This document is a Price-Cost Schedule for a federal contract opportunity. The contract is for Hazardous Waste Removal and Disposal Services for the Chillicothe VA Medical Center, managed by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The contract has a guaranteed minimum of $40,000 and a maximum total value of $380,000 over the base year and all option years. The contract is set-aside for SDVOSB firms under NAICS code 562112 - Hazardous Waste Collection.

The Price-Cost Schedule lists numerous line items for specific waste streams, such as controlled substances, pharmaceuticals, lab stains, batteries, used oil, and lamps/ballasts. Offerors must provide pricing for the estimated annual quantities of each item. Vendor invoicing is based on actual services rendered. The contract period is for the base year from 09/01/2024 to 08/31/2025, with options to extend. Offerors must submit the completed Price-Cost Schedule file with their quote response.

View the file

Other files

File Type Posted
PRICE-COST SCHEDULE 24Q0792 - v2.xlsx XLSX spreadsheet
36C25024Q0792 0001.docx DOCX document
36C25024Q0792.docx DOCX document
VAAR 852.219-75 - Certification Blank.docx DOCX document
PRICE-COST SCHEDULE 24Q0792.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM INFORMATION

The guaranteed minimum only applies to the Federal Government Fiscal Year in which the contract is awarded. The guaranteed minimum of this contract is $40,000.00. The guaranteed amount shall be expended in the initial fiscal year in which this contract is awarded. The maximum total value of the contract, inclusive of the base year and all options exercised, shall not exceed $380,000.00.

Individual task orders shall be funded annually. The Contracting Officer is the only authorized individual that can place annual task orders against this contract for the estimated amount of services for the specific timeframe, and the task orders shall be issued to the contractor. Offerors shall offer pricing for the entire estimated quantity for each CLIN.

Task order minimums and maximums are addressed in clause 52.216-19.

Some items listed below are estimated quantities: CLINS/SLINS 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011 and subsequent option year CLINS/SLINS.

Vendor shall invoice monthly, for ONLY actual services rendered. DO NOT perform other than those identified, unless the ACO has issued a modification to the contract to add a CLIN for that specific action.

Contractor shall invoice for actual performance and shall indicate CLINs/SLINS on all Tungsten Network invoices.

All Offerors shall fill out Price-Cost Schedule_24Q0792.xls-v2 file and submit with their quote response.

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0.00

__________________
__________________

Non-Exhaustive List of Waste Streams Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025 PRINCIPAL NAICS CODE: 562112 - Hazardous Waste Collection PRODUCT/SERVICE CODE: S222 - Housekeeping - Waste Treatment/Storage

0001AA

6.00
CO
__________________
__________________

Controlled Substance Disposal System Containers 30 Gallon Containers ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0001AB

3.00
CO
__________________
__________________

Pharmaceuticals - Aerosol (Includes HCFC's) 5 Gallon Containers ESTIMATED ANNUAL QUANTITY - Not to Exceed

0001AC

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules) 55 Gallon Containers ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0001AD

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0001AJ

6.00
CO
__________________
__________________

Lab Stains (methanol - flammable liquids)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0001AM

0.00
CD
__________________
__________________

Asbestos (Bagged) Cubic Yard ESTIMATED ANNUAL QUANTITY - Not to Exceed

0001AN

1.00
CO
__________________
__________________

Calibration Gas Cylinders

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0001AP

6.00
CO
__________________
__________________

Vista 500 Lab Cartridges (corrosive)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0.00

__________________
__________________

Waste Batteries

POP Begin: 09-01-2024 POP End: 08-31-2025

0002AA

8.00
CO
__________________
__________________

Batteries - Alkaline

ESTIMATED ANNUAL QUANTITY - Not to Exceed

0002AB

2.00
CO
__________________
__________________

Batteries - Lead Acid Batteries (leaking) 5 Gallons ESTIMATED ANNUAL QUANTITY - Not to Exceed

0002AC

80.00
EA
__________________
__________________

Batteries - Lead Acid Batteries (non-leaking) Each ESTIMATED ANNUAL QUANTITY - Not to Exceed

0002AD

6.00
CO
__________________
__________________

Batteries - Lithium

ESTIMATED ANNUAL QUANTITY - Not to Exceed

0002AE

2.00
CO
__________________
__________________

Batteries - NiCd

ESTIMATED ANNUAL QUANTITY - Not to Exceed

0.00

__________________
__________________

Machinery / Automotive Waste

POP Begin: 09-01-2024 POP End: 08-31-2025

0003AA

1.00
CO
__________________
__________________

Antifreeze - Used

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0003AB

1.00
CO
__________________
__________________

Brake and Transmission Fluids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0003AC

1.00
CO
__________________
__________________

Used Grease

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0003AD

12.00
CO
__________________
__________________

Used Oil

ESTIMATED ANNUAL QUANTITY - Not to Exceed

0003AE

6.00
CO
__________________
__________________

Oil Clean Up Materials

ESTIMATED ANNUAL QUANTITY - Not to Exceed

0.00

__________________
__________________

Waste Lamps and Bulbs

POP Begin: 09-01-2024 POP End: 08-31-2025

0004AA

1.00
CO
__________________
__________________

Lamps - Ballasts (PCB) <1980

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0004AB

1,500.00
EA
__________________
__________________

Lamps - Fluorescent 4-Foot Tubes ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0004AC

10.00
EA
__________________
__________________

Lamps - Fluorescent U-Tubes ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0004AD

10.00
EA
__________________
__________________

Lamps - HID Bulbs (Hg/Na/Metal/Halide) ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0.00

__________________
__________________

Waste Lab Packs

POP Begin: 09-01-2024 POP End: 08-31-2025

0005AA

6.00
CO
__________________
__________________

LAB Pack - Class 3

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0005AB

6.00
CO
__________________
__________________

LAB Pack - Class 8

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0005AC

1.00
CO
__________________
__________________

LAB Pack - Class 9

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0005AD

1.00
CO
__________________
__________________

LAB Pack - Mercury Containing

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0005AE

1.00
CO
__________________
__________________

LAB Pack - Other 55 Gallon Container ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0.00

__________________
__________________

Universal and Unknown Waste

POP Begin: 09-01-2024 POP End: 08-31-2025

0006AA

3.00
CO
__________________
__________________

Universal Waste Aerosol Cans

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0006AB

1.00
CO
__________________
__________________

Universal Waste Paint (Bulk)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0006AC

1.00
CO
__________________
__________________

Universal Waste Paint (Cans)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0006AD

1.00
CO
__________________
__________________

Unknown Liquids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0006AE

1.00
CO
__________________
__________________

Unknown Solids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0.00

__________________
__________________

Lead Based Items

POP Begin: 09-01-2024 POP End: 08-31-2025

0007AA

1.00
CO
__________________
__________________

Lead (Paint Chips)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0007AB

1.00
CY
__________________
__________________

Lead Debris 1 Cubic Yard ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0.00

__________________
__________________

Flammable Liquid Waste

POP Begin: 09-01-2024 POP End: 08-31-2025

0008AA

3.00
CO
__________________
__________________

Flammable Liquid - Alcohol Based Hand Sanitizer

ESTIMATED ANNUAL QUANTITY - Not to Exceed

0008AB

1.00
CO
__________________
__________________

Flammable Liquids - Solvents

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

1.00
YR
__________________
__________________

Waste Wizard Subscription - 1 year

POP Begin: 09-01-2024 POP End: 08-31-2025

6.00
EA
__________________
__________________

Labor and Transportation Bi-Monthly Trip to Facility ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

32.00
hr
__________________
__________________

Labor Hours As Needed/Required ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: BASE POP Begin: 09-01-2024 POP End: 08-31-2025

0.00

__________________
__________________

Non-Exhaustive List of Waste Streams Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1001AA

6.00
CO
__________________
__________________

Controlled Substance Disposal System Containers

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1001AB

3.00
CO
__________________
__________________

Pharmaceuticals - Aerosol (Includes HCFC's)

ESTIMATED ANNUAL QUANTITY - Not to Exceed

1001AC

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1001AD

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1001AJ

6.00
CO
__________________
__________________

Lab Stains (methanol - flammable liquids)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1001AM

0.00
CD
__________________
__________________

Asbestos (Bagged)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1001AN

1.00
CO
__________________
__________________

Calibration Gas Cylinders

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1001AP

6.00
CO
__________________
__________________

Vista 500 Lab Cartridges (corrosive)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

0.00

__________________
__________________

Waste Batteries

POP Begin: 09-01-2025 POP End: 08-31-2026

1002AA

8.00
CO
__________________
__________________

Batteries - Alkaline

ESTIMATED ANNUAL QUANTITY - Not to Exceed

1002AB

2.00
CO
__________________
__________________

Batteries - Lead Acid Batteries (leaking)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1002AC

80.00
EA
__________________
__________________

Batteries - Lead Acid Batteries (non-leaking)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1002AD

6.00
CO
__________________
__________________

Batteries - Lithium

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1002AE

2.00
CO
__________________
__________________

Batteries - NiCd

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

0.00

__________________
__________________

Machinery / Automotive Waste

POP Begin: 09-01-2025 POP End: 08-31-2026

1003AA

1.00
CO
__________________
__________________

Antifreeze - Used

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1003AB

1.00
CO
__________________
__________________

Brake and Transmission Fluids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1003AC

1.00
CO
__________________
__________________

Used Grease

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1003AD

12.00
CO
__________________
__________________

Used Oil

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1003AE

6.00
CO
__________________
__________________

Oil Clean Up Materials

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

0.00

__________________
__________________

Waste Lamps and Bulbs

POP Begin: 09-01-2025 POP End: 08-31-2026

1004AA

1.00
CO
__________________
__________________

Lamps - Ballasts (PCB) <1980

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1004AB

1,500.00
EA
__________________
__________________

Lamps - Fluorescent

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1004AC

10.00
EA
__________________
__________________

Lamps - Fluorescent

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1004AD

10.00
EA
__________________
__________________

Lamps - HID Bulbs (Hg/Na/Metal/Halide)

Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

0.00

__________________
__________________

Waste Lab Packs

POP Begin: 09-01-2025 POP End: 08-31-2026

1005AA

6.00
CO
__________________
__________________

LAB Pack - Class 3

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1005AB

6.00
CO
__________________
__________________

LAB Pack - Class 8

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1005AC

1.00
CO
__________________
__________________

LAB Pack - Class 9

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1005AD

1.00
CO
__________________
__________________

LAB Pack - Mercury Containing

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1005AE

1.00
CO
__________________
__________________

LAB Pack - Other

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

0.00

__________________
__________________

Universal and Unknown Waste

POP Begin: 09-01-2025 POP End: 08-31-2026

1006AA

3.00
CO
__________________
__________________

Universal Waste Aerosol Cans

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1006AB

1.00
CO
__________________
__________________

Universal Waste Paint (Bulk)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1006AC

1.00
CO
__________________
__________________

Universal Waste Paint (Cans)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1006AD

1.00
CO
__________________
__________________

Unknown Liquids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1006AE

1.00
CO
__________________
__________________

Unknown Solids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

0.00

__________________
__________________

Lead Based Items

POP Begin: 09-01-2025 POP End: 08-31-2026

1007AA

1.00
CO
__________________
__________________

Lead (Paint Chips)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1007AB

1.00
CY
__________________
__________________

Lead Debris

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

0.00

__________________
__________________

Flammable Liquid Waste

POP Begin: 09-01-2025 POP End: 08-31-2026

1008AA

3.00
CO
__________________
__________________

Flammable Liquid - Alcohol Based Hand Sanitizer

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1008AB

1.00
CO
__________________
__________________

Flammable Liquids - Solvents

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

1.00
YR
__________________
__________________

Waste Wizard Subscription - 1 year

POP Begin: 09-01-2025 POP End: 08-31-2026

6.00
EA
__________________
__________________

Labor and Transportation

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

32.00
hr
__________________
__________________

Labor Hours

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 1 POP Begin: 09-01-2025 POP End: 08-31-2026

0.00

__________________
__________________

Non-Exhaustive List of Waste Streams Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2001AA

6.00
CO
__________________
__________________

Controlled Substance Disposal System Containers

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2001AB

3.00
CO
__________________
__________________

Pharmaceuticals - Aerosol (Includes HCFC's)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2001AC

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2001AD

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2001AJ

6.00
CO
__________________
__________________

Lab Stains (methanol - flammable liquids)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2001AM

0.00
CD
__________________
__________________

Asbestos (Bagged)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2001AN

1.00
CO
__________________
__________________

Calibration Gas Cylinders

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2001AP

6.00
CO
__________________
__________________

Vista 500 Lab Cartridges (corrosive)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

0.00

__________________
__________________

Waste Batteries

POP Begin: 09-01-2026 POP End: 08-31-2027

2002AA

8.00
CO
__________________
__________________

Batteries - Alkaline

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2002AB

2.00
CO
__________________
__________________

Batteries - Lead Acid Batteries (leaking)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2002AC

80.00
EA
__________________
__________________

Batteries - Lead Acid Batteries (non-leaking)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2002AD

6.00
CO
__________________
__________________

Batteries - Lithium

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2002AE

2.00
CO
__________________
__________________

Batteries - NiCd

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

0.00

__________________
__________________

Machinery / Automotive Waste

POP Begin: 09-01-2026 POP End: 08-31-2027

2003AA

1.00
CO
__________________
__________________

Antifreeze - Used

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2003AB

1.00
CO
__________________
__________________

Brake and Transmission Fluids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2003AC

1.00
CO
__________________
__________________

Used Grease

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2003AD

12.00
CO
__________________
__________________

Used Oil

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2003AE

6.00
CO
__________________
__________________

Oil Clean Up Materials

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

0.00

__________________
__________________

Waste Lamps and Bulbs

POP Begin: 09-01-2026 POP End: 08-31-2027

2004AA

1.00
CO
__________________
__________________

Lamps - Ballasts (PCB) <1980

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2004AB

1,500.00
EA
__________________
__________________

Lamps - Fluorescent

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2004AC

10.00
EA
__________________
__________________

Lamps - Fluorescent

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2004AD

10.00
EA
__________________
__________________

Lamps - HID Bulbs (Hg/Na/Metal/Halide)

Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

0.00

__________________
__________________

Waste Lab Packs

POP Begin: 09-01-2026 POP End: 08-31-2027

2005AA

6.00
CO
__________________
__________________

LAB Pack - Class 3

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2005AB

6.00
CO
__________________
__________________

LAB Pack - Class 8

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2005AC

1.00
CO
__________________
__________________

LAB Pack - Class 9

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2005AD

1.00
CO
__________________
__________________

LAB Pack - Mercury Containing

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2005AE

1.00
CO
__________________
__________________

LAB Pack - Other

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

0.00

__________________
__________________

Universal and Unknown Waste

POP Begin: 09-01-2026 POP End: 08-31-2027

2006AA

3.00
CO
__________________
__________________

Universal Waste Aerosol Cans

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2006AB

1.00
CO
__________________
__________________

Universal Waste Paint (Bulk)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2006AC

1.00
CO
__________________
__________________

Universal Waste Paint (Cans)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2006AD

1.00
CO
__________________
__________________

Unknown Liquids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2006AE

1.00
CO
__________________
__________________

Unknown Solids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

0.00

__________________
__________________

Lead Based Items

POP Begin: 09-01-2026 POP End: 08-31-2027

2007AA

1.00
CO
__________________
__________________

Lead (Paint Chips)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2007AB

1.00
CY
__________________
__________________

Lead Debris

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

0.00

__________________
__________________

Flammable Liquid Waste

POP Begin: 09-01-2026 POP End: 08-31-2027

2008AA

3.00
CO
__________________
__________________

Flammable Liquid - Alcohol Based Hand Sanitizer

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

2008AB

1.00
CO
__________________
__________________

Flammable Liquids - Solvents

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

1.00
YR
__________________
__________________

Waste Wizard Subscription - 1 year

POP Begin: 09-01-2026 POP End: 08-31-2027

6.00
EA
__________________
__________________

Labor and Transportation

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

32.00
hr
__________________
__________________

Labor Hours

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 2 POP Begin: 09-01-2026 POP End: 08-31-2027

0.00

__________________
__________________

Non-Exhaustive List of Waste Streams Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3001AA

6.00
CO
__________________
__________________

Controlled Substance Disposal System Containers

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3001AB

3.00
CO
__________________
__________________

Pharmaceuticals - Aerosol (Includes HCFC's)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3001AC

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3001AD

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3001AJ

6.00
CO
__________________
__________________

Lab Stains (methanol - flammable liquids)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3001AM

0.00
CD
__________________
__________________

Asbestos (Bagged)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3001AN

1.00
CO
__________________
__________________

Calibration Gas Cylinders

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3001AP

6.00
CO
__________________
__________________

Vista 500 Lab Cartridges (corrosive)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

0.00

__________________
__________________

Waste Batteries

POP Begin: 09-01-2027 POP End: 08-31-2028

3002AA

8.00
CO
__________________
__________________

Batteries - Alkaline

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3002AB

2.00
CO
__________________
__________________

Batteries - Lead Acid Batteries (leaking)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3002AC

80.00
EA
__________________
__________________

Batteries - Lead Acid Batteries (non-leaking)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3002AD

6.00
CO
__________________
__________________

Batteries - Lithium

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3002AE

2.00
CO
__________________
__________________

Batteries - NiCd

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

0.00

__________________
__________________

Machinery / Automotive Waste

POP Begin: 09-01-2027 POP End: 08-31-2028

3003AA

1.00
CO
__________________
__________________

Antifreeze - Used

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3003AB

1.00
CO
__________________
__________________

Brake and Transmission Fluids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3003AC

1.00
CO
__________________
__________________

Used Grease

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3003AD

12.00
CO
__________________
__________________

Used Oil

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3003AE

6.00
CO
__________________
__________________

Oil Clean Up Materials

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

0.00

__________________
__________________

Waste Lamps and Bulbs

POP Begin: 09-01-2027 POP End: 08-31-2028

3004AA

1.00
CO
__________________
__________________

Lamps - Ballasts (PCB) <1980

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3004AB

1,500.00
EA
__________________
__________________

Lamps - Fluorescent

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3004AC

10.00
EA
__________________
__________________

Lamps - Fluorescent

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3004AD

10.00
EA
__________________
__________________

Lamps - HID Bulbs (Hg/Na/Metal/Halide)

Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

0.00

__________________
__________________

Waste Lab Packs

POP Begin: 09-01-2027 POP End: 08-31-2028

3005AA

6.00
CO
__________________
__________________

LAB Pack - Class 3

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3005AB

6.00
CO
__________________
__________________

LAB Pack - Class 8

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3005AC

1.00
CO
__________________
__________________

LAB Pack - Class 9

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3005AD

1.00
CO
__________________
__________________

LAB Pack - Mercury Containing

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3005AE

1.00
CO
__________________
__________________

LAB Pack - Other

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

0.00

__________________
__________________

Universal and Unknown Waste

POP Begin: 09-01-2027 POP End: 08-31-2028

3006AA

3.00
CO
__________________
__________________

Universal Waste Aerosol Cans

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3006AB

1.00
CO
__________________
__________________

Universal Waste Paint (Bulk)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3006AC

1.00
CO
__________________
__________________

Universal Waste Paint (Cans)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3006AD

1.00
CO
__________________
__________________

Unknown Liquids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3006AE

1.00
CO
__________________
__________________

Unknown Solids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

0.00

__________________
__________________

Lead Based Items

POP Begin: 09-01-2027 POP End: 08-31-2028

3007AA

1.00
CO
__________________
__________________

Lead (Paint Chips)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3007AB

1.00
CY
__________________
__________________

Lead Debris

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

0.00

__________________
__________________

Flammable Liquid Waste

POP Begin: 09-01-2027 POP End: 08-31-2028

3008AA

3.00
CO
__________________
__________________

Flammable Liquid - Alcohol Based Hand Sanitizer

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

3008AB

1.00
CO
__________________
__________________

Flammable Liquids - Solvents

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

1.00
YR
__________________
__________________

Waste Wizard Subscription - 1 year

POP Begin: 09-01-2027 POP End: 08-31-2028

6.00
EA
__________________
__________________

Labor and Transportation

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

32.00
hr
__________________
__________________

Labor Hours

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 3 POP Begin: 09-01-2027 POP End: 08-31-2028

0.00

__________________
__________________

Non-Exhaustive List of Waste Streams Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4001AA

6.00
CO
__________________
__________________

Controlled Substance Disposal System Containers

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4001AB

3.00
CO
__________________
__________________

Pharmaceuticals - Aerosol (Includes HCFC's)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4001AC

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4001AD

6.00
CO
__________________
__________________

HWPharms (after Ohio implements new rules)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4001AJ

6.00
CO
__________________
__________________

Lab Stains (methanol - flammable liquids)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4001AM

0.00
CD
__________________
__________________

Asbestos (Bagged)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4001AN

1.00
CO
__________________
__________________

Calibration Gas Cylinders

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4001AP

6.00
CO
__________________
__________________

Vista 500 Lab Cartridges (corrosive)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

0.00

__________________
__________________

Waste Batteries

POP Begin: 09-01-2028 POP End: 08-31-2029

4002AA

8.00
CO
__________________
__________________

Batteries - Alkaline

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4002AB

2.00
CO
__________________
__________________

Batteries - Lead Acid Batteries (leaking)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4002AC

80.00
EA
__________________
__________________

Batteries - Lead Acid Batteries (non-leaking)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4002AD

6.00
CO
__________________
__________________

Batteries - Lithium

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4002AE

2.00
CO
__________________
__________________

Batteries - NiCd

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

0.00

__________________
__________________

Machinery / Automotive Waste

POP Begin: 09-01-2028 POP End: 08-31-2029

4003AA

1.00
CO
__________________
__________________

Antifreeze - Used

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4003AB

1.00
CO
__________________
__________________

Brake and Transmission Fluids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4003AC

1.00
CO
__________________
__________________

Used Grease

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4003AD

12.00
CO
__________________
__________________

Used Oil

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4003AE

6.00
CO
__________________
__________________

Oil Clean Up Materials

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

0.00

__________________
__________________

Waste Lamps and Bulbs

POP Begin: 09-01-2028 POP End: 08-31-2029

4004AA

1.00
CO
__________________
__________________

Lamps - Ballasts (PCB) <1980

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4004AB

1,500.00
EA
__________________
__________________

Lamps - Fluorescent

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4004AC

10.00
EA
__________________
__________________

Lamps - Fluorescent

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4004AD

10.00
EA
__________________
__________________

Lamps - HID Bulbs (Hg/Na/Metal/Halide)

Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

0.00

__________________
__________________

Waste Lab Packs

POP Begin: 09-01-2028 POP End: 08-31-2029

4005AA

6.00
CO
__________________
__________________

LAB Pack - Class 3

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4005AB

6.00
CO
__________________
__________________

LAB Pack - Class 8

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4005AC

1.00
CO
__________________
__________________

LAB Pack - Class 9

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4005AD

1.00
CO
__________________
__________________

LAB Pack - Mercury Containing

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4005AE

1.00
CO
__________________
__________________

LAB Pack - Other

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

0.00

__________________
__________________

Universal and Unknown Waste

POP Begin: 09-01-2028 POP End: 08-31-2029

4006AA

3.00
CO
__________________
__________________

Universal Waste Aerosol Cans

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4006AB

1.00
CO
__________________
__________________

Universal Waste Paint (Bulk)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4006AC

1.00
CO
__________________
__________________

Universal Waste Paint (Cans)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4006AD

1.00
CO
__________________
__________________

Unknown Liquids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4006AE

1.00
CO
__________________
__________________

Unknown Solids

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

0.00

__________________
__________________

Lead Based Items

POP Begin: 09-01-2028 POP End: 08-31-2029

4007AA

1.00
CO
__________________
__________________

Lead (Paint Chips)

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4007AB

1.00
CY
__________________
__________________

Lead Debris

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

0.00

__________________
__________________

Flammable Liquid Waste

POP Begin: 09-01-2028 POP End: 08-31-2029

4008AA

3.00
CO
__________________
__________________

Flammable Liquid - Alcohol Based Hand Sanitizer

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

4008AB

1.00
CO
__________________
__________________

Flammable Liquids - Solvents

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

1.00
YR
__________________
__________________

Waste Wizard Subscription - 1 year

POP Begin: 09-01-2028 POP End: 08-31-2029

6.00
EA
__________________
__________________

Labor and Transportation

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

32.00
hr
__________________
__________________

Labor Hours

ESTIMATED ANNUAL QUANTITY - Not to Exceed Contract Period: Option 4 POP Begin: 09-01-2028 POP End: 08-31-2029

All Offerors shall fill out Price-Cost Schedule_24Q0792.xls-v2 file and submit with their quote response.