This document is a set of drawings and specifications for a federal contract opportunity to upgrade the building management controls for Buildings 210 and 211 at the Chillicothe VA Medical Center in Chillicothe, Ohio. The key details include:

The project involves upgrading the HVAC systems and controls in the two buildings, including replacing existing VAV terminal units, adding new JACE controllers, and integrating the system into the existing Building Automation System. The work must be coordinated with the Contracting Officer's Representative (COR) to minimize disruptions to the occupied facility. All demolition and construction activities have specific requirements, such as maintaining exit paths, limiting noise, and protecting existing services. The contractor is responsible for field verifying existing conditions, coordinating with other trades, and following all applicable codes and standards.

View the file

Other files

File Type Posted
Pre-Bid RFIs - 538-21-205_responses.pdf PDF
538-21-205 Addendum 1 Narrative.pdf PDF
538-21-205 Addendum 1_attachments.pdf PDF
36C25024B0047 A00002.docx DOCX document
36C25024B0047 A00001.docx DOCX document
36C25024B0047_1.docx DOCX document
Wage Determination - Ross County.pdf PDF
04 538-21-205 - Specifications_rev3a.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHILLICOTHE VA MEDICAL CENTER

PROJECT NUMBER: 538-21-205

DEPARTMENT OF VETERANS AFFAIRS

17273 STATE ROUTE 104, CHILLICOTHE, OHIO 45601

UPGRADE BUILDING MANAGEMENT

CONTROLS B210 AND B211

G E N E R A L N O T E S

1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE

EXISTING FACILITY.

2. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO

DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY

EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE

IMMEDIATE ATTENTION OF THE ARCHITECT.

3. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING

DEMOLITION AND CONSTRUCTION.

4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.

5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE

AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF

THE PROJECT.

6. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE

DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.

7. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE

SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN

APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT

ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED

SPACES.

8. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO AREAS THAT ARE IN OPERATION AND

SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES

WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE

C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR

UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.

9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S

AREAS ADJACENT TO NEW CONSTRUCTION OR AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR

EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE

CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL

CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.

10. THE CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO

PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF

THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.

11. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED FOR RETENTION, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING

FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.

12. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS

WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER

TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR

SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.

13. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED

AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.

14. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND

OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE

EXISTING MATERIALS OR AS NOTED ON DRAWINGS. IF THE PATCH IS TO BE MADE IN FIRE RATED

CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED

TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.

15. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE

SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO

BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE

PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.

16. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK.

DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW

WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.

17. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE

SAFE'D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH

DAY.

18. UNLESS OTHERWISE NOTED, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING

SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.

E X I S T I N G F A C I L I T I E S:

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.

2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF

WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S

INSTALLATION INSTRUCTIONS WILL SUPERSEDE.

3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE C.O.R. PRIOR TO PROCEEDING

WITH WORK.

4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR

BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE

IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL

WRITTEN CLARIFICATION FROM THE COR IS RECEIVED.

5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED PER THE APPLICABLE

PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.

6. ALL MATERIALS USED SHALL BE NEW. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT

NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE COR TO OBTAIN A MINIMUM STANDARD OF

QUALITY.

7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR

CONSTRUCTION.

8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE

ADHERENCE TO OSHA REGULATIONS.

9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE

WHERE THIS PROJECT IS LOCATED.

10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO

DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT

ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK

EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE

PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE.

11. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH

FACE OF CONSTRUCTION.

12. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.

13. THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO

MECHANICAL, ELECTRICAL, AND PLUMBING. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND

CAULK.

14. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRESTOPPED IN ACCORDANCE

WITH THE SPECIFICATIONS. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE

END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING

COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION

AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

15. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING

ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, C.O.R. PRIOR TO CONSTRUCTION.

N E W W O R K:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RYAN JETER

C U s e rs

\k e n fi \D o c u m e n ts

\R e v it L o c a l F ile s \2

\F

F E

C h ill ic o th e

U p g ra d e

B ld g M g m t C o n tr o ls

B

-2 k e n

.f it z g e ra ld E

V

L

.r v t

/1 /2

:0

:0

P M

GI000

COVER SHEET

11/16/2023 PQ KG

UPGRADE CONTROLS 210 AND 211 538-21-205

CHILLICOTHE, OHIO

CONSTRUCTION

DOCUMENTS 210 AND 211

STATION

Approved: Project Director

N

NTS

VACINITY MAP

N

NTS

CAMPUS MAP

SHEET INDEX

SHEET

NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

MECHANICAL

M001 HVAC LEGEND AND GENERAL NOTES

M101 B210 AND B211 GROUND FLOOR HVAC DEMOLITION PLANS

M102 B210 AND B21 GROUND FLOOR HVAC PLANS

M103 CONNECTOR FIRST FLOOR & B211 GROUND FLOOR HVAC PLANS

M701 CONTROL SCHEMATIC LEGEND AND VAV SCHEMATIC

M702 CONTROL SCHEMATIC - AIR HANDLING UNITS

08/04/2023 No. Revisions: Date:

1 CONSTRUCTION DOCUMENTS 11/16/2023

NOTE: ALL SYMBOLS AND ABBREVIATIONS

ARE SUBJECT TO MODIFICATIONS

ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS

MIGHT NOT NECESSARILY BE USED ON

THIS PROJECT.

ABBREVIATIONS

AC - AIR COMPRESSOR OR AIR CONDITIONER

ACCU - AIR COOLED CONDENSING UNIT

AD - ACCESS DOOR OR AREA DRAIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

AFMS - AIR FLOW MEASURING STATION

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

ATC - AUTOMATIC TEMPERATURE CONTROL

(SYNONYMOUS WITH BAS)

BAS - BUILDING AUTOMATION SYSTEM

BDD - BACK DRAFT DAMPER

BFP - BACKFLOW PREVENTER

BLDG - BUILDING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BTU - BRITISH THERMAL UNIT

BTUH - BRITISH THERMAL UNIT PER HOUR

CBD - COUNTER BALANCED BACKDRAFT DAMPER

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFM - CUBIC FEET PER MINUTE

CHS - CHILLED WATER SUPPLY

CHR - CHILLED WATER RETURN

CHGR - CHILLED WATER GLYCOL SOLUTION RETURN

CHGS - CHILLED WATER GLYCOL SOLUTION SUPPLY

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CO - CLEAN OUT

CO2 - CARBON DIOXIDE

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

CTR - CENTER

CU - COPPER

CW - COLD WATER

CWR - CONDENSER WATER RETURN

CWS - CONDENSER WATER SUPPLY

D - DRAIN LINE

DB - DRY BULB

DDC - DIRECT DIGITAL CONTROLS

DI - DEIONIZED WATER

DIA - DIAMETER

DIM - DIMENSION

DN - DOWN

DWG - DRAWING

EA - EACH OR EXHAUST AIR

EAT - ENTERING AIR TEMPERATURE

EC - ELECTRICAL CONTRACTOR (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQUIP - EQUIPMENT

ET - EXPANSION TANK

ETR - EXISTING TO REMAIN

EQS - EQUIPMENT SUPPLIER

EWT - ENTERING WATER TEMPERATURE

EXH - EXHAUST

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

FD - FLOOR DRAIN

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FOB - FLAT ON BOTTOM

FOF - FUEL OIL FLOW

FOG - FUEL OIL GAUGE

FOR - FUEL OIL RETURN

FOS - FUEL OIL SUPPLY

FOT - FLAT ON TOP

FPM - FEET PER MINUTE

FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)

FT - FEET

FTG - FOOTING

G - GAS OR NATURAL GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES CONTRACTOR

GPM - GALLONS PER MINUTE

HB - HOSE BIBB

HC - HVAC CONTRACTOR (DIVISION 23)

HD - HUB DRAIN

HG - REFRIGERANT HOT GAS

HP - HORSEPOWER

HPC - HIGH PRESSURE CONDENSATE RETURN

HPS - HIGH PRESSURE STEAM SUPPLY

HR - HOUR

HT - HEAT TRACE

HTR - HEATER

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

HW - HOT WATER

HWR - HEATING HOT WATER RETURN

HWS - HEATING HOT WATER SUPPLY

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

KEC - KITCHEN EQUIPMENT CONTRACTOR

L - LENGTH

LAT - LEAVING AIR TEMPERATURE

LAV - LAVATORY

LBS - POUNDS

LPC - LOW PRESSURE CONDENSATE RETURN

LPS - LOW PRESSURE STEAM SUPPLY

LWT - LEAVING WATER TEMPERATURE

MAX - MAXIMUM

MDD - MOTORIZED DAMPER

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE

MIN - MINIMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

MPC - MEDIUM PRESSURE CONDENSATE

RETURN

MPS - MEDIUM PRESSURE STEAM SUPPLY

MU - WATER MAKE-UP

N/C - NORMALLY CLOSED

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NOM - NOMINAL

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

OA - OUTDOOR AIR

OBD - OPPOSED BLADE DAMPER

OD - OUTSIDE DIAMETER

OFCI - OWNER FURNISHED CONTRACTOR

INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

P - PROPANE GAS

PC - PLUMBING CONTRACTOR (DIVISION 22)

OR PUMPED CONDENSATE RETURN

PLBG - PLUMBING

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSIG - POUNDS PER SQUARE INCH GAUGE

RA - RETURN AIR

RAD - RADIUS

RCP - REFLECTED CEILING PLAN

RD - ROOF DRAIN

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RL - REFRIGERANT LIQUID

ROS - REVERSE OSMOSIS WATER SUPPLY

ROR - REVERSE OSMOSIS WATER RETURN

RPM - REVOLUTIONS PER MINUTE

RS - REFRIGERANT SUCTION

S - SPRINKLER (WET)

SA - SUPPLY AIR

SAN - SANITARY OR SANITARY DRAIN

SCH - SCHEDULE

SCW - SOFT COLD WATER

SHT - SHEET

SPEC - SPECIFICATIONS

SQ - SQUARE

SR - SUPPLY RISER

SRV - SAFETY RELIEF VALVE

SS - STAINLESS STEEL

STD - STANDARD

STM - STORM OR STORM DRAINAGE

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TYP - TYPICAL

UNO - UNLESS NOTED OTHERWISE

V - VENT

VAC - VACUUM

VEL - VELOCITY

VFD - VARIABLE FREQUENCY DRIVE

(ADJUSTABLE FREQUENCY

MOTOR CONTROLLER)

VIB - VALVE IN BOX

VOL - VOLUME

VTR - VENT THROUGH ROOF

VR - VENT RISER

W/ - WITH

W/O - WITHOUT

WB - WET BULB

WCO - WALL CLEANOUT

GENERAL FLOOR PLAN NOTES

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN UNLESS

NOTED OTHERWISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

A1

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS

REFER TO SCHEDULES.

H1 H1OR

EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO

SCHEDULES.

H2

B

H2

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

H2 = SHEET WHERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

H2 = SHEET WHERE DETAIL IS LOCATED

A1 "UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF

EQUIPMENT, UNLESS NOTED OTHERWISE

10"

ELEV: 8' - 0"ELEV: 8' - 0"

TOD: 8' - 10"

BOD: 7' - 2"

20x20

20x20

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF

DUCTWORK, UNLESS NOTED OTHERWISE

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,

UNLESS NOTED OTHERWISE

DL-1

UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH

UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE WITH GC.

DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.

CONNECT TO EXISTING

HVAC PIPING DESIGNATIONS

CHILLED WATER SUPPLY PIPECHS

CONDENSER WATER SUPPLY PIPECWS

CONDENSER WATER RETURN PIPECWR

DRAIN LINE. PITCH IN DIRECTION INDICATEDD

HEATING HOT WATER SUPPLY PIPEHWS

HEATING HOT WATER RETURN PIPEHWR

WATER MAKE-UP PIPEMU

VENT PIPEV

REFRIGERANT LIQUID LINERL

REFRIGERANT SUCTION LINERS

EXPANSION TANK PIPEET

REFRIGERANT HOT GAS LINEHG

LOW PRESSURE CONDENSATE RETURN PIPELPC

LOW PRESSURE STEAM SUPPLY PIPELPS

MEDIUM PRESSURE CONDENSATE RETURN PIPEMPC

MEDIUM PRESSURE STEAM SUPPLY PIPEMPS

PUMPED CONDENSATE RETURN PIPEPC

HIGH PRESSURE CONDENSATE RETURN PIPEHPC

HIGH PRESSURE STEAM SUPPLY PIPEHPS

STEAM SUPPLY PIPE - NUMBER INDICATES P.S.I.G.10

MISC SYMBOLS

DUCTWORK SYMBOLS

ROUND BRANCH DUCTWORKCONICAL

FITTING

ACOUSTIC

FITTING

ACOUSTIC

FITTING

ADAD

D

R R

D

RECTANGULAR BRANCH DUCTWORK

SQUARE TEE WITH TURNING VANES

NOTE: ALL SQUARE ELBOWS IN

RECTANGULAR AND ROUND / OVAL

DUCTWORK SHALL BE PROVIDED WITH

TURNING VANES. REFER TO

SPECIFICATIONS FOR ADDITIONAL DETAILS.

EXISTING DUCTWORK TO REMOVED

RETURN AIR, RELIEF AIR, OR TRANSFER AIR

DUCTWORK. (UP AND DOWN) RADIUSED

OR SQUARE WITH TURNING VANES.

SUPPLY AIR OR OUTDOOR AIR DUCTWORK.

(UP AND DOWN) RADIUSED OR SQUARE

WITH TURNING VANES.

EXHAUST AIR DUCTWORK. (UP AND DOWN)

RADIUSED OR SQUARE WITH TURNING

VANES.

RECTANGULAR AND ROUND / OVAL

DUCTWORK RISE / DROP WITH 90° RADIUSED

OR SQUARE ELBOWS AND TURNING VANES.

RADIUS ELBOW

90° SQUARE ELBOW (WITH TURNING VANES)

NOTE: ALL SQUARE ELBOWS IN

RECTANGULAR AND ROUND DUCTWORK

SHALL BE PROVIDED WITH TURNING VANES.

ACCESS DOOR OR PANEL

DUCTWORK RISE IN DIRECTION OF AIR

FLOW

DUCTWORK DROP IN DIRECTION OF AIR

FLOW

DUCTWORK WITH ACOUSTICAL LINER.

LISTED DUCT SIZES ARE INSIDE CLEAR

DIMENSIONS.

RECTANGULAR ROUND / OVAL

FLEXIBLE DUCTWORK

FLEXIBLE CONNECTION

DUCTWORK CONSTRUCTED OF SPECIAL

MATERIAL AS NOTED

DIRECTION OF PITCH

RECTANGULAR DUCTWORK DIMENSIONS

(W x H)26x20

ROUND DUCTWORK DIMENSIONS (DIA)26ø

OVAL DUCTWORK DIMENSIONS (W x H)26x20 OV

DUCTWORK DEVICE SYMBOLS

WALL OR DUCTWORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER

TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).

300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM

OF GRILLE.

A3 10ø

MANUAL BALANCING DAMPER WITH LOCKING DEVICE

BDD = BACK DRAFT DAMPER

CBD = COUNTER-BALANCED BACK DRAFT DAMPER

SD = SMOKE DAMPER

FS = COMBINATION FIRE - SMOKE DAMPER

MDD = MOTORIZED DAMPER

AFMS = AIR FLOW MEASURING STATION

DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.

HUMIDITY SENSOR - DUCT MOUNTED

SG1

20x12

BOG: 9'-0"

XXX

A-D

XX

H

SD

SP

AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVICE

SCHEDULE FOR VARIOUS DESIGNATIONS).

10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE

DISCHARGE 4-WAY UNLESS NOTED WITH FLOW ARROWS. AIR DEVICE

SHOWN IS 2-WAY SIDE THROW. METHOD OF IDENTIFICATION ALSO APPLIES

TO OTHER CEILING MOUNTED AIR DEVICES.

FIRE DAMPER

A = TYPE (REFER TO FLOOR PLANS FOR VARIOUS TYPES)

D OR S = DYNAMIC OR STATIC

STATIC PRESSURE SENSOR - DUCT MOUNTED

C

CARBON DIOXIDE SENSOR - DUCT MOUNTED

S

TEMPERATURE SENSOR - DUCT MOUNTED

CHECK VALVE

T

P

FOB

FOT

SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR REQUIRED TYPE BASED ON

APPLICATIONS)

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

PRESSURE GAUGE

TEMPERATURE GAUGE OR THERMOMETER

VALVES AND FITTINGS

10"

TOE: 3' - 0"

BOE: 0' - 6"

CHILLED WATER GLYCOL SOLUTION RETURN PIPECHGR

CHILLED WATER GLYCOL SOLUTION SUPPLY PIPECHGS

CHILLED WATER RETURN PIPECHR

SQUARE THROAT / RADIUS HEEL

FITTINGS NOT ACCEPTABLE

PIPING SYMBOLS

DOUBLE LINE SINGLE LINE

BOTTOM CONNECTION (45°)

BRANCH TEE CONNECTION (NOTE:

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOWN

ELBOW UP

EXISTING PIPE TO BE REMOVED

EXISTING PIPE TO REMAIN

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

DD

RR

PIPE RISER

RADIUS'D BRANCH

RADIUS'D TEE

EXISTING DUCTWORK TO REMAIN

UNLESS NOTED OTHERWISE ON DRAWINGS,

15° MAX FOR DIVERGING, 30° MAX FOR

CONVERGING TRANSITION

EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERWISE.

SPACE TEMPERATURE SENSOR / THERMOSTAT. WHEN WALL MOUNTED, MOUNTING

HEIGHT 46" TO MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH

COORDINATE WITH ARCHITECT.

T

DP

DIFFERENTIAL PRESSURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO

MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH

ARCHITECT.

H

HUMIDITY SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.

CARBON DIOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.

C

CO

CARBON MONOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET

ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH

ARCHITECT.

TEMPERATURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH

ARCHITECT.

S

S TEMPERATURE SENSOR MOUNTED IN CEILING PLENUM.

STATIC PRESSURE SENSOR.SP

DRAIN VALVE WITH HOSE END CONNECTION

EXPANSION JOINT

MANUAL AIR VENT

AUTOMATIC AIR VENT

PRESSURE REDUCING VALVE

QUICK OPENING MANUAL VALVE

VACUUM BREAKER

NEEDLE VALVE

PRESSURE AND TEMPERATURE TEST PLUG

VACUUM GAUGE WITH STOP

END CAP

GLOBE VALVE

SHUTOFF VALVE AND BOX

SHUTOFF VALVE ON RISER

A

M

M

N

V

VB

SOLENOID VALVE

S

SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS PIPE DISCHARGE AIR GAPPED TO

FLOOR DRAIN UNLESS NOTED OTHERWISE. FOR STEAM SYSTEMS PIPE DISCHARGE

TO OUTDOORS.

WATER METERM

PRESSURE GAUGE WITH COCK AND SIPHON LOOP

BI-METALIC STEAM TRAP AND DRIP ASSEMBLY

THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY

BM

TD

IB

FT

TS

FLOW METER

F

UNION

CLEANOUT

STRAINER

M

MODULATING 2 PORT AUTOMATIC CONTROL VALVE

M

MODULATING 3 PORT AUTOMATIC CONTROL VALVE

M

COMBINATION SHUTOFF AND BALANCING VALVE (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

STRAINER WITH A BLOW DOWN VALVE AND HOSE CONNECTION

AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN AND OUT

2 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE

3 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE

AUTOMATIC PRESSURE INDEPENDENT CONTROL VALVE

THERMODYNAMIC STEAM TRAP AND DRIP ASSEMBLY

INVERTED BUCKET STEAM TRAP AND DRIP ASSEMBLY

FLOAT AND THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY

C DEMOLISH TO POINT INDICATED, 'C' INDICATES CAP TO BE ADDED.

1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.

2. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.

3. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAWINGS AND

GENERAL REQUIREMENTS.

4. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN

THE PERFORMANCE OF WORK IN THIS PROJECT.

5. THE CONTRACTORS SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF

BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES.

EACH CONTRACTOR SHALL REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE PROJECT ENGINEER THRU THE CONTRACTING OFFICER FOR CLARIFICATION BEFORE PROCEEDING.

6. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON

RESPONSIBILITIES.

7. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND PROJECT ENGINEER TO MAINTAIN

OPERATION OF THE EXISTING FACILITY.

8. EACH CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF OTHERS. THEY SHALL KEEP THEMSELVES INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING THEIR WORK WITH OTHERS SO THAT THE

PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON SCHEDULE.

9. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.

10. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON VISUAL OBSERVATION AND/OR AVAILABLE DRAWING

INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.

11. EACH CONTRACTOR AND/OR TRADE, FITTING OR PLACING THEIR WORK INTO OR ON THE WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE INSTALLATION OF THEIR WORK CONSTITUTES THEIR ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, THEY SHALL NOTIFY THE PROJECT ENGINEER AND SUCH WORK SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK

INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.

12. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE PROJECT ENGINEER. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR

ENCAPSULATED AND THE AREA DECLARED SAFE.

13. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS & FLOORS SHALL BE

FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.

14. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A

FURRED CHASE OR ABOVE THE SUSPENDED CEILING.

15. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

16. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES. REFER TO DETAIL SHEETS. COORDINATE SIZES AND LOCATIONS WITH ACCESSORIES PROVIDED BY OTHER TRADES.

17. ACCESS PANELS IN NON-ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC. COORDINATE SIZES AND LOCATIONS WITH OTHER

TRADES.

18. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

19. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD

DETAILS AND PIPING SCHEMATICS.

20. DIFFUSER SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. REGISTER AND GRILLE SIZES SHOWN ARE FACE

SIZES.

21. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.

22. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER

FLOW BETWEEN WATER AND AIR.

23. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM OF

REGISTERS SEVEN INCHES ABOVE FINISHED FLOOR.

24. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH

WALL/FLOOR/ROOF OPENING TO MATCH EXISTING WHERE OPENING IS NOT RE-USED.

25. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

26. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH

ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH EXISTING.

27. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.

28. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE OWNER. ITEMS NOT DESIRED BY THE OWNER

SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.

29. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH

MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES

AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.

30. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND

LOCATIONS PRIOR TO PERFORMING WORK.

31. HEPA FILTERATION WILL BE REQUIRED FOR CERTAIN WORK TASKS PER SPECIFICATION 01 35 26 SAFETY REQUIREMENTS, PART 1.12 INFECTION CONTROL. REFER TO INFECTION CONTROL PERMITS ISSUED FOR THIS

WORK. COORDINATE WITH GENERAL CONTRACTOR AND COR.

32. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

33. TERMINATE PIPING AND DUCTWORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL

CUTTING AND PATCHING SHALL MATCH EXISTING FINISHES.

34. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND

CAPPED; AND CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.

35. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN ON REMOVAL PLAN(S) SHALL BE

REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS ASSOCIATED WITH THE REMOVAL

WORK.

36. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC.

37. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON WEEKENDS OR WEEKNIGHTS, IF REQUIRED BY THE PROJECT ENGINEER. DOWNTIME SHALL BE KEPT TO A MINIMUM AND SHALL BE COORDINATED AND SCHEDULED WELL IN

ADVANCE WITH THE PROJECT ENGINEER.

38. WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION.

CLEANING OF EXISTING DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN

END OF THE DUCT.

39. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERWISE NOTED. REFER TO AIR TERMINAL

UNIT SCHEDULE(S).

40. APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS AND EQUIPMENT, AND

TO THE CENTER OF PIPES.

41. ALL INSULATED DUCTWORK AND PIPING SHALL HAVE DAMPER/VALVE HANDLE EXTENSIONS.

42. CONTROL CONTRACTORS RESPONSIBILITIES ARE LISTED IN SPECIFICATION SECTION 23 09 23, SECTION 1.1.

43. DIVISION 26 AND 27 WORK IS SHOWN ON DIVISION 23 DRAWINGS. WORK INCLUDES 120V POWER CIRCUITRY, BREAKERS, DISCONNECTS, DATA OUTLETS, ETC. DIV 26/27 CONTRACTOR TO COORDINATE ALL REQUIREMENTS

CLOSELY WITH DIV 01 AND DIV 23 CONTRACTORS.

44. REFER TO SPECIFICATION 01 00 00 GENERAL REQUIREMENTS, PARTS 1.6 H. PHASING AND 1.6 I. UTILITY SERVICES. THE REQUIREMENTS DESCRIBED IN THE REFERENCE SPECIFICATION SECTIONS SHALL APPLY TO

HVAC AS A UTILITY SERVICE.

45. THE NEW DDC COMPONENTS MUST BE FULLY COMPATIBLE WITH, FULLY COMMUNICATE WITH, AND BE FULLY

EDITABLE THRU THE EXISTING BMS.

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Ryan Jeter

C B

IM

\M o d e l\

-0

M E

P M o d e l R ts a lle n

A

H

H .r v t

/2 /2

:3

:3

P M

M001

HVAC LEGEND AND GENERAL

NOTES

11/16/2023

UPGRADE BLDG MGMT CONTROLS

B210\B211

538-21-205

CHILLICOTHE, OHIO

CONSTRUCTION

DOCUMENTS 210 AND 211

STATION

Approved: Owner

HVAC SHEET LIST

SHEET NUMBER SHEET NAME

M001 HVAC LEGEND AND GENERAL NOTES

M101 B210 AND B211 GROUND FLOOR HVAC DEMOLITION PLANS

M102 B210 AND B211 GROUND FLOOR HVAC PLANS

M103 CONNECTOR FIRST FLOOR & B211 ATTIC HVAC PLANS

M701 CONTROL SCHEMATIC LEGEND AND VAV SCHEMATIC

M702 CONTROL SCHEMATIC - AIR HANDLING UNITS

Total Count: 6

T T

T

T

T

T

T

T

TT

Sub-Waiting

G048

Break Room

G047

Copy Mail/Supply

G046

Exam Room

G045

Conference Room

G044

Reception

G037

Secretary Office

G038

Exam Room

G039

Provider's Office

G040

Provider's Office

G041

Mechanical Room

G034

Corridor

G036

Toilet

G035

Generator

G042

Room

G024

Stair

G049

ELEV. MACH. RM.

CL005

PT Clinic

G011

Managers Office

G012

Closet

G007A

Stair

G013

4 4

LIBRARY

AHU

SF

LIBRARY

AHU

RF

Mechanical

G023

Office

G022A

Office

G024D

Office

G024C

Office

G024E

Office

G024F

Storage

G024G

Library

G024

Classroom

G029

Stair

S2-G

Corridor

G030

2 2 x1

S A x1

S A

30x8 - SA

18x10 - SA x1

S A ø

S

A

1 2

B210 B211

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Ryan Jeter

C B

IM

\M o d e l\

-0

M E

P M o d e l R ts a lle n

A

H

H .r v t

/2 /2

:3

:3

P M

M101

B210 AND B211 GROUND FLOOR

HVAC DEMOLITION PLANS

11/16/2023

UPGRADE BLDG MGMT CONTROLS

B210\B211

538-21-205

CHILLICOTHE, OHIO

CONSTRUCTION

DOCUMENTS 210 AND 211

STATION

Approved: Owner

SCALE: 1/4" = 1'-0"

B210 - GROUND - HVAC DEMOLITION PLAN - OFFICES

SCALE: 1/4" = 1'-0"

B210 - GROUND - HVAC DEMOLITION PLAN - PT

NOTES

1 REMOVE EXISTING THERMOSTAT. THIS WORK CANNOT BE

PERFORMED DURING NORMAL BUSINESS HOURS. CONTRACTOR TO

COORDINATE WITH COR FOR AFTER-HOURS ACCESS TO PERFORM

THIS WORK.

2 REMOVE EXISTING VAV TERMINAL UNIT CONTROL MODULE AND

ASSOCIATED THERMOSTAT. THIS WORK CANNOT BE PERFORMED

DURING NORMAL BUSINESS HOURS. CONTRACTOR TO COORDINATE

WITH COR FOR AFTER-HOURS ACCESS TO PERFORM THIS WORK.

3 REMOVE EXISTING XCITE CONTROLLER AND REPLACE WITH NEW JACE

CONTROLLER FOR NINE VAVS IN ROOMS G022, G024, AND G026

SERVED BY LIBRARY AHU.

4 BEFORE CONSTRUCTION, PERFORM AN AIR SURVEY ON THE VAV BOX.

MEASURE MINIMUM AND MAXIMUM AIRFLOW.

SCALE: 1/4" = 1'-0"

B211 - GROUND - HVAC DEMOLITION PLAN - LIBRARY

KEYPLAN

T T

T

T

T

T

TT

20x8 - SA 20x8 - SA

21x15 - RA x1

S A

PT Clinic

G011

Managers Office

G012

Closet

G007A

Stair

G013

210-VAV-G011A

210-VAV-G011B5

14x6 - SA

12x6 - RA x1

R A ø

R

A

Sub-Waiting

G048

Break Room

G047

Copy Mail/Supply

G046

Exam Room

G045

Conference Room

G044

Reception

G037

Secretary Office

G038

Exam Room

G039

Provider's Office

G040

Provider's Office

G041

Mechanical Room

G034

Corridor

G036

Toilet

G035

Generator

G042

Room

G024

Stair

G049

ELEV. MACH. RM.

CL005

3 3

210-VAV-G047

210-VAV-G038

5 5

6 6

LIBRARY

AHU

SF

LIBRARY

AHU

RF

Mechanical

G023

Office

G022A

Office

G024D

Office

G024C

Office

G024E

Office

G024F

Storage

G024G

Library

G024

Classroom

G029

Stair

S2-G

Corridor

G030

4 4

VAV-9

VAV-8

VAV-7

VAV-6

VAV-5

VAV-3

VAV-4

VAV-1

VAV-2

6 (TYP 9)

1 2

B210 B211

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Ryan Jeter

C B

IM

\M o d e l\

-0

M E

P M o d e l R ts a lle n

A

H

H .r v t

/2 /2

:3

:4

P M

M102

B210 AND B211 GROUND FLOOR

HVAC PLANS

11/16/2023

UPGRADE BLDG MGMT CONTROLS

B210\B211

538-21-205

CHILLICOTHE, OHIO

CONSTRUCTION

DOCUMENTS 210 AND 211

STATION

Approved: Owner

SCALE: 1/4" = 1'-0"

B210 - GROUND - HVAC PLAN - PHYSICAL THERAPY

1SCALE: 1/4" = 1'-0"

B210 - GROUND - HVAC PLAN - OFFICES

SCALE: 1/4" = 1'-0"

B211 - GROUND - HVAC PLAN - LIBRARY

NOTES

1 PROVIDE NEW JACE CONTROLLER FOR LIBRARY AHU.

2 ALTERNATE DEDUCT 1: PROVIDE NEW JACE PANEL TO CONTROL UNIT

HEATER VALVES.

3 PROVIDE NEW DDC CONTROL BOX FOR EXISTING VAV BOX AND ADD NEW

CONTROL POINTS TO BAS. THIS WORK CANNOT BE PERFORMED DURING

NORMAL BUSINESS HOURS. CONTRACTOR TO COORDINATE WITH COR FOR

AFTER-HOURS ACCESS TO PERFORM THIS WORK.

4 PROVIDE NEW DDC CONTROL BOX FOR EXISTING VAV BOX AND ADD NEW

CONTROL POINTS TO BAS. PROVIDE TEST AND BALANCE AFTER

INSTALLATION. THIS WORK CANNOT BE PERFORMED DURING NORMAL

BUSINESS HOURS. CONTRACTOR TO COORDINATE WITH COR FOR

AFTER-HOURS ACCESS TO PERFORM THIS WORK.

5 REBALANCE VAV BOX TO MINIMUM AND MAXIMUM AIRFLOWS MEASURE

BEFORE CONSTRUCTION.

6 NEW THERMOSTAT PROGRAMMED TO SETPOINT AND OCCUPANCY

SCHEDULE PER COR INSTRUCTIONS

7 100% OUTDOOR AIR UNIT. BALANCE LOUVER, SF AND RF TO 6,000 CFM.

KEYPLAN

NOTES:

1. PROGRAM BAS SYSTEM TO ORIGINAL DESIGN AIRFLOWS,

RECREATED HERE.

AIR TERMINAL UNITS - HOT

WATER HEAT

M A

R K

CFM

R E

F E

R T

O N

O T

E

C O

O L

IN

G

M A

X

IM

U M

S U

M M

E R

M

IN

W

IN

T E

R M

IN

VAV-1 300 45 190 1

VAV-2 1,845 280 1,495 1

VAV-3 200 30 100 1

VAV-4 1,635 250 920 1

VAV-5 255 40 140 1

VAV-6 895 135 655 1

VAV-7 135 25 75 1

VAV-8 335 55 335 1

VAV-9 400 60 245 1

CONN-BC1

B210 B211

4-PIPE BLOWER-COIL UNIT CONTROLS

V1

HEATING COIL

COOLING COIL

V2

N.C.

N.O.

C H

R

C H

S HWS

HWR

BLOWER-COIL CONTROL SEQUENCE

BLOWER-COIL UNIT

SUPPLY

208 VOLT POWER

TEMPERATURE

ROOM SPACE

SENSOR T1

CONTROL PANEL

BLOWER COIL UNIT

SW

T2

1. GENERAL

A. BLOWER COIL UNIT SHALL BE STARTED AND STOPPED BY THE UNIT CONTROL

PANEL. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND

"OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE.

B. WHEN BLOWER COIL UNIT IS "OFF" FOR ANY REASON, 2-POSITION OUTSIDE AIR

DAMPER SHALL BE FULLY CLOSED, AND SUPPLY FAN SHALL BE OFF. WHEN THE

UNIT IS "ON", OUTSIDE AIR DAMPER SHALL OPEN AND SUPPLY FAN SHALL START.

C. PROVIDE SCHEDULED NIGHT SET-BACK CONTROL FOR CONTINUOUS FAN

OPERATION DURING THE OCCUPIED PERIOD AND CYCLED FAN OPERATION TO

MAINTAIN REDUCED TEMPERATURE IN THE UNOCCUPIED PERIOD.

D. COORDINATE AND ADJUST OCCUPANCY SCHEDULES AND TEMPERATURE RANGE

WITH COR.

2. TEMPERATURE CONTROL

A. SPACE AIR TEMPERATURE, AS SENSED BY WALL THERMOSTAT T1, SHALL BE

MAINTAINED AT SETPOINT (ADJUSTABLE) VIA UNIT CONTROL PANEL BY

MODULATING COOLING COIL VALVE V1 AND HEATING COIL VALVE V2, IN

SEQUENCE. SEPARATE CONTROL LOOPS SHALL BE UTILIZED FOR MECHANICAL

COOLING AND HEATING FUNCTIONS.

3. FREEZE PROTECTION

A. IF THE HEATING COIL DISCHARGE AIR TEMPERATURE FALLS BELOW 35 DEG. F.

(ADJUSTABLE) AS SENSED BY INTEGRAL FREEZESTAT T2, THE 2-POSITION O.A.

DAMPER SHALL CLOSE, THE SUPPLY FAN SHALL SHUT DOWN, AND A CRITICAL

ALARM SHALL INDICATE AT THE UNIT CONTROL PANEL. FREEZESTAT T2 SHALL BE

HARD WIRED TO THE SUPPLY FAN TO SHUT DOWN THE UNIT IN THE HAND OR

AUTOMATIC MODE. FREEZESTAT SHALL REQUIRE MANUAL RESET AT THE

DEVICE.

4. CONDENSATE OVERFLOW PROTECTION

A. IF THE CONDENSATE DRAIN PAN IS NOT ABLE TO DRAIN AND FILLS UP AS

DETECTED BY INTEGRAL CONDENSATE FLOAT SWITCH SW. UNIT SHALL SHUT

DOWN. UNIT SHALL RESTART ONCE FLOAT SWITCH CLOSES. FLOAT SW SHALL BE

HARD WIRED TO SUPPLY FAN TO SHUT DOWN. UNIT IN HAND OR AUTOMATIC

MODE.

211-AHU2

JACE FOR AHU-2

S A

R A

R A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Ryan Jeter

C B

IM

\M o d e l\

-0

M E

P M o d e l R ts a lle n

A

H

H .r v t

/2 /2

:3

:4

P M

M103

CONNECTOR FIRST FLOOR & B211

ATTIC HVAC PLANS

11/16/2023

UPGRADE BLDG MGMT CONTROLS

B210\B211

538-21-205

CHILLICOTHE, OHIO

CONSTRUCTION

DOCUMENTS 210 AND 211

STATION

Approved: Owner

SCALE: 1/4" = 1'-0"

CONNECTOR - FIRST FLOOR - HVAC

SCALE: 1/8" = 1'-0"

B211 ATTIC HVAC PLAN

NOTES

1 ALTERNATE DEDUCT 1: PROVIDE NEW JACE CONTROLLER FOR

BUILDING CONNECTOR BLOWER COIL UNIT.

2 ALTERNATE DEDUCT 1: ORIGINAL BLOWER COIL FAN SCHEDULED FOR

3,320 CFM TOTAL AIRFLOW AND 355 CFM OUTDOOR AIR. REBALANCE

THE FAN AND DAMPERS TO THIS AIRFLOW.

3 REPLACE OA AND RA MOTORIZED DAMPERS AND ACTUATORS.

DAMPERS TO BE PROVIDED BY THE VA. REPLACE SA HIGH STATIC AND

RA LOW STATIC PRESSURE SENSORS.

KEYPLAN

SCALE: NONE

BLOWER COIL CONTROLS SEQUENCE

AI

AO

BI

BO

PI

OAT

MAT

RAT

SAT

CCAT

HCAT

OAHY

RAH

SAH

NC

NO

L

H

C

XX-01

LEGEND-

AUTOMATIC TEMPERATURE CONTROLS

CONTROL POINT - SEE POINTS SCHEDULE

ANALOG INPUT

ANALOG OUTPUT

BINARY INPUT

BINARY OUTPUT

PULSED INPUT

OUTSIDE AIR TEMPERATURE

MIXED AIR TEMPERATURE

RETURN AIR TEMPERATURE

SUPPLY AIR TEMPERATURE

COOLING COIL LEAVING AIR TEMPERATURE

HEATING COIL LEAVING AIR TEMPERATURE

OUTSIDE AIR HUMIDITY

RETURN AIR HUMIDITY

SUPPLY AIR HUMIDITY

NORMALLY CLOSED (CLOSES ON LOSS OF POWER)

NORMALLY OPEN (OPENS ON LOSS OF POWER)

LOW

HIGH

COMMON

2-WAY AUTOMATIC 2-POSITION CONTROL VALVE

3-WAY AUTOMATIC 2-POSITION CONTROL VALVE

2-WAY AUTOMATIC MODULATING CONTROL VALVE

3-WAY AUTOMATIC MODULATING CONTROL VALVE

DIFFERENTIAL PRESSURE SENSOR

DIFFERENTIAL PRESSURE SWITCH

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CURRENT SENSOR TRANSMITTER

ELECTRONIC TO PNEUMATIC TRANSDUCER

FLOW METER TRANSMITTER

HUMIDITY SENSOR

LEVEL CONTROLLER

LEVEL TRANSMITTER

PRESSURE SENSOR

STATIC PRESSURE SENSOR

TEMPERATURE SENSOR

WATER FLOW SENSOR

WATER LEVEL SENSOR

CURRENT SWITCH

END SWITCH

FLOW SWITCH

HUMIDISTAT

OCCUPANCY SENSOR

PRESSURE SWITCH, HIGH LIMIT

PRESSURE SWITCH, LOW LIMIT

TEMPERATURE LOW LIMIT (FREEZE STAT)

ROOM THERMOSTAT

WATER LEVEL SWITCH

EMERGENCY SHUT-OFF STATION

AIR FLOW MEASURING STATION

VARIABLE FREQUENCY DRIVE (ADJUSTABLE FREQUENCY MOTOR CONTROLLER)

MOTOR STARTER

CONTACTOR

LOCAL TEMPERATURE CONTROL PANEL

PRESSURE SAFETY - HIGH

PRESSURE SAFETY - LOW

SMOKE DETECTOR

DAMPER OR VALVE ACTUATOR - MODULATING

DAMPER OR VALVE ACTUATOR - 2-POSITION

RELAY

UVGI LIGHT

PUMP

FAN

COOLING COIL

HEATING COIL

HUMIDIFIER

FILTER

ENERGY RECOVERY WHEEL

OPPOSED BLADE CONTROL DAMPER

PARALLEL BLADE CONTROL DAMPER

SMOKE DAMPER

MIN OA / ECON DAMPER

DX COIL

WALL MOUNTED DEVICE

DUCT INSERTION DEVICE

PIPE INSERTION OR IMMERSION DEVICE WITH WELL

AVERAGING SENSOR OR DEVICE

OUTDOOR SENSOR OR DEVICE, SHIELDED

FAN ARRAY, "X" FANS VERTICAL x "Y" FANS HORIZONTAL

GENERAL NOTES-

AUTOMATIC TEMPERATURE CONTROLS

A A COMPLETE SYSTEM OF AUTOMATIC TEMPERATURE CONTROLS SHALL BE INSTALLED

AS REQUIRED TO ACCOMPLISH THE SEQUENCE OF CONTROL FOR VARIOUS ITEMS OF

EQUIPMENT AND SYSTEMS DESCRIBED HEREINAFTER. THE SYSTEM SHALL BE A DIRECT

DIGITAL CONTROL SYSTEM UTILIZING ELECTRIC AS DEFINED IN THE SPECIFICATIONS.

B THE CONTROL DIAGRAMS AND INFORMATION CONTAINED WITHIN ARE TO SHOW DESIGN

INTENT. IT IS THE CONTROL SYSTEM SUPPLIERS RESPONSIBILITY TO DEVELOP

DETAILED AND COMPLETE CONTROL DIAGRAMS AND SHOP DRAWINGS TO ACCOMPLISH

THE SPECIFIED SEQUENCES.

C THE POINTS LIST IS SHOWN AS AN AID TO THE CONTRACTOR INDICATING THE MINIMUM

POINTS REQUIRED FOR CONTROL, AND MONITORING. ALL INPUT AND OUTPUT POINTS,

AND THEIR REQUIRED INTERFACE AND ACCESSORY HARDWARE, SHALL BE PROVIDED

FOR A COMPLETE AND FUNCTIONAL CONTROL SYSTEM. IF OR WHEN ADDITIONAL

POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL SPECIFIED,

THESE POINTS, ALONG WITH ADDITIONAL DIRECT DIGITAL CONTROL PANEL(S) (IF

REQUIRED), SHALL ALSO BE PROVIDED.

D BULB WELLS FOR TEMPERATURE SENSING AS INDICATED SHALL BE PROVIDED BY THE

HVAC CONTRACT. PIPING WORK SHALL INCLUDE PROPERLY SIZED WELDOLET OR

THREADOLET FITTINGS PLACED AS DIRECTED BY THE CONTROL SYSTEM SUPPLIER.

E ELECTRICAL WORK INCLUDES A POWER SOURCE TO THE MOTOR STARTERS. PROVIDE

ALL HVAC POWER SOURCES REQUIRED BEYOND THESE STARTERS OR BEYOND

SOURCES EXPLICITLY SHOWN ON THE ELECTRICAL DRAWINGS. THIS SHALL INCLUDE

BUT NOT BE LIMITED TO WIRING, CONDUIT, TRANSFORMERS, RELAYS AND FUSES.

M

M

M

M

DPH

L

DP

H

L

C

CO

CS

EPT

FM

H

LC

LT

P

SP

T

WF

WL

CS

ES

FS

H

OS

HL

P

LL

P

T

LL

T

WL

LEGEND-

AUTOMATIC TEMPERATURE CONTROLS

AFMS

VFD

MS

CON

TCP

SD

M

M

SD

X

X

X X

X

X

X

X

X

X

R

M M

MINECON

R

UV

3 x 1X x Y

PSH

PSL

AIR TERMINAL UNIT ATC DIAGRAM - H.W. REHEAT

SCALE: NONE

TO SPACE

AIR TERMINAL UNIT - H.W.

REHEAT POINTS LIST SCHEDULE

NOTES:

1. CONNECT DP FLOW SENSOR PROVIDED WITH AIR TERMINAL UNIT.

2. LOCATE SENSOR MINIMUM 24" DOWNSTREAM FROM AIR TERMINAL UNIT

DISCHARGE (BUT PRIOR TO FIRST DUCT BRANCH).

POINT NO.

TYPE

NOTES

POINT

NAME

ALARM

VAV-1 VAV-2

AI

D A

M P

E R

A C

T U

A T

O R

A

IR

F

LO

W

GENERAL NOTES:

A. THE FOLLOWING LIST SHALL BE THE MINIMUM POINTS REQUIRED OF THE

DIRECT DIGITAL CONTROL SYSTEM (BUILDING AUTOMATION SYSTEM). IT IS

NOT THE INTENT TO SHOW ALL REQUIRED POINTS. IF OR WHEN ADDITIONAL

POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL

SPECIFIED, THOSE POINTS SHALL ALSO BE PROVIDED.

AO

SUPPLY AIR

VAV-3 VAV-4

V A

V S

U P

P

LY

A

IR

E M

P E

R A

T U

R E

AI

R E

H E

A T

C O

IL

C

O N

T R

O L

V A

LV

E

AO

H

IG

H T

E M

P

5°

F

LO

W T

E M

P

0°

F

VAV-5

Z O

N E

S E

N S

O R

AI

REHEAT

COIL

M

VAV-3

RE-HEAT VALVE

VAV-1

AIRFLOW

VAV-2

DAMPER ACTUATOR

VAV-4

SUPPLY AIR

TEMPERATURE

M

T

VAV-5

ZONE SENSOR

T

SPACE

1. VAV SHUTOFF (COOLING-ONLY) CONTROL - IF THE SPACE TEMPERATURE IS BELOW SETPOINT, THE BOX DAMPER SHALL BE AT THE LISTED DEAD BAND MINIMUM CFM. IF SPACE TEMPERATURE RISES ABOVE THE COOLING SETPOINT, THE CONTROL SHALL MODULATE THE BOX DAMPER BETWEEN THE LISTED DEAD BAND MINIMUM CFM AND THE LISTED COOLING MAXIMUM CFM TO SATISFY THE SPACE COOLING SETPOINT. BOX

CONTROLS SHALL REVERSE ACTION DURING “WARM-UP” CYCLES.

A. VAV HOT WATER REHEAT AND HEATING CONTROL:

a. REHEAT MODE -- THE FOLLOWING SEQUENCE SHALL BE IMPLEMENTED:

• IF THE SPACE TEMPERATURE IS IN THE DEAD BAND BETWEEN HEATING AND COOLING SET

POINTS, THE BOX DAMPER SHALL BE POSITIONED TO THE LISTED DEAD BAND MINIMUM CFM. IF

SPACE TEMPERATURE RISES ABOVE THE COOLING SETPOINT, THE CONTROL SHALL MODULATE

THE BOX DAMPER BETWEEN THE LISTED DEAD BAND MINIMUM CFM AND THE LISTED COOLING

MAXIMUM CFM TO SATISFY THE SPACE COOLING SETPOINT. WHEN THE ROOM TEMPERATURE IS

BELOW SETPOINT, THE BOX DAMPER AND HOT WATER VALVE SHALL BE SEQUENCED TO MAINTAIN

THE SPACE HEATING SET POINT AS FOLLOWS:

• 1ST STAGE OF HEATING SHALL BE TO POSITION THE BOX DAMPER AT ITS LISTED DEAD BAND

MINIMUM CFM AND MODULATE THE HOT WATER VALVE TO MAINTAIN SPACE TEMPERATURE, WITH

A HIGH LIMIT DISCHARGE AIR TEMPERATURE OF 20 DEGREES ABOVE THE SPACE HEATING SET

POINT (EXCEPT DURING WARM-UP CYCLES).

• IF AFTER 10 MINUTES THE SPACE HEATING SET POINT CANNOT BE MAINTAINED FOR 5 MINUTES, 2ND STAGE OF HEATING SHALL BE TO MODULATE THE BOX DAMPER FORM THE LISTED DEAD

BAND MINIMUM CFM TO THE LISTED REHEAT MAXIMUM CFM WHILE MAINTAINING A DISCHARGE AIR

TEMPERATURE OF 20 DEGREES ABOVE THE SPACE HEATING SET POINT.

• REVERSE THE SEQUENCE WHEN SPACE HEATING SETPOINT IS REACHED. WHEN IN A “WARM UP”

CYCLE, THE BOX DAMPER SHALL GO TO THE LISTED HEATING MAXIMUM CFM AND THE HOT

WATER VALVE SHALL BE MODULATED TO MAINTAIN THE SPACE HEATING SET POINT (AND SUPPLY

AIR TEMPERATURE NOT LIMITED TO 20 DEGREES ABOVE ROOM SET POINT).

• IF HOT WATER IS NOT AVAILABLE THE BOXES SHALL ACT AS SHUTOFF (COOLING ONLY) BOXES.

2. CONSTANT VOLUME HOT WATER REHEAT CONTROL – THE BOX DAMPER SHALL BE CONTROLLED TO

MAINTAIN THE LISTED CONSTANT VOLUME CFM, AND THE REHEAT VALVE SHALL BE MODULATED TO MAINTAIN

THE SPACE TEMPERATURE SET POINT.

3. ENERGY MANAGEMENT - EACH VAV BOX SHALL HAVE ITS OWN TIME OF DAY SCHEDULE FOR “OCCUPIED” AND

“UNOCCUPIED” CONTROL.

SEQUENCE OF OPERATIONS

UNIT HEATER ATC DIAGRAM

SCALE: NONE

SUPPLY AIR

UH-1

FAN ON/OFF

UNIT HEATER POINTS LIST

NOTES:

1. CURRENT SENSOR.

POINT NO.

TYPE

NOTES

POINT

NAME

ALARM

UH-1 UH-2

BO

F A

N S

T A

T U

S

F A

N O

N /O

F F

GENERAL NOTES:

A. THE FOLLOWING LIST SHALL BE THE MINIMUM POINTS REQUIRED OF THE

DIRECT DIGITAL CONTROL SYSTEM (BUILDING AUTOMATION SYSTEM). IT

IS NOT THE INTENT TO SHOW ALL REQUIRED POINTS. IF OR WHEN

ADDITIONAL POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES

OF CONTROL SPECIFIED, THOSE POINTS SHALL ALSO BE PROVIDED.

BI

O N

F A

U

LT

RETURN AIR

UH-2

FAN STATUS

UH-3 UH-4

H O

T W

A T

E R

C O

N T

R O

L V

A

LV

E

AO

S P

A C

E T

E M

P E

R A

T U

R E

AI

B E

LO

W

0°

F

M

UH-4

HW VALVE

2 OR 3-WAY PER

SCHEDULE

HEATING

COIL

UH-3

SPACE

TEMPERATURE

T

SPACE

UNIT HEATER SEQUENCE

1. HOT WATER UNIT HEATERS: THE UNIT HEATER SHALL

CYCLE THE FAN AND MODULATE THE VALVE TO

MAINTAIN SPACE SETPOINT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Ryan Jeter

C B

IM

\M o d e l\

-0

M E

P M o d e l R ts a lle n

A

H

H .r v t

/2 /2

:3

:4

P M

M701

CONTROL SCHEMATIC LEGEND

AND VAV SCHEMATIC

11/16/2023

UPGRADE BLDG MGMT CONTROLS

B210\B211

538-21-205

CHILLICOTHE, OHIO

CONSTRUCTION

DOCUMENTS 210 AND 211

STATION

Approved: Owner

TYPICAL AIR HANDLING UNIT CONTROL DIAGRAM

SCALE: NONE

T

AH-35

SUPPLY AIR

TEMPERATURE

AH-36

SAFETY

SHUTDOWN

SP

AH-37

DUCT STATIC

PRESSURE

SUPPLY AIR

SUPPLY

FAN

AH-28

AIR FLOW

STATION

VFD

AH-30

START/STOP

AH-31

DRIVE SPEED

AH-32

FAN FAULT

AH-29

FAN STATUS

COOLING

COIL

AH-27

DRAIN PAN

OVERFLOW

T

AH-25

H.C.L.A.T.

AH-24

FREEZE-

STAT

PRE-HEAT

COIL WL

PRE- FILTER

AH-18

FILTER STATUS

OUTSIDE AIR

DPH

L

AH-16

AIR FLOW STATION

OUTSIDE AIR

DAMPER

RETURN AIR

DAMPER

PSL

SAFETY

SHUT-DOWN

AH-04

FIRE ALARM

SMOKE

DETECTION

AH-03

H

RETURN AIR

HUMIDITY

AH-02

AH-01

RETURN AIR

TEMPERATURE

RETURN AIR

RELIEF AIR

TO OUTSIDE

T

LL

AFMS

AFMS

RETURN FAN

AH-05

AIR FLOW

STATION

AFMS

VFD AH-06

FAN STATUS

AH-07

START/STOP

AH-08

DRIVE SPEED

AH-09

FAN FAULT

AH-38

RELIEF AIR DAMPER

RELIEF AIR

DAMPER

H

L

L

H

MAH-26

CHILLED WATER

CONTROL VALVE

M T

MS

AH-22

PUMP

STATUS

AH-23

HOT WATER PUMP

START/STOP

AH-21

HOT WATER

CONTROL VALVE AH-20

RETURN WATER

TEMPERATURE

PSH

H

L

AH-44

RETURN FAN

VFD INTER-

FACE

AH-43

SUPPLY FAN VFD

INTER-FACE

SD

M

M

M

SP

AH-40

RF DISCHARGE

PLENUM STATIC

PRESSURE

PSL

SAFETY

SHUT-DOWN

AH-17

H

L

AH-19

MIXED AIR

TEMPERATURE

T

AH-12

RETURN AIR DAMPER

AH-14

OUTSIDE AIR DAMPER

T

AH-46

HUMIDIFIER

M

AH-45

HUMIDIFIER

CONTROL VALVE

HUMIDIFIER

ISOLATION VALVE

M

FIRE ALARM

SMOKE

DETECTION

AH-33

H

SUPPLY AIR

HUMIDITY

AH-34

SD

SMOKE

DAMPER

M

SMOKE

DAMPER

M

T

AH-10

RETURN AIR

TEMPERATURE

1. RUN CONDITIONS - SCHEDULED

A. THE UNIT SHALL RUN BASED UPON AN OPERATOR ADJUSTABLE SCHEDULE.

2. FREEZE PROTECTION

A. THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A FREEZESTAT

STATUS. WHEN THE FREEZE STAT IS TRIPPED THE FOLLOWING SEQUENCE SHALL OCCUR:

B. THE OUTSIDE AIR DAMPERS SHALL CLOSE AND THE MIXED AIR

C. DAMPER SHALL BE OPEN.

D. STEAM PREHEAT COIL VALVE SHALL OPEN TO 100%(ADJ)

E. COOLING COIL VALVE SHALL OPEN TO 50%(ADJ

F. CLOSE HUMIDIFIER CONTROL VALVE

3. HIGH/LOW STATIC SAFETY SHUTDOWN

A. THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A HIGH STATIC

SHUTDOWN SIGNAL. HIGH STATIC ALARM SETPOINT SHALL BE 1" BELOW DUCTWORK

PRESSURE CLASS.

B. THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A LOW STATIC

SHUTDOWN SIGNAL. LOW STATIC ALARM SETPOINT SHALL BE NEGATIVE 2" S.P.

C. SUPPLY FAN SHALL BE OFF OUTSIDE OF SCHEDULED OPERATING HOURS AND THE

OUTSIDE AIR DAMPER SHALL CLOSE.

4. SMOKE DETECTION

A. THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON A DETECTOR TRIP ON

SUPPLY AIR OR RETURN AIR SMOKE DETECTOR. DISCHARGE AND RETURN SMOKE

DAMPERS SHALL CLOSE IN THIS EVENT.

5. SUPPLY FAN(S)

A. THE SUPPLY FANS SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN, UNLESS

SHUTDOWN ON SAFETIES.

6. IN THE EVENT OF A SINGLE FAN FAILURE, THE REMAINING FANS IN THE FAN ARRAY SHALL

RAMP UP TO MEET REQUIRED AIRFLOW.

A. ALARMS:

a. SUPPLY FAN FAILURE

b. HIGH STATIC

7. STATUS OF MOTORIZED BACKDRAFT DAMPER (MBD)

8. STATUS OF MBD TO BE VERIFIED AS OPEN, FAN SHALL NOT START IF MBD IS CLOSED.

9. SUPPLY AIR DUCT STATIC PRESSURE CONTROL

A. THE CONTROLLER SHALL MEASURE DUCT STATIC PRESSURE AND SHALL MODULATE THE

SUPPLY FAN VFD SPEED TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT. THE

SUPPLY FAN VFD SPEED SHALL NOT DROP BELOW 30%(ADJ.). THE INITIAL DUCT STATIC

PRESSURE SETPOINT SHALL BE 1.0", AND BE ADJUSTED UP DURING THE BALANCING

PROCESS. THE FINAL DUCT STATIC PRESSURE SETPOINT SHALL BE DETERMINED, SET,

AND DOCUMENTED BY THE BALANCING CONTRACTOR. THE SETPOINT SHALL BE

SUFFICIENT TO MEET THE VAV BOX AIRFLOW REQUIREMENTS DURING DESIGN

CONDITIONS.

B. ALARMS:

a. HIGH SUPPLY FAN STATIC PRESSURE

b. LOW SUPPLY FAN STATIC PRESSURE

c. SUPPLY FAN VFD FAULT

d. STATIC PRESSURE RESET

C. REVIEW ASHRAE 36 FOR CRITICALITY AND OPERATIONAL CONDITION

10. RETURN FAN(S)

A. THE RETURN FAN SHALL RUN WHENEVER THE SUPPLY FAN RUNS.

B. IN THE EVENT OF A SINGLE FAN FAILURE, THE REMAINING FANS IN THE FAN ARRAY SHALL

RAMP UP TO MEET REQUIRED AIRFLOW.

C. ALARMS

a. RETURN FAN FAILURE

b. RETURN FAN VFD FAULT

D. STATUS OF MOTORIZED BACKDRAFT DAMPER (MBD)

E. STATUS OF MBD TO BE VERIFIED AS OPEN, FAN SHALL NOT START IF MBD IS CLOSED.

11. RETURN AIRFLOW

A. THE RETURN FAN VFD SHALL MODULATE IN UNISON WITH THE SUPPLY FAN VFD. RETURN

AIRFLOW SETPOINT SHALL BE EQUAL TO SUPPLY AIR FLOW MINUS 10%(ADJ.) AND MINUS

EXHAUST AIR FLOW. THE RETURN FAN VFD SPEED SHALL NOT DROP BELOW 20%(ADJ.)

B. ALARMS

a. HIGH RETURN AIRFLOW (10% ABOVE SUPPLY AIRFLOW)

b. LOW RETURN AIRFLOW (30% BELOW SUPPLY AIRFLOW)

12. PREHEAT COIL

A. THE CONTROLLER SHALL MEASURE THE PREHEAT SECTION AIR TEMPERATURE AND

MODULATE THE PREHEAT COIL VALVE TO MAINTAIN SETPOINT. THE PREHEAT SECTION

TEMPERATURE SETPOINT SHALL EQUAL THE SUPPLY AIR TEMPERATURE SETPOINT MINUS

THE FAN HEAT OFFSET VALUE.

B. PREHEAT COIL SHALL BE ENABLED WHENEVER:

C. OUTSIDE AIR TEMPERATURE IS LESS THAN 50 DEG(ADJ),

D. AND THE ECONOMIZER IS DISABLED…