JCI Sole Source_Redacted.pdf

PDF 876 KB Posted

Attached to
Y1NE--Construct Contingency Water Supply 583-17-102 Federal contract opportunity
Solicitation number
36C25022R0134
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document includes a justification and approval for other than full and open competition and a related federal contract opportunity for construction services. The Department of Veterans Affairs is seeking a contractor to construct a new 500,000-gallon water tower and pump house to serve as a contingency water supply for the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana. The project is valued between $5-10 million and has a performance period of 550 calendar days. The contract will utilize other than full and open competition procedures due to the proprietary nature of the existing building management system. Offerors must submit proposals by July 29th, 2022 and comply with various reporting and safety requirements, including verifying employee vaccination status and conducting daily health screenings, if selected for award.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NE--Construct Contingency Water Supply 583-17-102, newest first.
File Type Posted
36C25022R0134 0005.docx DOCX document
R - 163-428 Geotechnical Report.pdf PDF
36C25022R0134 0004.docx DOCX document
36C25022R0134 0003.docx DOCX document
36C25022R0134 0002.docx DOCX document
Performance Relevancy Survey.docx DOCX document
ConServ Sole Source_Redacted.pdf PDF
Past Performance Questionnaire.docx DOCX document
36C25022R0134 0001.docx DOCX document
Wage determination July 2022.txt TXT text file
583-17-102 dwg pkg 4 of 4.pdf PDF
583-17-102 dwg pkg 3 of 4.pdf PDF
36C25022R0134.docx DOCX document
RFI Form.docx DOCX document
Contractor Certification Regarding Safety and Environmental.docx DOCX document
583-17-102 dwg pkg 2 of 4.pdf PDF
VHA Directive1192.01 Seasonal Influenza Prevention.pdf PDF
583-17-102 NEPA .pdf PDF
583-17-102 dwg pkg 1 of 4.pdf PDF
583-17-102 Specifications.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Part 806.3 Other Than Full and Open Competition (OFOC) Request for Sole Source Justification Format

Rev: 13 Effective Date: 02/01/22 Page 1 of 3

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A) For

Other Than Full and Open Competition

Acquisition Plan Action ID: 36C250-22-AP-3634

1. Contracting Activity: Department of Veterans Affairs, VISN 10, Richard L. Roudebush VA Medical

Center (RLRVAMC), 1481 W. 10th Street, Indianapolis, IN 46202. Network Contracting Office (NCO) 10 Contracting. 2237/PR is 583-22-3-651-0015

2. Nature and/or Description of the Action Being Processed: Emergency preparedness of the facility will be improved by the construction of a 500,000-gallon water tower and associated pump house.

These systems will be used in case of an emergency to supply water to the facility for a maximum of 2-days if the normal potable water source is interrupted.

3. Description of Supplies/Services Required to Meet the Agency’s Needs: The RLRVAMC operates a complex computerized building management system to execute its mission of delivering the highest quality of health care to our nation’s veterans. The building’s management system (BMS) has been subject to a systematic technology upgrade, both to replace outmoded equipment no longer supported by the manufacturer, Johnson Controls, and to expand the capabilities of the system in support of energy conservation initiatives as mandated by EO 13423 and EISA 2007. As of this time, the BMS is Facility Explorer manufactured by Johnson Controls Inc, JCI. This is an open protocol system capable of accepting numerous communication protocols to enable expansion of the system to include new equipment and devices. The RLRVAMC BMS monitoring system will have additional operating systems added to it following the construction of the water tower and pump house and will need to be successfully integrated utilizing Johnson Controls. The BMS/ECC, and associated equipment for HVAC control and monitoring, including trend and alarm capabilities of utilities, are the requested supplies for this project.

Identify the specification section(s) were the brand name only item is listed: Specification 23 09 23 (page 4, paragraph F).

4. Statutory Authority Permitting Other than Full and Open Competition:

( X ) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per 41 USC §3304(a)(1) as implemented by FAR 6.302-1;

( ) (2) Unusual and Compelling Urgency per 41 USC §3304(a)(2) as implemented by FAR 6.302-2;

( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by FAR 6.302-3;

( ) (4) International Agreement per 41 USC §3304(a)(4) as implemented by FAR 6.302-4 ( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by FAR 6.302-5;

( ) (6) National Security per 41 USC §3304(a)(6) as implemented by FAR 6.302-6;

( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by FAR 6.302-7;

Effective Date: 02/01/22 Page 2 of 3

5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority): When no existing building management system is in place, or the existing building management system is considered obsolete and will be replaced in its totality, then free and open market solicitation should be encouraged.

However, when expanding or enhancing a viable building control system, as might be the case of a wing addition or adding enhanced functionality such as modifications to user interfaces or complex optimization routines, past experience throughout the industry as well as within the Veterans Administration has proven that mixed-manufacturer systems, or specialized configuration from multiple systems integrators has been less than successful.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: During the design of the project by the professional AE firm, research performed confirmed that no other Building Management System can integrate with the current system successfully. An attempt to install another BMS system would cause significant issues across the entire facility and components of the system that will not communicate with each other. These issues will cause failure to provide heating and cooling to the project areas and other areas connected through the HVAC equipment.

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and

Reasonable: The Contracting Officer will ensure through the use of price analysis techniques, such as comparison against the independent Government estimate and other price analysis techniques identified in FAR 15.404-1(b), that the price will be fair and reasonable.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted: During the design of the project by the professional AE firm, research performed confirmed that no other Building Management System can integrate with the current system successfully. An attempt to install another BMS system would cause significant issues across the entire facility and components of the system that will not communicate with each other.

These issues will cause failure to provide heating and cooling to the project areas and other areas connected through the HVAC equipment.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition: See above.

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: All potential general contractors – the government is requiring, based on the proprietary BMS, that these contractors utilize these items from JCI.

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to

Competition before Making subsequent acquisitions for the supplies or services required: When no existing building management system is in place, or the existing building management system is considered obsolete and will be replaced in its totality, then free and open market solicitation should be encouraged.

12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

Effective Date: 02/01/22 Page 3 of 3

James Wallace Date Chief, Engineering

RLRVAMC

13. Approvals in accordance with the VHAPM Part 806.3 OFOC SOP:

a. Contracting Officer or Designee’s Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Julie A. Stout Date Contracting Officer NCO 10 Contracting

2022-07-28T14:51:25-0400
Julie A. Stout 356695