The file's text, extracted by GovTribe without its formatting.
A.3 PRICE/COST SCHEDULE *UPDATED*
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| AMOUNT |
| 0001 |
| A data jack installation requiring 1 data jack installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0002 |
| A data jack installation requiring 2 data jacks installed shall include terminations on both ends of the cable, 2 blue Cat 6A cable installations from point A to point B, up to 295’, 2 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0003 |
| A data jack installation requiring 3 data jacks installed shall include terminations on both ends of the cable, 3 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0004 |
| A data jack installation requiring 4 data jacks installed shall include terminations on both ends of the cable, 4 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0005 |
| Data jack installations requiring 6 data jacks installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, 6 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0006 |
| Provide and install an angled 24-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0007 |
| Provide and install an angled 48-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0008 |
| Provide and install a one RU 24 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0009 |
| Provide and install a one RU 48 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0010 |
| Wireless access point (WAP) installation only. The wireless access point and mounting hardware will be provided to the contractor prior to installation. This CLIN shall be for the installation of the WAP only. If cabling is required, then another CLIN will be added to the task order. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0011 |
| This LIN shall include diagnostics and testing of data jacks and cables. It also includes minor repairs based off the diagnostics to include re-termination, jack replacement, face plate replacement, and labeling. If the cabling is damaged and needs replaced, then another task order will be issued for replacement. This CLIN shall cover the cost of all repairs to an existing data jack or patch panel except for the cabling. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0012 |
| The contractor shall locate/tone 1 existing cable. This shall include labeling the cable at both ends and labeling the jack and patch panel. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0013 |
| The contractor shall test and re-terminate up to 12 strands of fiber optic cabling. Provide results to the COR. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0014 |
| The contractor shall provide and install a duplex metal phone wall plate only. If cabling is required, this CLIN will be combined with another CLIN. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0015 |
| The contractor shall provide a concrete penetration up to 1” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0016 |
| The contractor shall provide a concrete penetration up to 2” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0017 |
| The contractor shall provide a concrete penetration up to 3” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0018 |
| The contractor shall provide a concrete penetration up to 4” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0019 |
| The contractor shall provide and install labeling on up to 10 items in 10 different locations. See the labeling description for additional information. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0020 |
| The contractor shall provide and install up to 4’ of metal wire mold for data cabling and/or receptacles. This task shall include the surface mount electrical duplex box and all other hardware and fasteners required to complete the installation of the data jack. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0021 |
| The contractor shall include all tools, material, and labor to install all receptacles, conduit, wiring, and equipment from the existing junction box in the room to the location where the electrical outlet will be installed up to 10'. This task shall include all conduit, wiring, conduit supports, conduit straps anchors, couplings, conduit bends and modifications, compression fittings, wire nuts, junction boxes, fasteners, and bushing that are required to complete the installation. The contractor will be responsible for making the final connection to the device. The VA will verify that a sufficient power source has been identified and selected by the contractor prior to connection. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0021a |
| Branch Circuit Path Installation from 10’-20’ |
| 1.00 |
| JOB |
| $ |
| 0022 |
| Prevent airborne dust from accumulating. Seal air vents, and dust mat at the door. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0023 |
| Remove or isolate HVAC, complete all critical barriers, maintain negative air pressure, and cover transport carts. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0024 |
| Construct an anteroom, wear shoe coverings |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0025 |
| Provide and install a horizontal 2u organizer with loops. Approximate height is 3.5" |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0026 |
| Provide and install an 8” vertical organizer. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0027 |
| Provide and install a 10” vertical organizer. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0028 |
| Provide and install a 12” vertical organizer. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0029 |
| Provide and install Panduit. This cost is not to be priced with the cabling included in the cost. This will be in addition to the cost as specified in CLIN 1-5 (depending on whether a full location, duplex data location, quad data location, or voice location is requested). |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0030 |
| Provide and install a complete 84” Data Rack. Anchoring to the floor will be included. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0031 |
| Terminations only (where others installed the cabling). Will consist of both ends, a jack, and a faceplate may be required. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0032 |
| Provide and install 1 hospital-grade ivory or red duplex receptacle. Conduit run and wire pull take place in CLIN 21-21a. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0033 |
| Provide and install 1 ivory or red quadruplex receptacle. Conduit run and wire pull take place in CLIN 21-21a. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| 0034 |
| This task shall include all painting, wall modifications, and drywall/Gypsum board repair needed from receptacle installation. |
Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| AMOUNT |
| 10001 |
| A data jack installation requiring 1 data jack installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10002 |
| A data jack installation requiring 2 data jacks installed shall include terminations on both ends of the cable, 2 blue Cat 6A cable installations from point A to point B, up to 295’, 2 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10003 |
| A data jack installation requiring 3 data jacks installed shall include terminations on both ends of the cable, 3 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10004 |
| A data jack installation requiring 4 data jacks installed shall include terminations on both ends of the cable, 4 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10005 |
| Data jack installations requiring 6 data jacks installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, 6 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10006 |
| Provide and install an angled 24-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10007 |
| Provide and install an angled 48-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10008 |
| Provide and install a one RU 24 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10009 |
| Provide and install a one RU 48 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10010 |
| Wireless access point (WAP) installation only. The wireless access point and mounting hardware will be provided to the contractor prior to installation. This CLIN shall be for the installation of the WAP only. If cabling is required, then another CLIN will be added to the task order. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10011 |
| This LIN shall include diagnostics and testing of data jacks and cables. It also includes minor repairs based off the diagnostics to include re-termination, jack replacement, face plate replacement, and labeling. If the cabling is damaged and needs replaced, then another task order will be issued for replacement. This CLIN shall cover the cost of all repairs to an existing data jack or patch panel except for the cabling. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10012 |
| The contractor shall locate/tone 1 existing cable. This shall include labeling the cable at both ends and labeling the jack and patch panel. |
Contract Period: 1st year ordering period POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10013 |
| The contractor shall test and re-terminate up to 12 strands of fiber optic cabling. Provide results to the COR. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10014 |
| The contractor shall provide and install a duplex metal phone wall plate only. If cabling is required, this CLIN will be combined with another CLIN. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10015 |
| The contractor shall provide a concrete penetration up to 1” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10016 |
| The contractor shall provide a concrete penetration up to 2” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10017 |
| The contractor shall provide a concrete penetration up to 3” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10018 |
| The contractor shall provide a concrete penetration up to 4” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10019 |
| The contractor shall provide and install labeling on up to 10 items in 10 different locations. See the labeling description for additional information. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10020 |
| The contractor shall provide and install up to 4’ of metal wire mold for data cabling and/or receptacles. This task shall include the surface mount electrical duplex box and all other hardware and fasteners required to complete the installation of the data jack. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10021 |
| The contractor shall include all tools, material, and labor to install all receptacles, conduit, wiring, and equipment from the existing junction box in the room to the location where the electrical outlet will be installed up to 10'. This task shall include all conduit, wiring, conduit supports, conduit straps anchors, couplings, conduit bends and modifications, compression fittings, wire nuts, junction boxes, fasteners, and bushing that are required to complete the installation. The contractor will be responsible for making the final connection to the device. The VA will verify that a sufficient power source has been identified and selected by the contractor prior to connection. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10021a |
| Branch Circuit Path Installation from 10’-20’ |
| 1.00 |
| JOB |
| $ |
| 10022 |
| Prevent airborne dust from accumulating. Seal air vents, and dust mat at the door. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10023 |
| Remove or isolate HVAC, complete all critical barriers, maintain negative air pressure, and cover transport carts. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10024 |
| Construct an anteroom, wear shoe coverings |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10025 |
| Provide and install a horizontal 2u organizer with loops. Approximate height is 3.5" |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10026 |
| Provide and install an 8” vertical organizer. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10027 |
| Provide and install a 10” vertical organizer. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10028 |
| Provide and install a 12” vertical organizer. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10029 |
| Provide and install Panduit. This cost is not to be priced with the cabling included in the cost. This will be in addition to the cost as specified in CLIN 1-5 (depending on whether a full location, duplex data location, quad data location, or voice location is requested). |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10030 |
| Provide and install a complete 84” Data Rack. Anchoring to the floor will be included. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10031 |
| Terminations only (where others installed the cabling). Will consist of both ends, a jack, and a faceplate may be required. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10032 |
| Provide and install 1 hospital-grade ivory or red duplex receptacle. Conduit run and wire pull take place in CLIN 21-21a. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10033 |
| Provide and install 1 ivory or red quadruplex receptacle. Conduit run and wire pull take place in CLIN 21-21a. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| 10034 |
| This task shall include all painting, wall modifications, and drywall/Gypsum board repair needed from receptacle installation. |
Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| AMOUNT |
| 20001 |
| A data jack installation requiring 1 data jack installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20002 |
| A data jack installation requiring 2 data jacks installed shall include terminations on both ends of the cable, 2 blue Cat 6A cable installations from point A to point B, up to 295’, 2 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20003 |
| A data jack installation requiring 3 data jacks installed shall include terminations on both ends of the cable, 3 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20004 |
| A data jack installation requiring 4 data jacks installed shall include terminations on both ends of the cable, 4 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20005 |
| Data jack installations requiring 6 data jacks installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, 6 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20006 |
| Provide and install an angled 24-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20007 |
| Provide and install an angled 48-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20008 |
| Provide and install a one RU 24 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20009 |
| Provide and install a one RU 48 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20010 |
| Wireless access point (WAP) installation only. The wireless access point and mounting hardware will be provided to the contractor prior to installation. This CLIN shall be for the installation of the WAP only. If cabling is required, then another CLIN will be added to the task order. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20011 |
| This LIN shall include diagnostics and testing of data jacks and cables. It also includes minor repairs based off the diagnostics to include re-termination, jack replacement, face plate replacement, and labeling. If the cabling is damaged and needs replaced, then another task order will be issued for replacement. This CLIN shall cover the cost of all repairs to an existing data jack or patch panel except for the cabling. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20012 |
| The contractor shall locate/tone 1 existing cable. This shall include labeling the cable at both ends and labeling the jack and patch panel. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20013 |
| The contractor shall test and re-terminate up to 12 strands of fiber optic cabling. Provide results to the COR. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20014 |
| The contractor shall provide and install a duplex metal phone wall plate only. If cabling is required, this CLIN will be combined with another CLIN. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20015 |
| The contractor shall provide a concrete penetration up to 1” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20016 |
| The contractor shall provide a concrete penetration up to 2” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20017 |
| The contractor shall provide a concrete penetration up to 3” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20018 |
| The contractor shall provide a concrete penetration up to 4” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20019 |
| The contractor shall provide and install labeling on up to 10 items in 10 different locations. See the labeling description for additional information. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20020 |
| The contractor shall provide and install up to 4’ of metal wire mold for data cabling and/or receptacles. This task shall include the surface mount electrical duplex box and all other hardware and fasteners required to complete the installation of the data jack. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20021 |
| The contractor shall include all tools, material, and labor to install all receptacles, conduit, wiring, and equipment from the existing junction box in the room to the location where the electrical outlet will be installed up to 10'. This task shall include all conduit, wiring, conduit supports, conduit straps anchors, couplings, conduit bends and modifications, compression fittings, wire nuts, junction boxes, fasteners, and bushing that are required to complete the installation. The contractor will be responsible for making the final connection to the device. The VA will verify that a sufficient power source has been identified and selected by the contractor prior to connection. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20021a |
| Branch Circuit Path Installation from 10’-20’ |
| 1.00 |
| JOB |
| $ |
| 20022 |
| Prevent airborne dust from accumulating. Seal air vents, and dust mat at the door. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20023 |
| Remove or isolate HVAC, complete all critical barriers, maintain negative air pressure, and cover transport carts. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20024 |
| Construct an anteroom, wear shoe coverings |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20025 |
| Provide and install a horizontal 2u organizer with loops. Approximate height is 3.5" |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20026 |
| Provide and install an 8” vertical organizer. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20027 |
| Provide and install a 10” vertical organizer. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20028 |
| Provide and install a 12” vertical organizer. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20029 |
| Provide and install Panduit. This cost is not to be priced with the cabling included in the cost. This will be in addition to the cost as specified in CLIN 1-5 (depending on whether a full location, duplex data location, quad data location, or voice location is requested). |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20030 |
| Provide and install a complete 84” Data Rack. Anchoring to the floor will be included. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20031 |
| Terminations only (where others installed the cabling). Will consist of both ends, a jack, and a faceplate may be required. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20032 |
| Provide and install 1 hospital-grade ivory or red duplex receptacle. Conduit run and wire pull take place in CLIN 21-21a. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20033 |
| Provide and install 1 ivory or red quadruplex receptacle. Conduit run and wire pull take place in CLIN 21-21a. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| 20034 |
| This task shall include all painting, wall modifications, and drywall/Gypsum board repair needed from receptacle installation. |
Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| AMOUNT |
| 30001 |
| A data jack installation requiring 1 data jack installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30002 |
| A data jack installation requiring 2 data jacks installed shall include terminations on both ends of the cable, 2 blue Cat 6A cable installations from point A to point B, up to 295’, 2 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30003 |
| A data jack installation requiring 3 data jacks installed shall include terminations on both ends of the cable, 3 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30004 |
| A data jack installation requiring 4 data jacks installed shall include terminations on both ends of the cable, 4 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30005 |
| Data jack installations requiring 6 data jacks installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, 6 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30006 |
| Provide and install an angled 24-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30007 |
| Provide and install an angled 48-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30008 |
| Provide and install a one RU 24 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30009 |
| Provide and install a one RU 48 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30010 |
| Wireless access point (WAP) installation only. The wireless access point and mounting hardware will be provided to the contractor prior to installation. This CLIN shall be for the installation of the WAP only. If cabling is required, then another CLIN will be added to the task order. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30011 |
| This LIN shall include diagnostics and testing of data jacks and cables. It also includes minor repairs based off the diagnostics to include re-termination, jack replacement, face plate replacement, and labeling. If the cabling is damaged and needs replaced than another task order will be issued for replacement. This Lin shall cover the cost of all repairs to an existing data jack or patch panel except for the cabling. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30012 |
| The contractor shall locate/tone 1 existing cable. This shall include labeling the cable at both ends and labeling the jack and patch panel. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30013 |
| The contractor shall test and re-terminate up to 12 strands of fiber optic cabling. Provide results to the COR. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30014 |
| The contractor shall provide and install a duplex metal phone wall plate only. If cabling is required, this CLIN will be combined with another CLIN. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30015 |
| The contractor shall provide a concrete penetration up to 1” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30016 |
| The contractor shall provide a concrete penetration up to 2” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30017 |
| The contractor shall provide a concrete penetration up to 3” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30018 |
| The contractor shall provide a concrete penetration up to 4” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30019 |
| The contractor shall provide and install labeling on up to 10 items in 10 different locations. See the labeling description for additional information. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30020 |
| The contractor shall provide and install up to 4’ of metal wire mold for data cabling and/or receptacles. This task shall include the surface mount electrical duplex box and all other hardware and fasteners required to complete the installation of the data jack. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30021 |
| The contractor shall include all tools, material, and labor to install all receptacles, conduit, wiring, and equipment from the existing junction box in the room to the location where the electrical outlet will be installed up to 10'. This task shall include all conduit, wiring, conduit supports, conduit straps anchors, couplings, conduit bends and modifications, compression fittings, wire nuts, junction boxes, fasteners, and bushing that are required to complete the installation. The contractor will be responsible for making the final connection to the device. The VA will verify that a sufficient power source has been identified and selected by the contractor prior to connection. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30021a |
| Branch Circuit Path Installation from 10’-20’ |
| 1.00 |
| JOB |
| $ |
| 30022 |
| Prevent airborne dust from accumulating. Seal air vents, and dust mat at the door. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30023 |
| Remove or isolate HVAC, complete all critical barriers, maintain negative air pressure, and cover transport carts. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30024 |
| Construct an anteroom, wear shoe coverings |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30025 |
| Provide and install a horizontal 2u organizer with loops. Approximate height is 3.5" |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4
| 30026 |
| Provide and install an 8” vertical organizer. |
Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of…
This is the start of the file's text. The full file is on GovTribe.