36C25023R0228_2.docx

DOCX document 191 KB Posted

Attached to
Z1DA--Data and Power Requirements Contract Federal contract opportunity
Solicitation number
36C25023R0228
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is a solicitation for a data and power requirements contract to establish pricing for cabling projects and power installations at a VA medical center over five ordering periods. Products and services required include data jack installations, wireless access point installations, fiber optic testing, concrete penetrations, electrical installations, rack and organizer equipment, and repairs. Response due date is March 15, 2024 with award expected shortly after. The contract has one base year and four optional ordering periods. The solicitation utilizes Lowest Price Technically Acceptable source selection with evaluation factors of price, past performance, and inclusion of SDVOSBs/VOSBs as subcontractors. Pricing is fixed for each ordering period.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Data and Power Requirements Contract, newest first.
File Type Posted
36C25023R0228 0004.pdf PDF
Attachment XIV - 2nd Set RFI Questions AND Answers.pdf PDF
36C25023R0228 0003.docx DOCX document
Attachment XII - UPDATED SOW.docx DOCX document
Attachment XI - Price Cost Schedule UPDATED.docx DOCX document
ATTACHMENT XIII - RFI Questions AND Answers.docx DOCX document
36C25023R0228 0002.docx DOCX document
36C25023R0228 0001.docx DOCX document
ATTACHMENT VII - Electrical Specs.pdf PDF
Attachment VI - Data Specs.pdf PDF
ATTACHMENT X - Construction Waste Management Spec.pdf PDF
ATTACHMENT IX - PAST PERFORMANCE TEMPLATE.pdf PDF
ATTACHMENT VIII - General Specs.pdf PDF
Attachment V - Limitations on Subcontracting (JAN 2023).pdf PDF
Attachment IV - EMR.pdf PDF
Attachment III - RFI Template.pdf PDF
Attachment I - DBA WD.pdf PDF
ATTACHMENT II - VHA Directive 1192 01.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25023R0228 X 583-24-1-669-0005 None 36C250 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240 Elizabeth.Finley1@va.gov

Elizabeth Finley 317-371-1148 Data and Power Requirements Contract

This Requirements Construction Contract is for the provision of all labor, equipment, materials, and supervision to complete the tasks outlined in the Item Information and the Statement of Work to fulfill all actual purchase requirements of designated Government activities during a specified contract period (from one contractor), with performance occurring after the issuance of task orders and scheduling of the task order work.

This contract will consist of one base, 12 month ordering period, with four additional 12 month ordering periods.

All work will be located at the Richard L. Roudebush VA Medical Center, 1481 W. 10th Street, Indianapolis, IN 46202.

This solicitation is 100% set aside for Service-Disabled Veteran-Owned Small Businesses.

NAICS: 238210; Size Standard: $19 million

"Per TO" referenced in blocks 11, 12a, 13b, and 13d below and elsewhere in the solicitation refers to "Per Task Order".

Each Task Order issued shall cite the number of days to begin performance and the number of days to complete the work (Block 11), the number of days to provide bonds (Block 12b), and the number of days in which the Government can accept the offer submitted in response to the request for task order proposal.

per TO per TO X 52.211-10 X Per TO

2PM

EDT

03-15-2024 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

*See Price Schedule Unique Entity ID Number:

Federal Tax ID Number:

Email Address:

583-3630162-669-8541000-2543-010055590 36C250 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240 Department of Veterans Affairs Financial Management System P O Box 149971 Austin TX 78714-9971 512-242-7300 N/A X Luke A. Turner

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE6
ITEM INFORMATION6
BASIS FOR AWARD AND EVALUATION FACTORS35
STATEMENT OF WORK37
IMPORTANT OFFEROR INFORMATION47
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS53
2.1 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (NOV 2021) ALTERNATE I (OCT 1997)53
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)57
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)57
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)57
2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)58
2.6 52.228-1 BID GUARANTEE (SEP 1996)59
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)60
2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)61
2.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)61
2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)61
2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)62
2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)62
2.13 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (FEB 2023)63
REPRESENTATIONS AND CERTIFICATIONS64
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)64
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)68
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)70
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)72
3.5 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020)74
GENERAL CONDITIONS76
4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021)76
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)77
4.3 52.216-18 ORDERING (AUG 2020)78
4.4 52.216-19 ORDER LIMITATIONS (OCT 1995)78
4.5 52.216-21 REQUIREMENTS (OCT 1995)79
4.6 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)79
4.7 52.223-20 AEROSOLS (JUN 2016)82
4.8 52.223-21 FOAMS (JUN 2016)83
4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)84
4.10 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)88
4.11 SUPPLEMENTAL INSURANCE REQUIREMENTS88
4.12 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)89
4.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)89
4.14 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)92
4.15 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)92
4.16 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020)92
4.17 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023)93
4.18 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)102
4.19 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)105
4.20 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)106
4.21 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)106
4.22 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)107
4.23 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)109
4.24 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)111
4.25 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)111
4.26 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)112
4.27 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY (FEB 2023)112
4.28 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)113
4.29 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)114
4.30 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)114
ATTACHMENTS117
ATTACHMENT I - DBA WD117
ATTACHMENT II - VHA DIRECTIVE 1192 01117
ATTACHMENT III - RFI TEMPLATE117
ATTACHMENT IV - EMR117
ATTACHMENT V - LIMITATIONS ON SUBCONTRACTING (JAN 2023)117
ATTACHMENT VI - DATA SPECS117
ATTACHMENT VII - ELECTRICAL SPECS117
ATTACHMENT VIII - GENERAL SPECS117
ATTACHMENT IX - PAST PERFORMANCE TEMPLATE117
ATTACHMENT X - CONSTRUCTION WASTE MANAGEMENT SPEC117

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
AMOUNT
0001
A data jack installation requiring 1 data jack installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0002
A data jack installation requiring 2 data jacks installed shall include terminations on both ends of the cable, 2 blue Cat 6A cable installations from point A to point B, up to 295’, 2 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0003
A data jack installation requiring 3 data jacks installed shall include terminations on both ends of the cable, 3 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0004
A data jack installation requiring 4 data jacks installed shall include terminations on both ends of the cable, 4 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0005
Data jack installations requiring 6 data jacks installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, 6 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0006
Provide and install an angled 24-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0007
Provide and install an angled 48-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0008
Provide and install a one RU 24 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0009
Provide and install a one RU 48 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0010
Wireless access point (WAP) installation only. The wireless access point and mounting hardware will be provided to the contractor prior to installation. This CLIN shall be for the installation of the WAP only. If cabling is required, then another CLIN will be added to the task order.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0011
This LIN shall include diagnostics and testing of data jacks and cables. It also includes minor repairs based off the diagnostics to include re-termination, jack replacement, face plate replacement, and labeling. If the cabling is damaged and needs replaced, then another task order will be issued for replacement. This CLIN shall cover the cost of all repairs to an existing data jack or patch panel except for the cabling.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0012
The contractor shall locate/tone 1 existing cable. This shall include labeling the cable at both ends and labeling the jack and patch panel.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0013
The contractor shall test and re-terminate up to 12 strands of fiber optic cabling. Provide results to the COR.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0014
The contractor shall provide and install a duplex metal phone wall plate only. If cabling is required, this CLIN will be combined with another CLIN.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0015
The contractor shall provide a concrete penetration up to 1” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0016
The contractor shall provide a concrete penetration up to 2” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0017
The contractor shall provide a concrete penetration up to 3” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0018
The contractor shall provide a concrete penetration up to 4” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0019
The contractor shall provide and install labeling on up to 10 items in 10 different locations. See the labeling description for additional information.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0020
The contractor shall provide and install up to 4’ of metal wire mold for data cabling and/or receptacles. This task shall include the surface mount electrical duplex box and all other hardware and fasteners required to complete the installation of the data jack.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0021
The contractor shall include all tools, material, and labor to install all receptacles, conduit, wiring and equipment from the existing junction box in the room to the location where the electrical outlet will be installed up to 10'. This task shall include all receptacles, conduit, wiring, conduit supports, conduit straps anchors, couplings, conduit bends and modifications, compression fittings, wire nuts, junction boxes, fasteners and bushing that are required to complete the installation. The contractor will be responsible for making the final connection into the device. The VA will verify that a sufficient power source has been identified and selected by the contractor prior to connection.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0021a
Branch Circuit Path Installation from 10’-20’
1.00
JOB
_________
0022
Prevent airborne dust from accumulating. Seal air vents, and dust mat at the door.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_________
0023
Remove or isolate HVAC, complete all critical barriers, maintain negative air pressure, and cover transport carts.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_ ________
0024
Construct an anteroom, wear shoe coverings

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
__ _______
0025
Provide and install a horizontal 2u organizer with loops. Approximate height is 3.5"

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_____ ____
0026
Provide and install an 8” vertical organizer.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
______ ___
0027
Provide and install a 10” vertical organizer.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
______ ___
0028
Provide and install a 12” vertical organizer.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
_____ ____
0029
Provide and install Panduit. This cost is not to be priced with the cabling included in the cost. This will be in addition to the cost as specified in CLIN 1-5 (depending on whether a full location, duplex data location, quad data location, or voice location is requested).

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
____ _____
0030
Provide and install a complete 84” Data Rack. Anchoring to the floor will be included.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
______ ___
0031
Terminations only (where others installed the cabling). Will consist of both ends, a jack, and a faceplate may be required.

Contract Period: Ordering Period 1 POP Begin: Date of Contract Award POP End: One (1) year from Date of Contract Award

1.00
JOB
____ _____
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
AMOUNT
10001
A data jack installation requiring 1 data jack installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
___ ______
10002
A data jack installation requiring 2 data jacks installed shall include terminations on both ends of the cable, 2 blue Cat 6A cable installations from point A to point B, up to 295’, 2 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_ ________
10003
A data jack installation requiring 3 data jacks installed shall include terminations on both ends of the cable, 3 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
___ ______
10004
A data jack installation requiring 4 data jacks installed shall include terminations on both ends of the cable, 4 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
___ ______
10005
Data jack installations requiring 6 data jacks installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, 6 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_____ ____
10006
Provide and install an angled 24-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
______ ___
10007
Provide and install an angled 48-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
______ ___
10008
Provide and install a one RU 24 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
__ _______
10009
Provide and install a one RU 48 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
___ ______
10010
Wireless access point (WAP) installation only. The wireless access point and mounting hardware will be provided to the contractor prior to installation. This CLIN shall be for the installation of the WAP only. If cabling is required, then another CLIN will be added to the task order.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
___ ______
10011
This LIN shall include diagnostics and testing of data jacks and cables. It also includes minor repairs based off the diagnostics to include re-termination, jack replacement, face plate replacement, and labeling. If the cabling is damaged and needs replaced, then another task order will be issued for replacement. This CLIN shall cover the cost of all repairs to an existing data jack or patch panel except for the cabling.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
____ _____
10012
The contractor shall locate/tone 1 existing cable. This shall include labeling the cable at both ends and labeling the jack and patch panel.

Contract Period: 1st year ordering period POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
___ ______
10013
The contractor shall test and re-terminate up to 12 strands of fiber optic cabling. Provide results to the COR.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
__ _______
10014
The contractor shall provide and install a duplex metal phone wall plate only. If cabling is required, this CLIN will be combined with another CLIN.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_____ ____
10015
The contractor shall provide a concrete penetration up to 1” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_______ __
10016
The contractor shall provide a concrete penetration up to 2” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_____ ____
10017
The contractor shall provide a concrete penetration up to 3” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_____ ____
10018
The contractor shall provide a concrete penetration up to 4” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
____ _____
10019
The contractor shall provide and install labeling on up to 10 items in 10 different locations. See the labeling description for additional information.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
___ ______
10020
The contractor shall provide and install up to 4’ of metal wire mold for data cabling and/or receptacles. This task shall include the surface mount electrical duplex box and all other hardware and fasteners required to complete the installation of the data jack.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
______ ___
10021
The contractor shall include all tools, material, and labor to install all receptacles, conduit, wiring and equipment from the existing junction box in the room to the location where the electrical outlet will be installed up to 10'. This task shall include all receptacles, conduit, wiring, conduit supports, conduit straps anchors, couplings, conduit bends and modifications, compression fittings, wire nuts, junction boxes, fasteners and bushing that are required to complete the installation. The contractor will be responsible for making the final connection into the device. The VA will verify that a sufficient power source has been identified and selected by the contractor prior to connection.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
___ ______
10021a
Branch Circuit Path Installation from 10’-20’
1.00
JOB
_____ ____
10022
Prevent airborne dust from accumulating. Seal air vents, and dust mat at the door.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_____ ____
10023
Remove or isolate HVAC, complete all critical barriers, maintain negative air pressure, and cover transport carts.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_______ __
10024
Construct an anteroom, wear shoe coverings

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
______ ___
10025
Provide and install a horizontal 2u organizer with loops. Approximate height is 3.5"

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_____ ____
10026
Provide and install an 8” vertical organizer.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
______ ___
10027
Provide and install a 10” vertical organizer.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
____ _____
10028
Provide and install a 12” vertical organizer.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
______ ___
10029
Provide and install Panduit. This cost is not to be priced with the cabling included in the cost. This will be in addition to the cost as specified in CLIN 1-5 (depending on whether a full location, duplex data location, quad data location, or voice location is requested).

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_____ ____
10030
Provide and install a complete 84” Data Rack. Anchoring to the floor will be included.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
_____ ____
10031
Terminations only (where others installed the cabling). Will consist of both ends, a jack, and a faceplate may be required.

Contract Period: Ordering Period 2 POP Begin: Period of one (1) year after the last day of Ordering Period 1 POP End: One (1) year from the first day of Ordering Period 2

1.00
JOB
____ _____
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
AMOUNT
20001
A data jack installation requiring 1 data jack installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_____ ____
20002
A data jack installation requiring 2 data jacks installed shall include terminations on both ends of the cable, 2 blue Cat 6A cable installations from point A to point B, up to 295’, 2 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
__ _______
20003
A data jack installation requiring 3 data jacks installed shall include terminations on both ends of the cable, 3 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
______ ___
20004
A data jack installation requiring 4 data jacks installed shall include terminations on both ends of the cable, 4 blue Cat 6A cable installations from point A to point B, up to 295’, 3 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
________ _
20005
Data jack installations requiring 6 data jacks installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, 6 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_______ __
20006
Provide and install an angled 24-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20007
Provide and install an angled 48-port patch panel that accepts cat6A. The installation shall include bonding to the main rack, labeling, rear cable manager, and an angled panel cover.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20008
Provide and install a one RU 24 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20009
Provide and install a one RU 48 port patch panel that accepts cat6A. The installation shall include bonding to the main rack and labeling.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20010
Wireless access point (WAP) installation only. The wireless access point and mounting hardware will be provided to the contractor prior to installation. This CLIN shall be for the installation of the WAP only. If cabling is required, then another CLIN will be added to the task order.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20011
This LIN shall include diagnostics and testing of data jacks and cables. It also includes minor repairs based off the diagnostics to include re-termination, jack replacement, face plate replacement, and labeling. If the cabling is damaged and needs replaced, then another task order will be issued for replacement. This CLIN shall cover the cost of all repairs to an existing data jack or patch panel except for the cabling.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
____ _____
20012
The contractor shall locate/tone 1 existing cable. This shall include labeling the cable at both ends and labeling the jack and patch panel.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_ ________
20013
The contractor shall test and re-terminate up to 12 strands of fiber optic cabling. Provide results to the COR.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
______ ___
20014
The contractor shall provide and install a duplex metal phone wall plate only. If cabling is required, this CLIN will be combined with another CLIN.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
___ ______
20015
The contractor shall provide a concrete penetration up to 1” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
___ ______
20016
The contractor shall provide a concrete penetration up to 2” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_____ ____
20017
The contractor shall provide a concrete penetration up to 3” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20018
The contractor shall provide a concrete penetration up to 4” in diameter through up to 10” thick concrete. This task shall include concrete scanning, sleeve, and firestop.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20019
The contractor shall provide and install labeling on up to 10 items in 10 different locations. See the labeling description for additional information.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20020
The contractor shall provide and install up to 4’ of metal wire mold for data cabling and/or receptacles. This task shall include the surface mount electrical duplex box and all other hardware and fasteners required to complete the installation of the data jack.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20021
The contractor shall include all tools, material, and labor to install all receptacles, conduit, wiring and equipment from the existing junction box in the room to the location where the electrical outlet will be installed up to 10’. This task shall include wall modifications, drywall/Gypsum board repair, conduit, wiring, conduit supports, conduit straps anchors, couplings, conduit bends and modifications, compression fittings, wire nuts, junction boxes, fasteners and bushings that are required to complete the installation. The contractor will be responsible for making the final connection to the device. The contractor will not be responsible for providing the receptacle. The outlet receptacle will be covered under another task. The VA will verify the installed equipment and make the final connection to the power source once all equipment has been inspected.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20021a
Branch Circuit Path Installation from 10’-20’
1.00
JOB
_____ ____
20022
Prevent airborne dust from accumulating. Seal air vents, and dust mat at the door.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
___ ______
20023
Remove or isolate HVAC, complete all critical barriers, maintain negative air pressure, and cover transport carts.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_____ ____
20024
Construct an anteroom, wear shoe coverings

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_____ ____
20025
Provide and install a horizontal 2u organizer with loops. Approximate height is 3.5"

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_____ ____
20026
Provide and install an 8” vertical organizer.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
____ _____
20027
Provide and install a 10” vertical organizer.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20028
Provide and install a 12” vertical organizer.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20029
Provide and install Panduit. This cost is not to be priced with the cabling included in the cost. This will be in addition to the cost as specified in CLIN 1-5 (depending on whether a full location, duplex data location, quad data location, or voice location is requested).

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20030
Provide and install a complete 84” Data Rack. Anchoring to the floor will be included.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
_________
20031
Terminations only (where others installed the cabling). Will consist of both ends, a jack, and a faceplate may be required.

Contract Period: Ordering Period 3 POP Begin: Period of one (1) year after the last day of Ordering Period 2 POP End: One (1) year from the first day of Ordering Period 3

1.00
JOB
__ _______
ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
AMOUNT
30001
A data jack installation requiring 1 data jack installed shall include terminations on both ends of the cable, blue Cat 6A cable installation from point A to point B, up to 295’, Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4

1.00
JOB
____ _____
30002
A data jack installation requiring 2 data jacks installed shall include terminations on both ends of the cable, 2 blue Cat 6A cable installations from point A to point B, up to 295’, 2 Blue cat6A patch cords up to 10’, Firestop, cable ties, wall cutouts, duplex box, data jacks, testing, labeling, the face plate, and all other materials required for a complete installation. The data jack shall be completely installed, fully functional, and shall pass all tests once completed.

Contract Period: Ordering Period 4 POP Begin: Period of one (1) year after the last day of Ordering Period 3 POP End: One (1) year from the first day of Ordering Period 4

1.00
JOB
_______ __
30003

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .