3. Revised Bid Items for Project 541-18-103.docx
DOCX document 14 KB Posted
- Solicitation number
- 36C25020B0020
About this file
This document outlines four bid items for a federal construction project to replace roofs and overhangs at a Department of Veterans Affairs medical center. The base bid (Bid Item 1) includes all work in the drawings and specifications to complete the "Replace CARES Tower Roof and Overhangs" project at the Louis Stokes Department of Veterans Affairs Medical Center in Cleveland, Ohio within 290 calendar days of receiving the notice to proceed. Alternate bids deduct specific work—Bid Item 2 deletes two roof replacements, Bid Item 3 further deletes a soffit replacement, and Bid Item 4 additionally deletes another roof replacement. The solicitation will be posted on February 21, 2020 for this project with a magnitude between $1,000,000 to $5,000,000, set aside exclusively for service-disabled veteran-owned small businesses. The North American Industry Classification System code assigned is 236220 for commercial and institutional building construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0020 0005.docx | DOCX document | |
| 36C25020B0020 0004.docx | DOCX document | |
| 1a. Response to RFI #12 Record Drawings.pdf | ||
| 1. REVISED RFI Tracker with VA Responses (Updated as of 20200601).docx | DOCX document | |
| 2. Photographs of Existing Conditions (Taken in March 2018).pdf | ||
| 36C25020B0020-0003000.docx | DOCX document | |
| 36C25020B0020-0003001.pdf | ||
| 36C25020B0020-0002009.pdf | ||
| 36C25020B0020-0002012.pdf | ||
| 36C25020B0020-0002008.docx | DOCX document | |
| 36C25020B0020-0002010.pdf | ||
| 36C25020B0020-0002011.pdf | ||
| 36C25020B0020-0001000.docx | DOCX document | |
| 36C25020B0020-002.pdf | ||
| 36C25020B0020-005.docx | DOCX document | |
| 36C25020B0020-003.pdf | ||
| 36C25020B0020-001.docx | DOCX document | |
| 36C25020B0020-004.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF BID ITEM(S)
**Note: The Government intends to make award on BID ITEM 1; however, should the bids received exceed the funds available, award will be on BID ITEM 2, BID ITEM 3, or BID ITEM 4 in this order of priority, based on available funding. Bidders are required to submit a price for every bid item.
A. BID ITEM 1 (Base Bid): All work in the drawings and specifications. The contractor shall provide all materials, labor, tools, equipment, insurance, supervision, and any other items required to complete project “Replace CARES Tower Roof and Overhangs”, Project No. 541-18- 103 at the Louis Stokes Department of Veterans Affairs Medical Center, 10701 East Boulevard, Cleveland, OH 44106. Work includes general construction, necessary demolition, alterations, mechanical and electrical work, and certain other items shown and specified. All work shall be completed within 290 calendar days after receipt of Notice to Proceed.
B. BID ITEM 2: (Alternate Deduct 1): All work in BID ITEM 1, except DELETE Roof 2 Replacement and DELETE PROVIDE Roof 2 Sealer/Coating as indicated on the drawings. All work shall be completed within 290 calendar days after receipt of Notice-to-Proceed.
C. BID ITEM 3: (Alternate Deduct 2): All work in BID ITEM 1, except DELETE work as specified in BID ITEM 2. In addition, DELETE Soffit B Replacement as indicated on the drawings. All work shall be completed within 290 calendar days after receipt of Notice-to-Proceed.
D. BID ITEM 4: (Alternate Deduct 3): All work in BID ITEM 1, except DELETE work as specified in BID ITEM 2 and BID ITEM 3. In addition, DELETE Roof 5 Replacement as indicated on the drawings. All work shall be completed within 290 calendar days after receipt of Notice-to- Proceed.
NOTE: The first sixty (60) days after receipt of the Notice to Proceed shall be used for the following:
1. Submission and approval of the Submittal Register, Project Schedule, Safety Plan, Scaffolding Plan, and any other submittals required before actual on-site construction activities can begin.
2. Contractor will not be permitted to mobilize and/or perform/complete any construction es VA Medical Center facility during this sixty (60) day period unless approved by the Contracting Officer.