This document contains responses to requests for information regarding Solicitation 36C25023B0015 for the project "506-21-208 Upgrade and Expand Exterior Lighting" issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Key details include that the project scope involves updating existing lighting with more efficient fixtures, replacing damaged light poles, and adding new lighting in low-light areas. The contractor will be responsible for site restoration work over a period of 270 days. The document provides responses to questions about fixture specifications, circuit details, access to buildings for assessments, and clarification on other technical requirements to inform contractor bidding for the opportunity closing on May 30, 2023.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project 506-21-208 Upgrade and Expand Exterior Lighting RFI’s and Responses
1. The following specification section is missing: 26 08 00 Commissioning of Electrical Systems. Was this section supposed to be included for this project? Yes. Commissioning specifications added as a part of this Amendment.
2. Could you provide the current L5 and L6 fixture make and model? The part numbers listed on the construction drawings were provided by the lighting rep. If these are not the most current part numbers, contact the lighting rep for the updated part number matching the description indicated.
3. Is there an ICRA requirement for building T9? Information added as a part of this Amendment.
4. Could you provide pictures for the penetration locations, route for conduit, and distances needed to tie new lights into electrical panel RP3 in building T9 for work to be performed on sheet ES 103. The door was locked, and we could not view. A second Site Visit is to be scheduled via an Amendment.
Penetrations, distances, and routing shall be means and methods and are the responsibility of the contractor.
5. On sheet ES 101 building 30 has 4 L2 lights with note #2 “ON LEVEL 3 OF PARKING DECK 30, DISCONNECT AND REMOVE EXISTING SURFACE MOUNTED RECEPTACLE, BACKBOX AND CONDUIT
TO JUNCTION BOX. EXTEND EXISTING CIR CUIT IN ANEW CONDUIT TO NEW LIGHT FIXTURE TYPE L2, MOUNTED ON OUTSIDE OF COLUMN. CONDUIT SHALL BE SURFACE MOUNTED”. On the site visit, there were no existing lights. It would appear that this work will require a new circuit. If so, could you provide pictures for the penetration locations, rout for conduit, and distances needed to tie new lights into electrical panel. Will a new breaker be required? If so, what is the panel make and model?
The existing receptacles are being removed (there are no existing lights) and the circuit is being re-purposed for the new lights, which are mounted on the outside of the building on those columns as shown. Penetrations, distances and routing of the new circuit shall be means and methods and are the responsibility of the contractor. See picture in item 24 below for example.
6. On sheet ES 102, building 31 has 2 new L2 lights. Could you provide pictures for the penetration locations, rout for conduit, and distances needed to tie new lights into electrical panel? We did not have access. A second Site Visit is to be scheduled via an Amendment. Penetrations, distances, and routing shall be means and methods and are the responsibility of the contractor.
7. On sheet ES 103, building 1E has a L3 fixture with note 4 “PROVIDE NEW LIGHT FIXTURE AND
CIRCUIT AS SHOWN. CORE-DRILL EXISTING WALL FOR CONDUIT, SEAL ALL WALL PENETRATIONS AS PER SPECIFICATIONS”. Could you provide pictures for the penetration locations, rout for conduit, and distances needed to tie new lights into electrical panel? We did not have access. Dose the area have an ICRA requirement? A second Site Visit is to be scheduled via an Amendment. Penetrations, distances, and routing shall be means and methods and are the responsibility of the contractor. ICRA information provided with this Amendment.
8. On Sheet ES 110, building 29 has 2 L2 fixtures with note 14. Could you provide pictures for the penetration locations, rout for conduit, and distances needed to tie new lights into electrical panel?
We did not have access. Dose the area have an ICRA requirement? A second Site Visit is to be scheduled via an Amendment. Penetrations, distances, and routing shall be means and methods and are the responsibility of the contractor. ICRA information provided with this Amendment.
9. On sheet ES 112, building 28 has 1 L8 fixture with note 4. Could you provide pictures for the penetration locations, rout for conduit, and distances needed to tie new lights into electrical panel?
We did not have access. Dose the area have an ICRA requirement? A second Site Visit is to be
10. On sheet ES 112, building 28 has 2 L1 fixture with note 4. Could you provide pictures for the penetration locations, rout for conduit, and distances needed to tie new lights into electrical panel?
We did not have access. Dose the area have an ICRA requirement? A second Site Visit is to be
11. On sheet ES 113, a new fixture, pole, and pole base is called out. Is there an in ground junction box to extend the circuit from? Or will we need to intercept the circuit and install a new in ground junction box? It is assumed that the existing circuit shall be intercepted at the existing pole and extended to the new pole light.
12. Will the contractor have an onsite lay-down or storage area for poles, lifts, and trailer? Information shall be provided by VA. There will be limited lay-down space available for contractors on a first come, first serve basis.
13. In the specs it states that no tools that transmit vibrations can be used on building that are occupied. Core drilling will transmit vibrations. Should we intend on OT? If so, for what buildings and lights? Coordinate with COR and VA to perform work with minimal but anticipated disruption.
14. Will alternate lighting fixtures be considered and, if so, what additional information should be provided in the bid package? No.
15. Will the pre-bid participants sign-in sheet be posted as part of an amendment? Yes, posted with this Amendment.
16. Who is the assigned COR for this project. This was not announced at the pre-bid meeting. COR is David Gedraitis, who conducted the site visit.
17. During the site visit it was mentioned that there is no available parking /lay down / storage space on site for this project. Please confirm if this is correct or if there will be some available space on site to store materials and for contractor parking. There will be limited lay-down space available for contractors on a first come, first serve basis. Parking space will be available but limited to roof area of East parking structure.
18. Parking garage 29 & 30: What exact columns are we adding fixtures to? - Construction drawings are to scale. The fixtures should be placed on the column in the location shown. There are no column numbers. These can be field verified with the COR by the contractor.
19. Parking garage 29 & 30: There is no existing power, receptacle, or conduit on Parking Deck 30.
Please clarify. - The receptacles are mounted on the inside of the columns (inside the parking deck) on the level indicated.
20. Area 2 & Area 12: We did not get access to those buildings that we would be drilling through. Please provide photos of the interior, so we can confirm if this is an office, electrical or mechanical room. A second Site Visit is to be scheduled via an Amendment.
21. Area 2: Please provide the length from the fixture to the panel. Penetrations, distances, and routing shall be means and methods and are the responsibility of the contractor.
22. Area 3: please clarify if this is a pipe & wire. If so, please provide the length. Penetrations, distances and routing shall be means and methods and are the responsibility of the contractor. Raceway and wiring methods are illustrated in the construction documents and should be followed.
23. Area 9: Are we permanently removing the temporary lighting only or the flag pole as well. Only the temporary lighting. Flag pole shall be responsibility of the VA
24. Area 10: There is no existing receptacle, please clarify The receptacles are mounted on the inside of the columns (inside the parking deck) on the level indicated.
25. Area 13: Exact location of new concrete pole base, pole, fixture, and length between existing pole we will pull from. Refer to sheet ES112 for the continuation of dashed line and location of pole.
26. There is no existing power or receptacle Looking at the fixture schedule, it calls out the voltage for the L5 fixture: 480v, can you confirm that all other fixtures are 277 or 480? The pole mounted fixtures are 480V single phase. All other light fixtures listed as “multi-volt” shall be 120-277V.
27. After the site visit, the L5 calls for a fixture mounted on a square pole, we need to know the quantity of round mounts and square mounts. Contractor is responsible for reviewing the construction documents and for accurate counts of all work to be completed.
28. How many square poles and round poles are being replaced? Contractor is responsible for reviewing the construction documents and for accurate counts of all work to be completed.
29. How many concrete bases are being poured? Contractor is responsible for reviewing the construction documents and for accurate counts of all work to be completed.
30. What are the lengths of the distance we are pulling from and are we going underground?
Penetrations, distances and routing shall be means and methods and are the responsibility of the
31. Construction fencing: does the entire perimeter of the medical facility have to be fenced off while work is happening? Or can we fence off per area, as work is being done? Per area as work is being done.
32. Is a Connex required onsite for material/light fixture storage? An area may be available onsite for a connex box.
33. Are there new Pole Specs available? Pole information is listed in the fixture schedule and in the project manual.
34. Request to push the bid due date by a month, as there are multiple unanswered questions and need much more information. Amendment 002 extended the Bid Opening to May 30, 2023, at 2:00pm EST. If it is determined by the VA that an additional extension is needed one will be done via an
35. Regarding the new fixture and conduit on Level 3 of Parking Deck 30:
a. Is the existing circuit in the ceiling of the parking deck? The existing circuit is surface mounted as indicated in the work description notes.
b. If so, that circuit is a 24/7 circuit; should we add a photocell to the new L2 type fixture? The part number in the fixtures schedule indicates that a photocell is integral to the fixture.
c. Does the SOW require any aesthetic work (painting, etc) to the new conduit? No, the conduit shall meet the requirements listed in the specifications.
36. Regarding the interior fixtures and conduit, we were not provided access to most interior spaces.
Please provide the following information for each location:
a. How far is each new conduit run? Distances and routing shall be means and methods and are the responsibility of the contractor.
b. Some of the panels appear to be on different floors. Is there a chase through the floors or will additional core drilling be required? A second Site Visit is to be scheduled via an Amendment.
c. What type of ceilings are in each location (open, drop, etc)? This varies – A second Site Visit is to be scheduled via an Amendment.
d. Are pictures available of each new fixture location? No, but this is an exterior lighting project, therefore the exterior of the buildings are visible by walking the site.
37. Regarding extension of the non-switched leg of lighting circuit RS-41, please provide the following information:
a. How far is the new conduit run? Distances and routing shall be means and methods and are the responsibility of the contractor.
b. Some of the panels appear to be on different floors. Is there a chase through the floors or will core drilling be required? A second Site Visit is to be scheduled via an Amendment.
c. What type of ceilings are in this location (open, drop, etc)? This varies – A second Site Visit is to be scheduled via an Amendment.
d. Are pictures available of this location? No, but this is an exterior lighting project, therefore the exterior of the buildings are visible by walking the site.
38. Regarding the disconnection and removal of the temporary flagpole lights and supporting electrical equipment:
a. It appears the temporary flagpole lights are being fed from a light pole approximately ten feet away. Should the conduit be removed to this point, or will additional work be required? Please elaborate. Work should be as indicated in note 7. Existing circuit, conduit and all appurtenances should be removed in their entirety.
39. Regarding the extension of circuits from existing pole lighting, there are fire hydrant water lines and likely other services in the ground. Is there a recent GPR survey of this area or will one be required as part of this SOW? There is no recent GPR survey, it is the contractors’ responsibility to do an underground locate prior to digging on the site.
40. Regarding the new pole base specified in Detail 1 on Sheet ES100, would you consider a partial base replacement in lieu of a full base replacement? We believe it would be less intrusive to deconstruct the pole 12” below grade, reforming, and bonding the new section to the older section. No – full base replacement.
41. Regarding extension of the non-switched leg of lighting circuit RS-41, we were not given access inside. Please provide the following information:
a. Are we correct is assuming that one existing fixture will be used to feed the new fixture? The lighting circuit is coming from a labeled junction box.
b. What is the length of the new conduit run? Distances and routing shall be means and methods and are the responsibility of the contractor.
c. What type of ceiling is inside? This varies – A second Site Visit is to be scheduled via an
42. Regarding the circuit and conduit extension on Level 3 of Parking Deck 29:
a. Can the conduit be surface mounted? Yes, that is the intent.
b. Is the existing circuit in the ceiling of the parking deck? The existing circuit is surface mounted as indicated in the work description notes.
c. If so, that circuit is a 24/7 circuit; should we add a photocell to the new L2 type fixture? The part number in the fixtures schedule indicates that a photocell is integral to the fixture.
d. Does the SOW require any aesthetic work (painting, etc) to the new conduit? No, the conduit shall meet the requirements listed in the specifications.
43. What is the bidding assumption for length of extending existing surface mounted circuits? The assumption is that the contractor will perform a site visit and do a take-off based on their findings.
44. What is the assumption for elevation of new wall mounted fixtures when not noted? The elevations are noted or the fixtures are replacing existing fixtures.
45. Do we assume new breakers are needed for new circuits when not noted? Unless new breakers are listed in the work description notes, new breakers are not required.
46. What is the bidding assumption for flag light raceway demo to panel (ES109-note 7)? The assumption is that the contractor will perform a site visit and do a take-off based on their findings.
47. When extending existing circuits on outside of building, is exterior surface mount acceptable?
Surface mounted conduit is expected. On buildings other than the parking deck, the intent is the penetrate the exterior of the building without running conduit all over.
48. Area 3 is underground at building; please explain the intent of notes 19, 20, and 21. The intent for those work description notes is for the contractor to do the work as stated. A site visit will clear up any confusion. A second Site Visit is to be scheduled via an Amendment.
49. Requesting a walkthrough of the site to confirm work needed to verify sizes and work needed for the pole lights. Also the addition of a few wall packs. A second Site Visit is to be scheduled via an
50. Sheet ES102 – What is the existing panel R2-03 manufacturer? Is a new breaker required for installation of new light fixture? A new breaker is note required for this fixture, however the panel type is a Siemens Type S1.
51. Sheet ES103 – Where is new fixture L3 going to be circuited to? No circuit information shown on drawings. The intent is to extend the existing circuit from the wall pack located to the East of this new fixture.
-Is it acceptable to core though the building wall once and run conduit on the exterior of the building for the new L2 light fixtures on building T9? No. The conduit should penetrate at the fixture and be run inside the building.
52. Sheet ES109 – Where is the existing panel that is feeding the flag pole lights to be demolished located? Can you provide an approximate distance of demo? According to another source, the temporary lights are being fed from a light pole near the flag pole. Distances are to be performed by the
53. Specifications – Where is new lighting control required? There are no new devices or notes shown on the drawings. Existing control systems are being re-used. Where new fixtures are indicated, a photocell is integral to the light fixture.