538-21-205 Addendum 1_attachments.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25024B0047
About this file
This document is a set of HVAC drawings and general notes for a federal contract opportunity to upgrade the building management controls for Buildings 210 and 211 at Station 538 in Chillicothe, Ohio.
The key details include:
- The drawings cover plans for HVAC demolition, new HVAC installations, and control schematics. Specific requirements include new JACE controllers, VAV boxes, blower-coil units, and unit heaters.
- The work involves upgrades to the existing Building Automation System to fully integrate the new HVAC components.
- The contract opportunity is solicitation number 36C25024B0047, issued by the Department of Veterans Affairs.
- The work is to be performed in Buildings 210 and 211 at Station 538 in Chillicothe, Ohio.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid RFIs - 538-21-205_responses.pdf | ||
| 538-21-205 Addendum 1 Narrative.pdf | ||
| 36C25024B0047 A00002.docx | DOCX document | |
| 36C25024B0047 A00001.docx | DOCX document | |
| 36C25024B0047_1.docx | DOCX document | |
| Wage Determination - Ross County.pdf | ||
| 05 538-21-205 - Drawings_rev3a.pdf | ||
| 04 538-21-205 - Specifications_rev3a.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: ALL SYMBOLS AND ABBREVIATIONS
ARE SUBJECT TO MODIFICATIONS
ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS
MIGHT NOT NECESSARILY BE USED ON
THIS PROJECT.
ABBREVIATIONS
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
AFMS - AIR FLOW MEASURING STATION
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATC - AUTOMATIC TEMPERATURE CONTROL
(SYNONYMOUS WITH BAS)
BAS - BUILDING AUTOMATION SYSTEM
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CHGR - CHILLED WATER GLYCOL SOLUTION RETURN
CHGS - CHILLED WATER GLYCOL SOLUTION SUPPLY
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWR - CONDENSER WATER RETURN
CWS - CONDENSER WATER SUPPLY
D - DRAIN LINE
DB - DRY BULB
DDC - DIRECT DIGITAL CONTROLS
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DWG - DRAWING
EA - EACH OR EXHAUST AIR
EAT - ENTERING AIR TEMPERATURE
EC - ELECTRICAL CONTRACTOR (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EWT - ENTERING WATER TEMPERATURE
EXH - EXHAUST
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
FD - FLOOR DRAIN
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GPM - GALLONS PER MINUTE
HB - HOSE BIBB
HC - HVAC CONTRACTOR (DIVISION 23)
HD - HUB DRAIN
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HR - HOUR
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LAT - LEAVING AIR TEMPERATURE
LAV - LAVATORY
LBS - POUNDS
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LWT - LEAVING WATER TEMPERATURE
MAX - MAXIMUM
MDD - MOTORIZED DAMPER
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE
RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOMINAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OBD - OPPOSED BLADE DAMPER
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING CONTRACTOR (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PLBG - PLUMBING
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIG - POUNDS PER SQUARE INCH GAUGE
RA - RETURN AIR
RAD - RADIUS
RCP - REFLECTED CEILING PLAN
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
S - SPRINKLER (WET)
SA - SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SHT - SHEET
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SRV - SAFETY RELIEF VALVE
SS - STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
V - VENT
VAC - VACUUM
VEL - VELOCITY
VFD - VARIABLE FREQUENCY DRIVE
(ADJUSTABLE FREQUENCY
MOTOR CONTROLLER)
VIB - VALVE IN BOX
VOL - VOLUME
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/O - WITHOUT
WB - WET BULB
WCO - WALL CLEANOUT
GENERAL FLOOR PLAN NOTES
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN UNLESS
NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
A1
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS
REFER TO SCHEDULES.
H1 H1OR
EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
H2
B
H2
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
H2 = SHEET WHERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
H2 = SHEET WHERE DETAIL IS LOCATED
A1 "UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
EQUIPMENT, UNLESS NOTED OTHERWISE
10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOD: 8' - 10"
BOD: 7' - 2"
20x20
20x20
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
DUCTWORK, UNLESS NOTED OTHERWISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,
UNLESS NOTED OTHERWISE
DL-1
UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH
UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE WITH GC.
DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.
CONNECT TO EXISTING
HVAC PIPING DESIGNATIONS
CHILLED WATER SUPPLY PIPECHS
CONDENSER WATER SUPPLY PIPECWS
CONDENSER WATER RETURN PIPECWR
DRAIN LINE. PITCH IN DIRECTION INDICATEDD
HEATING HOT WATER SUPPLY PIPEHWS
HEATING HOT WATER RETURN PIPEHWR
WATER MAKE-UP PIPEMU
VENT PIPEV
REFRIGERANT LIQUID LINERL
REFRIGERANT SUCTION LINERS
EXPANSION TANK PIPEET
REFRIGERANT HOT GAS LINEHG
LOW PRESSURE CONDENSATE RETURN PIPELPC
LOW PRESSURE STEAM SUPPLY PIPELPS
MEDIUM PRESSURE CONDENSATE RETURN PIPEMPC
MEDIUM PRESSURE STEAM SUPPLY PIPEMPS
PUMPED CONDENSATE RETURN PIPEPC
HIGH PRESSURE CONDENSATE RETURN PIPEHPC
HIGH PRESSURE STEAM SUPPLY PIPEHPS
STEAM SUPPLY PIPE - NUMBER INDICATES P.S.I.G.10
MISC SYMBOLS
DUCTWORK SYMBOLS
ROUND BRANCH DUCTWORKCONICAL
FITTING
ACOUSTIC
FITTING
ACOUSTIC
FITTING
ADAD
D
R R
D
RECTANGULAR BRANCH DUCTWORK
SQUARE TEE WITH TURNING VANES
NOTE: ALL SQUARE ELBOWS IN
RECTANGULAR AND ROUND / OVAL
DUCTWORK SHALL BE PROVIDED WITH
TURNING VANES. REFER TO
SPECIFICATIONS FOR ADDITIONAL DETAILS.
EXISTING DUCTWORK TO REMOVED
RETURN AIR, RELIEF AIR, OR TRANSFER AIR
DUCTWORK. (UP AND DOWN) RADIUSED
OR SQUARE WITH TURNING VANES.
SUPPLY AIR OR OUTDOOR AIR DUCTWORK.
(UP AND DOWN) RADIUSED OR SQUARE
WITH TURNING VANES.
EXHAUST AIR DUCTWORK. (UP AND DOWN)
RADIUSED OR SQUARE WITH TURNING
VANES.
RECTANGULAR AND ROUND / OVAL
DUCTWORK RISE / DROP WITH 90° RADIUSED
OR SQUARE ELBOWS AND TURNING VANES.
RADIUS ELBOW
90° SQUARE ELBOW (WITH TURNING VANES)
NOTE: ALL SQUARE ELBOWS IN
RECTANGULAR AND ROUND DUCTWORK
SHALL BE PROVIDED WITH TURNING VANES.
ACCESS DOOR OR PANEL
DUCTWORK RISE IN DIRECTION OF AIR
FLOW
DUCTWORK DROP IN DIRECTION OF AIR
FLOW
DUCTWORK WITH ACOUSTICAL LINER.
LISTED DUCT SIZES ARE INSIDE CLEAR
DIMENSIONS.
RECTANGULAR ROUND / OVAL
FLEXIBLE DUCTWORK
FLEXIBLE CONNECTION
DUCTWORK CONSTRUCTED OF SPECIAL
MATERIAL AS NOTED
DIRECTION OF PITCH
RECTANGULAR DUCTWORK DIMENSIONS
(W x H)26x20
ROUND DUCTWORK DIMENSIONS (DIA)26ø
OVAL DUCTWORK DIMENSIONS (W x H)26x20 OV
DUCTWORK DEVICE SYMBOLS
WALL OR DUCTWORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER
TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).
300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM
OF GRILLE.
A3 10ø
MANUAL BALANCING DAMPER WITH LOCKING DEVICE
BDD = BACK DRAFT DAMPER
CBD = COUNTER-BALANCED BACK DRAFT DAMPER
SD = SMOKE DAMPER
FS = COMBINATION FIRE - SMOKE DAMPER
MDD = MOTORIZED DAMPER
AFMS = AIR FLOW MEASURING STATION
DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.
HUMIDITY SENSOR - DUCT MOUNTED
SG1
20x12
BOG: 9'-0"
XXX
A-D
XX
H
SD
SP
AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVICE
SCHEDULE FOR VARIOUS DESIGNATIONS).
10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE
DISCHARGE 4-WAY UNLESS NOTED WITH FLOW ARROWS. AIR DEVICE
SHOWN IS 2-WAY SIDE THROW. METHOD OF IDENTIFICATION ALSO APPLIES
TO OTHER CEILING MOUNTED AIR DEVICES.
FIRE DAMPER
A = TYPE (REFER TO FLOOR PLANS FOR VARIOUS TYPES)
D OR S = DYNAMIC OR STATIC
STATIC PRESSURE SENSOR - DUCT MOUNTED
C
CARBON DIOXIDE SENSOR - DUCT MOUNTED
S
TEMPERATURE SENSOR - DUCT MOUNTED
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR REQUIRED TYPE BASED ON
APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
VALVES AND FITTINGS
10"
TOE: 3' - 0"
BOE: 0' - 6"
CHILLED WATER GLYCOL SOLUTION RETURN PIPECHGR
CHILLED WATER GLYCOL SOLUTION SUPPLY PIPECHGS
CHILLED WATER RETURN PIPECHR
SQUARE THROAT / RADIUS HEEL
FITTINGS NOT ACCEPTABLE
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
DD
RR
PIPE RISER
RADIUS'D BRANCH
RADIUS'D TEE
EXISTING DUCTWORK TO REMAIN
UNLESS NOTED OTHERWISE ON DRAWINGS,
15° MAX FOR DIVERGING, 30° MAX FOR
CONVERGING TRANSITION
EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERWISE.
SPACE TEMPERATURE SENSOR / THERMOSTAT. WHEN WALL MOUNTED, MOUNTING
HEIGHT 46" TO MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH
COORDINATE WITH ARCHITECT.
T
DP
DIFFERENTIAL PRESSURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO
MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
H
HUMIDITY SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.
CARBON DIOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.
C
CO
CARBON MONOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET
ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
TEMPERATURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
S
S TEMPERATURE SENSOR MOUNTED IN CEILING PLENUM.
STATIC PRESSURE SENSOR.SP
DRAIN VALVE WITH HOSE END CONNECTION
EXPANSION JOINT
MANUAL AIR VENT
AUTOMATIC AIR VENT
PRESSURE REDUCING VALVE
QUICK OPENING MANUAL VALVE
VACUUM BREAKER
NEEDLE VALVE
PRESSURE AND TEMPERATURE TEST PLUG
VACUUM GAUGE WITH STOP
END CAP
GLOBE VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
A
M
M
N
V
VB
SOLENOID VALVE
S
SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERWISE. FOR STEAM SYSTEMS PIPE DISCHARGE
TO OUTDOORS.
WATER METERM
PRESSURE GAUGE WITH COCK AND SIPHON LOOP
BI-METALIC STEAM TRAP AND DRIP ASSEMBLY
THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY
BM
TD
IB
FT
TS
FLOW METER
F
UNION
CLEANOUT
STRAINER
M
MODULATING 2 PORT AUTOMATIC CONTROL VALVE
M
MODULATING 3 PORT AUTOMATIC CONTROL VALVE
M
COMBINATION SHUTOFF AND BALANCING VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
STRAINER WITH A BLOW DOWN VALVE AND HOSE CONNECTION
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN AND OUT
2 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE
3 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE
AUTOMATIC PRESSURE INDEPENDENT CONTROL VALVE
THERMODYNAMIC STEAM TRAP AND DRIP ASSEMBLY
INVERTED BUCKET STEAM TRAP AND DRIP ASSEMBLY
FLOAT AND THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY
C DEMOLISH TO POINT INDICATED, 'C' INDICATES CAP TO BE ADDED.
1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
2. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.
3. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAWINGS AND
GENERAL REQUIREMENTS.
4. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN
THE PERFORMANCE OF WORK IN THIS PROJECT.
5. THE CONTRACTORS SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF
BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES.
EACH CONTRACTOR SHALL REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE PROJECT ENGINEER THRU THE CONTRACTING OFFICER FOR CLARIFICATION BEFORE PROCEEDING.
6. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON
RESPONSIBILITIES.
7. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND PROJECT ENGINEER TO MAINTAIN
OPERATION OF THE EXISTING FACILITY.
8. EACH CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF OTHERS. THEY SHALL KEEP THEMSELVES INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING THEIR WORK WITH OTHERS SO THAT THE
PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON SCHEDULE.
9. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.
10. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON VISUAL OBSERVATION AND/OR AVAILABLE DRAWING
INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
11. EACH CONTRACTOR AND/OR TRADE, FITTING OR PLACING THEIR WORK INTO OR ON THE WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE INSTALLATION OF THEIR WORK CONSTITUTES THEIR ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, THEY SHALL NOTIFY THE PROJECT ENGINEER AND SUCH WORK SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK
INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.
12. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE PROJECT ENGINEER. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR
ENCAPSULATED AND THE AREA DECLARED SAFE.
13. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS & FLOORS SHALL BE
FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
14. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A
FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
15. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET
INSIDE DIMENSIONS.
16. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES. REFER TO DETAIL SHEETS. COORDINATE SIZES AND LOCATIONS WITH ACCESSORIES PROVIDED BY OTHER TRADES.
17. ACCESS PANELS IN NON-ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC. COORDINATE SIZES AND LOCATIONS WITH OTHER
TRADES.
18. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
19. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD
DETAILS AND PIPING SCHEMATICS.
20. DIFFUSER SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. REGISTER AND GRILLE SIZES SHOWN ARE FACE
SIZES.
21. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
22. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER
FLOW BETWEEN WATER AND AIR.
23. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM OF
REGISTERS SEVEN INCHES ABOVE FINISHED FLOOR.
24. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH
WALL/FLOOR/ROOF OPENING TO MATCH EXISTING WHERE OPENING IS NOT RE-USED.
25. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
26. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH
ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH EXISTING.
27. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.
28. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE OWNER. ITEMS NOT DESIRED BY THE OWNER
SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
29. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH
MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES
AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.
30. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND
LOCATIONS PRIOR TO PERFORMING WORK.
31. HEPA FILTERATION WILL BE REQUIRED FOR CERTAIN WORK TASKS PER SPECIFICATION 01 35 26 SAFETY REQUIREMENTS, PART 1.12 INFECTION CONTROL. REFER TO INFECTION CONTROL PERMITS ISSUED FOR THIS
WORK. COORDINATE WITH GENERAL CONTRACTOR AND COR.
32. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
33. TERMINATE PIPING AND DUCTWORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL
CUTTING AND PATCHING SHALL MATCH EXISTING FINISHES.
34. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND
CAPPED; AND CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
35. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN ON REMOVAL PLAN(S) SHALL BE
REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS ASSOCIATED WITH THE REMOVAL
WORK.
36. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC.
37. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON WEEKENDS OR WEEKNIGHTS, IF REQUIRED BY THE PROJECT ENGINEER. DOWNTIME SHALL BE KEPT TO A MINIMUM AND SHALL BE COORDINATED AND SCHEDULED WELL IN
ADVANCE WITH THE PROJECT ENGINEER.
38. WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION.
CLEANING OF EXISTING DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN
END OF THE DUCT.
39. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERWISE NOTED. REFER TO AIR TERMINAL
UNIT SCHEDULE(S).
40. APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS AND EQUIPMENT, AND
TO THE CENTER OF PIPES.
41. ALL INSULATED DUCTWORK AND PIPING SHALL HAVE DAMPER/VALVE HANDLE EXTENSIONS.
42. CONTROL CONTRACTORS RESPONSIBILITIES ARE LISTED IN SPECIFICATION SECTION 23 09 23, SECTION 1.1.
43. DIVISION 26 AND 27 WORK IS SHOWN ON DIVISION 23 DRAWINGS. WORK INCLUDES 120V POWER CIRCUITRY, BREAKERS, DISCONNECTS, DATA OUTLETS, ETC. DIV 26/27 CONTRACTOR TO COORDINATE ALL REQUIREMENTS
CLOSELY WITH DIV 01 AND DIV 23 CONTRACTORS.
44. REFER TO SPECIFICATION 01 00 00 GENERAL REQUIREMENTS, PARTS 1.6 H. PHASING AND 1.6 I. UTILITY SERVICES. THE REQUIREMENTS DESCRIBED IN THE REFERENCE SPECIFICATION SECTIONS SHALL APPLY TO
HVAC AS A UTILITY SERVICE.
45. THE NEW DDC COMPONENTS MUST BE FULLY COMPATIBLE WITH, FULLY COMMUNICATE WITH, AND BE FULLY
EDITABLE THRU THE EXISTING BMS.
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/1
/2
:2
:5
P M
M001
HVAC LEGEND AND GENERAL
NOTES
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
HVAC SHEET LIST
SHEET NUMBER SHEET NAME
M001 HVAC LEGEND AND GENERAL NOTES
M101 B210 AND B211 PARTIAL GROUND FLOOR HVAC DEMOLITION PLANS
M102 B210 AND B211 PARTIAL GROUND FLOOR HVAC PLANS
M103 PARTIAL CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS
M104 B210 PARTIAL BASEMENT AND GROUND FLOOR HVAC PLANS
M701 CONTROL SCHEMATIC LEGEND AND VAV SCHEMATIC
M702 CONTROL SCHEMATIC - AIR HANDLING UNITS
Total Count: 7
No. Revisions: Date:
1 CONSTRUCTION DOCUMENTS 11/16/2023
2 ADDENDUM 1 06/28/2024
T T
T
T
T
T
T
T
TT
T
PT Clinic
G011
Managers Office
G012
Closet
G007A
Stair
G013
4 4
1 2
B210 B211
LIBRARY
AHU
SF
LIBRARY
AHU
RF
Sub-Waiting
G048
Break Room
G047
Copy Mail/Supply
G046
Exam Room
G045
Conference Room
G044
Reception
G037
Secretary Office
G038
Exam Room
G039
Provider's Office
G040
Provider's Office
G041
Mechanical
G023
Mechanical Room
G039
Waiting
G030A
Storage
G043
OT Storage Closet
G30F
Corridor
G036
Toilet
G035
Patient Escorts
G031
Closet
G030A1
Generator
G042
Room
G024
OT Storage Closet
G30E
KT Clinic Office
G030D
Stair
G049
Occupational Therapy/Kinesiotherapy
G030
OT Clinic Office
G030B
Shell Space
G032
RECEPTION
CL002
ELEC. RM.
CL004
UNISEX RESTROOM
CL003
SOUTH VESTIBULE
CL001
EXT
EXT
ELEV. MACH. RM.
CL005
Corridor
G007
CORRIDOR
Office
G022A
Media Room
G024B
Office
G024D
Office
G024C
Office
G024E
Vestibule
G021
Shared Office
G024A
Veterans Library
G022
Office
G024F
Library Work Room
G026
Storage
G025
Storage
G024G
Library
G024
Classroom
G029
Stair
S2-G
Toilet
G031
Corridor
G030
2 2 x1
S A x1
S A
30x8 - SA
18x10 - SA x1
S A ø
S
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/1
/2
:2
:5
P M
M101
B210 AND B211 PARTIAL GROUND
FLOOR HVAC DEMOLITION PLANS
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
SCALE: 1/4" = 1'-0"
B210 - GROUND - HVAC DEMOLITION PLAN - PT
NOTES
1 REMOVE EXISTING THERMOSTAT AND ASSOCIATED CONTROL WIRING BACK
TO THE VAV BOX. THIS WORK CANNOT BE PERFORMED DURING NORMAL
BUSINESS HOURS. CONTRACTOR TO COORDINATE WITH COR FOR
AFTER-HOURS ACCESS TO PERFORM THIS WORK.
2 REMOVE EXISTING VAV TERMINAL UNIT CONTROL MODULE AND
ASSOCIATED WIRING BACK TO THE EXISTING XCITE CONTROLLER. THIS
WORK CANNOT BE PERFORMED DURING NORMAL BUSINESS HOURS.
CONTRACTOR TO COORDINATE WITH COR FOR AFTER-HOURS ACCESS TO
PERFORM THIS WORK.
3 REMOVE EXISTING XCITE CONTROLLER AND WIRING TO EXISTING VAV
BOXES. RETAIN THE ETHERNET CONNECTION TO THE EXISTING BAS
NETWORK SWITCH, IF COMPATIBLE WITH THE NEW JACE CONTROLLER.
4 BEFORE CONSTRUCTION, PERFORM AN AIR SURVEY ON THE VAV BOX.
MEASURE MINIMUM AND MAXIMUM AIRFLOW.
KEYPLAN
No. Revisions: Date:
1 CONSTRUCTION DOCUMENTS 11/16/2023
2 ADDENDUM 1 06/28/2024
GENERAL NOTES
1. DO NOT ABANDON WIRING OR DEVICES IN PLACE.
SCALE: 1/8" = 1'-0"
B210/211 - GROUND - HVAC DEMOLITION PLAN - LIBRARY AND OFFICES
T
T T
T
T
T
T
T
T
TT
T
20x8 - SA 20x8 - SA
21x15 - RA x1
S A
PT Clinic
G011
Managers Office
G012
Closet
G007A
Stair
G013
210-VAV-G011A
210-VAV-G011B5
1 2
B210 B211
LIBRARY
AHU
SF
LIBRARY
AHU
RF
14x6 - SA
12x6 - RA x1
R A ø
R
A
G048
Sub-Waiting
G047
Break
Room
G046
Copy
Mail/Supply
G045
Exam
Room
G044
Conference
Room
G037
Reception
G038
Secretary
Office
G039
Exam
Room
G040
Provider's
Office
G041
Provider's
Office
G023
Mechanical
G039
Mechanical
Room
G030A
Waiting
G043 Storage
G30F
OT Storage
Closet
G036 Corridor
G035
Toilet
G031
Patient
Escorts
G030A1 Closet
G042
Generator
G024 Room
G30E
OT Storage
Closet G030D
KT Clinic
Office
G049
Stair
G030
Occupational
Therapy/Kinesiotherapy
G030B
OT Clinic
Office
G032
Shell Space
CL002
RECEPTION
CL004
ELEC. RM.
CL003
UNISEX
RESTROOM
CL001
SOUTH
VESTIBULE
EXT
EXT
CL005
ELEV.
MACH. RM.
G007
Corridor
CORRIDOR
G022A
Office
G024B
Media
Room
G024D Office
G024C
Office
G024E
Office
G021
Vestibule
G024A
Shared
Office
G022
Veterans
Library
G024F
Office
G026
Library
Work Room
G025
Storage
G024G
Storage
G024
Library
G029
Classroom
S2-G Stair
G031
Toilet
G030 Corridor
VAV-9
VAV-8
VAV-7
VAV-6
VAV-5
VAV-3
VAV-4
VAV-1
VAV-2
210-VAV-G047
210-VAV-G038
8 8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/1
/2
:2
:5
P M
M102
B210 AND B211 PARTIAL GROUND
FLOOR HVAC PLANS
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
SCALE: 1/4" = 1'-0"
B210 - GROUND - HVAC PLAN - PHYSICAL THERAPY
NOTES
1 PROVIDE NEW JACE CONTROLLER FOR LIBRARY AHU AND VAV BOXES.
REUSE EXISTING ETHERNET CONNECTION, IF COMPATIBLE, WITH EXISTING
BAS NETWORK SWITCH IN B120 SUB BASEMENT
2 NOT USED.
3 PROVIDE NEW DDC CONTROLLER FOR EXISTING VAV BOX AND AND WIRING
TO NEW JACE IN ROOM G023. ADD NEW GRAPHICS AND CONTROL POINTS
TO BAS. THIS WORK CANNOT BE PERFORMED DURING NORMAL BUSINESS
HOURS. CONTRACTOR TO COORDINATE WITH COR FOR AFTER-HOURS
ACCESS TO PERFORM THIS WORK.
4 PROVIDE NEW DDC CONTROLLER FOR EXISTING VAV BOX AND AND WIRING
TO NEAREST JACE CONTROLLER. ADD NEW GRAPHICS AND CONTROL
POINTS TO BAS. THIS WORK CANNOT BE PERFORMED DURING NORMAL
BUSINESS HOURS. CONTRACTOR TO COORDINATE WITH COR FOR
AFTER-HOURS ACCESS TO PERFORM THIS WORK.
5 REBALANCE VAV BOX TO MINIMUM AND MAXIMUM AIRFLOWS MEASURE
BEFORE CONSTRUCTION.
6 NEW THERMOSTAT PROGRAMMED TO SETPOINT AND OCCUPANCY
SCHEDULE PER COR INSTRUCTIONS. PROVIDE NEW WIRING TO NEW VAV
CONTROLLER.
7 100% OUTDOOR AIR UNIT. BALANCE LOUVER, SF AND RF TO 6,000 CFM.
8 PROVIDE TEST AND BALANCE AFTER INSTALLATION TO VALUES IN THE
SCHEDULE ON THIS SHEET.
KEYPLAN
NOTES:
1. PROGRAM BAS SYSTEM TO ORIGINAL DESIGN AIRFLOWS,
RECREATED HERE.
AIR TERMINAL UNITS - HOT
WATER HEAT
M A
R K
CFM
R E
F E
R T
O N
O T
E
C O
O L
IN
G
M A
X
IM
U M
S U
M M
E R
M
IN
W
IN
T E
R M
IN
VAV-1 300 45 190 1
VAV-2 1,845 280 1,495 1
VAV-3 200 30 100 1
VAV-4 1,635 250 920 1
VAV-5 255 40 140 1
VAV-6 895 135 655 1
VAV-7 135 25 75 1
VAV-8 335 55 335 1
VAV-9 400 60 245 1
No. Revisions: Date:
1 CONSTRUCTION DOCUMENTS 11/16/2023
2 ADDENDUM 1 06/28/2024
SCALE: 1/8" = 1'-0"
B210 - GROUND - HVAC PLAN
CONN-BC1
12 4
B210 B211
4-PIPE BLOWER-COIL UNIT CONTROLS
V1
HEATING COIL
COOLING COIL
V2
N.C.
N.O.
C H
R
C H
S HWS
HWR
BLOWER-COIL CONTROL SEQUENCE
BLOWER-COIL UNIT
SUPPLY
208 VOLT POWER
TEMPERATURE
ROOM SPACE
SENSOR T1
CONTROL PANEL
BLOWER COIL UNIT
SW
T2
1. GENERAL
A. BLOWER COIL UNIT SHALL BE STARTED AND STOPPED BY THE UNIT CONTROL
PANEL. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND
"OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE.
B. WHEN BLOWER COIL UNIT IS "OFF" FOR ANY REASON, 2-POSITION OUTSIDE AIR
DAMPER SHALL BE FULLY CLOSED, AND SUPPLY FAN SHALL BE OFF. WHEN THE
UNIT IS "ON", OUTSIDE AIR DAMPER SHALL OPEN AND SUPPLY FAN SHALL START.
C. PROVIDE SCHEDULED NIGHT SET-BACK CONTROL FOR CONTINUOUS FAN
OPERATION DURING THE OCCUPIED PERIOD AND CYCLED FAN OPERATION TO
MAINTAIN REDUCED TEMPERATURE IN THE UNOCCUPIED PERIOD.
D. COORDINATE AND ADJUST OCCUPANCY SCHEDULES AND TEMPERATURE RANGE
WITH COR.
2. TEMPERATURE CONTROL
A. SPACE AIR TEMPERATURE, AS SENSED BY WALL THERMOSTAT T1, SHALL BE
MAINTAINED AT SETPOINT (ADJUSTABLE) VIA UNIT CONTROL PANEL BY
MODULATING COOLING COIL VALVE V1 AND HEATING COIL VALVE V2, IN
SEQUENCE. SEPARATE CONTROL LOOPS SHALL BE UTILIZED FOR MECHANICAL
COOLING AND HEATING FUNCTIONS.
3. FREEZE PROTECTION
A. IF THE HEATING COIL DISCHARGE AIR TEMPERATURE FALLS BELOW 35 DEG. F.
(ADJUSTABLE) AS SENSED BY INTEGRAL FREEZESTAT T2, THE 2-POSITION O.A.
DAMPER SHALL CLOSE, THE SUPPLY FAN SHALL SHUT DOWN, AND A CRITICAL
ALARM SHALL INDICATE AT THE UNIT CONTROL PANEL. FREEZESTAT T2 SHALL BE
HARD WIRED TO THE SUPPLY FAN TO SHUT DOWN THE UNIT IN THE HAND OR
AUTOMATIC MODE. FREEZESTAT SHALL REQUIRE MANUAL RESET AT THE
DEVICE.
4. CONDENSATE OVERFLOW PROTECTION
A. IF THE CONDENSATE DRAIN PAN IS NOT ABLE TO DRAIN AND FILLS UP AS
DETECTED BY INTEGRAL CONDENSATE FLOAT SWITCH SW. UNIT SHALL SHUT
DOWN. UNIT SHALL RESTART ONCE FLOAT SWITCH CLOSES. FLOAT SW SHALL BE
HARD WIRED TO SUPPLY FAN TO SHUT DOWN. UNIT IN HAND OR AUTOMATIC
MODE.
211-AHU2
JACE FOR AHU-2
S A
R A
R A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/1
/2
:2
:5
P M
M103
PARTIAL CONNECTOR FIRST
FLOOR & B211 ATTIC HVAC PLANS
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
SCALE: 1/4" = 1'-0"
CONNECTOR - FIRST FLOOR - HVAC
SCALE: 1/8" = 1'-0"
B211 ATTIC HVAC PLAN
NOTES
1 ALTERNATE DEDUCT 1: PROVIDE NEW JACE CONTROLLER FOR
BUILDING CONNECTOR BLOWER COIL UNIT.
2 ALTERNATE DEDUCT 1: ORIGINAL BLOWER COIL FAN SCHEDULED FOR
3,320 CFM TOTAL AIRFLOW AND 355 CFM OUTDOOR AIR. REBALANCE
THE FAN AND DAMPERS TO THIS AIRFLOW.
3 REPLACE OA AND RA MOTORIZED DAMPERS AND ACTUATORS.
DAMPERS TO BE PROVIDED BY THE VA. BOTH DAMPERS ARE 68" x
25.5". REPLACE SA HIGH STATIC AND RA LOW STATIC PRESSURE
SENSORS.
4 PROVIDE NEW WIRING FROM JACE TO EXISTING BAS NETWORK
SWITCH IN B210 SUB-BASEMENT TANK ROOM.
KEYPLAN
SCALE: NONE
BLOWER COIL CONTROLS SEQUENCE
No. Revisions: Date:
1 CONSTRUCTION DOCUMENTS 11/16/2023
2 ADDENDUM 1 06/28/2024
T T
T
T
T
T T
T
210-C1210-C2
DOMESTIC
BOOSTER
PUMP
WATER
HEATERS
210-CP1
JACE FOR BTU METERS
(ABANDONED)
NEW UNIT
HEATER JACE
EXISTING BAS NETWORK SWITCH
210-CCU2
210-CCU1
G011 PT Clinic
G048 Sub-Waiting
G047
Break
Room
G046
Copy
Mail/Supply
G045
Exam
Room
G044
Conference
Room
G037 Reception
G038
Secretary
Office
G039
Exam
Room
G040
Provider's
Office
G041
Provider's
Office
G039
Mechanical
Room
G030A Waiting
G001 Entry
G019 Stair
G033 Stair
G043 Storage
G010
Elevator
Equipment
G30F
OT Storage
Closet
G028D Closet
G016B Pipe Chase
G050 Tank Room
G025U Closet
G025B Storage
G024A Toilet
G025F Office
G025E Office
G025D Office
G025C Office
G025M Office
G025G Office
G025L
Mechanical
Room
G025Q Office
G025P Office
G025N Office
G025T Office
G025R
Open
Office/Shared Workspace
G024B Toilet
G036 Corridor
G035 Toilet
G031
Patient
Escorts
G030A1 ClosetG020
HAC
G016 Engineering
G009 Corridor
G012
Managers
Office
G042 Generator
G025 Corridor
G024 Room
G003 Toilet
G005 Bathroom
G002 Entrance
G011 PT Clinic
G015A Closet
G007A Closet
G016A Engineering
G021
Soiled
Linen
G022 ADL Clinic
G30E
OT Storage
Closet
G030D
KT Clinic
Office
G030C
Managers
Office
G049 Stair
G030
Occupational
Therapy/Kinesiotherapy
G029 Engineering
G051 Waiting
G028A
Speech
PathologistG027
Electric
Switchgear
G028
Speech
Clinic
G008 Waiting
G015 Toilet
G028E
Sound
Booth
G027A
Elect.
Room
G025S
Elect.
Room
G052B Corridor
G023 Tele Closet
G013 Stair
G030B
OT Clinic
Office
G032 Shell Space
G025A Open Office
G025A Open Office
G052
Elevator
Equipment
G006 Stair
G004 Toilet
G026 Stair
CL005
ELEV.
MACH. RM.
G007 Corridor
G025H Copy
G025K Office
G025J Office
CUH-5CUH-3
CUH-2
CUH-1
CUH-4
B210
B211
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RYAN JETER
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/1
/2
:2
:5
P M
M104
B210 PARTIAL BASEMENT AND
GROUND FLOOR HVAC PLANS
11/16/2023 Checker Author
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211STATION 538
Approved: Owner
No. Revisions: Date:
1 CONSTRUCTION DOCUMENTS 11/16/2023
2 ADDENDUM 1 06/28/2024
SCALE: 1/8" = 1'-0"
B210 BASEMENT - HVAC PLAN
SCALE: 3/32" = 1'-0"
B210 - GROUND - HVAC PLAN
NOTES
1 ALTERNATE DEDUCT 1: PROVIDE NEW JACE CONTROLLER FOR UNIT
HEATER CONTROL VALVES.
2 ALTERNATE DEDUCT 1: REMOVE EXISTING THERMOSTAT AND PROVIDE
NEW THERMOSTAT AND CONTROL WIRING FOR UNIT HEATER.
3 ALTERNATE DEDUCT 1: WIRING FROM UNIT HEATERS TO NEW JACE
CONTROLLER IN SUB BASEMENT.
4 PROVIDE NEW WIRING FROM NEW JACE CONTROLLERS SERVING THE
LIBRARY AHU AND VAV BOXES, BC-1, AND UNIT HEATERS TO EXISTING
BAS NETWORK SWITCH.
KEYPLAN
| Sheets |
| M001 - HVAC LEGEND AND GENERAL NOTES |
| M101 - B210 AND B211 PARTIAL GROUND FLOOR HVAC DEMOLITION PLANS |
| M102 - B210 AND B211 PARTIAL GROUND FLOOR HVAC PLANS |
| M103 - PARTIAL CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS |
| M104 - B210 PARTIAL BASEMENT AND GROUND FLOOR HVAC PLANS |
| M101 - B210 AND B211 PARTIAL GROUND FLOOR HVAC DEMOLITION PLANS.pdf |
| Sheets |
| M001 - HVAC LEGEND AND GENERAL NOTES |
| M101 - B210 AND B211 PARTIAL GROUND FLOOR HVAC DEMOLITION PLANS |
| M102 - B210 AND B211 PARTIAL GROUND FLOOR HVAC PLANS |
| M103 - PARTIAL CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS |
| M104 - B210 PARTIAL BASEMENT AND GROUND FLOOR HVAC PLANS |
| M102 - B210 AND B211 PARTIAL GROUND FLOOR HVAC PLANS.pdf |
| Sheets |
| M001 - HVAC LEGEND AND GENERAL NOTES |
| M101 - B210 AND B211 PARTIAL GROUND FLOOR HVAC DEMOLITION PLANS |
| M102 - B210 AND B211 PARTIAL GROUND FLOOR HVAC PLANS |
| M103 - PARTIAL CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS |
| M104 - B210 PARTIAL BASEMENT AND GROUND FLOOR HVAC PLANS |
| M103 - PARTIAL CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS.pdf |
| Sheets |
| M001 - HVAC LEGEND AND GENERAL NOTES |
| M101 - B210 AND B211 PARTIAL GROUND FLOOR HVAC DEMOLITION PLANS |
| M102 - B210 AND B211 PARTIAL GROUND FLOOR HVAC PLANS |
| M103 - PARTIAL CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS |
| M104 - B210 PARTIAL BASEMENT AND GROUND FLOOR HVAC PLANS |
| M104 - B210 PARTIAL BASEMENT AND GROUND FLOOR HVAC PLANS.pdf |
| Sheets |
| M001 - HVAC LEGEND AND GENERAL NOTES |
| M101 - B210 AND B211 PARTIAL GROUND FLOOR HVAC DEMOLITION PLANS |
| M102 - B210 AND B211 PARTIAL GROUND FLOOR HVAC PLANS |
| M103 - PARTIAL CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS |
| M104 - B210 PARTIAL BASEMENT AND GROUND FLOOR HVAC PLANS |
File details come from the government source that posted it. Updated .