Updated Statement of Work (SOW).pdf
PDF 70 KB Posted
- Solicitation number
- 36C25020B0054
About this file
This presolicitation notice is for a construction project to stabilize Building 129 for the National Historic Archives at the Dayton VA Medical Center. The Department of Veterans Affairs seeks to provide complete construction services including all necessary tools, equipment, and personnel as specified in the design drawings, specifications, and statement of work. The project is set aside solely for service-disabled veteran-owned small businesses and will require payment and performance bonds. Interested firms should register at SAM.gov to receive the solicitation which will be issued on or around June 22, 2020, with proposals due approximately 30 days later. The construction work must be completed within 270 calendar days of notice to proceed. Firms must have the relevant NAICS code and be verified as SDVOSBs in order to be eligible for award. The contractor will be required to perform a minimum of 15% of the construction work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S07. Bid Abstract - Stabilize Building 129 for National Historic Archives.pdf | ||
| 36C25020B0054 0004.docx | DOCX document | |
| 36C25020B0054 0003.docx | DOCX document | |
| Stabilize Bldg. 129 Questions and Answers.pdf | ||
| Stabilize Bldg. 129 Sign-in Sheet.pdf | ||
| 36C25020B0054 0002.docx | DOCX document | |
| Updated Project Manual.pdf | ||
| 36C25020B0054 0001.docx | DOCX document | |
| Updated Bid Drawings.pdf | ||
| 36C25020B0054_1.docx | DOCX document | |
| Bid Set Addendum 1 Drawings.pdf | ||
| Bid Set Specifications.pdf | ||
| Bid Set Addendum 1.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Stabilize B129
For National Historic Archives
Project 552-18-202
Provide complete construction services, including all necessary tools, equipment and personnel to perform work as specified in the design drawings for this project on the Veterans Affairs Medical Center, located at 4100 West Third Street, Dayton, OH 45428. The installations, when complete, must be permanent and part of an overall plan to restore and preserve the building. The purpose of this design is an effort to prevent further deterioration of this structure, allowing for subsequent conservation and restoration.
Building 129 was constructed in 1881 and is considered to be an important structure that is architecturally significant and hence this project shall consider and abide by all applicable federal, state and local historical regulatory agency statutes. In view of this, no permanent exterior alterations may be incorporated into the planning, design and execution of the project without approvals from appropriate agencies. The contractor shall consult with and/or retain a qualified historic preservation specialist.
In support of this project, a detailed report of existing conditions has been prepared. For planning purposes, this report shall be used as a source document.
All schematics, design development and construction drawings and specifications documents have been developed in accordance with the following listed Department of Veterans Affairs References:
PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards PG-18-5 Equipment Guide List H-18-8 Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management http://www.cfm.va.gov/CFM/TIL/spec.asp http://www.cfm.va.gov/CFM/TIL/cPro.asp http://www.cfm.va.gov/CFM/TIL/sDetail.asp http://www.cfm.va.gov/CFM/TIL/equip.asp http://www.cfm.va.gov/CFM/TIL/seismic.asp http://www.cfm.va.gov/CFM/TIL/planning.asp http://www.cfm.va.gov/cfm/til/dManual.asp http://www.cfm.va.gov/cfm/til/dGuide.asp http://www.cfm.va.gov/CFM/TIL/accessibility.asp http://www.cfm.va.gov/CFM/contract/aeDesSubReq.asp http://www.cfm.va.gov/cfm/til/spclRqmts.asp#EC http://www1.va.gov/vapubs/viewPublication.asp?Pub_ID=312&FType=2
The contractor is expected to be familiar with all referenced design guides. The items below are reiterated from the design guides to place special emphasis upon them. In some cases there are slight modifications from the design guides relevant to the particular project or the internal processes at the Dayton VAMC. The contractor is required to meet with the contracting officer (CO) and/or contracting officer’s representative (COR) to discuss and clarify all expectations of the contractor before any work is begun on the construction. The contractor shall provide submissions in strict accordance with Program Guide 18-15 Volume C (PG-18-15) and shall provide submissions for Government review. A quality assurance/quality control (QA/QC) is required.
Accuracy of Planning Information: The contractor shall meet with the CO and/or COTR before any work is begun on the construction. The contractor shall visit the project site to investigate the information shown on the Government furnished drawings, record (as-built) drawings and other planning documents which are part of this contract. This information is the best available, but the Government does not guarantee its accuracy or completeness. The contractor’s investigation of field conditions shall be performed in a competent professional manner in accordance with the industry standards.
The Government shall have 14 calendar days to review each submission. In the event that a submission is rejected the contractor shall resubmit the materials specified in the prior submission, revised according to the comments made by the VA resulting from the prior review(s).
The Contractor shall perform all necessary quality control and design review to identify and correct all design errors and omissions and shall not rely on Government review for such purposes. The Contractor shall provide a detailed description of its quality control plan for ensuring documents have been thoroughly reviewed for proper design coordination and errors and omission identification and corrections. Any errors or discrepancies identified in the design documents and specifications by the Government shall be corrected prior to the next stage of construction.
Performance Period: The Contractor shall complete all work including site restoration and redline drawings no later than 180 calendar days from contractor’s receipt of notice to proceed (NTP).