This document is an amendment to a federal solicitation for the project "Correct Water Intrusion, Building 8" at the VA Northern Indiana Health Care System in Marion, IN (Project #610-22-214). The amendment includes the following key details:
The purpose of the amendment is to add questions and answers, attachments (including a site visit sign-in sheet), and a call-in number for the bid opening. The bid opening date has been extended to December 11, 2024 at 1:00 PM EST. The solicitation is for a contract to provide labor, equipment, materials, and supervision to install waterproof coving around Building 8, including excavation, backfilling, road/sidewalk/drainage repairs, and landscaping. The contract has a 365-calendar day period of performance. Key requirements include adherence to OSHA, ICRA, and VA safety/security procedures. Bidders are instructed to review the solicitation, drawings, and specifications for additional details.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 9
0001 11-05-2024
610-25-1-6901-0005
610-22-214
36C250
Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 325 Indianapolis IN 46240
36C250
Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 325 Indianapolis IN 46240
To all Offerors/Bidders
36C25024B0068
10-21-2024
X
X X
EXTENDED to: 12-11-2024 13:00 EST
610-3650162-6901-854200-3220-23NRNR001
X 1
The purpose of this amendment is to do the follow actions:
1) Add Questions and Answers
2) Add attachments including site visit sign-in
3) Add Call-in line for bid opening
4) Extended bid opening date
All other terms and conditions remain unchanged.
Luke A. Turner Contracting Officer
CONTINUATION PAGE
CORRECT WATER INTRUSION, BUILDING 8
VA NORTHERN INDIANA HEALTH CARE SYSTEM--MARION, IN
PROJECT NUMBER: 610-22-214
QUESTION AND ANSWER (RFI)
CORRECTION AND CLARIFICATION
Question #1:
Will the owner accept Procore Project Management software as this project's primary submittal and data tracking tool?
Answer #1:
The decision on the Project Management tool or software is at the awardee's discretion, giving them the flexibility to choose. This detail will be discussed with the awardee upon issuance of the notice to proceed, giving them control over the process.
Question #2:
Due to the effect of COVID-19 throughout the U.S. and the resulting Federal, State, and local governments' responses/requirements of safe distancing and potential advocates of working remotely and complete organization closures, please advise how the Government intends to address delays resulting there as it pertains to the current solicitation schedule for this and all future projects.
Answer #2:
The information you seek is available in the solicitation, particularly on pages 1-
13. We encourage you to review it and ask questions relevant to the project to ensure you are well-informed and prepared.
Question #3:
As there will be no in-person bid opening for this project, can the CO or COR provide a conference line number to call so bidders can listen to the bid opening?
Answer #3:
See the end of the document for this information.
Question #4
Can we submit our bid via email if we mail the original hard copy of the bid bond before the due date?
Answer #4
No, all documents must be submitted in hard copy only by December 11, 2024, at 1:00 p.m. EST to 8888 Keystone Crossing Suite 325, Indianapolis, IN 46240. See solicitation for details of bid specifics.
Question #5: Is this project tax-exempt, and will the CO/COR provide the necessary tax-exempt certificates?
Answer #5:
See Solicitation Clause and provisions.
Question #6:
Will the owner provide as-built drawings for the project's existing structures/work area?
Answer #6:
See drawings and specifications.
Question #7:
What is the approximate Square Footage of the project? Please confirm that the space will be free from debris and free-standing medical equipment, office supplies, etc.
Answer #7:
Please review the drawings and specifications.
Question #8:
Please confirm that the project will be completed during regular working hours, not nights and weekends.
Answer #8:
Please review the drawings and specifications.
Question #9:
Does the contract include liquidated damages?
Answer #9:
See solicitation.
Question # 10:
Will owner vendors be providing coordination drawings in addition to approved shop drawings?
Answer #10:
See solicitation.
Question #11:
Can the owner confirm that the General Contractor will not include any Asbestos or Lead Removal?
Answer #11:
Please review the drawings and specifications.
Question #12:
Has the work area been checked for asbestos, lead-based materials, and other hazardous materials? Is there a report available?
Answer #12:
Please review the drawings and specifications.
Question #13:
Please confirm that no expansion joints are required for this project.
Answer #13:
Please review the drawings and specifications.
Question #14:
Can you confirm that the owner will be contracting directly with a third-party commissioning agent for the project and that the contractor is only to include participation/coordination with the Commissioning Agent?
Answer #14:
Question #15:
Is a bid bond required? What is the % necessary?
Answer #15:
See solicitation.
Question #16
Please confirm that only the original sealed bid is required. Is there clear access to the elevator shaft inside from the floor below? How far does the elevator shaft extend down below the 3rd level?
Answer #16
See solicitation.
Question #17
Is the bid due time in EST or CST?
Answer #17
See solicitation and Amendment.
Question #18
When are final RFI's due?
Answer #18
The deadline for submitting RFIs for this solicitation is November 14, 2024, at the close of business (4 p.m.).
Question #19
Phase 1B shows work on both sides of the main corridor on G1003 & G1004. There are two sets/locations of ICRA barriers down the corridor: east and west. Can both work areas of Phase 1B (east & west) be worked simultaneously in Phase 1B? That would mean two ICRA partitions on the east and west simultaneously. What minimum width should be maintained in the corridor by working both sides and two containment walls?
Answer #19:
Both sides can be worked on at the same time. However, the wall closest to the corridor will have to be done separately to allow the barrier to be adjusted. Please see GI003; it shows a minimum 5'1" distance with the obstacles adjusted per side.
Question #20
Can CPARs be used in place of PPQs (past performance qualification)?
Answer #20:
No.
Question #21:
If RFI answers elicit a follow-up question, will an additional RFI submission period be allowed?
Answer #21:
At the discretion of the Government.
Question #22:
Will the owner provide the civil site SWPPP (Storm Water Pollution Prevention Plan) and associated permitting fees?
Answer #22:
See drawings and specifications.
Question #23:
Can the contractor use the existing restroom facilities in the work area or adjacent ones nearby?
Answer #23:
See drawings and specifications.
Question #24:
Many VA campuses are beginning to address tuberculosis protocols in VA campus projects. Are there any TB-required protocols for this campus/project?
Answer # 24:
Question #25:
Will you provide a copy of the site visit attendance and sign-in sheet in amendment?
Answer #25:
Please review the amendment document.
Question #26:
Will the owner accept the "Out-Build Scheduling Software" software for schedule submission and monthly updates?
Answer #26:
Only Microsoft-based software is approved due to compatibility and security reasons. The software choice is contingent on the awardee's discretion. This detail will be discussed with the awardee upon issuance of the notice to proceed.
Question 27: Will a cross-section be provided for the new retaining wall on each side of the lower stair?
Is a footing required? If so, what size? What depth? The thickness of the wall? Length of wall? Reinforcing?
Answer 27:
See Attachments for more details.
Question 28:
Can the Superintendent fulfill multiple roles?
a) If so, can they also fulfill the Quality Control role?
b) What about the SSHO role?
Answer 28:
FAR 52.236-6 Superintendence by the Contractor- “At all times during the performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.” The Government is in contract with the Primary contractor, not its subs. Therefore, the superintendent must be an employee of the Primary Contractor.
The Superintendent is permitted to have multiple roles if the following exists:
a) OSHA requirements and training certificates are adhered to.
b) Alternate is identified in writing with training certification as well. For example, if the superintendent is the primary safety officer, a secondary must be identified with competent credentials to perform the task.
c) Approved through government staff (i.e., Contracting Officer Representative)
Question 29:
Drawing CS301 Note 5 calls for a 4" Type IV Inlet per detail #5/CS502. Detail #5/CS502 calls for 8"Inlet. Please verify which is needed.
Answer 29:
Please install a 4" Type IV Inlet. Detail #5/CS502 can be used with a 4" inlet head in place of the 8" inlet head and a 4 " connecting pipe instead of 6".
End of Amendment Questions and Answers
BID OPENING:
Wednesday, December 11, 2024, 1:00 PM EST
Dial in by phone
+1 872-701-0185, 991067194# United States
Phone conference ID: 991 067 194#
ATTACHMENT:
Attachment A – Prebid Sign-in
Attachment B – Drawings
Attachment C - Drawings
File details come from the government source that posted it. Updated .