36C25022R0134 0002.docx
DOCX document 27 KB Posted
- Attached to
- Y1NE--Construct Contingency Water Supply 583-17-102 Federal contract opportunity
- Solicitation number
- 36C25022R0134
About this file
This solicitation is for construction services to construct a contingency water supply at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana. Key details include that the project size is estimated between $5 million to $10 million, the period of performance is 550 calendar days from receipt of the notice to proceed, the required wage determination is included, the submission deadline for requests for information is July 29th, 2022, offerors must register in the System for Award Management and not be on the Excluded Parties List System to be eligible for award, and documentation of vaccinations or negative COVID-19 tests are required for contractor employees working onsite or having direct patient contact along with daily health screenings. Subcontracting plans and safety violation explanations may be required from non-small businesses, and performance and payment bonds are due within 10 days of notification of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25022R0134 0005.docx | DOCX document | |
| 36C25022R0134 0004.docx | DOCX document | |
| R - 163-428 Geotechnical Report.pdf | ||
| 36C25022R0134 0003.docx | DOCX document | |
| JCI Sole Source_Redacted.pdf | ||
| Performance Relevancy Survey.docx | DOCX document | |
| ConServ Sole Source_Redacted.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| 36C25022R0134 0001.docx | DOCX document | |
| RFI Form.docx | DOCX document | |
| Contractor Certification Regarding Safety and Environmental.docx | DOCX document | |
| 583-17-102 dwg pkg 2 of 4.pdf | ||
| Wage determination July 2022.txt | TXT text file | |
| 583-17-102 dwg pkg 4 of 4.pdf | ||
| 583-17-102 dwg pkg 3 of 4.pdf | ||
| 36C25022R0134.docx | DOCX document | |
| VHA Directive1192.01 Seasonal Influenza Prevention.pdf | ||
| 583-17-102 NEPA .pdf | ||
| 583-17-102 dwg pkg 1 of 4.pdf | ||
| 583-17-102 Specifications.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 583-22-3-651-0015 583-17-102 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240 To all Offerors/Bidders
36C25022R0134 07-18-2022
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
583-3620162-651-854200-3220 23NRNR001
X This solicitation is hereby amended as follows:
RFI Question 1: Past Performance. Are we to include CPARS or a PPQ for this project?
Answer: Yes, this was inadvertently left off the solicitation. Offeror shall complete the appropriate section of the Past Performance Questionnaire (PPQ) and submit to prior client(s) for completion. Prepare a minimum of one and up five projects that include a minimum of a 500,000 gallon w ater tower addition to a medical facility OR a federal facility.
Offerors shall submit attachment, Performance Relevancy Survey - for each project/ contract intended to have See Page 2 for further information.
Julie A. Stout Contracting Officer considered for evaluation. See attachments Past Performance Questionnaire and Past Performance Relevancy.
RFI Question 2: Technical Factor: Management states the offeror shall submit a listing of at least three similar projects the subcontractors have completed in the last 5 years. Are we to provide 3 similar projects for each subcontractor separately?
Answer: If you are using the subcontractor because they have experience with constructing water towers, then yes, we need three similar projects.
Two sole source items were found in the specs.
1- Some of the equipment is manufactured by Johnson Controls (JCI), so offeror shall use this brand of equipment where specified. (see attached JCI sole source). This is stated in the Statement of Work and Spec 23 09 23.
2- Because this water tower needs to tie into the Building Management System (BMS), a certified JCI contractor must be utilized to update the system. The government, as such, requires offerors to subcontract with ConServ, Inc. (Building Automation Systems) to complete this work (see attached ConServ sole source). This is stated in Spec 23 09 23.
All other terms and conditions remain the same.
See attached document: ConServ Sole Source_Redacted.
See attached document: JCI Sole Source_Redacted.
See attached document: Past Performance Questionnaire.
See attached document: Performance Relevancy Survey.
File details come from the government source that posted it. Updated .