

BB22

AB91

AB90

BB42

BB44

BB05B

BB05C

BB05A

BB07B

BB07

BB03

BB02

BB08

BB09C

BB09A

BB09B

BB13

BB10

BB06

BB12

BB13B

A21A

AB46

AB48

AB47

AB42

A37C

AB41

BB26C

BB26B

BB26A BB80

FG01

FG02

FG10

FG10D

FG16

FG17

FG14 FG12

FG10C

FG10B

FG10A

FG09FG11

FG08 FG06

FG07

FG01A

FG00

FG01

FG04

FG02

FG05

DB00

DB02

DB03

DB04

DB05

CB-12

DB06

DB07

DB08

DB09

DB16

DB16A

DB16C

DB06D

DB06B

DB10

DB15

DB17

DB18

CB-12

CB-13

EB60

EB60B EB60A

COM.

EB02E EB02F EB02G EB02H

EB04D EB04E EB04F EB04G

EB04H EB04J EB04K EB04L EB04M

EB02K

EB02L

EB02M

DB60

DB39

DB50

DB50

CB08

CB08A

CB10

CB10A

CB11 CB12A

DB50

CB13

CB15

CB16

BB85

BB70

BB68

BB24

BB24a

BB26

BB30

BB30c

BB36 BB30a

BB30b

BB85a

EB60a DB60b

DB61

A22c

DB60 DB60b

EB60a

DB61 EB60B

EB60A

COM.

EB60

ELECTRICAL

MECHANICAL

CORRIDOR

CORRIDOR

OFFICE

CLERICAL

OFFICE

SUPERVISORINVEST

DRUGS/ADMIN

WORK

DRUG INFO

SERV

FEMALE

LOCKERS

MALE

LOCKERS

LLTS

LOUNGE

CONF/

CLASSROOM

STUDY

CHRONICLES

PHAR

LAB

CORRIDOR

OFFICE

CLIN

TEACHING

OFFICE

ASSIST

CHIEF

OFFICE

CHIEF

OFFICE

WAITING

OFFICE

MAN.

ASSIST

CHIEF

ELECTRIC

SHOP

GARDEN

COURTYARD

STAIR 1

HEALING

GARDEN

ELECTRICAL

ELEC.SOILED

UTILITY

HAC

ELEVATOR

MECHANICAL

DIETICIAN

STORAGE

RECREATIONAL

THERAPY

FEMALE

TOILET

MALE

TOILET

PATIENT

LOUNGE

PASSAGE

DINING

ROOM

ELECTRICAL

SHOP

STORAGE

ELECTRICAL

SHOP

HACELEC.

STAFF

OFFICE

SOILED

UTILITY

CLEAN

LINEN

STORAGE

STAFF

OFFICE

STAFF

OFFICE

PANTRYTOILET

GROUND &

TRANSPORTATION

EQUIPMENT

STRUCTUREPASSAGE

EMERFENCY

GENERATORS

EMERGENCY

SWITCHGEAR

PAINT

SHOP

EMS

STORAGE

CLEAN

LINEN

FACILITIES

SIGN SHOP

STAIR 5

MAINTENANCE

SHOP

STORAGE

FLAMMABLE

WASTE

MECH

MORGUE

REFRIGERATOR

AUTOPSY

OFFICE

AUTOPSY

ROOM

NUCLEAR

MEDICINE WASTE

HOLDING

MECHANICAL

CANTEEN

FREEZER

FM

STORAGE

INDUSTRIAL

HYGIENE

STORAGE

CORRIDOR

ELECTRICAL

EQUIPMENT

CANTEEN

SERVICE

STORAGE

BOTTLED

GAS

STORAGE

N & FS

STORAGE

N & FS

FREEZER

FIRE

ALARM

ROOM

CARDIOLOGY

RECORDS

MECHANICAL

NUTRITION

& FOOD

SERVICE

DRY

STORAGE

NUTRITION

& FOOD

SERVICE

FREEZER

LINEN

CARTS

NUTRITION

& FOOD

SERVICE

STORAGE

HOLDING

ROOM

FOR

SHREDDING

MATERIAL

MANAGEMENT

OFFICE

SPD

STORAGE

TEL

CLOS

COMM

CLOS

STAIR 1

HIMS/

DATA

QUALITY

MEDICAL

RECORDS

AREAWAY

CHIEF OF

HIMS

POLICE

STORAGE

FEMALE

TOILET

CHIEF

POLICE

CORRIDOR

STORAGE

KITCHEN

CANTEEN

STORAGE

AREAWAYS

STAIR 4

S-17

PAINT

BOOTH

CLEAN LINEN

EMS STORAGE

STORAGE

STAFF

OFFICE

PATIENT

LOUNGE

STORAGESTORAGE

LAUNDRY

SUPERVISOR

OFFICE

STAFF

BREAKROOM

KITCHEN STAFF

CONFRENCE

TOILET

TOILET

TOILET

TOILET

TOILET TOILET TOILET

TOILET

TOILET

TOILET

TOILET TOILET TOILET

TOILETTOILETTOILET

TOILETTOILET

TOILET

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

CIRC

SPACE

OPEN

OFFICES

HAC

CIRC

SPACE

VEST.

ANTE ROOM

SUPPLIES

ONCOLOGY

MIXING

IV

ADMIXTURE

PRIMARY

PICK

RECEIVING/

UNPACKING

EXIST.

VAULT

VEST. EXTEMP.

COMP.

CORRIDOR

STAIR

CORRIDOR CORRIDOR

REPRODUCTIONMAILROOM/

DISTRIBUTION

PAPER/RIBBON

DISTRIBUTION

REPRODUCTION

STAFF

TOILET

TELEPHONE

SWITCH

ROOM

LLTSSTAFF

TOILET

STORAGE

WHEELCHAIR

STORAGE/REPAIR

SERVICE

ELEVATOR

LOBBYCORRIDOR

DETERGENT

& WATER

CLEAN

CASE CART

STAGING

SPD RME

COORD

OFFICE

SPD ASSIST

CHIEF

OFFICE

SPD CHIEF

OFFICE

FEMALE

STAFF

SHOWER

FEMALE

STAFF

LOCKER

LOCKER

ANTE RM

CORRIDOR

DISPATCH

ANTE RM

FEMALE

STAFF

SHOWER

FEMALE

STAFF

LOCKER

LOCKER

ANTE ROOM

MALE

STAFF

LOCKER

MALE STAFF

SHOWER

CHEMICAL &

SOLVENT STORAGE

DECONTAM

ANTE RMHAC

SOILED

RECEIVING

DECONTAM

HAC

CLEAN PREP

ASSEMBLY &

STERILIZATION

STERILIZERS

SURGERY STERILE

& NON-STERILE

STORAGE

DISPATCH

BREAK OUT

& CLEAN

RECEIVING

BULK

STORAGE

MALE

STAFF

TOILET RM

FEMALE

STAFF

TOILET RM

STAFF

TRAINING

STAFF

LOUNGE

CONFERENCE

CENTRAL

SUPPLY

PURCHASING

GIP

PURCHASING

CHIEF

INVENTORY

MANAGEMENT

CLEAN

STAFF

PASSAGE

CHIEF

CENTRAL

SUPPLY

SUPERVISOR

CENTRAL

SUPPLY

CLEAN

SUPPLY

ANTE ROOM

DISPATCH

BULK

STORAGE

BREAK OUT

CLEAN

RECEIVING

NURSING

UNITS

NON-STERILE

STORAGE

CORRIDOR

PASSAGE

MECHANICAL

CORRIDOR

CORRIDOR

ELEC.

OFFICE

OFFICE

OFFICE

STORAGE

PASSAGE

STAFF

MECHANICAL

CORRIDOR

MENS

TOILET

STAIR 3

CORRIDOR

EMERGENCY

OPERATION

CENTER

POLICE

CORRIDOR

LOCKERS

VOLUNTEERS

CORRIDOR

AUDITORIUM LOBBY

UNISEX

TOILET

PATIENT

TOILET

RECEPTION

EXAM

EXAM

PASSAGE

CORRIDOR

STAFF

TOILET

CORRIDOR

VENDING

STAFF WORK

AREA

PHARMACY

X-RAY

OFFICE

OFFICE

RECEPTION

STORAGE

CORRIDOR

CORRIDOR

MENS

LOCKERS

TOILET

MENS

TOILET

EQUIP.

STOR.

EVS

BREALK

ROOM

CORRIDOR

ELEC

CLOSET

SERVICE

ELEV. LOBBY

VIEWING

ROOM

MORGUE

SCAN/

EQUIP. PREP

OFFICESOILED

LINEN

WAITING

VOLUNTEER

STORAGE

ELECTRICAL

OFFICE

RAMP

CONF./

LOUNGE

VALVE

ROOM

VESTIBULE

BLOCK/

STORAGE

DOSIMETRYPASSAGE

C.T.

CONTROL

ROOM

TOILET

CLOSET

OFFICE OFFICE

TOILETTOILET

SECONDARY

WAITING

CONTROL

ROOM 1

OFFICE

RAMP

OFFICE

CONSULT

PASSAGE

EXAM

ELEVATOR

MECH

UNASSIGNED

FUTURE

ELEVATOR

FUTURE

STAIR

PASSAGE

WOMENS

TOILET

MENS

TOILET

SPRINKLER

RISER RM

ELECTRICAL

MODULATOR

CONTROL

ROOM 2

PASSAGE MODULATOR

EXISTING

PASSAGE

MEGA

VOLTAGELINAC

VAULT

LOBBY

WAITING

VESTIBULE

WC

A.O.D.

STORAGE

POLICE

OFFICE

CORRIDOR

MENS

TOILET

WOMENS

TOILET

MENTAL

HEALTH

DIRECTOR

CHIEF

ER NURSE

EDUCATION

TOILET

EXAM 4

EXAM 3

EXAM 2

EXAM 1

TRIAGE 2

TRAUMA 2

TRIAGE 1

EMERGENCY

WAITING

CORRIDOR

REGISTRATION

RECEPTION

TRIAGE

RECEPTION

TRIAGE

LOUNGE

TRAUMA 1

CORRIDOR

NURSE

OBSERVATION 5OBSERVATION 4OBSERVATION 3OBSERVATION 2

CORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDOR

TREATMENT 5

TREATMENT 4

TREATMENT 3

TREATMENT 2

NOUR PASSAGE

CORRIDOR

MENTOR

MEDS

CHARTING

PATIENT

TOILET

WORK MD. WORK

NURSE

ANTE-ROOM

SOILED

UTILITY

CORRIDOR

HSKGSTORAGE

I.T.

OBSERVATION 1

ELECTRICAL

ELECTRICAL

CORRIDOR

WOMENS

LOCKERWOMENS

TOILET

EVS

STORAGE

CLEAN UTILITY

TREATMENT 1

DECON/

PROCESSINGDECON

VESTIBULE

ISOLATION

UNIT A

UNIT C

1EFREEDOM BUILDING

1WLIBERTY BUILDING

MALE STAFF LOCKER

MALE STAFF SHOWER

OFFICE CHIEF OFFICE CONFERENCE

RECEPTION OFFICE OFFICE OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE

SW/ PHARMACIST OFFICE

OFFICE

OFFICE

MECHANICAL

NURSE STATION

OFFICE

SOCIAL

WORKER

MED

ROOM

ELECTRICAL

CLOSET

OFFICEEQUIP STORAGEHAC

TELEPHONE

SWITCH BOARD

TELE SUPERVISOR

IT

STORAGE/WORKROOM

GENERAL

MAINTENANCE

FLEET OFF.

OFFICE TECH FOREMAN

EQUIP STORAGE

COMPRESSOR

STORAGE

ELECTRICAL

TESTING STATION CHIEF OFFICE OFFICE VOLUNTEER SERVICES

OFFICE

OFFICE

OFFICEOFFICEOFFICEOFFICE

EQUIP STORAGE BIOMED

AUDITORIUM

OFFICE

ELECTRICAL

COMM CLOS

AB02

VOLUNTARY SERVICE STORAGE

(CACHE)

ELECTRICAL EQUIPMENT

AB00

GYM

STAIR

STAIR

COM. ELECTRICAL

MECHANICAL

MECHANICAL ELECTRICAL

COM.

MECHANICAL ELECTRICAL MECHANICAL

0 2 4 8 16

GRAPHIC SCALE: FEET

BASEMENT FLOOR PLAN

CL-3

PROJECT AREA

1W

1E

T2

T3

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

RENOVATIONS FOR:

LOCATION MAP

NO SCALE VICINITY MAP

NO SCALE

AREA MAP

NO SCALE

PROJECT LOCATION

N

EW

S

N

EW

S

N

EW

S

LAKE ERIE

GRAND RAPIDS

TRAVERSE CITY

LAKE SUPERIOR

UPPER PENINSULA

MACKINAW CITY

LAKE HURON

ALPENA

PETOSKEY

GAYLORD

GRAYLING

LA

KE

M

IC

H

IG

AN

SAGINAW

ST.JOHNS FLINT

LANSING

JACKSON DETROITKALAMAZOO

ANN ARBOR

CAMPUS MAP

NO SCALE

N

E

W

S

PROJECT LOCATION

GENERAL DESIGN NOTES

PRODUCTS LISTED ARE FOR BASIS OF DESIGN ONLY.

SUBJECT TO COMPLIANCE WITH REQUIREMENTS IN

SPECIFICATIONS. PROVIDE PRODUCTS AS SCHEDULED

OR COMPARABLE PRODUCTS BY OTHER

MANUFACTURERS.

1" = 60'-0"

INSTALL GYPBOARD CEILING IN SPS

11/15/2024 1E

G-001

506-25-502

CORRECT SPS CEILING SYSTEM

FINDING

COVER SHEET

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

CORRECT SPS CEILING

SYSTEM FINDING

ANN ARBOR, MICHIGAN

ISSUE DATE: 11/15/2024

ANN ARBOR VA MEDICAL

CENTER

BID DOCUMENTS

506-25-502

DRAWING INDEX

SHEET # SHEET NAME

GENERAL

G-001 COVER SHEET

G-100 PARTIAL BASEMENT LIFE SAFETY AND ICRA PLANS

ARCHITECTURAL

A-100 BASEMENT FLOOR PLAN

FIRE PROTECTION

FP100 BASEMENT FIRE PROTECTION PLAN

MECHANICAL

M-001 MECHANICAL ABBREVIATIONS, SYMBOLS & GENERAL NOTES

1" = 60'-0"

OVERALL BASEMENT FLOOR PLAN

REVISION SCHEDULE

# DATE DESCRIPTION

M-100 BASEMENT MECHANICAL PLAN

ELECTRICAL

E-100 BASEMENT SPS ELECTRICAL PLAN

M-101 BASEMENT MECHANICAL PLAN -INTERSTITIAL

M-102 BASEMENT MECHANICAL PLAN -AIR FLOW DIAGRAM

E-001 BASEMENT ABBREVIATIONS, LEGENDS & SYMBOLS

G-101 PARTIAL BASEMENT PHASING PLANS

ID-100 BASEMENT FURNITURE PLAN

11/15/2024 100% Bid Documents

FIRE CODE RATINGS

1-HR. SMOKE BARRIER

1-HR. FIRE RATED

WALL/SMOKE BARRIER

2-HR. FIRE RATED WALL

EXISTING 1-HR. SMOKE BARRIER

EXISTING 1-HR. FIRE RATED

WALL/SMOKE BARRIER

EXISTING 2-HR. FIRE RATED WALL

FIRE PROOFING NOTES

NOTE: EXISTING RATED WALL SHOWN SCREENED ON PLAN. - V.I.F. WALLS MEET DESIGNATED REQUIREMENTS

& ADD OPENING & PENETRATION PROTECTIVES AS REQ'D

SMOKE COMPARTMENT AREAS

NO CHANGES TO GROSS SQUARE FOOTAGE OF SMOKE

COMPARTMENTS

EXISTING FIRE RESISTANCE RATINGS FOR STRUCTURAL ELEMENTS TO REMAIN INTACT - TYPE II (222)

COLUMNS: 2 HOUR

FLOOR ASSEMBLY: 2 HOUR

STAIR ENCLOSURES: 2 HOUR

1-HR. FIRE RATED WALL

SMOKE TIGHT PARTITION

EXISTING 1-HR. FIRE RATED WALL

EXISTING SMOKE TIGHT PARTITION

2-HR. FIRE RATED

WALL/SMOKE BARRIER

EXISTING 2-HR. FIRE RATED

WALL/SMOKE BARRIER

APPLICABLE CODES AND STANDARDS

APPLICABLE CODES EDITION:

BUILDING CODES:

NFPA 101 LIFE SAFETY CODE 2024

INTERNATIONAL BUILDING CODE 2024

BARRIER FREE CODES:

ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS) MOST CURRENT EDITION

VA BARRIER FREE DESIGN GUIDE (SUPPLEMENT) 2011

FIRE PREVENTION CODE:

NFPA FIRE CODES (EXCEPT 900 & 5000) 2024

PLUMBING CODE:

INTERNATIONAL PLUMBING CODE 2024

HVAC CODE:

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ASHREA STANDARD 62.1 - VENTILATION FOR

ACCEPTABLE INDOOR AIR QUALITY 2022

ASHREA STANDARD 15 - SAFETY STANDARD FOR

REFRIGERATION SYSTEMS 2022

ELECTRICAL CODE:

NATIONAL ELECTRICAL CODE 2014

ENERGY CODE:

ENERGY POLICY ACT (EPAct) 2005

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:

MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY,

AND TRANSPORTATION MANAGEMENT.

STRUCTURAL CODE:

VA SEISMIC DESIGN REQUIREMENTS H-18-8

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMMENTARY ACI 318

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN

SPECIFICATIONS FOR STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL

CONSTRUCTION (AISC)

MISC. CODE:

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS SAFETY CODE FOR

ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A17.1

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS

THE PRIMARY CODE USED FOR THIS SUMMARY IS NFPA 101 LIFE SAFETY 2024. THE IBC 2024 IS ONLY USED WHEN NFPA 101 IS SILENT ON THE SUBJECT MATTER, OR THE IBC IS SPECIFICALLY REFERENCED IN VA DESIGN

DOCUMENTS.

CODE SUMMARY IS BASED ON THE FOLLOWING CRITERIA:

EXISTING BUILDING AND RENOVATION ARE TO BE SPRINKLERED THROUGHOUT.

EXISTING BUILDING MEETS THE REQUIREMENTS OF NFPA 101,

CHAPTER 19 - EXISTING HEALTH CARE OCCUPANCIES

OCCUPANCY CLASSIFICATION:

· HEALTHCARE: I-2 HOSPITALS (UNCHANGED)

BUILDING AREA:

· NO CHANGE TO EXISTING BUILDING AREA

FLOOR AREAS:

· NO CHANGE TO EXISTING FLOOR AREA

TYPES OF CONSTRUCTION:

· II(222) (UNCHANGED)

AUTOMATIC SPRINKLER SYSTEM:

· EXISTING BUILDING FULLY SPRINKLED, RENOVATION TO REWORKED EXISTING SYSTEM FOR PLAN CHANGES

FIRE ALARM SYSTEM AND SMOKE DETECTION:

· RENOVATION TO TIE INTO EXISTING FIRE ALARM SYSTEM

EGRESS REQUIREMENTS:

· NO CHANGES OR RESTRICTIONS TO EXISTING EXIT ACCESS COMPONENTS

· NO CHANGES TO EXISTING TRAVEL DISTANCES

CODE SUMMARY

FIRE EXTINGUISHER CABINETFEC

SYMBOL LEGEND

EXISTING AREA TO REMAIN

DIST. TO

EXIT

PERSONS

TO EXIT EGRESS PATH COMPUTATION

HE HORIZONTAL EXIT

SMOKE COMPARTMENT #2

22,277 SF - NO CHANGES

SMOKE COMPARTMENT #1

15,608 SF - NO CHANGES

CONSTRUCTION

ACCESS PHASE 2

WORK

Phase 1

CORRIDOR

CB14

CONFERENCE

DB11

RO WATER

DB13

STAFF

LOUNGE

DB14

F. STAFF

TLT.

DB19

M. STAFF

TLT.

DB20

BULK

STORAGE

DB21

BREAK OUT

@ CLEAN

RECEIVING

DB22

STERILE

STORAGE

DB37

STERILIZERS

DB34A

CLEAN PREP

ASSEMBLY &

STERILIZATION

DB34

DISPATCH

ANTE RM

DB42

MALE

SHOWER

DB25B

MALE

LOCKER

DB25A

LOCKER

ANTE RM

D25

FEMALE

LOCKER

DB25C

FEMALE

SHOWER

DB25D

OFFICE

DB40

OFFICE

DB41

OFFICE

DB42

OFFICE

DB39

EQUIP STOR

DB38

HAC

DB50

FEMALE

SHOWER

DB48D

FEMALE

LOCKER

DB48C

SOILED

ANTE

DB48

MALE

LOCKER

MALE

SHOWER

DB48B

CHEM/SOL

STORAGE

DB49

DECON

ANTE

DB36

DECONTAMINATION

DB32A

DETERGENT

& WATER

CB22B

CART WASH

CB22A

MANUAL

EQUIP.

WASH

DB46

MECHANICAL

ROOM

DB45

CASE CART

STAGING

DB43

VENDOR

DROP OFF

DB35

TRAVEL

DISTANCE

62'-0"

ETO

EQUIPMENT

ROOM

DB45

CART LIFT

HAC

DB47

CART LIFT

VESTIBULE

DB44

WORK

Phase 2

TRAVEL

DISTANCE

95'-0"

CONSTRUCTION

ACCESS PHASE 1

SMOKE COMPARTMENT #2

22,277 SF - NO CHANGES

SMOKE COMPARTMENT #1

15,608 SF - NO CHANGES

CONSTRUCTION

ACCESS FOR

PHASE 2

WORK

Phase 1

CORRIDOR

CB14

CONFERENCE

DB11

RO WATER

DB13

STAFF

LOUNGE

DB14

F. STAFF

TLT.

DB19

M. STAFF

TLT.

DB20

BULK

STORAGE

DB21

BREAK OUT

@ CLEAN

RECEIVING

DB22

STERILE

STORAGE

DB37

STERILIZERS

DB34A

CLEAN PREP

ASSEMBLY &

STERILIZATION

DB34

DISPATCH

ANTE RM

DB42

MALE

SHOWER

DB25B

MALE

LOCKER

DB25A

LOCKER

ANTE RM

D25

FEMALE

LOCKER

DB25C

FEMALE

SHOWER

DB25D

OFFICE

DB40

OFFICE

DB41

OFFICE

DB42

OFFICE

DB39EQUIP STOR

DB38

HAC

DB50FEMALE

SHOWER

DB48D

FEMALE

LOCKER

DB48C

SOILED

ANTE

DB48

MALE

LOCKER

MALE

SHOWER

DB48B

CHEM/SOL

STORAGE

DB49

DECON

ANTE

DB36

DECONTAMINATION

DB32A

DETERGENT

& WATER

CB22B

CART WASH

CB22A

MANUAL

EQUIP.

WASH

DB46

MECHANICAL

ROOM

DB45

CASE CART

STAGING

DB43

VENDOR

DROP OFF

DB35

SEAL OFF EXISTING WASHERS DURING CONSTRUCTION.

PROVIDE DUST TIGHT CONSTRUCTION FROM WALL TO

WALL AND FLOOR TO CEILING PER INFECTION CONTROL

SPECIFICATIONS. PROTECT WASHERS FROM ANY

DAMAGE DURING CONSTRUCTION.

EXIST. WASHERS

EXISTING

STERILIZER'S

HAC

DB47

CART LIFT

ETO

EQUIPMENT

ROOM

DB45

CART LIFT

VESTIBULE

TEMPORARY

AIRTIGHT HARD WALL

BARRIER LOCATION

FOR PHASE 1

WORK

Phase 2

ADHESIVE

WALK-OFF MAT CONSTRUCTION

ACCESS FOR

PHASE 1

TEMPORARY AIRTIGHT

HARD WALL BARRIER

SEAL OFF DOORS & WINDOW DURING

CONSTRUCTION TO PROVIDE DUST TIGHT

CONSTRUCTION PER ICRA SPECIFICATION

TEMPORARY

AIR TIGHT HARD

WALL BARRIER

FOR PHASE 2

WORK

ADHESIVE

WALK-OFF MAT

ADHESIVE

WALK-OFF MAT

SEAL OFF DOORS DURING CONSTRUCTION.

PROVIDE DUST TIGHT CONSTRUCTION PER

INFECTION CONTROL SPECIFICATIONS.

SEAL OFF EXISTING WALL CABINETS DURING CONSTRUCTION.

PROVIDE DUST TIGHT CONSTRUCTION FROM WALL TO

WALL AND FLOOR TO CEILING PER INFECTION CONTROL

SPECIFICATIONS. PROTECT CABINETS FROM ANY

DAMAGE DURING CONSTRUCTION.

SEAL OFF STERILIZERS AND CART LIFT DURING

CONSTRUCTION.

ANTE ROOM

(NEGATIVE AIR PRESSURE

DURING PHASE 2)

ANTE ROOM

(NEGATIVE AIR PRESSURE

DURING PHASE 2)

ANTE ROOMS

(NEGATIVE AIR

PRESSURE DURING

PHASE 1)

GENERAL NOTES:

-- CONTRACTOR TO COVER ALL EXISTING

WALL MOUNTED EQUIPMENT IN ROOM DB34

WITHIN THE EACH PHASE FROM DUST AND

CONSTRUCTION DEBRIS DURING THAT AREA OF

CONSTRUCTION.

- REFER TO SHEET G101 FOR ADDITIONAL ICRA

PLANS AND REQUIREMENTS.

CLEAN

CART

DIRTY

CART

G.C TO COVER ALL SHELVING AND CARTS

IN ROOM DB43 DURING BOTH PHASES ON

CONSTRUCTION - SEE ICRA NOTES FOR

ADDITIONAL REQUIREMENTS. NOTE

CONTRACTOR TO FIELD VERIFY QUANTITY

OF SHELVING AND CARTS THAT REQUIRE

COVERAGE - DRAWINGS DO NOT SHOWN

ALL SHELVING AND CARTS.

G.C TO COVER ALL SHELVING AND CARTS

IN ROOM DB37 DURING BOTH PHASES ON

CONSTRUCTION - SEE ICRA NOTES FOR

ADDITIONAL REQUIREMENTS.NOTE

CONTRACTOR TO FIELD VERIFY QUANTITY

OF SHELVING AND CARTS THAT REQUIRE

COVERAGE - DRAWINGS DO NOT SHOWN

ALL SHELVING AND CARTS

ICRA ASSESSMENT

CONSTRUCTION TYPE: TYPE C

RISK GROUP: HIGHEST RISK

IC MATRIX: CLASS IV

TEMPORARY CONSTRUCTION GENERAL NOTES

ALL AREAS TO COMPLY WITH 01 35 26 SAFETY REQUIREMENTS PART 1.12 INFECTION CONTROL

ANY CONSTRUCTION ACTIVITIES IN ROOM DB34, INCLUDING SPACES DIRECTLY

ADJACENT TO THESE SPACES (NOT INCLUDING THE INTERSTITIAL FLOOR) AND SPACES USED TO ACCESS THE ROOMS LISTED, WILL NEED TO BE COMPLETED DURING THE WORK PERIODS AS NOTED BELOW:

TEMPORARY CONSTRUCTION GENERAL NOTES

1.

2.

3.

4.

5.

ALL AREAS TO COMPLY WITH 01 35 26 SAFETY REQUIREMENTS PART 1.12 INFECTION CONTROL

ANY CONSTRUCTION ACTIVITIES IN ROOM DB34, INCLUDING SPACES DIRECTLY

ADJACENT TO THESE SPACES (NOT INCLUDING THE INTERSTITIAL FLOOR) AND SPACES USED TO ACCESS THE ROOMS LISTED, WILL NEED TO BE COMPLETED DURING THE WORK PERIODS AS NOTED BELOW:

START - 2 SHIFTS PER DAY - MONDAY THRU FRIDAY: 6 AM THRU MIDNIGHT

1 SHIFTS PER DAY - SATURDAY AND SUNDAY: 6 AM THRU 5 PM

ALL REQUIRED PPE TO BE PROVIDED BY VA

ALLOW (4) WORKING DAY (WEEKDAYS) BETWEEN PHASE 1 & PHASE 2 FOR VA TO MOVE

AND STERILIZE FURNITURE.

IT IS EXPECTED THAT WORK WILL BE CONTINOUS, UTILIZING SHIFT WORK, DURING THESE WORK PERIODS.

COMPLETION OF CONSTRUCTION FOR BOTH PHASES IS TO BE COMPLETED IN NO MORE THAN (6) FOUR CONSECUTIVE WORK WEEKS. ANY DEVIATIONS FROM THESE WORK PERIODS ARE TO BE COORDINATED

WITH AND APPROVED BY THE VA.

WORK INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING:

TEMPORARY AIRTIGHT HARD BARRIERS ARE TO BE PROPERLY INSTALLED AND SEALED PRIOR TO

COMMENCEMENT OF WORK EACH WORK PERIOD.

ADHESIVE WALK-OFF MATS ARE TO BE IN PLACE PRIOR TO COMMENCEMENT OF WORK EACH WORK

PERIOD. REPLACE AS NEEDED DURING CONSTRUCTION ACTIVITIES WHEN THEY BECOME SOILED

BEYOND USEFULNESS.

EXISTING SUPPLY & EXHAUST DUCTWORK TO BE ISOLATED AND/OR PROTECTED FROM DUST DURING

CONSTRUCTION.

ALL SPACES AFFECTED BY CONSTRUCTION WORK ARE TO HAVE THE ROOM PRESSURES,

TEMPERATURE AND HUMIDITY LEVELS CONTINOUSLY MONITORED AND MAINTAINED AT CURRENT

LEVELS DURING ENTIRE PROJECT. THIS INCLUDES ADJACENT SPACES ONLY BEING USED FOR ACCESS

TO THE CONSTRUCTION SITE.

ANY WORK NOT COMPLETED BY THE END OF THE WORK PERIOD WILL NEED TO HAVE TEMPORARY

ENCLOSURES INSTALLED TO PROTECT THE REST OF THE SPS AREA FROM CONTAMINATION FROM THE

CONSTRUCTION SITE.

THESE ENCLOSURES ARE TO BE AIRTIGHT, TAUNT AND OCCLUSIVE, AND SHALL FOLLOW THE

REQUIREMENTS FOR BARRIERS LISTED IN 01 35 26 SAFETY REQUIREMENTS PART 1.12 INFECTION

CONTROL.

THESE ENCLOSURES MUST NOT IMPEDE THE SERVICES OF SPS, BUT MUST COMPLETELY ENCLOSE

ANY OPEN AREAS, INCLUDING CEILING AREAS.

ENCLOSURES MUST LAST UNTIL COMMENCEMENT OF NEXT WORK PERIOD.

ANY HVAC DIFFUSERS OR GRILLES IN THE CEILING ARE NOT TO BE ENCLOSED AND ENCLOSURE OF CEILING IS TO BE SEALED TO DIFFUSER OR GRILLE TO ALLOW SUPPLY AND EXHAUST AIR INTO OR

OUT OF THE SPACE.

IN THE EVENT THAT ANY ENCLOSURES FAIL, IN ANY WAY, DURING THE TIME BETWEEN WORK

PERIODS, THE CONTRACTOR SHALL PROVIDE STAFF AVAILABLE TO RESPOND WITH 1 HOUR TO

MAKE THE NECESSARY REPAIR(S) .

CONTRACTOR IS RESPONSIBLE FOR CLEANING AT THE END OF EACH WORK PERIOD. THE CONTRACTOR IS REQUIRED TO COMPLETE A TERMINAL CLEANING AT THE END OF PHASES. THE VA WILL DISINFECT THE

THE AREAS AT THE END OF EACH PHASE.

PROPER APPROVAL IS REQUIRED PRIOR TO REMOVAL OF TEMPORARY AIRTIGHT BARRIERS

AT THE END OF EACH WORK PERIOD.

ADHESIVE WALK-OFF MATS ARE TO BE REMOVED FROM THE SPACE AT THE END OF EACH WORK

PERIOD.

• CONTRACTOR DUMPSTER LOCATION TO BE IN LOT 'H' OR ASSIGNED LOCATION BY COR.

• CONTRACTOR WILL BE PROVIDED WITH (2) PARKING SPACES IN THE EAST PARKING STRUCTURE.

• CONTRACTOR MATERIALS STORAGE LAY-DOWN AREA IS WITHIN THE CONSTRUCTION AREA.

• CONTRACTOR ADDITIONAL STORAGE CAN BE PLACED IN LOT 'H ' PARKING LOT AS DESIGNATED BY COR.

KEY PLAN

NOT TO SCALE

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1W

1E

As indicated

INSTALL GYPBOARD CEILING IN SPS

1E

G-100

506-25-502

CORRECT SPS CEILING SYSTEM

FINDINGPARTIAL BASEMENT LIFE

SAFETY AND ICRA PLANS

pr e-de si gn

D O

C U

M

EN

TS

1/8" = 1'-0"PARTIAL BASEMENT LIFE SAFETY PLAN 1/8" = 1'-0"

PARTIAL BASEMENT ICRA PLAN

REVISION SCHEDULE

# DATE DESCRIPTION

CONNECT TO NEAREST

EXHAUST DUCT THAT

LEADS TO AN MAIN CORRIDOR

EXHUAST VENT.

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

CROSS SECTION "A"1

NOT TO SCALE

EX

IS

TI

N

G W

AL

L

V.

I.F

EX

IS

TI

N

G W

AL

L

V.

I.F

UNDERSIDE OF EXISTING

DECK

FIRE RATED TEMPORARY

WALL SYSTEM -

BASIS OF DESIGN -

ONE HOUR FIRE RATED MODULAR

CONTAINMENT WALL SYSTEM

FIREBLOCKWALL AS MANUFACTURER BY

STARC WALL OR APPROVED EQUAL

TEMPORARY WALL PANEL TO INCLUDE

BUILT IN PRESSURE MONITOR (MONITOR

PROVIDED BY G.C.) & FIRE DAMPER

WITH FUSIBLE LINK FOR CONNECTION TO THE

HEPA FILTER MACHINES

PROVIDE (2) PRE-WIRED PANELS FOR POWER

AND DATA FOR WORKSTATIONS - SEE ELECT.

DWGS.

EXISTING FLOOR

4 7/8"

C

EI

LI

N

G H

EI

G

H T

VA

R

IE

S, F

IE

LD

V

ER

IF

Y

ICRA WALL

NOT TO SCALE

ICRA NOTES

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE

DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF

PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD

SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED

ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 6 MIL) TO

SEAL AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER

SYSTEM IS INTACT AND ACTIVE.

1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING

CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS

NEAR THE SPS ROOM ENTRANCE SPACES - CONSTRUCTION

ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION

AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE

AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF

WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY

CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER.

UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS

SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND

THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN

PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.

2. PROVIDE STICKY MATS AND BLANKET AT THE ANTE RM. BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY

OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND

DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND

DEBRIS CONTROL

3. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES;

AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER

THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN

TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER

CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN

CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED

BETWEEN THE CONSTRUCTION AND THE CONSTRUCTION STAGING/PREP

AREA.

4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.

EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE

VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH

EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR

MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE

SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED

BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA.

THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR.

4B. ALL EQUIPMENT AND SHELVING REMAINING IN THE SPS ROOM AND THE

ADJACENT STORAGE ROOMS (DB43 & DB37) SHALL BE COVERED AND

PROTECTED WITH A PLASTIC BARRIER PRIOR STARTING EACH CONSTRUCTION

PHASING. CONTRACTOR REQUIRED TO CLEAN PLASTIC SHEET COVERAGE

DAILY AND WHEN DUST ON THE COVER IS APPARENT.

VENTILATION AND ENVIRONMENTAL CONTROLS

5. AIR SYSTEM FLOW: CONTRACTOR TO DISCHARGE AIR FLOW

FROM HEPA FILTER MACHINES IN THE MAIN CORRIDORS TO CREATE

THE NEGATIVE AIR PRESSURE FOR THE CONSTRUCTION AREA AND THE

ANTE ROOMS. CONTRACTOR MUST PROTECT THE EXISTING MECHANICAL

SYSTEM BY COVERING AND ADD FILTERS ON THE EXISTING SUPPLY AND

RETURN AIR GRILLES IN THE CONSTRUCTION AREA. AIR FLOW FROM THE

CLEAN TO DIRTY AREAS. MAINTAIN .01 INCHES/ WATER GAUGE NEGATIVE

PRESSURIZATION OF THE ENTIRE WORKSPACE.

5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA

& ANTE ROOMS SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS

AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE

OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO

REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE,

PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800

CUBIC FEET PER MINUTE (FT3/MIN),

5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHALL BE VERIFIED DAILY.

5E. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC

AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN

CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS

NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE

CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING

THROUGHOUT THE DURATION OF THE PROJECT. THE TESTING SHALL BE

CONTINUOUSLY MONITOR WITH A DIGITAL MONITOR WITH A ALARM THAT

NOTIFIES THE CONTRACTOR OF ANY FAILURE IN THE NEGATIVE PRESSURE.

CONTRACTOR MUST MAKE CORRECTIVE MEASURE TO RESTORE NEGATIVE

IN A TIMELY MANNER AND MUST NOTIFIED THE VA/COR IMMEDIATELY OF THE

ISSUE.

6. WORKSITE CLOTHING: CONTRACTOR CLOTHING SHALL BE FREE OF LOOSE

DUST AND DEBRIS BEFORE LEAVING CONSTRUCTION AREA/ ANTE ROOM.

WHEN LEAVING ANY ANTE ROOM, THE CONTRACTOR SHALL USE A

HEPA-FILTERED VACUUM (ON THE PROTECTIVE APPAREL WHEN

MOVING THRU THE STERILE STORAGE ROOMS AND THE PERSONAL CLOTHING

WHEN ENTER THE MAIN HOSPITAL CORRIDORS. PROTECTIVE APPAREL

(COVERALLS, FOOTGEAR AND HEADGEAR) WILL BE PROVIDED AND DISPOSED BY

THE VA DURING THE DURATION OF THE CONSTRUCTION PROJECT. THE CONTRACTOR

SHALL CONSTRUCT AN ANTEROOM FOR CHANGING CLOTHING AND STORING

EQUIPMENT. CONTRACTOR IS REQUIRED TO DISPOSE OF PROTECTIVE APPAREL FROM

THE ANTEROOM IMMEDIATE ADJACENT TO THE CONSTRUCTION AREA. ALL

EQUIPMENT, TOOLS, TOOLS CARTS, AND MATERIALS TRANSPORTED THROUGH

OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING

AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE

OR WORK AREA.

6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL

HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION

SITE, VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA

INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE

CLEANING.

INSTALL AIR TIGHT/ DUST PROOF BARRIER

FROM TOP OF TEMPORARY HARD WALL SYSTEM

TO THE BOTTOM OF DECK ABOVE - SEAL THE

BARRIER TIGHT TO ALL THRU PENETRATIONS .

5D. PRIOR TO START OF WORK, INCLUDING ASSEMBLY OF THE ICRA BARRIERS,

INITIAL BASELINE AIR SAMPLING MEASUREMENT OF PARTICULATE LEVELS

MUST BE TAKEN IN THE PLANNED AREA OF DISCHARGE, ONCE CONTAINMENT

IS ERECTED, HEPA FILTRATION MUST THEN BE VERIFIED BY PARTICULATE

MEASUREMENTS, USING A PARTICLE COUNTER (PARTICULATE COUNTER FURNISHED

BY G.C.) WITH A MULTI-CHANNEL CAPABILITIES TO MEASURE DOWN TO 0.3 MICRONS,

TO CONFIRM THAT DISCHARGE OF THE HEPA UNIT DOE NOT EXCEED THE BASELINE

PARTICULATE COUNT. VERIFICATION MUST CONTINUE AT LEAST THREE TIMES PER DAY

(ONCE EVERY 8 HOURS) 7 DAYS PER WEEK DURING THE USE OF THE NEGATIVE

AIR MACHINE. ANY EXCEEDANCE MUST TRIGGER A WORK STOPPAGE AND IMMEDIATE

RESPONSE AND RESOLUTION. TO ACCOMMODATE SAMPLING, THE NEGATIVE AIR

PRESSURE MACHINE MUST BE FITTED WITH 2 FT OF RIDGED DUCTWORK AT THE

DISCHARGE, THE SAMPLE PORT FOR MONITORING MUST BE IN THE RIDGE

DUCT SECTION.

5C. CONTRACTOR MUST DO A COMPLETE FLOW AND PRESSURE ANALYSIS

OF THE AREA THE AIR IS BEING DISCHARGED TO ENSURE THE FLOW AND

PRESSURE RELATIONSHIP IN THE DISCHARGE AREA IS NOT BEING

ADVERSE IMPACTED.

11/15/2024

CONSTRUCTION

ACCESS PHASE 2

WORK

Phase 1

CORRIDOR

CB14

CONFERENCE

DB11

RO WATER

DB13

STAFF

LOUNGE

DB14

F. STAFF

TLT.

DB19

M. STAFF

TLT.

DB20

BULK

STORAGE

DB21

BREAK OUT

@ CLEAN

RECEIVING

DB22

STERILE

STORAGE

DB37

STERILIZERS

DB34A

CLEAN PREP

ASSEMBLY &

STERILIZATION

DB34

DISPATCH

ANTE RM

DB42

MALE

SHOWER

DB25B

MALE

LOCKER

DB25A

LOCKER

ANTE RM

D25

FEMALE

LOCKER

DB25C

FEMALE

SHOWER

DB25D

OFFICE

DB40

OFFICE

DB41

OFFICE

DB42

OFFICE

DB39

EQUIP STOR

DB38

HAC

DB50

FEMALE

SHOWER

DB48D

FEMALE

LOCKER

DB48C

SOILED

ANTE

DB48

MALE

LOCKER

DB48A

MALE

SHOWER

DB48B

CHEM/SOL

STORAGE

DB49

DECON

ANTE

DB36

DECONTAMINATION

DB32A

DETERGENT

& WATER

CB22B

CART WASH

CB22A

MANUAL

EQUIP.

WASH

DB46

MECHANICAL

ROOM

DB45

CASE CART

STAGING

DB43

VENDOR

DROP OFF

DB35

ETO

EQUIPMENT

ROOM

DB45

CART LIFT

HAC

DB47

CART LIFT

VESTIBULE

DB44

WORK

Phase 2

WORK

Phase 1

CORRIDOR

CB14

CONFERENCE

DB11

RO WATER

DB13

STAFF

LOUNGE

DB14

F. STAFF

TLT.

DB19

M. STAFF

TLT.

DB20

BULK

STORAGE

DB21

BREAK OUT

@ CLEAN

RECEIVING

DB22

STERILE

STORAGE

DB37

STERILIZERS

DB34A

CLEAN PREP

ASSEMBLY &

STERILIZATION

DB34

DISPATCH

ANTE RM

DB42

MALE

SHOWER

DB25B

MALE

LOCKER

DB25A

LOCKER

ANTE RM

D25

FEMALE

LOCKER

DB25C

FEMALE

SHOWER

DB25D

OFFICE

DB40

OFFICE

DB41

OFFICE

DB42

OFFICE

DB39EQUIP STOR

DB38

HAC

DB50FEMALE

SHOWER

DB48D

FEMALE

LOCKER

DB48C

SOILED

ANTE

DB48

MALE

LOCKER

MALE

SHOWER

DB48B

CHEM/SOL

STORAGE

DB49

DECON

ANTE

DB36

DECONTAMINATION

DB32A

DETERGENT

& WATER

CB22B

CART WASH

CB22A

MANUAL

EQUIP.

WASH

DB46

MECHANICAL

ROOM

DB45

CASE CART

STAGING

DB43

VENDOR

DROP OFF

DB35

SEAL OFF EXISTING WASHERS DURING CONSTRUCTION.

PROVIDE DUST TIGHT CONSTRUCTION FROM WALL TO

WALL AND FLOOR TO CEILING PER INFECTION CONTROL

SPECIFICATIONS. PROTECT WASHERS FROM ANY

DAMAGE DURING CONSTRUCTION.

EXIST. WASHERS

EXISTING

STERILIZER'S

HAC

DB47

CART LIFT

ETO

EQUIPMENT

ROOM

DB45

CART LIFT

VESTIBULE

TEMPORARY

AIRTIGHT HARD WALL

BARRIER LOCATION

FOR PHASE 1

WORK

Phase 2

CONSTRUCTION

ACCESS FOR

PHASE 1

SEAL OFF DOOR OPENING (ADD LOCKABLE DOOR),

WINDOW AND (3) WASHERS DURING CONSTRUCTION

TO PROVIDE DUST TIGHT CONSTRUCTION PER ICRA

SPECIFICATIONS

ADHESIVE

WALK-OFF MAT

ADHESIVE

WALK-OFF MAT

ADHESIVE

WALK-OFF MAT

SEAL OFF DOORS DURING CONSTRUCTION.

PROVIDE DUST TIGHT CONSTRUCTION PER

INFECTION CONTROL SPECIFICATIONS.

SEAL OFF EXISTING WALL CABINETS DURING CONSTRUCTION.

PROVIDE DUST TIGHT CONSTRUCTION FROM WALL TO

WALL AND FLOOR TO CEILING PER INFECTION CONTROL

SPECIFICATIONS. PROTECT CABINETS FROM ANY

DAMAGE DURING CONSTRUCTION.

EXIST. WASHERS

TEMPORARY

AIRTIGHT HARD WALL

BARRIER LOCATION

FOR PHASE 2

SEAL OFF PASS THRU WINDOW & (3) WASHERS DURING

CONSTRUCTION TO PROVIDE DUST TIGHT

CONSTRUCTION PER ICRA SPECIFICATION

ANTE ROOM

ANTE ROOM

SEAL OFF STERILIZERS & CART ELEVATOR DOOR

DURING PHASE 1 CONSTRUCTION TO PROVIDE DUST

TIGHT CONSTRUCTION PER ICRA SPECIFICATIONS

SEAL OFF DOORS DURING CONSTRUCTION.

PROVIDE DUST TIGHT CONSTRUCTION PER

INFECTION CONTROL SPECIFICATIONS.

SEAL OFF STERILIZERS OPENING DURING PHASE 2

CONSTRUCTION TO PROVIDE DUST TIGHT

CONSTRUCTION PER ICRA SPECIFICATIONS

EXISTING

STERILIZER'S

CLEAN

CART

DIRTY

CART

CLEAN

CART

DIRTY

CART

ADHESIVE

WALK-OFF MAT

TEMPORARY AIRTIGHT

HARD WALL BARRIER

ANTE ROOM

PROVIDE TEMPORARY/

EMERGENCY ACCESS ONLY

DOORS WITHIN

BARRIER WALL

PROVIDE TEMPORARY/

EMERGENCY ACCESS ONLY

DOORS WITHIN

BARRIER WALL

ICRA ASSESSMENT

CONSTRUCTION TYPE: TYPE C

RISK GROUP: HIGHEST RISK

IC MATRIX: CLASS IV

KEY PLAN

NOT TO SCALE

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1W

1E

As indicated

INSTALL GYPBOARD CEILING IN SPS

1E

G-101

506-25-502

CORRECT SPS CEILING SYSTEM

FINDINGPARTIAL BASEMENT -

PHASING PLANS

pr e-de si gn

D O

C U

M

EN

TS

1/8" = 1'-0"

PARTIAL BASEMENT - PHASE 1 SCOPE OF WORK

1/8" = 1'-0"

PARTIAL BASEMENT - PHASE 2 SCOPE OF WORK

REVISION SCHEDULE

# DATE DESCRIPTION

SYMBOL LEGEND

DENOTES WALL TYPE NUMBER. REFER TO THIS SHEET FOR

WALL TYPE DESCRIPTIONS.

A1

UNAFFECTED AREAS SHOWN SHADED

CLEAN PREP

ASSEMBLY &

STERILIZATION

DB34

RO WATER

DB13

STAFF

LOUNGE

DB14

STERILE

STORAGE

DB37

F. STAFF

TLT.

DB19

M. STAFF

TLT.

DB20

BULK

STORAGE

DB21

CASE CART

STAGING

DB43

DECONTAMINATION

DB32A

HAC

DB47

STERILIZERS

DB34A

CONFERENCE

DB11

MECHANICAL

ROOM

DB45

DETERGENT

& WATER

CB22B

MANUAL

EQUIP.

WASH

DB46

CART WASH

CB22A

STER3 STER1 STER2

STER4

BREAK OUT

@ CLEAN

RECEIVING

DB22

DISPATCH

ANTE RM

DB42

MALE

SHOWER

DB25B

MALE

LOCKER

DB25A

LOCKER

ANTE RM

D25

FEMALE

LOCKER

DB25C

FEMALE

SHOWER

DB25D

OFFICE

DB40

OFFICE

DB41

OFFICE

DB42

OFFICE

DB39

EQUIP STOR

DB38

WASHERS

CORRIDOR

CB14

VENDOR

DROP OFF

DB35

DECON

ANTE

DB36

CHEM/SOL

STORAGE

DB49

MALE

SHOWER

DB48B

MALE

LOCKER

DB48A

SOILED

ANTE

DB48

FEMALE

LOCKER

DB48C

FEMALE

SHOWER

DB48D

HAC

DB50

ETO

EQUIPMENT

ROOM

DB45

CART LIFT

CART LIFT

VESTIBULE

DB44

ALCOVE

CB22C

PROVIDE DOOR LEAF AND LOCK DURING

DURING THE PHASING 1 CONSTRUCTION

PROVIDE WALL REPAIR AND PAINT AS

REQUIRED AT THE NEW CEILING PERIMETER

(TYP.THROUGH-OUT)

OSOSOS

OS

OS

OS

WAP

C

C

C

OS

OS OS

CLEAN PREP

ASSEMBLY &

STERILIZATION

DB34

RO WATER

DB13

STAFF

LOUNGE

DB14

STERILE

STORAGE

DB37

F. STAFF

TLT.

DB19

M. STAFF

TLT.

DB20

BULK

STORAGE

DB21

CASE CART

STAGING

DB43

DECONTAMINATION

DB32A

HAC

DB47

STERILIZERS

DB34A

CONFERENCE

DB11

MECHANICAL

ROOM

DB45

DETERGENT

& WATER

CB22B

MANUAL

EQUIP.

WASH

DB46

CART WASH

CB22A

CORRIDOR

CB14

OPEN TO DECK ABOVE

WASHERS

S O

EXIST. CONDUIT

UP THRU CLG - SEAL TIGHT

ETO

EQUIPMENT

ROOM

DB45

8'-6"

AP NEW AP

NEW SUSPENDED GYP. BD. CEILING.

MATCH HEIGHT TO EXISTING ADJACENT

CEILING. PROVIDE CONTROL JOINTS

EVERY MAX. 30 FT . O.C.

PROVIDE LOCKABLE, FLUSH MOUNTED

ACCESS PANEL - FIELD VERIFY LOCATION

WITH EXISTING MECHANICAL EQUIPMENT

A.P. A.P.

A.P.

A.P.

EXISTING POWER

POLES TO REMAIN, COORD.

NEW CEILING AND C.J.

REFLECTED CEILING PLAN LEGEND

SUPPLY DIFFUSER

RETURN GRILL

2'x4' LIGHT FIXTURE

CEILING HEIGHT- ABOVE FINISH FLOOR

2X2 ACOUSTIC CEILING PANEL

GYPSUM BOARD CEILING

EXPOSED TO DECK ABOVE, NO CEILING

S SPEAKER

W

EXIT SIGN

X'-X"

WIFI

SPRINKLER LOCATION

CEILING ACCESS PANELAP

C SECURITY CAMERA

EXHAUST GRILL

W

84"

CONFERENCE

DB11

RO WATER

DB13

STAFF

LOUNGE

DB14

F. STAFF

TLT.

DB19

M. STAFF

TLT.

DB20

BULK

STORAGE

DB21

STERILE

STORAGE

DB37

STERILIZERS

DB34A

CLEAN PREP

ASSEMBLY &

STERILIZATION

DB34

HAC

DB47

CASE CART

STAGING

DB43

MECHANICAL

ROOM

DB45

MANUAL

EQUIP.

WASH

DB46

CART WASH

CB22A

DECONTAMINATION

DB32A

DETERGENT

& WATER

CB22B

REMOVE WALL

AND BASE

REMOVE ALL EXISTING CEILING

PANELS AND GRIDPANELS AND GRID.

TEMPORARILY SUPPORT ANY CEILING

MOUNTED OR CEILING SUPPORTED

ITEMS AS NECESSARY TO INSTALL

NEW CEILING.

REFER TO M-100 & E-100 FOR

ADDITIONAL NOTES ON REMOVAL OF

OTHER CEILING MOUNTED ITEMS.

CORRIDOR

CB14

EXISTING WASHERS

EXISTING STERILIZERS

• REWORK EXISTING CEILING GRID TO STOP AT

PHASING SEPARATION AS NEEDED. REMOVE

UN-NEEDEDACOUSTICAL CEILING PANELS AND CUT AND

REINSTALL PANELS AS NEEDED FOR PHASING

LAYOUT.

ETO

EQUIPMENT

ROOM

DB45

CART LIFT

CART LIFT

• REMOVE ALL LIGHT FIXTURES, MECH.

GRILLES, EXIT SIGNS, FIRE ALARM

DEVICES, CAMERA'S, SPEAKERS ANY

ADDITIONAL CEILING MOUNTED

EQUIPMENT - SALVAGE FOR REUSE

GENERAL DEMOLITION NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

ALL EXISTING LOOSE MATERIALS, FURNITURE, PORTABLE ELECTRONIC DEVICES AND

EQUIPMENT TO BE RETAINED BY THE VA WILL BE MOVED, BY THE VA, PRIOR TO

DEMOLITION.

REFER TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL,

FIRE PROTECTION DRAWINGS, AND ALL OTHER DRAWINGS FOR OTHER DEMOLITION

NOTES AND INFORMATION.

SHORE AND BRACE ALL WORK REQUIRED TO REMAIN.

THE CONTRACTOR SHALL FIELD VERIFY EXACT DIMENSIONS AND CONDITIONS IN FIELD

PRIOR TO START OF WORK.

ALL DISTURBED SURFACES TO BE PATCHED/ REPAIRED TO RECEIVE NEW FINISHES IN

NEW CONDITION TO MATCH ADJACENT FINISH.

ALL EXISTING ATTACHED ITEMS (WALL GUARDS, SWITCHES, ETC.) AND EQUIPMENT TO BE

RETAINED ARE TO BE REMOVED AND REINSTALLED BY CONTRACTOR UPON COMPLETION

OF FINISHING WORK.

PATCH/REPAIR/REPLACE ALL MATERIALS AFFECTED BY RENOVATION TO MATCH

ORIGINAL EXISTING MATERIAL, FINISH, COLOR, ETC., U.N.O.

PATCH, REPAIR, REPLACE EXISTING MATERIALS AS REQUIRED TO RECEIVE NEW

FINISHES.

REFER TO FLOOR PLAN FOR DIMENSIONS AND OTHER INFORMATION NOT SHOWN HERE.

ALL ITEMS TO BE REMOVED ARE SHOWN DARKER AND DASHED, U.N.O.

11. DUMPSTER TO BE LOCATED IN PARKING LOT 'H'

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME NATURE AS

SHOWN FOR SIMILAR CONDITIONS. ANY UNCLEAR CONDITIONS SHALL BE VERIFIED

WITH COR PRIOR TO CONSTRUCTION OF THAT AREA.

DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS OR DIMENSIONAL

DISCREPANCIES SHALL BE VERIFIED WITH COR.

ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS INDICATED IN THE

CONTRACT DOCUMENTS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION,

ERECTION, AND/OR CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT

INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED TO THE COR FOR

REVIEW PRIOR TO FABRICATION, ERECTION, AND/OR CONSTRUCTION.

THE CONTRACTOR IS TO REVIEW THE ENTIRE SET OF CONSTRUCTION DOCUMENTS

(DRAWINGS & SPECIFICATIONS) AND SHALL COORDINATE WORK BETWEEN ALL

TRADES. IF CONFLICTS ARISE DUE TO COORDINATION OF TRADES, THE

CONTRACTOR IS TO VERIFY CONFLICT WITH COR PRIOR TO CONSTRUCTION /

INSTALLATION OF CONFLICTING ITEMS.

REMODELING OR PATCHING SHALL BE EXECUTED IN CONJUNCTION WITH THE NEW

WORK AND THE DEMOLITION WORK IN THE DRAWINGS.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATIONS OF THE

WALLS, AND CEILINGS FOR NEW FINISHES.

WHEN REMOVING DEBRIS FROM CONSTRUCTION AREA WIPE OFF WHEELS BEFORE

LEAVING CONSTRUCTION AREA AND USE WET RAGS OVER DUMPSTER TO REDUCE

DUST.

THE CONTRACTING OFFICER RESERVES THE RIGHT TO HALT CONSTRUCTION

ACTIVITY AT ANY TIME DUE TO NOISE AND VIBRATION WHICH MIGHT EFFECT THE

OWNER'S ONGOING USE OF THE FACILITY.

ALL DIMENSIONS ARE FROM FACE OF FINISH, TO FACE OF FINISH, U.N.O.

COORDINATE LOCATION OF ALL RECESSED OR IMBEDDED ITEMS SO AS NOT TO

INTERFERE WITH OTHER TRADE'S WORK.

MAINTAIN WALL & CEILING FIRE RATING BEHIND RECESSED ACCESSORIES & EQUIPMENT.

ADDITIONS OF OPENINGS, PENETRATIONS OR EMBEDMENTS IN THE FIELD SHALL BE

FIRST VERIFIED WITH COR.

PROVIDE NEOPRENE OR VINYL ISOLATION MATERIAL BETWEEN DISSIMILAR METALS

THAT ARE IN CONTACT WITH ONE ANOTHER, TYPICAL.

WHERE DRYWALL ABUTS DISSIMILAR MATERIALS, USE METAL DRYWALL EDGE BEAD

AND SEALANT WITH BACKER ROD.

GENERAL NOTES

THERE IS NO ONSITE STORAGE AT THIS FACILITY OUTSIDE OF THE CONTRACTOR'S

PROJECT SPECIFIC SCOPE OF WORK BOUNDARY. CONTRACTOR SHALL BE LIMIT

LAY-DOWN AREA TO WORK SITE, ON SITE STORAGE CONTAINER PARKED IN LOT H (IF

AVAILABLE) OF OFF-SITE LOCATIONS.

15.

COORDINATE WITH COR A MINIMUM OF TWO WEEKS IN ADVANCE FOR ANY SHUTDOWN

OR OUTAGE THAT WILL AFFECT ONE FLOOR/ WING/ OR SERVICE DEPARTMENT AT A

TIME. OUTAGE MUST BE SUBMITTED IN WRITING TO THE COR AND APPROVED IN

WRITING.

COORDINATE WITH COR A MINIMUM OF FOUR WEEKS IN ADVANCE FOR ANY SHUT DOWN

OR OUTAGE THAT WILL AFFECT MULTIPLE FLOOR WITHIN THE BUILDING. OUTAGE MUST

BE SUBMITTED IN WRITING TO THE COR AND APPROVED IN WRITING.

17.

16.

IN THE FIELD CONSTRUCTION WORK IS NOT TO PROCEED UNTIL ALL CONSTRUCTION

MATERIAL HAS BEEN PURCHASED AND IS ON SITE AND READY TO BE INSTALLED.

18.

REFLECTED CEILING PLAN GENERAL NOTES

1.

2.

SEE MECHANICAL & ELECTRICAL DRAWINGS FOR OTHER APPLICABLE NOTES & ITEMS.

AIR DIFFUSERS/GRILLS, AND LIGHTS ARE TO BE FLUSH WITH THE NEW GYP. BD.

CEILING.

1/8" = 1'-0"

PARTIAL BASEMENT FLOOR PLAN

1/8" = 1'-0"

PARTIAL BASEMENT REFLECTED CEILING PLAN

KEY PLAN

NOT TO SCALE

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1W

1E

As indicated

INSTALL GYPBOARD CEILING IN SPS

1E

A-100

506-25-502

CORRECT SPS CEILING SYSTEM

FINDINGBASEMENT FLOOR PLAN

BI

D

D O

C U

M

EN

TS

1/8" = 1'-0"

PARTIAL BASEMENT DEMOLITION PLAN

ROOM FINISH SCHEDULE

ROOM

NO. ROOM NAME

FLOOR WALL CEILING

FINISH NOTESFINISH BASE NORTH SOUTH EAST WEST FINISH

DB34 CLEAN PREP ASSEMBLY &

STERILIZATION

--- --- SEE NOTE SEE NOTE SEE NOTE SEE NOTE PTD. PATCH EXIST WALLS AS REQ'D TO MATCH EXIST

MATERIALS SCHEDULE

SYSTEM CODE MANUFACTURER STYLE PATTERN & COLOR

FINISH

NOTES

SPECIFICATION

SECTION

GLAZED CEILING

COATING

GCC-1 STONHARD STONGLAZE VSE WHITE -- 099659

PAINT PT-1 GRAHAM PAINT AQUA BORNE CERAMIC -

LATEX EGGSHELL

GOLDEN BUFF #2-27-2 MATCH EXIST 099100

VERIFY DIMENSIONS IN THE FIELD

REVISION SCHEDULE

# DATE DESCRIPTION

CLEAN PREP

ASSEMBLY &

STERILIZATION

DB34

DECONTAMINATION

DB32AB

ETO EQUIPMENT

ROOM

DB45

MANUAL EQUIP.

WASH

DB46

STERILIZERS

DB34A

STERILE

STORAGE

DB37

HAC

DB47

PROVIDE NEW CONCEALED TYPE SPRINKLER

HEADS, CONNECTED TO EXISTING WET FIRE

PROTECTION SYSTEM, IN NEW GYP. BOARD

CEILING. REWORK EXISTING WET FIRE

PROTECTION PIPING AS NEEDED FOR

INSTALLATION.

MECHANICAL

ROOM

DB45

LKJH

FIRE PROTECTION GENERAL NOTES:

INSTALLATION OF NEW FIRE SUPPRESSION SYSTEM AND ALTERATIONS TO EXISTING SYSTEM SHALL BE MADE BY A CERTIFIED FIRE PROTECTION CONTRACTOR AND SHALL COMPLY WITH NFPA 13 AND ALL FM GLOBAL DATA SHEETS, MOST STRINGENT SHALL GOVERN.

ALL FIRE PROTECTION SPRINKLER HEADS IN AREAS WITH FINISHED CEILINGS SHALL BE CONCEALED TYPE.

REFER TO SPECIFICATION SECTION 211313-WET PIPE SPRINKLER SYSTEMS FOR ADDITIONAL INFORMATION.

THE FIRE PROTECTION CONTRACTOR SHALL CHOOSE ONE OF THE FOLLOWING:

A. IF THE SYSTEM IS DOWN FOR MORE THAN 10 HOURS IN A 24 HOUR PERIOD, A FIRE WATCH WILL HAVE TO BE PUT IN PLACE. IF THE SYSTEM CAN

BE BROUGHT BACK ONLINE WITHIN THE 10 HOURS NO FIRE WATCH WILL BE NECESSARY.

B. IF THE DISTANCE OF THE SPRINKLER HEADS IS WITHIN 12 INCHES OF THE DECK WHEN THE CEILINGS ARE REMOVED, NO SPECIAL PRECAUTIONS ARE REQUIRED AS LONG AS THE SYSTEM IS LEFT ONLINE. IF THE DISTANCE IS MORE THAN 12 INCHES, UPRIGHT SPRINKLER HEADS SHALL BE INSTALLED WITHIN 12 INCHES OF THE DECK AND THE SYSTEM WILL NEED TO BE BROUGHT BACK ONLINE.

1.

2.

3.

4.

KEY PLAN

NOT TO SCALE

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1W

1E

1/8" = 1'-0"

INSTALL GYPBOARD CEILING IN SPS

1E

FP100

506-25-502

CORRECT SPS CEILING SYSTEM

FINDINGBASEMENT FIRE

PROTECTION PLAN

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

1/8" = 1'-0"

1E-BASEMENT FIRE PROTECTION PLAN

REVISION SCHEDULE

# DATE DESCRIPTION

KEY PLAN

NOT TO SCALE

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1W

1E

INSTALL GYPBOARD CEILING IN SPS

1E

M-001

506-25-502

CORRECT SPS CEILING SYSTEM

FINDING

MECHANICAL ABBREVIATIONS, SYMBOLS

AND GENERAL NOTES

11/15/2024

11/15/2024 100% Bid Documents

REVISION SCHEDULE

# DATE DESCRIPTION

AutoCAD SHX Text

%%UDUCTWORK SYMBOLS

AutoCAD SHX Text

LIMIT OF DEMOLITION

AutoCAD SHX Text

(WALL TYPE)

AutoCAD SHX Text

(WALL TYPE)

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

SUPPLY DUCT (UP & DOWN)

AutoCAD SHX Text

EXHAUST DUCT (UP & DOWN)

AutoCAD SHX Text

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

AutoCAD SHX Text

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

AutoCAD SHX Text

EXHAUST OR RETURN REGISTER OR TOP GRILLE

AutoCAD SHX Text

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

AutoCAD SHX Text

CONNECT NEW DUCT TO EXISTING DUCT

AutoCAD SHX Text D

AutoCAD SHX Text

INCLINED RISE, IN DIRECTION OF AIR FLOW

AutoCAD SHX Text

INCLINED DROP, IN DIRECTION OF AIR FLOW

AutoCAD SHX Text R

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

RETURN DUCT (UP & DOWN)

AutoCAD SHX Text

BACK DRAFT DAMPER

AutoCAD SHX Text

BDD

AutoCAD SHX Text

SECTION.)

AutoCAD SHX Text

FC

AutoCAD SHX Text 10x8

AutoCAD SHX Text

FLEXIBLE CONNECTION, EQUIPMENT,

AutoCAD SHX Text

VANED ELBOW (PROVIDE ALL SQUARE OR

AutoCAD SHX Text

RECTANGULAR ELBOWS WITH VANES EVEN IF

AutoCAD SHX Text

SYMBOL IS MISSING)

AutoCAD SHX Text

VANED ELBOW (SHORT RADIUS)

AutoCAD SHX Text

STANDARD RADIUS ELBOW (LONG RADIUS)

AutoCAD SHX Text NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

AutoCAD SHX Text

EXISTING DUCT TO REMAIN

AutoCAD SHX Text

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

AutoCAD SHX Text

FIRE DAMPER

AutoCAD SHX Text F

AutoCAD SHX Text

VD

AutoCAD SHX Text

DUCT WITH SOUND LINING

AutoCAD SHX Text

FLEXIBLE DUCTWORK (INSULATED)

AutoCAD SHX Text

MANUAL VOLUME DAMPER

AutoCAD SHX Text

EXISTING DUCT TO BE REMOVED

AutoCAD SHX Text

VIBRATION, OR SEISMIC

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

STANDARD BRANCH SUPPLY OR

AutoCAD SHX Text

MANUAL SPLITTER DAMPER

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

POINT OF CHANGE IN DUCT CONSTRUCTION BY

AutoCAD SHX Text

STATIC PRESSURE CLASS. THE NUMBER ASSIGNS

AutoCAD SHX Text

PRESSURE CLASS (IN. OF WATER) WHICH WILL

AutoCAD SHX Text

ACCOMMODATE MAXIMUM OPERATING PRESSURE

AutoCAD SHX Text

COMBINATION FIRE/SMOKE DAMPER

AutoCAD SHX Text 1/2

AutoCAD SHX Text

AutoCAD SHX Text

IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES

AutoCAD SHX Text

THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR

AutoCAD SHX Text

ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT

AutoCAD SHX Text

INDICATES NEGATIVE PRESSURE.

AutoCAD SHX Text

STAINLESS STEEL DUCT

AutoCAD SHX Text

AUTOMATIC CONTROL DAMPER MODULATING

AutoCAD SHX Text

AUTOMATIC CONTROL DAMPER TWO POSITION

AutoCAD SHX Text

%%U(NOT ALL SYMBOLS WILL APPLY TO THIS WORK)

AutoCAD SHX Text

ANCHOR

AutoCAD SHX Text

REDUCER OR INCREASER

AutoCAD SHX Text

DIRECTION OF FLOW

AutoCAD SHX Text

SIDE CONNECTION

AutoCAD SHX Text

ECCENTRIC REDUCER

AutoCAD SHX Text BOTTOM CONNECTION, 45%%d OR 90%%d

AutoCAD SHX Text TOP CONNECTION, 45%%d OR 90%%d

AutoCAD SHX Text

DIRECTION OF PIPE PITCH (DOWN)

AutoCAD SHX Text

UNION

AutoCAD SHX Text

RISE OR DROP IN PIPE

AutoCAD SHX Text

CAPPED OUTLET

AutoCAD SHX Text

PRESSURE GAGE

AutoCAD SHX Text

THERMOMETER

AutoCAD SHX Text

FLOW ELEMENT

AutoCAD SHX Text

FLOAT & THERMOSTATIC TRAP SET INCLUDING

AutoCAD SHX Text

PIPING ACCESSORIES SEE DETAIL

AutoCAD SHX Text

PIPING ACCESSORIES SEE DETAIL

AutoCAD SHX Text

INVERTED BUCKET TRAP SET INCLUDING

AutoCAD SHX Text

FE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PIPE UP

AutoCAD SHX Text

PIPE DOWN

AutoCAD SHX Text

REFRIGERANT SIGHT GLASS

AutoCAD SHX Text

TEST PLUG (PRESSURE/TEMPERATURE)

AutoCAD SHX Text

AUTOMATIC AIR VENT

AutoCAD SHX Text

AV

AutoCAD SHX Text

MANUAL AIR VENT

AutoCAD SHX Text

MV

AutoCAD SHX Text

THERMOSTATIC TRAP SET INCLUDING

AutoCAD SHX Text

PIPING ACCESSORIES SEE DETAIL

AutoCAD SHX Text

QUICK-COUPLE HOSE CONNECTOR

AutoCAD SHX Text

%%UGENERAL PIPING SYMBOLS

AutoCAD SHX Text

%%U(NOT ALL SYMBOLS WILL APPLY TO THIS WORK)

AutoCAD SHX Text

HIGH PRESSURE STEAM CONDENSATE RETURN

AutoCAD SHX Text

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

AutoCAD SHX Text

HOT WATER HEATING SUPPLY

AutoCAD SHX Text

CONDENSATE PUMP DISCHARGE

AutoCAD SHX Text

LOW PRESSURE STEAM CONDENSATE RETURN

AutoCAD SHX Text

LOW PRESSURE STEAM (15 PSIG AND BELOW)

AutoCAD SHX Text

MEDIUM PRESSURE STEAM CONDENSATE RETURN

AutoCAD SHX Text

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

AutoCAD SHX Text

VENT LINE

AutoCAD SHX Text

SOLAR WATER RETURN

AutoCAD SHX Text

SOLAR WATER SUPPLY

AutoCAD SHX Text

GLYCOL-WATER HEATING RETURN

AutoCAD SHX Text

GLYCOL-WATER HEATING SUPPLY

AutoCAD SHX Text

REFRIGERANT SUCTION

AutoCAD SHX Text

REFRIGERANT HOT GAS

AutoCAD SHX Text

REFRIGERANT LIQUID

AutoCAD SHX Text

CHILLED WATER SUPPLY

AutoCAD SHX Text

CHILLED WATER RETURN

AutoCAD SHX Text

DRAIN LINE

AutoCAD SHX Text

MAKE-UP WATER

AutoCAD SHX Text

CONDENSER WATER RETURN (TO TOWER)

AutoCAD SHX Text

CHILLED GLYCOL-WATER RETURN

AutoCAD SHX Text

CHILLED GLYCOL-WATER SUPPLY

AutoCAD SHX Text

CONDENSER WATER SUPPLY (FROM TOWER)

AutoCAD SHX Text

HOT WATER HEATING RETURN

AutoCAD SHX Text

HPS

AutoCAD SHX Text

HPR

AutoCAD SHX Text

MPS

AutoCAD SHX Text

MPR

AutoCAD SHX Text

LPS

AutoCAD SHX Text

LPR

AutoCAD SHX Text

PC

AutoCAD SHX Text

HWS

AutoCAD SHX Text

HWR

AutoCAD SHX Text

GHS

AutoCAD SHX Text

GHR

AutoCAD SHX Text V

AutoCAD SHX Text

SWS

AutoCAD SHX Text

SWR

AutoCAD SHX Text

CWR

AutoCAD SHX Text

CHR

AutoCAD SHX Text

GCR

AutoCAD SHX Text

RL

AutoCAD SHX Text

RS

AutoCAD SHX Text

RHG

AutoCAD SHX Text

CWS

AutoCAD SHX Text

CHS

AutoCAD SHX Text

GCS

AutoCAD SHX Text

MW

AutoCAD SHX Text D

AutoCAD SHX Text

GLYCOL-WATER RUN AROUND SUPPLY

AutoCAD SHX Text

GLYCOL-WATER RUN AROUND RETURN

AutoCAD SHX Text

GRR

AutoCAD SHX Text

GRS

AutoCAD SHX Text X

AutoCAD SHX Text

EXISTING PIPE TO BE REMOVED

AutoCAD SHX Text

VACUUM CONDENSATE RETURN

AutoCAD SHX Text

CONDENSATE TRANSFER PUMP SUCTION

AutoCAD SHX Text

CONDENSATE TRANSFER PUMP DISCHARGE

AutoCAD SHX Text

FEEDWATER PUMP DISCHARGE

AutoCAD SHX Text

FEEDWATER PUMP SUCTION

AutoCAD SHX Text

VR

AutoCAD SHX Text

CTPS

AutoCAD SHX Text

CTPD

AutoCAD SHX Text

FWPS

AutoCAD SHX Text

FWPD

AutoCAD SHX Text

FEEDWATER SAMPLE (FROM DEAERATOR)

AutoCAD SHX Text

BOILER WATER SAMPLE

AutoCAD SHX Text

CONTINUOUS BLOWDOWN

AutoCAD SHX Text

CF

AutoCAD SHX Text

FWS

AutoCAD SHX Text

BWS

AutoCAD SHX Text

CBD

AutoCAD SHX Text

BO

AutoCAD SHX Text

CHEMICAL FEED

AutoCAD SHX Text

BOILER BLOWOFF

AutoCAD SHX Text

TUBE CLEANER WATER SUPPLY

AutoCAD SHX Text

TC

AutoCAD SHX Text A

AutoCAD SHX Text

OFL

AutoCAD SHX Text

COMPRESSED AIR

AutoCAD SHX Text

OVERFLOW

AutoCAD SHX Text

COLD WATER (CITY WATER)

AutoCAD SHX Text

LIQUEFIED PETROLEUM GAS IGNITER FUEL

AutoCAD SHX Text

NATURAL GAS IGNITER FUEL

AutoCAD SHX Text

NATURAL GAS MAIN FUEL

AutoCAD SHX Text

HW

AutoCAD SHX Text

SW

AutoCAD SHX Text

CW

AutoCAD SHX Text

FOR

AutoCAD SHX Text

FOS

AutoCAD SHX Text

LPG(I)

AutoCAD SHX Text G(I)

AutoCAD SHX Text G

AutoCAD SHX Text

HOT WATER

AutoCAD SHX Text

SOFTENED WATER

AutoCAD SHX Text

FUEL OIL RETURN

AutoCAD SHX Text

FUEL OIL SUPPLY

AutoCAD SHX Text

RH

AutoCAD SHX Text

SCH

AutoCAD SHX Text

SH

AutoCAD SHX Text

TH

AutoCAD SHX Text

PS

AutoCAD SHX Text

RC

AutoCAD SHX Text

RISER CLAMP (TYPE 42)*

AutoCAD SHX Text

FLOOR-SUPPORTED PIPE STAND

AutoCAD SHX Text

CLEVIS-TYPE HANGER

AutoCAD SHX Text

VARIABLE SPRING-TYPE HANGER (TYPE 51)*

AutoCAD SHX Text

ROLLER-TYPE HANGER

AutoCAD SHX Text

SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*

AutoCAD SHX Text

WB

AutoCAD SHX Text

CSH

AutoCAD SHX Text

SS

AutoCAD SHX Text

STANDARD PRACTICE SP-58

AutoCAD SHX Text

SLIDING SUPPORTS (TYPE 35)*

AutoCAD SHX Text

CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*

AutoCAD SHX Text

WALL BRACKET (TYPE 31, 32, 33)*

AutoCAD SHX Text

* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY

AutoCAD SHX Text

%%UPIPING SYMBOLS

AutoCAD SHX Text

%%U(NOT ALL SYMBOLS WILL APPLY TO THIS WORK)

AutoCAD SHX Text TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

GATE VALVE WITH 3/4" HOSE ADAPTER

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

ANGLE GLOBE VALVE

AutoCAD SHX Text

BUTTERFLY VALVE

AutoCAD SHX Text

MODULATING CONTROL VALVE

AutoCAD SHX Text

TWO POSITION CONTROL VALVE

AutoCAD SHX Text

THREE-WAY MODULATING CONTROL VALVE

AutoCAD SHX Text

AUTOMATIC BALANCING CONTROL VALVE

AutoCAD SHX Text

PRESSURE SAFETY VALVE

AutoCAD SHX Text

GATE VALVE - THREADED/FLANGED

AutoCAD SHX Text

GLOBE VALVE - THREADED/FLANGED

AutoCAD SHX Text

PRESSURE REGULATING VALVE

AutoCAD SHX Text

THREE-WAY TWO POSITION CONTROL VALVE

AutoCAD SHX Text

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

AutoCAD SHX Text

FLEXIBLE CONNECTION

AutoCAD SHX Text

WATER BALANCE DEVICE

AutoCAD SHX Text

MODULATING CONTROL BUTTERFLY VALVE

AutoCAD SHX Text

CIRCUIT SETTER VALVE

AutoCAD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .