05 538-21-205 - Drawings_rev3a.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25024B0047
About this file
This document is a set of drawings and specifications for a federal contract opportunity to upgrade the building management controls for Buildings 210 and 211 at the Chillicothe VA Medical Center in Chillicothe, Ohio. The key details include:
The project involves upgrading the HVAC systems and controls in the two buildings, including replacing existing VAV terminal units, adding new JACE controllers, and integrating the system into the existing Building Automation System. The work must be coordinated with the Contracting Officer's Representative (COR) to minimize disruptions to the occupied facility. All demolition and construction activities have specific requirements, such as maintaining exit paths, limiting noise, and protecting existing services. The contractor is responsible for field verifying existing conditions, coordinating with other trades, and following all applicable codes and standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid RFIs - 538-21-205_responses.pdf | ||
| 538-21-205 Addendum 1 Narrative.pdf | ||
| 538-21-205 Addendum 1_attachments.pdf | ||
| 36C25024B0047 A00002.docx | DOCX document | |
| 36C25024B0047 A00001.docx | DOCX document | |
| 36C25024B0047_1.docx | DOCX document | |
| Wage Determination - Ross County.pdf | ||
| 04 538-21-205 - Specifications_rev3a.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHILLICOTHE VA MEDICAL CENTER
PROJECT NUMBER: 538-21-205
DEPARTMENT OF VETERANS AFFAIRS
17273 STATE ROUTE 104, CHILLICOTHE, OHIO 45601
UPGRADE BUILDING MANAGEMENT
CONTROLS B210 AND B211
G E N E R A L N O T E S
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE
EXISTING FACILITY.
2. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO
DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY
EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE
IMMEDIATE ATTENTION OF THE ARCHITECT.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING
DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE
AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF
THE PROJECT.
6. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE
DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.
7. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE
SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN
APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT
ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED
SPACES.
8. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO AREAS THAT ARE IN OPERATION AND
SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES
WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE
C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR
UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S
AREAS ADJACENT TO NEW CONSTRUCTION OR AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR
EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE
CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL
CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
10. THE CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO
PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF
THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
11. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED FOR RETENTION, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING
FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
12. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS
WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER
TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR
SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.
13. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED
AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.
14. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND
OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE
EXISTING MATERIALS OR AS NOTED ON DRAWINGS. IF THE PATCH IS TO BE MADE IN FIRE RATED
CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED
TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
15. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE
SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO
BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE
PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
16. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK.
DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW
WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
17. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE
SAFE'D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH
DAY.
18. UNLESS OTHERWISE NOTED, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING
SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
E X I S T I N G F A C I L I T I E S:
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF
WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S
INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE C.O.R. PRIOR TO PROCEEDING
WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR
BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL
WRITTEN CLARIFICATION FROM THE COR IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER THE APPLICABLE
PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.
6. ALL MATERIALS USED SHALL BE NEW. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT
NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE COR TO OBTAIN A MINIMUM STANDARD OF
QUALITY.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR
CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE
ADHERENCE TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE
WHERE THIS PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO
DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT
ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK
EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE
PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE.
11. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH
FACE OF CONSTRUCTION.
12. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
13. THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO
MECHANICAL, ELECTRICAL, AND PLUMBING. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND
CAULK.
14. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRESTOPPED IN ACCORDANCE
WITH THE SPECIFICATIONS. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE
END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING
COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION
AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
15. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING
ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, C.O.R. PRIOR TO CONSTRUCTION.
N E W W O R K:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RYAN JETER
C U s e rs
\k e n fi \D o c u m e n ts
\R e v it L o c a l F ile s \2
\F
F E
C h ill ic o th e
U p g ra d e
B ld g M g m t C o n tr o ls
B
-2 k e n
.f it z g e ra ld E
V
L
.r v t
/1 /2
:0
:0
P M
GI000
COVER SHEET
11/16/2023 PQ KG
UPGRADE CONTROLS 210 AND 211 538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Project Director
N
NTS
VACINITY MAP
N
NTS
CAMPUS MAP
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
MECHANICAL
M001 HVAC LEGEND AND GENERAL NOTES
M101 B210 AND B211 GROUND FLOOR HVAC DEMOLITION PLANS
M102 B210 AND B21 GROUND FLOOR HVAC PLANS
M103 CONNECTOR FIRST FLOOR & B211 GROUND FLOOR HVAC PLANS
M701 CONTROL SCHEMATIC LEGEND AND VAV SCHEMATIC
M702 CONTROL SCHEMATIC - AIR HANDLING UNITS
08/04/2023 No. Revisions: Date:
1 CONSTRUCTION DOCUMENTS 11/16/2023
NOTE: ALL SYMBOLS AND ABBREVIATIONS
ARE SUBJECT TO MODIFICATIONS
ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS
MIGHT NOT NECESSARILY BE USED ON
THIS PROJECT.
ABBREVIATIONS
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
AFMS - AIR FLOW MEASURING STATION
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATC - AUTOMATIC TEMPERATURE CONTROL
(SYNONYMOUS WITH BAS)
BAS - BUILDING AUTOMATION SYSTEM
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CHGR - CHILLED WATER GLYCOL SOLUTION RETURN
CHGS - CHILLED WATER GLYCOL SOLUTION SUPPLY
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWR - CONDENSER WATER RETURN
CWS - CONDENSER WATER SUPPLY
D - DRAIN LINE
DB - DRY BULB
DDC - DIRECT DIGITAL CONTROLS
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DWG - DRAWING
EA - EACH OR EXHAUST AIR
EAT - ENTERING AIR TEMPERATURE
EC - ELECTRICAL CONTRACTOR (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EWT - ENTERING WATER TEMPERATURE
EXH - EXHAUST
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
FD - FLOOR DRAIN
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GPM - GALLONS PER MINUTE
HB - HOSE BIBB
HC - HVAC CONTRACTOR (DIVISION 23)
HD - HUB DRAIN
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HR - HOUR
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LAT - LEAVING AIR TEMPERATURE
LAV - LAVATORY
LBS - POUNDS
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LWT - LEAVING WATER TEMPERATURE
MAX - MAXIMUM
MDD - MOTORIZED DAMPER
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE
RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOMINAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OBD - OPPOSED BLADE DAMPER
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING CONTRACTOR (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PLBG - PLUMBING
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIG - POUNDS PER SQUARE INCH GAUGE
RA - RETURN AIR
RAD - RADIUS
RCP - REFLECTED CEILING PLAN
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
S - SPRINKLER (WET)
SA - SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SHT - SHEET
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SRV - SAFETY RELIEF VALVE
SS - STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
V - VENT
VAC - VACUUM
VEL - VELOCITY
VFD - VARIABLE FREQUENCY DRIVE
(ADJUSTABLE FREQUENCY
MOTOR CONTROLLER)
VIB - VALVE IN BOX
VOL - VOLUME
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/O - WITHOUT
WB - WET BULB
WCO - WALL CLEANOUT
GENERAL FLOOR PLAN NOTES
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN UNLESS
NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
A1
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS
REFER TO SCHEDULES.
H1 H1OR
EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
H2
B
H2
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
H2 = SHEET WHERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
H2 = SHEET WHERE DETAIL IS LOCATED
A1 "UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
EQUIPMENT, UNLESS NOTED OTHERWISE
10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOD: 8' - 10"
BOD: 7' - 2"
20x20
20x20
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
DUCTWORK, UNLESS NOTED OTHERWISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,
UNLESS NOTED OTHERWISE
DL-1
UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH
UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE WITH GC.
DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.
CONNECT TO EXISTING
HVAC PIPING DESIGNATIONS
CHILLED WATER SUPPLY PIPECHS
CONDENSER WATER SUPPLY PIPECWS
CONDENSER WATER RETURN PIPECWR
DRAIN LINE. PITCH IN DIRECTION INDICATEDD
HEATING HOT WATER SUPPLY PIPEHWS
HEATING HOT WATER RETURN PIPEHWR
WATER MAKE-UP PIPEMU
VENT PIPEV
REFRIGERANT LIQUID LINERL
REFRIGERANT SUCTION LINERS
EXPANSION TANK PIPEET
REFRIGERANT HOT GAS LINEHG
LOW PRESSURE CONDENSATE RETURN PIPELPC
LOW PRESSURE STEAM SUPPLY PIPELPS
MEDIUM PRESSURE CONDENSATE RETURN PIPEMPC
MEDIUM PRESSURE STEAM SUPPLY PIPEMPS
PUMPED CONDENSATE RETURN PIPEPC
HIGH PRESSURE CONDENSATE RETURN PIPEHPC
HIGH PRESSURE STEAM SUPPLY PIPEHPS
STEAM SUPPLY PIPE - NUMBER INDICATES P.S.I.G.10
MISC SYMBOLS
DUCTWORK SYMBOLS
ROUND BRANCH DUCTWORKCONICAL
FITTING
ACOUSTIC
FITTING
ACOUSTIC
FITTING
ADAD
D
R R
D
RECTANGULAR BRANCH DUCTWORK
SQUARE TEE WITH TURNING VANES
NOTE: ALL SQUARE ELBOWS IN
RECTANGULAR AND ROUND / OVAL
DUCTWORK SHALL BE PROVIDED WITH
TURNING VANES. REFER TO
SPECIFICATIONS FOR ADDITIONAL DETAILS.
EXISTING DUCTWORK TO REMOVED
RETURN AIR, RELIEF AIR, OR TRANSFER AIR
DUCTWORK. (UP AND DOWN) RADIUSED
OR SQUARE WITH TURNING VANES.
SUPPLY AIR OR OUTDOOR AIR DUCTWORK.
(UP AND DOWN) RADIUSED OR SQUARE
WITH TURNING VANES.
EXHAUST AIR DUCTWORK. (UP AND DOWN)
RADIUSED OR SQUARE WITH TURNING
VANES.
RECTANGULAR AND ROUND / OVAL
DUCTWORK RISE / DROP WITH 90° RADIUSED
OR SQUARE ELBOWS AND TURNING VANES.
RADIUS ELBOW
90° SQUARE ELBOW (WITH TURNING VANES)
NOTE: ALL SQUARE ELBOWS IN
RECTANGULAR AND ROUND DUCTWORK
SHALL BE PROVIDED WITH TURNING VANES.
ACCESS DOOR OR PANEL
DUCTWORK RISE IN DIRECTION OF AIR
FLOW
DUCTWORK DROP IN DIRECTION OF AIR
FLOW
DUCTWORK WITH ACOUSTICAL LINER.
LISTED DUCT SIZES ARE INSIDE CLEAR
DIMENSIONS.
RECTANGULAR ROUND / OVAL
FLEXIBLE DUCTWORK
FLEXIBLE CONNECTION
DUCTWORK CONSTRUCTED OF SPECIAL
MATERIAL AS NOTED
DIRECTION OF PITCH
RECTANGULAR DUCTWORK DIMENSIONS
(W x H)26x20
ROUND DUCTWORK DIMENSIONS (DIA)26ø
OVAL DUCTWORK DIMENSIONS (W x H)26x20 OV
DUCTWORK DEVICE SYMBOLS
WALL OR DUCTWORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER
TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).
300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM
OF GRILLE.
A3 10ø
MANUAL BALANCING DAMPER WITH LOCKING DEVICE
BDD = BACK DRAFT DAMPER
CBD = COUNTER-BALANCED BACK DRAFT DAMPER
SD = SMOKE DAMPER
FS = COMBINATION FIRE - SMOKE DAMPER
MDD = MOTORIZED DAMPER
AFMS = AIR FLOW MEASURING STATION
DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.
HUMIDITY SENSOR - DUCT MOUNTED
SG1
20x12
BOG: 9'-0"
XXX
A-D
XX
H
SD
SP
AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVICE
SCHEDULE FOR VARIOUS DESIGNATIONS).
10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE
DISCHARGE 4-WAY UNLESS NOTED WITH FLOW ARROWS. AIR DEVICE
SHOWN IS 2-WAY SIDE THROW. METHOD OF IDENTIFICATION ALSO APPLIES
TO OTHER CEILING MOUNTED AIR DEVICES.
FIRE DAMPER
A = TYPE (REFER TO FLOOR PLANS FOR VARIOUS TYPES)
D OR S = DYNAMIC OR STATIC
STATIC PRESSURE SENSOR - DUCT MOUNTED
C
CARBON DIOXIDE SENSOR - DUCT MOUNTED
S
TEMPERATURE SENSOR - DUCT MOUNTED
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR REQUIRED TYPE BASED ON
APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
VALVES AND FITTINGS
10"
TOE: 3' - 0"
BOE: 0' - 6"
CHILLED WATER GLYCOL SOLUTION RETURN PIPECHGR
CHILLED WATER GLYCOL SOLUTION SUPPLY PIPECHGS
CHILLED WATER RETURN PIPECHR
SQUARE THROAT / RADIUS HEEL
FITTINGS NOT ACCEPTABLE
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
DD
RR
PIPE RISER
RADIUS'D BRANCH
RADIUS'D TEE
EXISTING DUCTWORK TO REMAIN
UNLESS NOTED OTHERWISE ON DRAWINGS,
15° MAX FOR DIVERGING, 30° MAX FOR
CONVERGING TRANSITION
EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERWISE.
SPACE TEMPERATURE SENSOR / THERMOSTAT. WHEN WALL MOUNTED, MOUNTING
HEIGHT 46" TO MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH
COORDINATE WITH ARCHITECT.
T
DP
DIFFERENTIAL PRESSURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO
MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
H
HUMIDITY SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.
CARBON DIOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.
C
CO
CARBON MONOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET
ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
TEMPERATURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
S
S TEMPERATURE SENSOR MOUNTED IN CEILING PLENUM.
STATIC PRESSURE SENSOR.SP
DRAIN VALVE WITH HOSE END CONNECTION
EXPANSION JOINT
MANUAL AIR VENT
AUTOMATIC AIR VENT
PRESSURE REDUCING VALVE
QUICK OPENING MANUAL VALVE
VACUUM BREAKER
NEEDLE VALVE
PRESSURE AND TEMPERATURE TEST PLUG
VACUUM GAUGE WITH STOP
END CAP
GLOBE VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
A
M
M
N
V
VB
SOLENOID VALVE
S
SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERWISE. FOR STEAM SYSTEMS PIPE DISCHARGE
TO OUTDOORS.
WATER METERM
PRESSURE GAUGE WITH COCK AND SIPHON LOOP
BI-METALIC STEAM TRAP AND DRIP ASSEMBLY
THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY
BM
TD
IB
FT
TS
FLOW METER
F
UNION
CLEANOUT
STRAINER
M
MODULATING 2 PORT AUTOMATIC CONTROL VALVE
M
MODULATING 3 PORT AUTOMATIC CONTROL VALVE
M
COMBINATION SHUTOFF AND BALANCING VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
STRAINER WITH A BLOW DOWN VALVE AND HOSE CONNECTION
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN AND OUT
2 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE
3 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE
AUTOMATIC PRESSURE INDEPENDENT CONTROL VALVE
THERMODYNAMIC STEAM TRAP AND DRIP ASSEMBLY
INVERTED BUCKET STEAM TRAP AND DRIP ASSEMBLY
FLOAT AND THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY
C DEMOLISH TO POINT INDICATED, 'C' INDICATES CAP TO BE ADDED.
1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
2. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.
3. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAWINGS AND
GENERAL REQUIREMENTS.
4. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN
THE PERFORMANCE OF WORK IN THIS PROJECT.
5. THE CONTRACTORS SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF
BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES.
EACH CONTRACTOR SHALL REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE PROJECT ENGINEER THRU THE CONTRACTING OFFICER FOR CLARIFICATION BEFORE PROCEEDING.
6. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON
RESPONSIBILITIES.
7. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND PROJECT ENGINEER TO MAINTAIN
OPERATION OF THE EXISTING FACILITY.
8. EACH CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF OTHERS. THEY SHALL KEEP THEMSELVES INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING THEIR WORK WITH OTHERS SO THAT THE
PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON SCHEDULE.
9. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.
10. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON VISUAL OBSERVATION AND/OR AVAILABLE DRAWING
INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
11. EACH CONTRACTOR AND/OR TRADE, FITTING OR PLACING THEIR WORK INTO OR ON THE WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE INSTALLATION OF THEIR WORK CONSTITUTES THEIR ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, THEY SHALL NOTIFY THE PROJECT ENGINEER AND SUCH WORK SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK
INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.
12. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE PROJECT ENGINEER. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR
ENCAPSULATED AND THE AREA DECLARED SAFE.
13. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS & FLOORS SHALL BE
FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
14. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A
FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
15. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET
INSIDE DIMENSIONS.
16. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES. REFER TO DETAIL SHEETS. COORDINATE SIZES AND LOCATIONS WITH ACCESSORIES PROVIDED BY OTHER TRADES.
17. ACCESS PANELS IN NON-ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC. COORDINATE SIZES AND LOCATIONS WITH OTHER
TRADES.
18. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
19. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD
DETAILS AND PIPING SCHEMATICS.
20. DIFFUSER SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. REGISTER AND GRILLE SIZES SHOWN ARE FACE
SIZES.
21. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
22. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER
FLOW BETWEEN WATER AND AIR.
23. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM OF
REGISTERS SEVEN INCHES ABOVE FINISHED FLOOR.
24. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH
WALL/FLOOR/ROOF OPENING TO MATCH EXISTING WHERE OPENING IS NOT RE-USED.
25. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
26. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH
ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH EXISTING.
27. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.
28. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE OWNER. ITEMS NOT DESIRED BY THE OWNER
SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
29. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH
MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES
AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.
30. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND
LOCATIONS PRIOR TO PERFORMING WORK.
31. HEPA FILTERATION WILL BE REQUIRED FOR CERTAIN WORK TASKS PER SPECIFICATION 01 35 26 SAFETY REQUIREMENTS, PART 1.12 INFECTION CONTROL. REFER TO INFECTION CONTROL PERMITS ISSUED FOR THIS
WORK. COORDINATE WITH GENERAL CONTRACTOR AND COR.
32. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
33. TERMINATE PIPING AND DUCTWORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL
CUTTING AND PATCHING SHALL MATCH EXISTING FINISHES.
34. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND
CAPPED; AND CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
35. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN ON REMOVAL PLAN(S) SHALL BE
REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS ASSOCIATED WITH THE REMOVAL
WORK.
36. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC.
37. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON WEEKENDS OR WEEKNIGHTS, IF REQUIRED BY THE PROJECT ENGINEER. DOWNTIME SHALL BE KEPT TO A MINIMUM AND SHALL BE COORDINATED AND SCHEDULED WELL IN
ADVANCE WITH THE PROJECT ENGINEER.
38. WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION.
CLEANING OF EXISTING DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN
END OF THE DUCT.
39. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERWISE NOTED. REFER TO AIR TERMINAL
UNIT SCHEDULE(S).
40. APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS AND EQUIPMENT, AND
TO THE CENTER OF PIPES.
41. ALL INSULATED DUCTWORK AND PIPING SHALL HAVE DAMPER/VALVE HANDLE EXTENSIONS.
42. CONTROL CONTRACTORS RESPONSIBILITIES ARE LISTED IN SPECIFICATION SECTION 23 09 23, SECTION 1.1.
43. DIVISION 26 AND 27 WORK IS SHOWN ON DIVISION 23 DRAWINGS. WORK INCLUDES 120V POWER CIRCUITRY, BREAKERS, DISCONNECTS, DATA OUTLETS, ETC. DIV 26/27 CONTRACTOR TO COORDINATE ALL REQUIREMENTS
CLOSELY WITH DIV 01 AND DIV 23 CONTRACTORS.
44. REFER TO SPECIFICATION 01 00 00 GENERAL REQUIREMENTS, PARTS 1.6 H. PHASING AND 1.6 I. UTILITY SERVICES. THE REQUIREMENTS DESCRIBED IN THE REFERENCE SPECIFICATION SECTIONS SHALL APPLY TO
HVAC AS A UTILITY SERVICE.
45. THE NEW DDC COMPONENTS MUST BE FULLY COMPATIBLE WITH, FULLY COMMUNICATE WITH, AND BE FULLY
EDITABLE THRU THE EXISTING BMS.
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/2 /2
:3
:3
P M
M001
HVAC LEGEND AND GENERAL
NOTES
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
HVAC SHEET LIST
SHEET NUMBER SHEET NAME
M001 HVAC LEGEND AND GENERAL NOTES
M101 B210 AND B211 GROUND FLOOR HVAC DEMOLITION PLANS
M102 B210 AND B211 GROUND FLOOR HVAC PLANS
M103 CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS
M701 CONTROL SCHEMATIC LEGEND AND VAV SCHEMATIC
M702 CONTROL SCHEMATIC - AIR HANDLING UNITS
Total Count: 6
T T
T
T
T
T
T
T
TT
Sub-Waiting
G048
Break Room
G047
Copy Mail/Supply
G046
Exam Room
G045
Conference Room
G044
Reception
G037
Secretary Office
G038
Exam Room
G039
Provider's Office
G040
Provider's Office
G041
Mechanical Room
G034
Corridor
G036
Toilet
G035
Generator
G042
Room
G024
Stair
G049
ELEV. MACH. RM.
CL005
PT Clinic
G011
Managers Office
G012
Closet
G007A
Stair
G013
4 4
LIBRARY
AHU
SF
LIBRARY
AHU
RF
Mechanical
G023
Office
G022A
Office
G024D
Office
G024C
Office
G024E
Office
G024F
Storage
G024G
Library
G024
Classroom
G029
Stair
S2-G
Corridor
G030
2 2 x1
S A x1
S A
30x8 - SA
18x10 - SA x1
S A ø
S
A
1 2
B210 B211
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/2 /2
:3
:3
P M
M101
B210 AND B211 GROUND FLOOR
HVAC DEMOLITION PLANS
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
SCALE: 1/4" = 1'-0"
B210 - GROUND - HVAC DEMOLITION PLAN - OFFICES
SCALE: 1/4" = 1'-0"
B210 - GROUND - HVAC DEMOLITION PLAN - PT
NOTES
1 REMOVE EXISTING THERMOSTAT. THIS WORK CANNOT BE
PERFORMED DURING NORMAL BUSINESS HOURS. CONTRACTOR TO
COORDINATE WITH COR FOR AFTER-HOURS ACCESS TO PERFORM
THIS WORK.
2 REMOVE EXISTING VAV TERMINAL UNIT CONTROL MODULE AND
ASSOCIATED THERMOSTAT. THIS WORK CANNOT BE PERFORMED
DURING NORMAL BUSINESS HOURS. CONTRACTOR TO COORDINATE
WITH COR FOR AFTER-HOURS ACCESS TO PERFORM THIS WORK.
3 REMOVE EXISTING XCITE CONTROLLER AND REPLACE WITH NEW JACE
CONTROLLER FOR NINE VAVS IN ROOMS G022, G024, AND G026
SERVED BY LIBRARY AHU.
4 BEFORE CONSTRUCTION, PERFORM AN AIR SURVEY ON THE VAV BOX.
MEASURE MINIMUM AND MAXIMUM AIRFLOW.
SCALE: 1/4" = 1'-0"
B211 - GROUND - HVAC DEMOLITION PLAN - LIBRARY
KEYPLAN
T T
T
T
T
T
TT
20x8 - SA 20x8 - SA
21x15 - RA x1
S A
PT Clinic
G011
Managers Office
G012
Closet
G007A
Stair
G013
210-VAV-G011A
210-VAV-G011B5
14x6 - SA
12x6 - RA x1
R A ø
R
A
Sub-Waiting
G048
Break Room
G047
Copy Mail/Supply
G046
Exam Room
G045
Conference Room
G044
Reception
G037
Secretary Office
G038
Exam Room
G039
Provider's Office
G040
Provider's Office
G041
Mechanical Room
G034
Corridor
G036
Toilet
G035
Generator
G042
Room
G024
Stair
G049
ELEV. MACH. RM.
CL005
3 3
210-VAV-G047
210-VAV-G038
5 5
6 6
LIBRARY
AHU
SF
LIBRARY
AHU
RF
Mechanical
G023
Office
G022A
Office
G024D
Office
G024C
Office
G024E
Office
G024F
Storage
G024G
Library
G024
Classroom
G029
Stair
S2-G
Corridor
G030
4 4
VAV-9
VAV-8
VAV-7
VAV-6
VAV-5
VAV-3
VAV-4
VAV-1
VAV-2
6 (TYP 9)
1 2
B210 B211
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/2 /2
:3
:4
P M
M102
B210 AND B211 GROUND FLOOR
HVAC PLANS
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
SCALE: 1/4" = 1'-0"
B210 - GROUND - HVAC PLAN - PHYSICAL THERAPY
1SCALE: 1/4" = 1'-0"
B210 - GROUND - HVAC PLAN - OFFICES
SCALE: 1/4" = 1'-0"
B211 - GROUND - HVAC PLAN - LIBRARY
NOTES
1 PROVIDE NEW JACE CONTROLLER FOR LIBRARY AHU.
2 ALTERNATE DEDUCT 1: PROVIDE NEW JACE PANEL TO CONTROL UNIT
HEATER VALVES.
3 PROVIDE NEW DDC CONTROL BOX FOR EXISTING VAV BOX AND ADD NEW
CONTROL POINTS TO BAS. THIS WORK CANNOT BE PERFORMED DURING
NORMAL BUSINESS HOURS. CONTRACTOR TO COORDINATE WITH COR FOR
AFTER-HOURS ACCESS TO PERFORM THIS WORK.
4 PROVIDE NEW DDC CONTROL BOX FOR EXISTING VAV BOX AND ADD NEW
CONTROL POINTS TO BAS. PROVIDE TEST AND BALANCE AFTER
INSTALLATION. THIS WORK CANNOT BE PERFORMED DURING NORMAL
BUSINESS HOURS. CONTRACTOR TO COORDINATE WITH COR FOR
AFTER-HOURS ACCESS TO PERFORM THIS WORK.
5 REBALANCE VAV BOX TO MINIMUM AND MAXIMUM AIRFLOWS MEASURE
BEFORE CONSTRUCTION.
6 NEW THERMOSTAT PROGRAMMED TO SETPOINT AND OCCUPANCY
SCHEDULE PER COR INSTRUCTIONS
7 100% OUTDOOR AIR UNIT. BALANCE LOUVER, SF AND RF TO 6,000 CFM.
KEYPLAN
NOTES:
1. PROGRAM BAS SYSTEM TO ORIGINAL DESIGN AIRFLOWS,
RECREATED HERE.
AIR TERMINAL UNITS - HOT
WATER HEAT
M A
R K
CFM
R E
F E
R T
O N
O T
E
C O
O L
IN
G
M A
X
IM
U M
S U
M M
E R
M
IN
W
IN
T E
R M
IN
VAV-1 300 45 190 1
VAV-2 1,845 280 1,495 1
VAV-3 200 30 100 1
VAV-4 1,635 250 920 1
VAV-5 255 40 140 1
VAV-6 895 135 655 1
VAV-7 135 25 75 1
VAV-8 335 55 335 1
VAV-9 400 60 245 1
CONN-BC1
B210 B211
4-PIPE BLOWER-COIL UNIT CONTROLS
V1
HEATING COIL
COOLING COIL
V2
N.C.
N.O.
C H
R
C H
S HWS
HWR
BLOWER-COIL CONTROL SEQUENCE
BLOWER-COIL UNIT
SUPPLY
208 VOLT POWER
TEMPERATURE
ROOM SPACE
SENSOR T1
CONTROL PANEL
BLOWER COIL UNIT
SW
T2
1. GENERAL
A. BLOWER COIL UNIT SHALL BE STARTED AND STOPPED BY THE UNIT CONTROL
PANEL. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND
"OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE.
B. WHEN BLOWER COIL UNIT IS "OFF" FOR ANY REASON, 2-POSITION OUTSIDE AIR
DAMPER SHALL BE FULLY CLOSED, AND SUPPLY FAN SHALL BE OFF. WHEN THE
UNIT IS "ON", OUTSIDE AIR DAMPER SHALL OPEN AND SUPPLY FAN SHALL START.
C. PROVIDE SCHEDULED NIGHT SET-BACK CONTROL FOR CONTINUOUS FAN
OPERATION DURING THE OCCUPIED PERIOD AND CYCLED FAN OPERATION TO
MAINTAIN REDUCED TEMPERATURE IN THE UNOCCUPIED PERIOD.
D. COORDINATE AND ADJUST OCCUPANCY SCHEDULES AND TEMPERATURE RANGE
WITH COR.
2. TEMPERATURE CONTROL
A. SPACE AIR TEMPERATURE, AS SENSED BY WALL THERMOSTAT T1, SHALL BE
MAINTAINED AT SETPOINT (ADJUSTABLE) VIA UNIT CONTROL PANEL BY
MODULATING COOLING COIL VALVE V1 AND HEATING COIL VALVE V2, IN
SEQUENCE. SEPARATE CONTROL LOOPS SHALL BE UTILIZED FOR MECHANICAL
COOLING AND HEATING FUNCTIONS.
3. FREEZE PROTECTION
A. IF THE HEATING COIL DISCHARGE AIR TEMPERATURE FALLS BELOW 35 DEG. F.
(ADJUSTABLE) AS SENSED BY INTEGRAL FREEZESTAT T2, THE 2-POSITION O.A.
DAMPER SHALL CLOSE, THE SUPPLY FAN SHALL SHUT DOWN, AND A CRITICAL
ALARM SHALL INDICATE AT THE UNIT CONTROL PANEL. FREEZESTAT T2 SHALL BE
HARD WIRED TO THE SUPPLY FAN TO SHUT DOWN THE UNIT IN THE HAND OR
AUTOMATIC MODE. FREEZESTAT SHALL REQUIRE MANUAL RESET AT THE
DEVICE.
4. CONDENSATE OVERFLOW PROTECTION
A. IF THE CONDENSATE DRAIN PAN IS NOT ABLE TO DRAIN AND FILLS UP AS
DETECTED BY INTEGRAL CONDENSATE FLOAT SWITCH SW. UNIT SHALL SHUT
DOWN. UNIT SHALL RESTART ONCE FLOAT SWITCH CLOSES. FLOAT SW SHALL BE
HARD WIRED TO SUPPLY FAN TO SHUT DOWN. UNIT IN HAND OR AUTOMATIC
MODE.
211-AHU2
JACE FOR AHU-2
S A
R A
R A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/2 /2
:3
:4
P M
M103
CONNECTOR FIRST FLOOR & B211
ATTIC HVAC PLANS
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
SCALE: 1/4" = 1'-0"
CONNECTOR - FIRST FLOOR - HVAC
SCALE: 1/8" = 1'-0"
B211 ATTIC HVAC PLAN
NOTES
1 ALTERNATE DEDUCT 1: PROVIDE NEW JACE CONTROLLER FOR
BUILDING CONNECTOR BLOWER COIL UNIT.
2 ALTERNATE DEDUCT 1: ORIGINAL BLOWER COIL FAN SCHEDULED FOR
3,320 CFM TOTAL AIRFLOW AND 355 CFM OUTDOOR AIR. REBALANCE
THE FAN AND DAMPERS TO THIS AIRFLOW.
3 REPLACE OA AND RA MOTORIZED DAMPERS AND ACTUATORS.
DAMPERS TO BE PROVIDED BY THE VA. REPLACE SA HIGH STATIC AND
RA LOW STATIC PRESSURE SENSORS.
KEYPLAN
SCALE: NONE
BLOWER COIL CONTROLS SEQUENCE
AI
AO
BI
BO
PI
OAT
MAT
RAT
SAT
CCAT
HCAT
OAHY
RAH
SAH
NC
NO
L
H
C
XX-01
LEGEND-
AUTOMATIC TEMPERATURE CONTROLS
CONTROL POINT - SEE POINTS SCHEDULE
ANALOG INPUT
ANALOG OUTPUT
BINARY INPUT
BINARY OUTPUT
PULSED INPUT
OUTSIDE AIR TEMPERATURE
MIXED AIR TEMPERATURE
RETURN AIR TEMPERATURE
SUPPLY AIR TEMPERATURE
COOLING COIL LEAVING AIR TEMPERATURE
HEATING COIL LEAVING AIR TEMPERATURE
OUTSIDE AIR HUMIDITY
RETURN AIR HUMIDITY
SUPPLY AIR HUMIDITY
NORMALLY CLOSED (CLOSES ON LOSS OF POWER)
NORMALLY OPEN (OPENS ON LOSS OF POWER)
LOW
HIGH
COMMON
2-WAY AUTOMATIC 2-POSITION CONTROL VALVE
3-WAY AUTOMATIC 2-POSITION CONTROL VALVE
2-WAY AUTOMATIC MODULATING CONTROL VALVE
3-WAY AUTOMATIC MODULATING CONTROL VALVE
DIFFERENTIAL PRESSURE SENSOR
DIFFERENTIAL PRESSURE SWITCH
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CURRENT SENSOR TRANSMITTER
ELECTRONIC TO PNEUMATIC TRANSDUCER
FLOW METER TRANSMITTER
HUMIDITY SENSOR
LEVEL CONTROLLER
LEVEL TRANSMITTER
PRESSURE SENSOR
STATIC PRESSURE SENSOR
TEMPERATURE SENSOR
WATER FLOW SENSOR
WATER LEVEL SENSOR
CURRENT SWITCH
END SWITCH
FLOW SWITCH
HUMIDISTAT
OCCUPANCY SENSOR
PRESSURE SWITCH, HIGH LIMIT
PRESSURE SWITCH, LOW LIMIT
TEMPERATURE LOW LIMIT (FREEZE STAT)
ROOM THERMOSTAT
WATER LEVEL SWITCH
EMERGENCY SHUT-OFF STATION
AIR FLOW MEASURING STATION
VARIABLE FREQUENCY DRIVE (ADJUSTABLE FREQUENCY MOTOR CONTROLLER)
MOTOR STARTER
CONTACTOR
LOCAL TEMPERATURE CONTROL PANEL
PRESSURE SAFETY - HIGH
PRESSURE SAFETY - LOW
SMOKE DETECTOR
DAMPER OR VALVE ACTUATOR - MODULATING
DAMPER OR VALVE ACTUATOR - 2-POSITION
RELAY
UVGI LIGHT
PUMP
FAN
COOLING COIL
HEATING COIL
HUMIDIFIER
FILTER
ENERGY RECOVERY WHEEL
OPPOSED BLADE CONTROL DAMPER
PARALLEL BLADE CONTROL DAMPER
SMOKE DAMPER
MIN OA / ECON DAMPER
DX COIL
WALL MOUNTED DEVICE
DUCT INSERTION DEVICE
PIPE INSERTION OR IMMERSION DEVICE WITH WELL
AVERAGING SENSOR OR DEVICE
OUTDOOR SENSOR OR DEVICE, SHIELDED
FAN ARRAY, "X" FANS VERTICAL x "Y" FANS HORIZONTAL
GENERAL NOTES-
AUTOMATIC TEMPERATURE CONTROLS
A A COMPLETE SYSTEM OF AUTOMATIC TEMPERATURE CONTROLS SHALL BE INSTALLED
AS REQUIRED TO ACCOMPLISH THE SEQUENCE OF CONTROL FOR VARIOUS ITEMS OF
EQUIPMENT AND SYSTEMS DESCRIBED HEREINAFTER. THE SYSTEM SHALL BE A DIRECT
DIGITAL CONTROL SYSTEM UTILIZING ELECTRIC AS DEFINED IN THE SPECIFICATIONS.
B THE CONTROL DIAGRAMS AND INFORMATION CONTAINED WITHIN ARE TO SHOW DESIGN
INTENT. IT IS THE CONTROL SYSTEM SUPPLIERS RESPONSIBILITY TO DEVELOP
DETAILED AND COMPLETE CONTROL DIAGRAMS AND SHOP DRAWINGS TO ACCOMPLISH
THE SPECIFIED SEQUENCES.
C THE POINTS LIST IS SHOWN AS AN AID TO THE CONTRACTOR INDICATING THE MINIMUM
POINTS REQUIRED FOR CONTROL, AND MONITORING. ALL INPUT AND OUTPUT POINTS,
AND THEIR REQUIRED INTERFACE AND ACCESSORY HARDWARE, SHALL BE PROVIDED
FOR A COMPLETE AND FUNCTIONAL CONTROL SYSTEM. IF OR WHEN ADDITIONAL
POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL SPECIFIED,
THESE POINTS, ALONG WITH ADDITIONAL DIRECT DIGITAL CONTROL PANEL(S) (IF
REQUIRED), SHALL ALSO BE PROVIDED.
D BULB WELLS FOR TEMPERATURE SENSING AS INDICATED SHALL BE PROVIDED BY THE
HVAC CONTRACT. PIPING WORK SHALL INCLUDE PROPERLY SIZED WELDOLET OR
THREADOLET FITTINGS PLACED AS DIRECTED BY THE CONTROL SYSTEM SUPPLIER.
E ELECTRICAL WORK INCLUDES A POWER SOURCE TO THE MOTOR STARTERS. PROVIDE
ALL HVAC POWER SOURCES REQUIRED BEYOND THESE STARTERS OR BEYOND
SOURCES EXPLICITLY SHOWN ON THE ELECTRICAL DRAWINGS. THIS SHALL INCLUDE
BUT NOT BE LIMITED TO WIRING, CONDUIT, TRANSFORMERS, RELAYS AND FUSES.
M
M
M
M
DPH
L
DP
H
L
C
CO
CS
EPT
FM
H
LC
LT
P
SP
T
WF
WL
CS
ES
FS
H
OS
HL
P
LL
P
T
LL
T
WL
LEGEND-
AUTOMATIC TEMPERATURE CONTROLS
AFMS
VFD
MS
CON
TCP
SD
M
M
SD
X
X
X X
X
X
X
X
X
X
R
M M
MINECON
R
UV
3 x 1X x Y
PSH
PSL
AIR TERMINAL UNIT ATC DIAGRAM - H.W. REHEAT
SCALE: NONE
TO SPACE
AIR TERMINAL UNIT - H.W.
REHEAT POINTS LIST SCHEDULE
NOTES:
1. CONNECT DP FLOW SENSOR PROVIDED WITH AIR TERMINAL UNIT.
2. LOCATE SENSOR MINIMUM 24" DOWNSTREAM FROM AIR TERMINAL UNIT
DISCHARGE (BUT PRIOR TO FIRST DUCT BRANCH).
POINT NO.
TYPE
NOTES
POINT
NAME
ALARM
VAV-1 VAV-2
AI
D A
M P
E R
A C
T U
A T
O R
A
IR
F
LO
W
GENERAL NOTES:
A. THE FOLLOWING LIST SHALL BE THE MINIMUM POINTS REQUIRED OF THE
DIRECT DIGITAL CONTROL SYSTEM (BUILDING AUTOMATION SYSTEM). IT IS
NOT THE INTENT TO SHOW ALL REQUIRED POINTS. IF OR WHEN ADDITIONAL
POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL
SPECIFIED, THOSE POINTS SHALL ALSO BE PROVIDED.
AO
SUPPLY AIR
VAV-3 VAV-4
V A
V S
U P
P
LY
A
IR
E M
P E
R A
T U
R E
AI
R E
H E
A T
C O
IL
C
O N
T R
O L
V A
LV
E
AO
H
IG
H T
E M
P
5°
F
LO
W T
E M
P
0°
F
VAV-5
Z O
N E
S E
N S
O R
AI
REHEAT
COIL
M
VAV-3
RE-HEAT VALVE
VAV-1
AIRFLOW
VAV-2
DAMPER ACTUATOR
VAV-4
SUPPLY AIR
TEMPERATURE
M
T
VAV-5
ZONE SENSOR
T
SPACE
1. VAV SHUTOFF (COOLING-ONLY) CONTROL - IF THE SPACE TEMPERATURE IS BELOW SETPOINT, THE BOX DAMPER SHALL BE AT THE LISTED DEAD BAND MINIMUM CFM. IF SPACE TEMPERATURE RISES ABOVE THE COOLING SETPOINT, THE CONTROL SHALL MODULATE THE BOX DAMPER BETWEEN THE LISTED DEAD BAND MINIMUM CFM AND THE LISTED COOLING MAXIMUM CFM TO SATISFY THE SPACE COOLING SETPOINT. BOX
CONTROLS SHALL REVERSE ACTION DURING “WARM-UP” CYCLES.
A. VAV HOT WATER REHEAT AND HEATING CONTROL:
a. REHEAT MODE -- THE FOLLOWING SEQUENCE SHALL BE IMPLEMENTED:
• IF THE SPACE TEMPERATURE IS IN THE DEAD BAND BETWEEN HEATING AND COOLING SET
POINTS, THE BOX DAMPER SHALL BE POSITIONED TO THE LISTED DEAD BAND MINIMUM CFM. IF
SPACE TEMPERATURE RISES ABOVE THE COOLING SETPOINT, THE CONTROL SHALL MODULATE
THE BOX DAMPER BETWEEN THE LISTED DEAD BAND MINIMUM CFM AND THE LISTED COOLING
MAXIMUM CFM TO SATISFY THE SPACE COOLING SETPOINT. WHEN THE ROOM TEMPERATURE IS
BELOW SETPOINT, THE BOX DAMPER AND HOT WATER VALVE SHALL BE SEQUENCED TO MAINTAIN
THE SPACE HEATING SET POINT AS FOLLOWS:
• 1ST STAGE OF HEATING SHALL BE TO POSITION THE BOX DAMPER AT ITS LISTED DEAD BAND
MINIMUM CFM AND MODULATE THE HOT WATER VALVE TO MAINTAIN SPACE TEMPERATURE, WITH
A HIGH LIMIT DISCHARGE AIR TEMPERATURE OF 20 DEGREES ABOVE THE SPACE HEATING SET
POINT (EXCEPT DURING WARM-UP CYCLES).
• IF AFTER 10 MINUTES THE SPACE HEATING SET POINT CANNOT BE MAINTAINED FOR 5 MINUTES, 2ND STAGE OF HEATING SHALL BE TO MODULATE THE BOX DAMPER FORM THE LISTED DEAD
BAND MINIMUM CFM TO THE LISTED REHEAT MAXIMUM CFM WHILE MAINTAINING A DISCHARGE AIR
TEMPERATURE OF 20 DEGREES ABOVE THE SPACE HEATING SET POINT.
• REVERSE THE SEQUENCE WHEN SPACE HEATING SETPOINT IS REACHED. WHEN IN A “WARM UP”
CYCLE, THE BOX DAMPER SHALL GO TO THE LISTED HEATING MAXIMUM CFM AND THE HOT
WATER VALVE SHALL BE MODULATED TO MAINTAIN THE SPACE HEATING SET POINT (AND SUPPLY
AIR TEMPERATURE NOT LIMITED TO 20 DEGREES ABOVE ROOM SET POINT).
• IF HOT WATER IS NOT AVAILABLE THE BOXES SHALL ACT AS SHUTOFF (COOLING ONLY) BOXES.
2. CONSTANT VOLUME HOT WATER REHEAT CONTROL – THE BOX DAMPER SHALL BE CONTROLLED TO
MAINTAIN THE LISTED CONSTANT VOLUME CFM, AND THE REHEAT VALVE SHALL BE MODULATED TO MAINTAIN
THE SPACE TEMPERATURE SET POINT.
3. ENERGY MANAGEMENT - EACH VAV BOX SHALL HAVE ITS OWN TIME OF DAY SCHEDULE FOR “OCCUPIED” AND
“UNOCCUPIED” CONTROL.
SEQUENCE OF OPERATIONS
UNIT HEATER ATC DIAGRAM
SCALE: NONE
SUPPLY AIR
UH-1
FAN ON/OFF
UNIT HEATER POINTS LIST
NOTES:
1. CURRENT SENSOR.
POINT NO.
TYPE
NOTES
POINT
NAME
ALARM
UH-1 UH-2
BO
F A
N S
T A
T U
S
F A
N O
N /O
F F
GENERAL NOTES:
A. THE FOLLOWING LIST SHALL BE THE MINIMUM POINTS REQUIRED OF THE
DIRECT DIGITAL CONTROL SYSTEM (BUILDING AUTOMATION SYSTEM). IT
IS NOT THE INTENT TO SHOW ALL REQUIRED POINTS. IF OR WHEN
ADDITIONAL POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES
OF CONTROL SPECIFIED, THOSE POINTS SHALL ALSO BE PROVIDED.
BI
O N
F A
U
LT
RETURN AIR
UH-2
FAN STATUS
UH-3 UH-4
H O
T W
A T
E R
C O
N T
R O
L V
A
LV
E
AO
S P
A C
E T
E M
P E
R A
T U
R E
AI
B E
LO
W
0°
F
M
UH-4
HW VALVE
2 OR 3-WAY PER
SCHEDULE
HEATING
COIL
UH-3
SPACE
TEMPERATURE
T
SPACE
UNIT HEATER SEQUENCE
1. HOT WATER UNIT HEATERS: THE UNIT HEATER SHALL
CYCLE THE FAN AND MODULATE THE VALVE TO
MAINTAIN SPACE SETPOINT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Ryan Jeter
C B
IM
\M o d e l\
-0
M E
P M o d e l R ts a lle n
A
H
H .r v t
/2 /2
:3
:4
P M
M701
CONTROL SCHEMATIC LEGEND
AND VAV SCHEMATIC
11/16/2023
UPGRADE BLDG MGMT CONTROLS
B210\B211
538-21-205
CHILLICOTHE, OHIO
CONSTRUCTION
DOCUMENTS 210 AND 211
STATION
Approved: Owner
TYPICAL AIR HANDLING UNIT CONTROL DIAGRAM
SCALE: NONE
T
AH-35
SUPPLY AIR
TEMPERATURE
AH-36
SAFETY
SHUTDOWN
SP
AH-37
DUCT STATIC
PRESSURE
SUPPLY AIR
SUPPLY
FAN
AH-28
AIR FLOW
STATION
VFD
AH-30
START/STOP
AH-31
DRIVE SPEED
AH-32
FAN FAULT
AH-29
FAN STATUS
COOLING
COIL
AH-27
DRAIN PAN
OVERFLOW
T
AH-25
H.C.L.A.T.
AH-24
FREEZE-
STAT
PRE-HEAT
COIL WL
PRE- FILTER
AH-18
FILTER STATUS
OUTSIDE AIR
DPH
L
AH-16
AIR FLOW STATION
OUTSIDE AIR
DAMPER
RETURN AIR
DAMPER
PSL
SAFETY
SHUT-DOWN
AH-04
FIRE ALARM
SMOKE
DETECTION
AH-03
H
RETURN AIR
HUMIDITY
AH-02
AH-01
RETURN AIR
TEMPERATURE
RETURN AIR
RELIEF AIR
TO OUTSIDE
T
LL
AFMS
AFMS
RETURN FAN
AH-05
AIR FLOW
STATION
AFMS
VFD AH-06
FAN STATUS
AH-07
START/STOP
AH-08
DRIVE SPEED
AH-09
FAN FAULT
AH-38
RELIEF AIR DAMPER
RELIEF AIR
DAMPER
H
L
L
H
MAH-26
CHILLED WATER
CONTROL VALVE
M T
MS
AH-22
PUMP
STATUS
AH-23
HOT WATER PUMP
START/STOP
AH-21
HOT WATER
CONTROL VALVE AH-20
RETURN WATER
TEMPERATURE
PSH
H
L
AH-44
RETURN FAN
VFD INTER-
FACE
AH-43
SUPPLY FAN VFD
INTER-FACE
SD
M
M
M
SP
AH-40
RF DISCHARGE
PLENUM STATIC
PRESSURE
PSL
SAFETY
SHUT-DOWN
AH-17
H
L
AH-19
MIXED AIR
TEMPERATURE
T
AH-12
RETURN AIR DAMPER
AH-14
OUTSIDE AIR DAMPER
T
AH-46
HUMIDIFIER
M
AH-45
HUMIDIFIER
CONTROL VALVE
HUMIDIFIER
ISOLATION VALVE
M
FIRE ALARM
SMOKE
DETECTION
AH-33
H
SUPPLY AIR
HUMIDITY
AH-34
SD
SMOKE
DAMPER
M
SMOKE
DAMPER
M
T
AH-10
RETURN AIR
TEMPERATURE
1. RUN CONDITIONS - SCHEDULED
A. THE UNIT SHALL RUN BASED UPON AN OPERATOR ADJUSTABLE SCHEDULE.
2. FREEZE PROTECTION
A. THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A FREEZESTAT
STATUS. WHEN THE FREEZE STAT IS TRIPPED THE FOLLOWING SEQUENCE SHALL OCCUR:
B. THE OUTSIDE AIR DAMPERS SHALL CLOSE AND THE MIXED AIR
C. DAMPER SHALL BE OPEN.
D. STEAM PREHEAT COIL VALVE SHALL OPEN TO 100%(ADJ)
E. COOLING COIL VALVE SHALL OPEN TO 50%(ADJ
F. CLOSE HUMIDIFIER CONTROL VALVE
3. HIGH/LOW STATIC SAFETY SHUTDOWN
A. THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A HIGH STATIC
SHUTDOWN SIGNAL. HIGH STATIC ALARM SETPOINT SHALL BE 1" BELOW DUCTWORK
PRESSURE CLASS.
B. THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A LOW STATIC
SHUTDOWN SIGNAL. LOW STATIC ALARM SETPOINT SHALL BE NEGATIVE 2" S.P.
C. SUPPLY FAN SHALL BE OFF OUTSIDE OF SCHEDULED OPERATING HOURS AND THE
OUTSIDE AIR DAMPER SHALL CLOSE.
4. SMOKE DETECTION
A. THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON A DETECTOR TRIP ON
SUPPLY AIR OR RETURN AIR SMOKE DETECTOR. DISCHARGE AND RETURN SMOKE
DAMPERS SHALL CLOSE IN THIS EVENT.
5. SUPPLY FAN(S)
A. THE SUPPLY FANS SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN, UNLESS
SHUTDOWN ON SAFETIES.
6. IN THE EVENT OF A SINGLE FAN FAILURE, THE REMAINING FANS IN THE FAN ARRAY SHALL
RAMP UP TO MEET REQUIRED AIRFLOW.
A. ALARMS:
a. SUPPLY FAN FAILURE
b. HIGH STATIC
7. STATUS OF MOTORIZED BACKDRAFT DAMPER (MBD)
8. STATUS OF MBD TO BE VERIFIED AS OPEN, FAN SHALL NOT START IF MBD IS CLOSED.
9. SUPPLY AIR DUCT STATIC PRESSURE CONTROL
A. THE CONTROLLER SHALL MEASURE DUCT STATIC PRESSURE AND SHALL MODULATE THE
SUPPLY FAN VFD SPEED TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT. THE
SUPPLY FAN VFD SPEED SHALL NOT DROP BELOW 30%(ADJ.). THE INITIAL DUCT STATIC
PRESSURE SETPOINT SHALL BE 1.0", AND BE ADJUSTED UP DURING THE BALANCING
PROCESS. THE FINAL DUCT STATIC PRESSURE SETPOINT SHALL BE DETERMINED, SET,
AND DOCUMENTED BY THE BALANCING CONTRACTOR. THE SETPOINT SHALL BE
SUFFICIENT TO MEET THE VAV BOX AIRFLOW REQUIREMENTS DURING DESIGN
CONDITIONS.
B. ALARMS:
a. HIGH SUPPLY FAN STATIC PRESSURE
b. LOW SUPPLY FAN STATIC PRESSURE
c. SUPPLY FAN VFD FAULT
d. STATIC PRESSURE RESET
C. REVIEW ASHRAE 36 FOR CRITICALITY AND OPERATIONAL CONDITION
10. RETURN FAN(S)
A. THE RETURN FAN SHALL RUN WHENEVER THE SUPPLY FAN RUNS.
B. IN THE EVENT OF A SINGLE FAN FAILURE, THE REMAINING FANS IN THE FAN ARRAY SHALL
RAMP UP TO MEET REQUIRED AIRFLOW.
C. ALARMS
a. RETURN FAN FAILURE
b. RETURN FAN VFD FAULT
D. STATUS OF MOTORIZED BACKDRAFT DAMPER (MBD)
E. STATUS OF MBD TO BE VERIFIED AS OPEN, FAN SHALL NOT START IF MBD IS CLOSED.
11. RETURN AIRFLOW
A. THE RETURN FAN VFD SHALL MODULATE IN UNISON WITH THE SUPPLY FAN VFD. RETURN
AIRFLOW SETPOINT SHALL BE EQUAL TO SUPPLY AIR FLOW MINUS 10%(ADJ.) AND MINUS
EXHAUST AIR FLOW. THE RETURN FAN VFD SPEED SHALL NOT DROP BELOW 20%(ADJ.)
B. ALARMS
a. HIGH RETURN AIRFLOW (10% ABOVE SUPPLY AIRFLOW)
b. LOW RETURN AIRFLOW (30% BELOW SUPPLY AIRFLOW)
12. PREHEAT COIL
A. THE CONTROLLER SHALL MEASURE THE PREHEAT SECTION AIR TEMPERATURE AND
MODULATE THE PREHEAT COIL VALVE TO MAINTAIN SETPOINT. THE PREHEAT SECTION
TEMPERATURE SETPOINT SHALL EQUAL THE SUPPLY AIR TEMPERATURE SETPOINT MINUS
THE FAN HEAT OFFSET VALUE.
B. PREHEAT COIL SHALL BE ENABLED WHENEVER:
C. OUTSIDE AIR TEMPERATURE IS LESS THAN 50 DEG(ADJ),
D. AND THE ECONOMIZER IS DISABLED…
This is the start of the file's text. The full file is on GovTribe.