This document is a Price-Cost Schedule for a federal contract opportunity. The contract is for Hazardous Waste Removal and Disposal Services for the Chillicothe VA Medical Center, managed by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The contract has a guaranteed minimum of $40,000 and a maximum total value of $380,000 over the base year and all option years. The contract is set-aside for SDVOSB firms under NAICS code 562112 - Hazardous Waste Collection.
The Price-Cost Schedule lists numerous line items for specific waste streams, such as controlled substances, pharmaceuticals, lab stains, batteries, used oil, and lamps/ballasts. Offerors must provide pricing for the estimated annual quantities of each item. Vendor invoicing is based on actual services rendered. The contract period is for the base year from 09/01/2024 to 08/31/2025, with options to extend. Offerors must submit the completed Price-Cost Schedule file with their quote response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PRICE-COST SCHEDULE 24Q0792 - v2.xlsx | XLSX spreadsheet | |
| 36C25024Q0792 0001.docx | DOCX document | |
| 36C25024Q0792.docx | DOCX document | |
| VAAR 852.219-75 - Certification Blank.docx | DOCX document | |
| PRICE-COST SCHEDULE 24Q0792.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM INFORMATION
The guaranteed minimum only applies to the Federal Government Fiscal Year in which the contract is awarded. The guaranteed minimum of this contract is $40,000.00. The guaranteed amount shall be expended in the initial fiscal year in which this contract is awarded. The maximum total value of the contract, inclusive of the base year and all options exercised, shall not exceed $380,000.00.
Individual task orders shall be funded annually. The Contracting Officer is the only authorized individual that can place annual task orders against this contract for the estimated amount of services for the specific timeframe, and the task orders shall be issued to the contractor. Offerors shall offer pricing for the entire estimated quantity for each CLIN.
Task order minimums and maximums are addressed in clause 52.216-19.
Some items listed below are estimated quantities: CLINS/SLINS 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011 and subsequent option year CLINS/SLINS.
Vendor shall invoice monthly, for ONLY actual services rendered. DO NOT perform other than those identified, unless the ACO has issued a modification to the contract to add a CLIN for that specific action.
Contractor shall invoice for actual performance and shall indicate CLINs/SLINS on all Tungsten Network invoices.
All Offerors shall fill out Price-Cost Schedule_24Q0792.xls-v2 file and submit with their quote response.
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0.00
| __________________ |
| __________________ |
Non-Exhaustive List of Waste Streams Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025 PRINCIPAL NAICS CODE: 562112 - Hazardous Waste Collection PRODUCT/SERVICE CODE: S222 - Housekeeping - Waste Treatment/Storage
0001AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
Controlled Substance Disposal System Containers 30 Gallon Containers ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0001AB
| 3.00 |
| CO |
| __________________ |
| __________________ |
Pharmaceuticals - Aerosol (Includes HCFC's) 5 Gallon Containers ESTIMATED ANNUAL QUANTITY - Not to Exceed
0001AC
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules) 55 Gallon Containers ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0001AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0001AJ
| 6.00 |
| CO |
| __________________ |
| __________________ |
Lab Stains (methanol - flammable liquids)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0001AM
| 0.00 |
| CD |
| __________________ |
| __________________ |
Asbestos (Bagged) Cubic Yard ESTIMATED ANNUAL QUANTITY - Not to Exceed
0001AN
| 1.00 |
| CO |
| __________________ |
| __________________ |
Calibration Gas Cylinders
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0001AP
| 6.00 |
| CO |
| __________________ |
| __________________ |
Vista 500 Lab Cartridges (corrosive)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0.00
| __________________ |
| __________________ |
Waste Batteries
POP Begin: 09-01-2024 POP End: 08-31-2025
0002AA
| 8.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Alkaline
ESTIMATED ANNUAL QUANTITY - Not to Exceed
0002AB
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (leaking) 5 Gallons ESTIMATED ANNUAL QUANTITY - Not to Exceed
0002AC
| 80.00 |
| EA |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (non-leaking) Each ESTIMATED ANNUAL QUANTITY - Not to Exceed
0002AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lithium
ESTIMATED ANNUAL QUANTITY - Not to Exceed
0002AE
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - NiCd
ESTIMATED ANNUAL QUANTITY - Not to Exceed
0.00
| __________________ |
| __________________ |
Machinery / Automotive Waste
POP Begin: 09-01-2024 POP End: 08-31-2025
0003AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Antifreeze - Used
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0003AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Brake and Transmission Fluids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0003AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Used Grease
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0003AD
| 12.00 |
| CO |
| __________________ |
| __________________ |
Used Oil
ESTIMATED ANNUAL QUANTITY - Not to Exceed
0003AE
| 6.00 |
| CO |
| __________________ |
| __________________ |
Oil Clean Up Materials
ESTIMATED ANNUAL QUANTITY - Not to Exceed
0.00
| __________________ |
| __________________ |
Waste Lamps and Bulbs
POP Begin: 09-01-2024 POP End: 08-31-2025
0004AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lamps - Ballasts (PCB) <1980
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0004AB
| 1,500.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent 4-Foot Tubes ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0004AC
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent U-Tubes ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0004AD
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - HID Bulbs (Hg/Na/Metal/Halide) ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0.00
| __________________ |
| __________________ |
Waste Lab Packs
POP Begin: 09-01-2024 POP End: 08-31-2025
0005AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 3
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0005AB
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 8
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0005AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 9
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0005AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Mercury Containing
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0005AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Other 55 Gallon Container ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0.00
| __________________ |
| __________________ |
Universal and Unknown Waste
POP Begin: 09-01-2024 POP End: 08-31-2025
0006AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Aerosol Cans
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0006AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Bulk)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0006AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Cans)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0006AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Liquids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0006AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Solids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0.00
| __________________ |
| __________________ |
Lead Based Items
POP Begin: 09-01-2024 POP End: 08-31-2025
0007AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lead (Paint Chips)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0007AB
| 1.00 |
| CY |
| __________________ |
| __________________ |
Lead Debris 1 Cubic Yard ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0.00
| __________________ |
| __________________ |
Flammable Liquid Waste
POP Begin: 09-01-2024 POP End: 08-31-2025
0008AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquid - Alcohol Based Hand Sanitizer
ESTIMATED ANNUAL QUANTITY - Not to Exceed
0008AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquids - Solvents
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
| 1.00 |
| YR |
| __________________ |
| __________________ |
Waste Wizard Subscription - 1 year
POP Begin: 09-01-2024 POP End: 08-31-2025
| 6.00 |
| EA |
| __________________ |
| __________________ |
Labor and Transportation Bi-Monthly Trip to Facility ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
| 32.00 |
| hr |
| __________________ |
| __________________ |
Labor Hours As Needed/Required ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025
0.00
| __________________ |
| __________________ |
Non-Exhaustive List of Waste Streams Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1001AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
Controlled Substance Disposal System Containers
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1001AB
| 3.00 |
| CO |
| __________________ |
| __________________ |
Pharmaceuticals - Aerosol (Includes HCFC's)
ESTIMATED ANNUAL QUANTITY - Not to Exceed
1001AC
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1001AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1001AJ
| 6.00 |
| CO |
| __________________ |
| __________________ |
Lab Stains (methanol - flammable liquids)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1001AM
| 0.00 |
| CD |
| __________________ |
| __________________ |
Asbestos (Bagged)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1001AN
| 1.00 |
| CO |
| __________________ |
| __________________ |
Calibration Gas Cylinders
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1001AP
| 6.00 |
| CO |
| __________________ |
| __________________ |
Vista 500 Lab Cartridges (corrosive)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
0.00
| __________________ |
| __________________ |
Waste Batteries
POP Begin: 09-01-2025 POP End: 08-31-2026
1002AA
| 8.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Alkaline
ESTIMATED ANNUAL QUANTITY - Not to Exceed
1002AB
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (leaking)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1002AC
| 80.00 |
| EA |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (non-leaking)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1002AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lithium
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1002AE
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - NiCd
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
0.00
| __________________ |
| __________________ |
Machinery / Automotive Waste
POP Begin: 09-01-2025 POP End: 08-31-2026
1003AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Antifreeze - Used
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1003AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Brake and Transmission Fluids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1003AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Used Grease
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1003AD
| 12.00 |
| CO |
| __________________ |
| __________________ |
Used Oil
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1003AE
| 6.00 |
| CO |
| __________________ |
| __________________ |
Oil Clean Up Materials
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
0.00
| __________________ |
| __________________ |
Waste Lamps and Bulbs
POP Begin: 09-01-2025 POP End: 08-31-2026
1004AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lamps - Ballasts (PCB) <1980
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1004AB
| 1,500.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1004AC
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1004AD
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - HID Bulbs (Hg/Na/Metal/Halide)
Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
0.00
| __________________ |
| __________________ |
Waste Lab Packs
POP Begin: 09-01-2025 POP End: 08-31-2026
1005AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 3
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1005AB
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 8
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1005AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 9
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1005AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Mercury Containing
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1005AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Other
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
0.00
| __________________ |
| __________________ |
Universal and Unknown Waste
POP Begin: 09-01-2025 POP End: 08-31-2026
1006AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Aerosol Cans
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1006AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Bulk)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1006AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Cans)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1006AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Liquids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1006AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Solids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
0.00
| __________________ |
| __________________ |
Lead Based Items
POP Begin: 09-01-2025 POP End: 08-31-2026
1007AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lead (Paint Chips)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1007AB
| 1.00 |
| CY |
| __________________ |
| __________________ |
Lead Debris
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
0.00
| __________________ |
| __________________ |
Flammable Liquid Waste
POP Begin: 09-01-2025 POP End: 08-31-2026
1008AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquid - Alcohol Based Hand Sanitizer
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
1008AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquids - Solvents
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
| 1.00 |
| YR |
| __________________ |
| __________________ |
Waste Wizard Subscription - 1 year
POP Begin: 09-01-2025 POP End: 08-31-2026
| 6.00 |
| EA |
| __________________ |
| __________________ |
Labor and Transportation
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
| 32.00 |
| hr |
| __________________ |
| __________________ |
Labor Hours
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026
0.00
| __________________ |
| __________________ |
Non-Exhaustive List of Waste Streams Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2001AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
Controlled Substance Disposal System Containers
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2001AB
| 3.00 |
| CO |
| __________________ |
| __________________ |
Pharmaceuticals - Aerosol (Includes HCFC's)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2001AC
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2001AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2001AJ
| 6.00 |
| CO |
| __________________ |
| __________________ |
Lab Stains (methanol - flammable liquids)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2001AM
| 0.00 |
| CD |
| __________________ |
| __________________ |
Asbestos (Bagged)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2001AN
| 1.00 |
| CO |
| __________________ |
| __________________ |
Calibration Gas Cylinders
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2001AP
| 6.00 |
| CO |
| __________________ |
| __________________ |
Vista 500 Lab Cartridges (corrosive)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
0.00
| __________________ |
| __________________ |
Waste Batteries
POP Begin: 09-01-2026 POP End: 08-31-2027
2002AA
| 8.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Alkaline
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2002AB
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (leaking)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2002AC
| 80.00 |
| EA |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (non-leaking)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2002AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lithium
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2002AE
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - NiCd
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
0.00
| __________________ |
| __________________ |
Machinery / Automotive Waste
POP Begin: 09-01-2026 POP End: 08-31-2027
2003AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Antifreeze - Used
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2003AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Brake and Transmission Fluids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2003AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Used Grease
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2003AD
| 12.00 |
| CO |
| __________________ |
| __________________ |
Used Oil
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2003AE
| 6.00 |
| CO |
| __________________ |
| __________________ |
Oil Clean Up Materials
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
0.00
| __________________ |
| __________________ |
Waste Lamps and Bulbs
POP Begin: 09-01-2026 POP End: 08-31-2027
2004AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lamps - Ballasts (PCB) <1980
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2004AB
| 1,500.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2004AC
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2004AD
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - HID Bulbs (Hg/Na/Metal/Halide)
Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
0.00
| __________________ |
| __________________ |
Waste Lab Packs
POP Begin: 09-01-2026 POP End: 08-31-2027
2005AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 3
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2005AB
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 8
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2005AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 9
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2005AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Mercury Containing
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2005AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Other
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
0.00
| __________________ |
| __________________ |
Universal and Unknown Waste
POP Begin: 09-01-2026 POP End: 08-31-2027
2006AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Aerosol Cans
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2006AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Bulk)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2006AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Cans)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2006AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Liquids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2006AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Solids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
0.00
| __________________ |
| __________________ |
Lead Based Items
POP Begin: 09-01-2026 POP End: 08-31-2027
2007AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lead (Paint Chips)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2007AB
| 1.00 |
| CY |
| __________________ |
| __________________ |
Lead Debris
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
0.00
| __________________ |
| __________________ |
Flammable Liquid Waste
POP Begin: 09-01-2026 POP End: 08-31-2027
2008AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquid - Alcohol Based Hand Sanitizer
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
2008AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquids - Solvents
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
| 1.00 |
| YR |
| __________________ |
| __________________ |
Waste Wizard Subscription - 1 year
POP Begin: 09-01-2026 POP End: 08-31-2027
| 6.00 |
| EA |
| __________________ |
| __________________ |
Labor and Transportation
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
| 32.00 |
| hr |
| __________________ |
| __________________ |
Labor Hours
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027
0.00
| __________________ |
| __________________ |
Non-Exhaustive List of Waste Streams Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3001AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
Controlled Substance Disposal System Containers
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3001AB
| 3.00 |
| CO |
| __________________ |
| __________________ |
Pharmaceuticals - Aerosol (Includes HCFC's)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3001AC
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3001AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3001AJ
| 6.00 |
| CO |
| __________________ |
| __________________ |
Lab Stains (methanol - flammable liquids)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3001AM
| 0.00 |
| CD |
| __________________ |
| __________________ |
Asbestos (Bagged)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3001AN
| 1.00 |
| CO |
| __________________ |
| __________________ |
Calibration Gas Cylinders
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3001AP
| 6.00 |
| CO |
| __________________ |
| __________________ |
Vista 500 Lab Cartridges (corrosive)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
0.00
| __________________ |
| __________________ |
Waste Batteries
POP Begin: 09-01-2027 POP End: 08-31-2028
3002AA
| 8.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Alkaline
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3002AB
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (leaking)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3002AC
| 80.00 |
| EA |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (non-leaking)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3002AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lithium
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3002AE
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - NiCd
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
0.00
| __________________ |
| __________________ |
Machinery / Automotive Waste
POP Begin: 09-01-2027 POP End: 08-31-2028
3003AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Antifreeze - Used
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3003AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Brake and Transmission Fluids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3003AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Used Grease
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3003AD
| 12.00 |
| CO |
| __________________ |
| __________________ |
Used Oil
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3003AE
| 6.00 |
| CO |
| __________________ |
| __________________ |
Oil Clean Up Materials
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
0.00
| __________________ |
| __________________ |
Waste Lamps and Bulbs
POP Begin: 09-01-2027 POP End: 08-31-2028
3004AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lamps - Ballasts (PCB) <1980
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3004AB
| 1,500.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3004AC
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3004AD
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - HID Bulbs (Hg/Na/Metal/Halide)
Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
0.00
| __________________ |
| __________________ |
Waste Lab Packs
POP Begin: 09-01-2027 POP End: 08-31-2028
3005AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 3
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3005AB
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 8
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3005AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 9
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3005AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Mercury Containing
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3005AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Other
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
0.00
| __________________ |
| __________________ |
Universal and Unknown Waste
POP Begin: 09-01-2027 POP End: 08-31-2028
3006AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Aerosol Cans
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3006AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Bulk)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3006AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Cans)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3006AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Liquids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3006AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Solids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
0.00
| __________________ |
| __________________ |
Lead Based Items
POP Begin: 09-01-2027 POP End: 08-31-2028
3007AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lead (Paint Chips)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3007AB
| 1.00 |
| CY |
| __________________ |
| __________________ |
Lead Debris
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
0.00
| __________________ |
| __________________ |
Flammable Liquid Waste
POP Begin: 09-01-2027 POP End: 08-31-2028
3008AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquid - Alcohol Based Hand Sanitizer
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
3008AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquids - Solvents
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
| 1.00 |
| YR |
| __________________ |
| __________________ |
Waste Wizard Subscription - 1 year
POP Begin: 09-01-2027 POP End: 08-31-2028
| 6.00 |
| EA |
| __________________ |
| __________________ |
Labor and Transportation
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
| 32.00 |
| hr |
| __________________ |
| __________________ |
Labor Hours
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028
0.00
| __________________ |
| __________________ |
Non-Exhaustive List of Waste Streams Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4001AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
Controlled Substance Disposal System Containers
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4001AB
| 3.00 |
| CO |
| __________________ |
| __________________ |
Pharmaceuticals - Aerosol (Includes HCFC's)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4001AC
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4001AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
HWPharms (after Ohio implements new rules)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4001AJ
| 6.00 |
| CO |
| __________________ |
| __________________ |
Lab Stains (methanol - flammable liquids)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4001AM
| 0.00 |
| CD |
| __________________ |
| __________________ |
Asbestos (Bagged)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4001AN
| 1.00 |
| CO |
| __________________ |
| __________________ |
Calibration Gas Cylinders
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4001AP
| 6.00 |
| CO |
| __________________ |
| __________________ |
Vista 500 Lab Cartridges (corrosive)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
0.00
| __________________ |
| __________________ |
Waste Batteries
POP Begin: 09-01-2028 POP End: 08-31-2029
4002AA
| 8.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Alkaline
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4002AB
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (leaking)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4002AC
| 80.00 |
| EA |
| __________________ |
| __________________ |
Batteries - Lead Acid Batteries (non-leaking)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4002AD
| 6.00 |
| CO |
| __________________ |
| __________________ |
Batteries - Lithium
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4002AE
| 2.00 |
| CO |
| __________________ |
| __________________ |
Batteries - NiCd
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
0.00
| __________________ |
| __________________ |
Machinery / Automotive Waste
POP Begin: 09-01-2028 POP End: 08-31-2029
4003AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Antifreeze - Used
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4003AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Brake and Transmission Fluids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4003AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Used Grease
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4003AD
| 12.00 |
| CO |
| __________________ |
| __________________ |
Used Oil
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4003AE
| 6.00 |
| CO |
| __________________ |
| __________________ |
Oil Clean Up Materials
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
0.00
| __________________ |
| __________________ |
Waste Lamps and Bulbs
POP Begin: 09-01-2028 POP End: 08-31-2029
4004AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lamps - Ballasts (PCB) <1980
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4004AB
| 1,500.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4004AC
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - Fluorescent
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4004AD
| 10.00 |
| EA |
| __________________ |
| __________________ |
Lamps - HID Bulbs (Hg/Na/Metal/Halide)
Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
0.00
| __________________ |
| __________________ |
Waste Lab Packs
POP Begin: 09-01-2028 POP End: 08-31-2029
4005AA
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 3
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4005AB
| 6.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 8
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4005AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Class 9
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4005AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Mercury Containing
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4005AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
LAB Pack - Other
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
0.00
| __________________ |
| __________________ |
Universal and Unknown Waste
POP Begin: 09-01-2028 POP End: 08-31-2029
4006AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Aerosol Cans
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4006AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Bulk)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4006AC
| 1.00 |
| CO |
| __________________ |
| __________________ |
Universal Waste Paint (Cans)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4006AD
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Liquids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4006AE
| 1.00 |
| CO |
| __________________ |
| __________________ |
Unknown Solids
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
0.00
| __________________ |
| __________________ |
Lead Based Items
POP Begin: 09-01-2028 POP End: 08-31-2029
4007AA
| 1.00 |
| CO |
| __________________ |
| __________________ |
Lead (Paint Chips)
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4007AB
| 1.00 |
| CY |
| __________________ |
| __________________ |
Lead Debris
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
0.00
| __________________ |
| __________________ |
Flammable Liquid Waste
POP Begin: 09-01-2028 POP End: 08-31-2029
4008AA
| 3.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquid - Alcohol Based Hand Sanitizer
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
4008AB
| 1.00 |
| CO |
| __________________ |
| __________________ |
Flammable Liquids - Solvents
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
| 1.00 |
| YR |
| __________________ |
| __________________ |
Waste Wizard Subscription - 1 year
POP Begin: 09-01-2028 POP End: 08-31-2029
| 6.00 |
| EA |
| __________________ |
| __________________ |
Labor and Transportation
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
| 32.00 |
| hr |
| __________________ |
| __________________ |
Labor Hours
ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029
All Offerors shall fill out Price-Cost Schedule_24Q0792.xls-v2 file and submit with their quote response.