Updated Bid Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25020B0054
About this file
This is a presolicitation notice for a construction project to stabilize Building 129 for the National Historic Archives at the Dayton VA Medical Center. The Department of Veterans Affairs Network Contracting Office 10 will issue a solicitation on or about June 22, 2020 for complete construction services including all tools, equipment, and personnel. The contractor must provide work specified in the design drawings, specifications, and solicitation attachments. The project duration is 270 calendar days from notice to proceed. The solicitation will be posted at SAM.gov. This is a 100% set-aside for service-disabled veteran-owned small businesses. The NAICS code is 236220 with a small business size standard of $36.5 million. The SDVOSB must be registered and verified on VIP.vetbiz.va.gov, SAM.gov, and D&B. Bid, payment, and performance bonds will be required. A site visit will be scheduled. Amendments will be posted at SAM.gov and offerors must check for updates. Questions may be emailed by the deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S07. Bid Abstract - Stabilize Building 129 for National Historic Archives.pdf | ||
| 36C25020B0054 0004.docx | DOCX document | |
| 36C25020B0054 0003.docx | DOCX document | |
| Stabilize Bldg. 129 Questions and Answers.pdf | ||
| Stabilize Bldg. 129 Sign-in Sheet.pdf | ||
| 36C25020B0054 0002.docx | DOCX document | |
| Updated Project Manual.pdf | ||
| 36C25020B0054 0001.docx | DOCX document | |
| Updated Statement of Work (SOW).pdf | ||
| 36C25020B0054_1.docx | DOCX document | |
| Bid Set Addendum 1 Drawings.pdf | ||
| Bid Set Specifications.pdf | ||
| Bid Set Addendum 1.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAYTON VA MEDICAL CENTER
STABILIZE BLDG. 129 FOR NHA (PHASE 2)
DAYTON, OHIO
Contact:Contact: Contact:
GUIDON DESIGN INC.
Kyle Cyr Sr. Civil Engineer p: 317.800.6388 x 110 e: kcyr@guidondesign.com
CIVIL
ENGINEER
DAYTON VA MEDICAL
CENTER
RICK KIRKENDALL
Project Engineer
4100 W. Third Street Dayton, OH 45428 p: 937.268.6511 x 2837 e: Richard.Kirkendall@va.gov
OWNER
GUIDON DESIGN INC.
Adam Ogrzewalla Project
PM
1221 N. Pennsylvania Street Indianapolis, Indiana 46202 p: 317.800.6388 x 103 e: aogrzewalla@guidondesign.com
ARCHITECT
Contact:
DAYTON VA MEDICAL
CENTER
Robert Ivey Contracting Officer
OWNER
BID SET
1221 N. Pennsylvania Street Indianapolis, Indiana 46202
VICINITY MAP N
PROJECT LOCATION
LOCATION MAP
N
BUILDING LOCATION
N
BUILDING 129
GOVERNING CODES:
Refer to VA Manual PG-18-3 for additional codes, standards, guidelines and regulations, below listing is not comprehensive.
ICC, International Building Code, 2018 edition (IBC) ICC, International Plumbing Code, 2018 edition (IPC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, Design Handbook NFPA 101, Life Safety Code, 2018 edition (LSC) NFPA 70, National Electric Code, 2014 edition.
NFPA 80, Standard for Fire Doors and Fire Windows, 2016 edition.
NFPA 220, Standard Types of Building Construction, 2015 edition.
NFPA 780, Standard for Installation of Lighting Protection Systems, 2014 edition.
ANSI A117.1-2009 Standard on Accessible & Usable Buildings and Facilities Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Energy policy Act of 2005 (EPAct) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
Occupational, Safety and Health Administration (OSHA) Standards.
VA DESIGN MANUALS:
VA Barrier Free Design Guide PG-18-13 Architectural Asbestos Abatement Physical Security Design Manual: Life-Safety Protected Facilities Plumbing Site Structural
Local Codes:
As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc.). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notified about planned projects and given opportunity to review drawings provided that VA does not pay for review or inspection fees.
NOTES:
1. Conflicts between Nationally Recognized Codes and Standards and VA equirements – Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure a consistency system wide.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RICHARD KIRKENDALL
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET | INDIANAPOLIS, IN. 46202
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e rs
\a o g rz e w a lla
\D o c u m e n ts
\1 .1
.0
D a y to n V
A b ld g .1
V
A ro g rz e w a lla
.r v t
BID SET
GI000
KNARO
COVER SHEET
02/21/2020
16.1012.02STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
SHEET LIST
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 CODE ANALYSIS
CIVIL
CS101 DEMOLITION PLAN
CS201 SITE PLAN
CS301 GRADING AND UTILITY PLAN
CS501 DETAILS
ARCHITECTURAL
AA001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD101 DEMOLITION PLAN - BASEMENT LEVEL
AD102 DEMOLITION PLAN - FIRST LEVEL
AD105 DEMOLITION PLAN - ROOF
AS101 FLOOR PLAN - BASEMENT LEVEL
AS102 FLOOR PLAN - FIRST LEVEL
AS121 ROOF PLAN
AS201 BUILDING ELEVATION
AS401 DETAILS
02/28/2020
G. MEANS OF EGRESS
Means of egress. The building is equipped with an automated sprinkler system.
1. Maximum travel distance: 300 feet
2. Common path of travel: 50 feet
3. Dead ends: 50 feet
4. Corridors: Table 1018.1: Corridors are not required to be rated.
NFPA 101. 38.2.5.21 In buildings protected throughout by an approved, supervised automatic sprinkler system in accordance with Section
9.7.1.1(1), dead- end corridors shall not exceed 50 ft (15 m).
NFPA 101. 38.2.5.3.1 A common path of travel shall be permitted for the first 100 ft (30 m) in a building protected throughout by an approved, supervised a automatic sprinkler system in accordance with Section 9.7.
NFPA 101. 389.2.6.3 Travel distance shall not exceed 300 ft (91 m) in business occupancies protected throughout by an approved, supervised automatic sprinkler system in accordance with Section 9.7.
5. Number of exits: At least two exits shall be provided from every floor/tier. Existing exiting from floors above and below not modified within project scope.
NFPA 101. 38.2.3.2 Egress Width Factor: Table 7.3.3.1 requires a minimum egress width of 0.2 in per occupant for doors. ramps, and corridors and a minimum egress width of 0.3 in per occupant for stairs. Corridor shall not be less than 44 inches.
7. Occupant Load factor: Chapter 10, Table 1004.1.2, Business requires an occupancy load of 1 person per 100 square foot. The group rooms are assembly areas, unconcentrated with seating and tables which require an occupancy load of 1 person per 15 square foot.
8. Spaces with one exit or exit access doorway for occupancy B shall only require 1 door with a room occupancy of 49 or less.
Where two or more exist are required they shall comply with the following:
Remoteness of exits: Where two or more exits or exit access doorways are required from any portion of the exit access, at least two of the exit doors or exit access doorways must be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the building or area to be served measured in a straight line between exit doors or exit access doorways.
NFPA 101, 38.2.4.1 (3),Exit access, shall be permitted to include a single exit access path for the distances permitted as common paths of travel by 38.2.5.3. (38.2.4.2)
NFPA 101, 38.2.4.3. A single exit shall be permitted for a room or area with a total occupant load of less than 100 persons, provided that all of the following criteria are met: (38.2.4.3)
1. The exit shall discharge directly to the outside at the level of exit discharge for the building.
2. The total distance of travel from any point, including travel within the exit, shall not exceed 100 ft (30 m) .
9. Doors shall swing in the direction of egress travel where serving an occupant load of 50 or more persons. (Chapter 10, 1008.1.2)
10. Ramp Design: per the LSC 7.2.5:
Maximum Slope: 1/12
Guard: 42 inches(Required where elevation change exceeds 30 inches. Design shall prevent the passage of a 4 inch Sphere.)
4 inch curbs required for drop off edge of ramp
Handrail: 30-38 inches (required for ramps with more than a 6 inch rise.
11. Means of Egress Illumination shall be provided.
12. Exit Signs 1013.1 Exception 1, Exit signs are not required in rooms or areas that required only one exit or exit access.
NFPA 101 Life Safety 2015
38.3.6.1* Where access to exits is provided by corridors, such corridors shall be separated from use areas by fire barriers in accordance with Section
8.3 having a minimum 1 hour fire resistance rating, unless one of the following conditions existing Exception No. 1:* Where exits are available from an open floor area. Exception No. 2:* Within a space occupied by a single tenant. Exception No. 3: Within buildings protected throughout by an approved, supervised automatic sprinkler system in accordance with Section 9.7.1.1(1)
38.5.2 Heating, Ventilating, and Air Conditioning. Heating, ventilating, and air conditioning equipment shall comply with the provisions of Section 9.2.
ICC IBC 2015
A. OCCUPANCY CLASSIFICATION
1. The existing building occupancy is Group B, Business, Clinic-outpatient. (Chapter 3, 304) (NFPA 101 6.1.11)
2. Occupancy Classification does not require any special requirements based on use and occupancy. (Chapter 4)
B. CONSTRUCTION CLASSIFICATION
1. The building is an existing 3-story building with a B occupancy. The project scope does not change the construction type or expand the overall building height or allowable area. (Chapter 5)
2. Primary structural elements are existing and concrete. The project scope does not change the structural elements in anyway.
4. Existing Building, Assume: Type II B, 3 story limit, 69,000 square feet.
5. Fully Sprinkled
C. FIRE RESISTANCE RATED SEPARATIONS
1. Fire-Resistance Rating Requirements for Building Elements (hours) (Chapter 6, Table 601)
Existing Building, Assume:
Primary Structure: 0
Bearing Walls
Exterior 0
Interior 0
Non-Bearing Walls Interior 0
Floor Construction and secondary members 0
Roof Construction and secondary members 0
D. FIRE AND SMOKE PROTECTION FEATURES
1. Fire barriers and shaft enclosures shall meet Table 707.3.9 which requires a 2-hour fire-resistance rating for B occupancies. Existing 2 hour fire barrier assumed to separate the existing building. (Chapter 7, Table 707.3.10)
2. Existing fire/smoke rated barriers shall be maintain within project boundary.
NFPA 101 38.3.2 Protection from hazards. 38.3.2.1 General. Hazardous areas including, but not limited to, areas used for general storage, boiler, furnace rooms, and maintenance shops taht include woodworking and painting areas shall be protected in accordance with Section 8.7. No high hazards are stored within building/project boundary.
NFPA 101. 8.7.1.1 Protection from any area having a degree of hazard greater that of normal to the general occupancy of the building or structure shall be provided by one of the following means: (1) Enclosing the area with a fire barrier without windows that has a 1-hour fire resistance rating in accordance with Section 8.3. (2) Protecting the area with automatic extinguishing systems in accordance with Section 9.7. All storage rooms within project boundary are protected by both item 1 and 2.
E. INTERIOR FINISH
Interior wall and ceiling finish to be designed in accordance with Table 803.11. (Chapter 8, Table 803.11)
1. Class A, B and C finish is permitted for interior walls and ceilings in rooms, and corridors. Class A or B finish is permitted for exits. (NFPA 38.3.3)
NFPA 101. 38.3.3.3.1 Interior finishes shall comply with Section 10.2.
NFPA 101. 38.3.3.3. Interior floor finishes in exit corridors shall be Class 1 or Class II.
NFPA 101. 38.3.3.3.3 Interior floor finishes shall comply with 10.27.1 or 10.2.7.2 as applicable.
G. FIRE PROTECTION SYSTEMS
1. Automatic Sprinkler System is provided within the building and shall be modified to accommodate the renovation and it shall be revised in compliance with NFPA 13. (Chapter 9, (F) 903.2.11.4)
2. Portable Fire Extinguishers shall be provided and installed in accordance with Chapter 9 and NFPA 10. A single 2-A extinguisher shall be provided per 3,000 square feet, and within a travel distance of 75 feet. (Table 906.3(1)) NFPA 101, 38.3.5 Extinguishing Requirements. Portable fire extinguishers shall be provided in every business occupancy in accordance with 9.9/ NFPA 10.
3. Fire Alarm and Detection Systems is an existing system and shall be brought to current NFPA 72 as the existing system allows.
a. Chapter 9 (F) 907.2.2 Group B, Exception: Manual fire alarm boxes are not required where the building is equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1 and the occupant notification appliances with activate through the notification zones upon sprinkler water flow.
NFPA 101. 38.3.4.1 Detection, Alarm and Communications Systems. General. A fire alarm system in accordance with Section 9.6 shall be provided in all business occupancies where (2) The occupancy is subject to 50 of more occupants above or below the level of exit discharge.
NFPA 101. 38.3.4.2 Initiation. Initiation of the required fire alarm system shall be by any one of the following means (3) Approved automatic sprinkler system in accordance with 9.6.2.1(3) that provides protection through the building and provisions 9.6.2.6 shall apply.
NFPA 101. 38.3.4.3 Occupant Notification. During all times that the building is occupied the required fire alarm system, once initiation shall perform on of the following functions: (1) It shall activate a general alarm in accordance with 9.6.3. (2) A positive alarm sequence in accordance with 9.6.3.4 shall be permitted.
NFPA 101. 38.3.4.4. Emergency Forces Notifications. Emergency forces shall be provided and shall include notifying both of the following: (1) Fire department in accordance with 9.6.4. (2) Approved local emergency organization, if provided.
CODE ANALYSISGOVERNING CODES:
Refer to VA Manual PG-18-3 for additional codes, standards, guidelines and regulations, below listing is not comprehensive.
ICC, International Building Code, 2015 edition (IBC)
ICC, International Plumbing Code, 2015 edition (IPC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
NFPA 101, Life Safety Code, 2015 edition (LSC)
2010 ADA Standards for Accessible Design
VA DESIGN MANUALS:
VA Mental Health Facilities Design Guide December
VA Barrier Free Design Guide PG-18-13
Architectural
Asbestos Abatement
Electrical
Equipment
Fire Protection, Sixth Edition Revised September 2011
HVAC
Interior Design
Physical Security Design Manual: Life-Safety Protected
Facilities
Plumbing
Site
Structural
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RICHARD KIRKENDALL
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET | INDIANAPOLIS, IN. 46202
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e rs
\a o g rz e w a lla
\D o c u m e n ts
\1 .1
.0
D a y to n V
A b ld g .1
V
A ro g rz e w a lla
.r v t
BID SET
GI101
KNARO
CODE ANALYSIS
02/21/2020
16.1012.02STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
02/28/202002/28/2020
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e i g h t h i n c h o n e f o o t 1 t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RONALD LYNN
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e r s a o g r z e w a l l a
D o c u m e n t s
D a y t o n
V
A b l d g a o g r z e w a l l a r v t
BID SET
CMBSLP06/29/2018
16.1012.02
STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
N
0 2010
DEMOLITION PLAN
CS101
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e i g h t h i n c h o n e f o o t 1 t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RONALD LYNN
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e r s a o g r z e w a l l a
D o c u m e n t s
D a y t o n
V
A b l d g a o g r z e w a l l a r v t
BID SET
CMBSLP06/29/2018
16.1012.02
STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
N
0 2010
SITE PLAN
CS201
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e i g h t h i n c h o n e f o o t 1 t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RONALD LYNN
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e r s a o g r z e w a l l a
D o c u m e n t s
D a y t o n
V
A b l d g a o g r z e w a l l a r v t
BID SET
CMBSLP06/29/2018
16.1012.02
STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
N
0 2010
PONDING
GRADING AND UTILITY
PLAN
CS301
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e i g h t h i n c h o n e f o o t 1 t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RONALD LYNN
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e r s a o g r z e w a l l a
D o c u m e n t s
D a y t o n
V
A b l d g a o g r z e w a l l a r v t
BID SET
CMBSLP06/29/2018
16.1012.02
STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
DETAILS
CS501
DOME GRATE NOTES:
1 - 8" - 30" DOME GRATES SHALL BE DUCTILE IRON PER ASTM A536
GRADE 70-50-05.
2 - 8" & 10" DOME GRATES FIT ONTO THE DRAIN BASINS WITH THE USE
OF A PVC BODY TOP.
3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN
DETAILS. RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING
RESTRICTIONS.
4 - DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO
ASTM D3212 FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL),
N-12 HP, & PVC SEWER (4" - 24").
5 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°.
6 - 8" - 30" DOME GRATES HAVE NO LOAD RATING.
SOLID COVER NOTES:
1 - 8" - 30" SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05.
2 - 12" - 30" FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05.
8" & 10" SOLID COVERS FIT DIRECTLY ONTO DRAIN BASINS WITH THE USE OF
A PVC BODY TOP.
3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN
DETAILS. RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING
RESTRICTIONS.
4 - DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO
ASTM D3212 FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL),
N-12 HP, & PVC SEWER (4" - 24").
5 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°.
6 - SOLID COVERS ARE RATED FOR LIGHT DUTY APPLICATIONS ONLY;
NO CONCRETE COLLAR NEEDED FOR LIGHT DUTY RATING.
PROJECT GENERAL NOTES
1. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE
CONTRACT DOCUMENTS, THE BETTER QUALITY, MORE STRINGENT
REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE
GOVERNMENT, SHALL BE PROVIDED.
2. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,
SUB CONTRACTORS, MANUFACTURERS, SUPPLIERS: CAREFULLY AND
THOROUGHLY REVIEW THESE GENERAL NOTES. IT IS YOUR RESPONSIBILITY
TO KNOW AND ADHERE TO THESE REQUIREMENTS.
3. DO NOT PRESUME THAT YOUR SCOPE OF WORK IS SINGULARLY DEFINED.
YOUR SCOPE OF WORK IS DEFINED THROUGHOUT THE ENTIRE SET OF
DRAWINGS AND SPECIFICATIONS AND IS NOT CONTAINED IN JUST ONE
SERIES OF DRAWINGS OR DIVISION OF SPECIFICATIONS. YOU MUST REVIEW
THE ENTIRE SET OF CONTRACT DOCUMENTS TO DETERMINE YOUR SCOPE
OF WORK.
4. EVERY EFFORT HAS BEEN MADE TO MAKE THESE DOCUMENTS CONCISE
AND COORDINATED, TO DEFINE WORK IN THE MOST LOGICAL PLACE AND
TO ELIMINATE REDUNDANCY. KEEP IN MIND HOWEVER THAT YOUR SCOPE
OF WORK CAN BE CONTAINED IN VARIOUS PLACES, WITH VARYING
DESCRIPTIONS. DO NOT CONSIDER THAT THERE IS ONE CUSTOMARY
PLACE TO LOCATE YOUR WORK. THERE IS A DANGER OF OMITTING WORK
FROM YOUR SCOPE BECAUSE THE ENTIRE SET OF DOCUMENTS WAS NOT
REVIEWED.
5. MECHANICAL AND ELECTRICAL DRAWINGS SHOW INFORMATION IN A
DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, AND SUCH.
6. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH SITE
CONDITIONS AS THEY MAY AFFECT CARRYING OUT THE WORK AS
DESCRIBED IN THESE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
INVESTIGATE, VERIFY, AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE
PROJECT, AND NOTIFY THE ARCHITECT OF ANY CONDITIONS THAT REQUIRE
MODIFICATION BEFORE PROCEEDING WITH THE WORK.
7. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, LABOR,
AND SERVICES NECESSARY TO COMPLETE THE WORK.
8. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT
SHALL BE FAMILIAR WITH THE RULES AND REGULATIONS OF THE
OCCUPATIONAL SAFETY AND HEALTH ACT, AND IMPLEMENT THOSE RULES
AS THEY APPLY TO THIS PROJECT.
9. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE BUILDING
CODES AS NOTED ON CODE SHEETS AND VA STANDARDS.
10. CONTRACTOR SHALL SUBMIT CONFORMATION OF ORDERED MATERIALS OR
ITEMS NECESSARY TO COMPLETE THE PROJECT WITH PROJECTED
DELIVERY DATE GREATER THAN FOUR WEEKS.
11. ALL SUBCONTRACTORS SHALL SUBMIT SHOP DRAWINGS AS REQUIRED FOR
APPROVAL PRIOR TO COMMENCING ANY WORK.
12. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COORDINATION OF ALL TRADES AND THE PREVENTION OF CONFLICT
AMONG ALL TRADES.
13. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND
PROTECTING ALL UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE.
REPAIR ALL DAMAGE TO UTILITY LINES CAUSED BY CONSTRUCTION
OPERATIONS AT NO COST TO THE OWNER.
14. PROVIDE SEALANT AT ALL JOINTS OR CRACKS THAT OCCUR WHERE
DISSIMILAR MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND
THE INTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISE
ON
THE DRAWINGS.
15. ALL PENETRATIONS AT SMOKE AND FIRE RATED WALLS, FLOORS, OR
CEILINGS, SHALL BE PROTECTED, SEALED OR DAMPERED USING ONLY HILTI
FIRE STOPPING APPROVED METHODS, MATERIALS AND INSTALLATION.
16. CONTRACTOR SHALL TAKE CARE TO MAINTAIN EXISTING FIRE PROTECTION
SYSTEMS. REPLACE FIRE-PROOFING AND SEALANTS TO ORIGINAL STATE
WHERE DISTURBED BY CONSTRUCTION AND WHERE CONNECTIONS OF NEW
CONSTRUCTION MUST INTERFACE WITH EXISTING PROTECTED
STRUCTURAL
MEMBERS OR BUILDING COMPONENTS.
17. PAINT ALL EXPOSED STEEL UNLESS NOTED OTHERWISE.
18. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND
SHORING REQUIRED DURING CONSTRUCTION.
19. ALL WORK AND MATERIAL SHALL BE REGARDED AS NEW UNLESS
SPECIFICALLY INDICATED AS “EXISTING” OR “(E)” ON THE DRAWINGS AND
DESCRIBED WITHIN THE SPECIFICATIONS.
20. TYPICAL DETAILS MAY NOT NECESSARILY BE REFERENCED ON THE
DRAWINGS, BUT APPLY UNLESS NOTED OTHERWISE.
21. SECURITY AND SAFETY ARE THE CONTRACTOR'S RESPONSIBILITY.
COORDINATE WITH CONTRACTING OFFICER'S REPRESENTATIVE.
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING
INFORMATION MODEL (BIM) WAS DEVELOPED SOLELY TO COMMUNICATE THE
DESIGN TO THE OWNER AND IS NOT SUITABLE FOR ANY OTHER PURPOSE.
FOR EXAMPLE THE REVIT MODEL IS NOT SUITABLE FOR COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THESE DOCUMENTS WERE PRODUCED USING THE CONSTRUCTION
SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE NATIONAL
CAD STANDARD AS GUIDES.
3. ANY INDICATION OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, AND ARE NOT TO BE TAKEN
LITERALLY. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY THE
CONTRACTOR AND APPROVED BY THE OWNER BEFORE ACTUAL
CONSTRUCTION WORK BEGINS.
4. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT
CONFIGURATIONS OR DETAILS OF SPECIFIC MANUFACTURERS. DIMENSIONS
AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE
ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER
MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL
INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN.
CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL
PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESSES
FOR RECESSED OR SEMI-RECESSED PRODUCTS), AND IS RESPONSIBLE FOR
ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR
PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
5. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR
CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES
OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT
THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE
DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS
ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE
CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
6. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY
SPECIFIC ENGINEERING DISCIPLINES (SUCH AS CIVIL, STRUCTURAL,
MECHANICAL, ELECTRICAL, ETC.) ARE COMPLEMENTARY; ITEMS SHOWN IN ANY
ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE
REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN
INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN
EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR
INTERPRETATION FROM THE ARCHITECT PRIOR TO BIDDING. WHERE
INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE
ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE
CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY
OF WORK.
7. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE
CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF
EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE ARCHITECT OF ANY
DISCREPANCY DISCOVERED.
8. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE
ARCHITECT IMMEDIATELY SHOULD ANY DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
9. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD
CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD
DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
10. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR
REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL
OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
11. ALL DIMENSIONS INDICATED ARE TO FACES OF STRUCTURAL MATERIALS OR
COLUMN GRID LINES UNLESS NOTED OTHERWISE. ROUGH OPENINGS SHALL
ALLOW FOR SHIM SPACE.
12. THE TERM "ALIGN" REFERS TO LOCATING DIFFERENT COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
13. SHOULD DIMENSIONS BE MISSING OR CONFLICTING, NOTIFY ARCHITECT PRIOR
TO PROCEEDING WITH RELATED WORK.
DRAWINGS AND DIMENSIONS
A/C AIR CONDITIONING
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
A&E ARCHITECT AND ENGINEERS
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITIES HAVING JURISDICTION
AHU AIR HANDLING UNIT
ALT ALTERNATIVE
ALT TRANS ALTERNATIVE TRANSPORTATION
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AVG AVERAGE
BB BULLETIN BOARD
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BRG BEARING
CB CATCH BASIN
CBB CEMENTITIOUS BACKER BOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISH CONTRACTOR INSTALL
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD, CEILING GRILLE
C & G CURB & GUTTER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNITS
CO CLEANOUT(S)
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CP CONCRETE PIPE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST STONE
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CY CUBIC YARD
D DRYER
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATED
ETS EXPOSED TO STRUCTURE
ARCHITECTURAL ABBREVIATIONS
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE FIXTURES & EQUIPMENT
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLR FLOOR
FLUOR FLUORESCENT
FO FINISH OPENING
FOS FACE OF STUD
FR FIRE RATED
FSP FIRE STANDPIPE
FT FOOT / FEET
FTG FOOTING
FURR FURRING
FV FIELD VERIFY
FVC FIRE VALVE CABINET
FWC FABRIC WALLCOVERING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GARBAGE DISPOSAL
GF CMU GROUND FACE CMU
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLACK
GLU LAM GLUE LAMINATED WOOD
GND GROUND
GT GROUT
GYP BD GYPSUM BOARD
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCP HANDICAPPED
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR, HANDRAIL
HT HEIGHT
HVAC HEATING, VENTILATING & AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IG INSULATING GLASS
IN INCH
INCAN INCANDESCENT
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
ITG INSULATED TEMPERED GLASS
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
L LONG
LAV LAVATORY
LB(S) # POUND(S)
LF LINEAL FEET
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
M & BH MOP AND BROOM HOLDER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MECH MECHANICAL
MEPF MECHANICAL, ELECTRICAL, PLUMBING,
FIRE PROTECTION (CONDUIT)
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
N NORTH
NA NOT APPLICABLE
NECY NECESSARY
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER,
OVERFLOW DRAIN
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OH OPPOSITE HAND
OPN OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PLASTIC
PARTN PARTITION
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PT CONC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTL PORCELAIN TILE
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
QT QUARRY TILE
R R-VALUE (INSULATION),
RADIUS, RISER
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFERENCE
REBAR REINFORCING BAR
REC RECESSED
RECPT RECEPTACLE
REF REFRIGERATOR
REG REGISTER
REINF REINFORCE
REQD REQUIRED
RESIL RESILIENT
REV REVISION
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RT RUBBER STAIR TREAD
S SOUTH
SAF SEAMLESS ACRYLIC FLOORING
SAP SUSPENDED ACOUSTICAL PANELS
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASHBLOCK
SC SEALED CONCRETE, SOLID CORE
SCHED SCHEDULE
SCP SCUPPER
SD SOAP DISPENSER
SEAL SEALER
SECT SECTION
SECT SECTION
SF SQUARE FOOT
SF CMU SPLIT-FACE CMU
SHR SHOWER
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SL SLOPE
SLV SHORT LEG VERTICAL
SND SANITARY NAPKIN DISPOSER
SNV SANITARY NAPKIN VENDOR
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TB TACKBOARD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
TD TUBULAR DAYLIGHTING DEVICE
TEL TELEPHONE
TEMP TEMPERATURE
TG TEMPERED GLASS,
TONGUE & GROOVE,
TRANSFER GRILLE
THRU THROUGH
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TTD TOILET TISSUE DISPENSER
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
URN URINAL
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDP WOOD PANELING
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
WR WASTE RECEPTACLE,
WATER RESISTANT
WS WATER STOP
WSCT WAINSCOTT
WT WEIGHT
WWF WELDED WIRE FABRIC
ARCHITECTURAL SYMBOLS
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
BUILDING
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
ELEVATION REFERENCES
X
XXXX
X
XXXX
1 VIEW NAME
SCALE: 1/8" = 1'-0"A101
VIEW TITLE
HANDICAP SYMBOL
N TRUE NORTH ARROW
X PLAN NOTE INDICATOR
X ALTERNATE INDICATOR
ROOM NAME
150 SF
ROOM INDICATOR
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RICHARD KIRKENDALL
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET | INDIANAPOLIS, IN. 46202
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e rs
\a o g rz e w a lla
\D o c u m e n ts
\1 .1
.0
D a y to n V
A b ld g .1
V
A ro g rz e w a lla
.r v t
BID SET
AA001
KNARO
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONS
02/21/2020
16.1012.02STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
UP
UP
DEMOLITION GENERAL NOTES
D.
E.
DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED UNLESS
OTHERWISE NOTED. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS.
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY, THE CONTRACTOR
SHALL RETURN ANY EXISTING CEILING TO REMAIN TO LIKE NEW CONDITION.
THIS SHALL INCLUDE REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM
AND ALL ASSOCIATED ASSEMBLIES AS WELL AS THE REPLACEMENT OF
DAMAGED CEILING PANELS, WITHIN AND BEYOND PROJECT LIMITS.
DEMOLITION PLAN NOTES
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE
APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO
BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW
CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF
NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.
A. IF APPLICABLE, REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, AND
PLUMBING DOCUMENTS FOR ADDITIONAL DEMOLITION INFORMATION.
B. COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND
REGULATIONS. ALWAYS ABIDE BY THE MOST RESTRICTIVE CODE.
C. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION
AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL
CONSTRUCTION SHALL BE INCLUDED. CONTRACTOR SHALL REMOVE ALL
EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON
THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
REMOVE AND DISPOSE OF EXISTING WOOD RAMP AND HANDRAIL IN ITS
ENTIRETY.
PLAN LEGEND
ROOM
NEW WALL
EXISTING WALL TO REMAIN
NEW DOOR101
DOOR TAG
EXISTING DOOR
101 ROOM TAG
1 PLAN NOTE
ALTERNATE/BID DEDUCT ITEM
PT-1 FINISH INDICATION
A STOREFRONT/WINDOW
T GLAZING
ITEMS TO BE
DEMOLISHED
G. PROJECT IS SINGLE PHASE CONSTRUCTION.
H. PROJECT LIMITS SHALL HAVE THE FOLLOWING REMOVED: WALLS, DOORS,
FRAMES, FLOORING, THICKSET CERAMIC TILE, CEILING ASSEMBLIES,
PLUMBING FIXTURES, LIGHTING, METAL BUILT IN CABINETS.
I. REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL
DOORS AND WINDOWS. PROVIDE DRAWING INDICATING DOOR AND
WINDOW IDENTIFICATION.
2 REMOVE AND DISPOSE OF EXISTING STAIRS, LANDING, AND HANDRAIL IN
ITS ENTIRETY.
95' - 0"
15' - 4" 4' - 0" 4' - 10" 4' - 0" 38' - 5" 4' - 6" 4' - 7" 4' - 0"
0"
/2
/2
95' - 0"
0"
UNEXCAVATED
DEDUCT ALTERNATES
1 DEDUCT ALL WORK ASSOCIATED WITH THE DEMOLITION OF THE EXISTING
STAIRS AND CONSTRUCTION OF NEW EXTERIOR STONE STAIRS AND
LANDING. EXISTING STAIRS AND LANDING TO BE PROTECTED IN PLACE.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RICHARD KIRKENDALL
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET | INDIANAPOLIS, IN. 46202
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e rs
\a o g rz e w a lla
\D o c u m e n ts
\1 .1
.0
D a y to n V
A b ld g .1
V
A ro g rz e w a lla
.r v t
BID SET
AD101
KNARO
DEMOLITION PLAN - BASEMENT LEVEL
02/21/2020
16.1012.02STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
SCALE: 1/4" = 1'-0"AD101
1 DEMOLITION - BASEMENT LEVEL
N
DN
DEMOLITION GENERAL NOTES
D.
E.
DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED UNLESS
OTHERWISE NOTED. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS.
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY, THE CONTRACTOR
SHALL RETURN ANY EXISTING CEILING TO REMAIN TO LIKE NEW CONDITION.
THIS SHALL INCLUDE REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM
AND ALL ASSOCIATED ASSEMBLIES AS WELL AS THE REPLACEMENT OF
DAMAGED CEILING PANELS, WITHIN AND BEYOND PROJECT LIMITS.
DEMOLITION PLAN NOTES
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE
APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO
BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW
CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF
NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.
A. IF APPLICABLE, REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, AND
PLUMBING DOCUMENTS FOR ADDITIONAL DEMOLITION INFORMATION.
B. COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND
REGULATIONS. ALWAYS ABIDE BY THE MOST RESTRICTIVE CODE.
C. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION
AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL
CONSTRUCTION SHALL BE INCLUDED. CONTRACTOR SHALL REMOVE ALL
EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON
THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
REMOVE AND DISPOSE OF EXISTING WOOD RAMP AND HANDRAIL IN ITS
ENTIRETY.
PLAN LEGEND
ROOM
NEW WALL
EXISTING WALL TO REMAIN
NEW DOOR101
DOOR TAG
EXISTING DOOR
101 ROOM TAG
1 PLAN NOTE
ALTERNATE/BID DEDUCT ITEM
PT-1 FINISH INDICATION
A STOREFRONT/WINDOW
T GLAZING
ITEMS TO BE
DEMOLISHED
G. PROJECT IS SINGLE PHASE CONSTRUCTION.
H. PROJECT LIMITS SHALL HAVE THE FOLLOWING REMOVED: WALLS, DOORS,
FRAMES, FLOORING, THICKSET CERAMIC TILE, CEILING ASSEMBLIES,
PLUMBING FIXTURES, LIGHTING, METAL BUILT IN CABINETS.
I. REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL
DOORS AND WINDOWS. PROVIDE DRAWING INDICATING DOOR AND
WINDOW IDENTIFICATION.
2 REMOVE AND DISPOSE OF EXISTING STAIRS, LANDING, AND HANDRAIL IN
ITS ENTIRETY.
0"
44' - 4 3/4" 7' - 0" 43' - 7 1/4"
95' - 0"
DEDUCT ALTERNATES
1 DEDUCT ALL WORK ASSOCIATED WITH THE DEMOLITION OF THE EXISTING
STAIRS AND CONSTRUCTION OF NEW EXTERIOR STONE STAIRS AND
LANDING. EXISTING STAIRS AND LANDING TO BE PROTECTED IN PLACE.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RICHARD KIRKENDALL
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET | INDIANAPOLIS, IN. 46202
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e rs
\a o g rz e w a lla
\D o c u m e n ts
\1 .1
.0
D a y to n V
A b ld g .1
V
A ro g rz e w a lla
.r v t
BID SET
AD102
KNARO
DEMOLITION PLAN - FIRST LEVEL
02/21/2020
16.1012.02STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
SCALE: 1/4" = 1'-0"AD102
1 DEMOLITION - FIRST LEVEL
1 2
/2
/2
5 1/2" / 12"5 1/2" / 12" 33
101' - 8"
DEMOLITION GENERAL NOTES
DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED UNLESS
OTHERWISE NOTED. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS.
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY, THE CONTRACTOR
SHALL RETURN ANY EXISTING CEILING TO REMAIN TO LIKE NEW CONDITION.
THIS SHALL INCLUDE REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM
AND ALL ASSOCIATED ASSEMBLIES AS WELL AS THE REPLACEMENT OF
DAMAGED CEILING PANELS, WITHIN AND BEYOND PROJECT LIMITS.
DEMOLITION ROOF PLAN NOTES
REMOVE AND DISPOSE OF ASPHALT SINGLES AND FELT UNDERLAYMENT IN
ITS ENTIRETY.
REMOVE AND REPLACE DETERIORATED SHEATHING.
6 DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE
APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK TO
BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE NEW
CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF
NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK.
1 IF APPLICABLE, REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, AND
PLUMBING DOCUMENTS FOR ADDITIONAL DEMOLITION INFORMATION.
2 COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES
AND REGULATIONS. ALWAYS ABIDE BY THE MOST RESTRICTIVE CODE.
3 COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE INCLUDED. CONTRACTOR SHALL REMOVE ALL EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS
REQUIRED TO BE REMOVED.
REMOVE METAL GUTTERS, DRIP EDGE, FASCIA, AND DOWNSPOUTS IN ITS
ENTIRETY.
EXISTING BRICK CHIMNEY TO REMAIN IN PLACE REMOVE EXISTING
FLASHING AND SEALANT AT ROOF INTERSECTION.
PLAN LEGEND
ROOM
NEW DOOR101
DOOR TAG
EXISTING DOOR
101 ROOM TAG
1 PLAN NOTE
ALTERNATE/BID DEDUCT ITEM
PT-1 FINISH INDICATION
A STOREFRONT/WINDOW
T GLAZING
ITEMS TO BE
DEMOLISHED
REMOVE AND DISPOSE OF EXISTING ROOF HATCH. INFILL ROOF DECK
FLUSH WITH ADJACENT DECK.
7 PROJECT IS SINGLE PHASE CONSTRUCTION.
8 PROJECT LIMITS SHALL HAVE THE FOLLOWING REMOVED: WALLS, DOORS,
FRAMES, FLOORING, THICKSET CERAMIC TILE, CEILING ASSEMBLIES,
PLUMBING FIXTURES, LIGHTING, METAL BUILT IN CABINETS.
9 REMOVE, LABEL, BUNDLE AND STORE INTERIOR MILLWORK FROM ALL
DOORS AND WINDOWS. PROVIDE DRAWING INDICATING DOOR AND
WINDOW IDENTIFICATION.
6 EXISTING ROOF PENETRATION TO BE REMOVED AND ROOF
SHEATHING TO BE INFILLED PRIOR TO INSTALLING NEW ROOF.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RICHARD KIRKENDALL
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET | INDIANAPOLIS, IN. 46202
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e rs
\a o g rz e w a lla
\D o c u m e n ts
\1 .1
.0
D a y to n V
A b ld g .1
V
A ro g rz e w a lla
.r v t
BID SET
AD105
KNARO
DEMOLITION PLAN - ROOF
02/21/2020
16.1012.02STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
SCALE: 1/4" = 1'-0"AD105
1 DEMOLITION - ROOF
UP
AS
AS
AS
AS
0"
/2
V .I.
F
6'
/2
95' - 0"
0"
0"
95' - 0"
95' - 0"
AS401
AS401
AS101
TYP.
2'
2'
6" 6" 6"6"
CONSTRUCTION PLAN GENERAL NOTES
CONSTRUCTION PLAN NOTES
A. ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY
UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR "CLEAR"
INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF FINISH.
B. KEYNOTES AND LEGENDS ARE TYPICAL FOR ALL FLOOR PLAN SHEETS,
INDIVIDUAL NOTES MAY NOT APPLY TO EACH SHEET.
C. REFERENCE STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL FOR
ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,
BLOCKING, ETC.
D. VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.
E. PATCH EXISTING WALLS WHERE NEW WALLS MEET.
F. ALL GYPSUM WALLBOARD IS 5/8" TYPE "X" UNLESS NOTED OTHERWISE.
G. PROVIDE CONTROL JOINT IN ALL GYPSUM BOARD WALLS GREATER THAN 30'
LONG. PLACE CONTROL JOINTS AT CORNERS OF DOORS OR WINDOWS.
H. ALL HANDRAILS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH
ALL REQUIREMENTS OF AMERICANS WITH DISABILITIES ACT GUIDELINES AND
ALL CODES AND REGULATIONS HAVING JURISDICTION, THE MOST STRINGENT
SHALL PREVAIL.
I. PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER DETAILS.
J. CONTRACTOR TO MAINTAIN/REPAIR RATING OF EXISTING PARTITIONS AS
AFFECTED BY DEMOLITION/NEW CONSTRUCTION, TYPICAL THROUGHOUT
K. ALL NEW PARTITONS ARE WALL TYPE S3.A1 UNLESS NOTED OTHERWISE.
L. WHERE NO DIMENSION IS INDICATED, FINISH DOORS 6" FROM EDGE OF STUD
FRAMING AT CORNERS UNLESS OTHERWISED NOTED.
PROVIDE NEW GRANITE STEPS AND LANDING ON CONCRETE FOUNDATION.
CONSTRUCTION PLAN LEGEND
ROOM
NEW WALL
EXISTING WALL TO REMAIN
NEW DOOR101
DOOR TAG
EXISTING DOOR
101 ROOM TAG
1 PLAN NOTE
ALTERNATE/BID DEDUCT ITEM
PT-1 FINISH INDICATION
A STOREFRONT/WINDOW
T GLAZING
ITEMS TO BE
DEMOLISHED
EXISTING BRICK AND
STONE WALL
PVC DRAIN CONNECT TO
UNDERDRAIN
COMPACTED GRANULAR
BASE (RE: CIVIL)
SEAL NEW CONCRETE
TO STONE WALL
#4 REBAR - 8" EPOXY
ANCHOR DOWEL INTO
STONE FOUNDATION.
4" EMB. @ 12" O.C.
PVC DRAIN COVER
GALV METAL GRATE
WITH CONTINUOUS
GALV METAL ANGLE
SUPPORT PER
MANUFACTURER.
NEW DOUBLE
HUNG WINDOW
NEW CONCRETE
WINDOW WELL,
VERIFY WELL DEPTH. M
IN
8"
M
IN
4"
SLOPE 2%
AWAY FROM
BUILDING
1' - 6"
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
DAYTON VAMC
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
RICHARD KIRKENDALL
PROJECT ENGINEER
552-18-202
GUIDON DESIGN INC.
1221 N. PENNSYLVANIA STREET | INDIANAPOLIS, IN. 46202
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
DAYTON VA MEDICAL CENTER
4100 W. THIRD STREET, DAYTON, OH 45428
C U s e rs
\a o g rz e w a lla
\D o c u m e n ts
\1 .1
.0
D a y to n V
A b ld g .1
V
A ro g rz e w a lla
.r v t
BID SET
AS101
KNARO
FLOOR PLAN - BASEMENT LEVEL
02/21/2020
16.1012.02STABILIZE BLDG. 129 FOR NHA
(PHASE 2)
SCALE: 1/4" = 1'-0"AS101
1 BASEMENT LEVEL
N
SCALE: 1/2" = 1'-0"AS101
2 BASEMENT NEW WINDOW WELL SECTION TYP.
DN
AS
AS
AS
AS
0"
95' - 0"
1'
0"
95' - 0"
82' - 4" 12' - 8"
AS401
AS401
32' - 4" 9' - 2" 10' - 8" 5' - 6" 37' - 4"
6' - 8"
CONSTRUCTION PLAN GENERAL NOTES
CONSTRUCTION PLAN NOTES
A. ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY
UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR "CLEAR"
INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF FINISH.
B. KEYNOTES AND LEGENDS ARE TYPICAL FOR ALL FLOOR PLAN SHEETS,
INDIVIDUAL NOTES MAY NOT APPLY TO EACH SHEET.
C. REFERENCE STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL FOR
ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,
BLOCKING, ETC.
D. VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.
E. PATCH EXISTING WALLS WHERE NEW WALLS MEET.
F. ALL GYPSUM WALLBOARD IS 5/8" TYPE "X" UNLESS NOTED OTHERWISE.
G. PROVIDE CONTROL JOINT IN ALL GYPSUM BOARD WALLS GREATER THAN 30'
LONG. PLACE CONTROL JOINTS AT CORNERS OF DOORS OR WINDOWS.
H. ALL HANDRAILS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH
ALL REQUIREMENTS OF…