This document includes a pre-solicitation notice and project description for a federal contract opportunity, as well as photographs documenting existing conditions at the project site.

The Department of Veterans Affairs Network Contracting Office 10 is seeking bids for project 541-18-103 to replace the roof overhangs at the CARES Tower located at the Louis Stokes Cleveland VA Medical Center. The contractor will be responsible for all preparation, demolition, construction and coordination required to complete the roof replacement. The project is set aside solely for service-disabled veteran-owned small businesses and has a budget between $1 million and $5 million. Bids are due approximately 30 days after solicitation documents are posted to SAM.gov on February 21, 2020. The selected contractor must complete all work within 290 calendar days of receiving the notice to proceed and perform a minimum of 15% of construction work. The project is subject to bonding requirements.

View the file

Other files

File Type Posted
36C25020B0020 0005.docx DOCX document
36C25020B0020 0004.docx DOCX document
1a. Response to RFI #12 Record Drawings.pdf PDF
1. REVISED RFI Tracker with VA Responses (Updated as of 20200601).docx DOCX document
3. Revised Bid Items for Project 541-18-103.docx DOCX document
36C25020B0020-0003000.docx DOCX document
36C25020B0020-0003001.pdf PDF
36C25020B0020-0002009.pdf PDF
36C25020B0020-0002012.pdf PDF
36C25020B0020-0002008.docx DOCX document
36C25020B0020-0002010.pdf PDF
36C25020B0020-0002011.pdf PDF
36C25020B0020-0001000.docx DOCX document
36C25020B0020-002.pdf PDF
36C25020B0020-005.docx DOCX document
36C25020B0020-003.pdf PDF
36C25020B0020-001.docx DOCX document
36C25020B0020-004.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

crogers Oval crogers Oval crogers Oval crogers Oval crogers Oval crogers Oval crogers Oval crogers Text Box

CORE 1

crogers Text Box

CORE 2

crogers Text Box

CORE 3

crogers Text Box

CORE 4

crogers Text Box

CORE 5

crogers Text Box

CORE 6

crogers Text Box

CORE 7

crogers Text Box

ROOF 1

crogers Text Box

ROOF 2

crogers Text Box

ROOF 3

crogers Line crogers Line crogers Line crogers Line crogers Line crogers Line crogers Line crogers Typewritten Text Appendix B crogers Text Box Core Cut Locations Roofs 1, 2 & 3

Text Box

ROOF 4

crogers Text Box

SPIKE TEST

crogers Text Box

CORE 8

crogers Oval crogers Oval crogers Line crogers Line crogers Typewritten Text Appendix B crogers Text Box

Roof 4

Oval crogers Text Box

PLAZA

crogers Text Box

PAVER & INSULATION REMOVED

crogers Line crogers Typewritten Text Appendix B crogers Text Box

Plaza

Appendix A

EXISTING CONDITIONS PHOTOS

Roof Area 1: Elevator Penthouse:

Overview of Roof area 1

Core 1: Approx. 6.5” depth. Concrete deck, Insulation wet

Core 2: Approx. 2.5” depth. Concrete deck, Insulation wet

Roof Area 2: Penthouse:

Overview of Roof area 2

Core 3 at flashing: Approx. 5” depth.

Metal deck, Insulation with densdeck cover board, Insulation dry.

Core 4: Approx. 3” depth. Metal deck. Core was cut at bullet hole, Insulation with densdeck cover board, Insulation wet

Roof Area 2: Penthouse:

Roof Area 3: 6 th Floor

Core 5: Approx. 8” depth. Metal deck, Insulation with densdeck cover board, Insulation dry

Core 6: Concrete deck, Insulation wet

A metal leg was present that may have been present to close a deck to wall gap.

Core 7: Approx. 3.5” depth. Concrete deck, Insulation wet

Roof Area 3: 6

Overview of area

Open seam, wet insulation and wind damage

Evidence of past wind damage.

Roof Area 3: 6

Roof Area 4: 2 nd

Elongated cut made to core 7: no vapor retarder.

Spike: Approx. 2.25” depth. Concrete deck, Insulation wet

Core 8: Approx. 6” depth, 7” to top of wood sitting on steel. Concrete deck, Insulation wet

Roof Area 4: 2 nd

Wind damage evident

Overview of roof area

Through wall flashing and weeps visible, low flashing heights.

Roof Area: Plaza Deck

Paver and insulation removed, did not cut through drainage mat.

Overview of Plaza Deck

Overview of roof area 6: West ledge.

CARES Roof Report, Legend for existing condition photographs, Mar 2018
CARES Roof Report, Existing condition photographs, Mar 2018

File details come from the government source that posted it. Updated .