36C25020B0020-0003001.pdf
PDF Posted
- Solicitation number
- 36C25020B0020
About this file
This pre-solicitation notice is for project number 541-18-103 to replace the CARES Tower roof overhangs at the Louis Stokes Cleveland VA Medical Center. The project has a magnitude between $1,000,000 to $5,000,000, and is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. Interested offerors must register at www.fbo.gov and www.sam.gov, and the selected contractor must ensure at least 15% of construction work is performed by a SDVOSB. The solicitation documents will be posted on February 21, 2020 at www.fbo.gov, with bids due approximately 30 days later. A site visit will be scheduled. The North American Industry Classification System code is 236220 for Commercial and Institutional Building Construction. The project must be completed within 290 calendar days of notice to proceed. Bonds will be required.
36C25020B0020 0003 Replace CARES Tower Roof and Overhangs - Drawings_Part1 20190920 - Working Version.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0020 0005.docx | DOCX document | |
| 36C25020B0020 0004.docx | DOCX document | |
| 1a. Response to RFI #12 Record Drawings.pdf | ||
| 1. REVISED RFI Tracker with VA Responses (Updated as of 20200601).docx | DOCX document | |
| 2. Photographs of Existing Conditions (Taken in March 2018).pdf | ||
| 3. Revised Bid Items for Project 541-18-103.docx | DOCX document | |
| 36C25020B0020-0003000.docx | DOCX document | |
| 36C25020B0020-0002009.pdf | ||
| 36C25020B0020-0002012.pdf | ||
| 36C25020B0020-0002008.docx | DOCX document | |
| 36C25020B0020-0002010.pdf | ||
| 36C25020B0020-0002011.pdf | ||
| 36C25020B0020-0001000.docx | DOCX document | |
| 36C25020B0020-002.pdf | ||
| 36C25020B0020-005.docx | DOCX document | |
| 36C25020B0020-003.pdf | ||
| 36C25020B0020-001.docx | DOCX document | |
| 36C25020B0020-004.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H.2 H.8
C
J
14'-8"±
17.1
E
X
S
L
A
B
COLUMN DROP
PANEL (TYPICAL)
15.6
H.2 H.8
C
J
14'-8"±
17.1
15.6
H.9
1'-7 11/16"±
H.9
1'-7 11/16"±
11.6
E
W x
E
H
S
S x x
E
C x
O
W
E X
K
E X
K
E X
K
E X
W x
E X
W x
E X
C x
O W
E
X
C x
O W
E X
K
E
X
K
E X
K
E X
K
E X
K
E X
K
EX. W18x35
E x
E x
O
W
EX. W14x22
EX. RD-1.5
T
Y
P
O
F
S
C
W x
W x
W x
W x
W x
W x
W x
W12x26
W12x26
W12x26
W x
W x
W x
W x
7'-3"
7'-3"
PENTHOUSE FLOOR FRAMING PLAN
1/8"=1'-0"
PENTHOUSE ROOF FRAMING PLAN
1/8"=1'-0"
N N
R D
HSS4x4x1/4
(TYPICAL)
R
D
HSS4x4x1/4
(TYPICAL)
S1.1
S1.1
S1.1
S
S
EXISTING CONCRETE CURB
F
A
B
D
G
3 1/2"
FACE BLDG
FACE OF EXISTING METAL
SIDING
T O
P
W
T O
P
W
T
T
DESIGN LOADS (OBC 2017)
Roof live load
Roof live load ------------------------------------------------------------------------- 20 psf
Roof snow load data
Ground snow load (ASCE 7, Figure 7-1) -------------------------------------- Pg = 20 psf
Flat-roof snow load (ASCE 7, 7.3) ---------------------------------------------- Pf = 21 psf (1)+ 5 psf (2)
Snow exposure factor (ASCE 7, Table 7-2) ---------------------------------- Ce = 1.0
Snow importance factor (ASCE 7, Table 1.5-2) ----------------------------- Is = 1.2
Thermal factor (ASCE 7, Table 7-3) -------------------------------------------- Ct = 1.2
(1) Increased for snow buildup / unbalanced per ASCE 7, 7.6 to 7.9
(2) Rain-on-snow surcharge (ASCE 7, 7.10) applied only to balanced snow load
Wind design data
Ultimate design wind speed (ASCE 7, Figure 26.5-1) --------------------- Vult = 120 mph
Nominal design wind speed (OBC 1609.3.1) -------------------------------- Vasd = 93 mph
Risk category (ASCE 7, Table 1.5-1) ------------------------------------------ IV
Exposure category (ASCE 7, 26.7.3) ------------------------------------------ B
Internal pressure coefficient (ASCE 7, Table 26.11-1) -------------------- GCpi = ±0.18
Components and cladding (Ultimate)
Effective Wind Area -------------------------------------------------------- 10 ft² (3)
Zone 1 (Roof Interior) ------------------------------------------------------ +10.0, -58.0 psf
Zone 4 (Wall Interior) ------------------------------------------------------ +40.0, -40.0 psf
(+) Indicates pressure acting toward the surface
(-) Indicates pressure acting away from the surface
(3) Components and cladding engineer may calculate wind loads based on actual effective wind area per ASCE 7
Earthquake design data
Risk category (ASCE 7, Table 1.5-1) ------------------------------------------ IV
Seismic importance factor (ASCE 7, Table 1.5-2) -------------------------- Ie = 1.5
Mapped spectral response acceleration parameters
Short period ------------------------------------------------------------------ Ss = 0.180 g
1-second period ------------------------------------------------------------- S1 = 0.098 g
Site class ------------------------------------------------------------------------------ C
Design spectral response acceleration parameters
Short period ------------------------------------------------------------------ Sds = 0.144 g
1-second period ------------------------------------------------------------- Sd1 = 0.066 g
Seismic design category ----------------------------------------------------------- A
Addition complies with all exceptions listed in ASCE 7, Appendix 11B.3. Further analysis and design of the existing structure for seismic force-resistance are not required.
CODES AND STANDARDS
1. New construction has been designed to, and shall be constructed in accordance with the following building codes and standards:
A. 2015 International Building Code (IBC 2015)
B. ASCE 7-10, Minimum Design Loads for Buildings and Other Structures
2. Unless explicitly modified in the Contract Drawings and Specifications, the Contractor shall comply with provisions of:
A. ACI 301-10, Specifications for Structural Concrete
B. ACI 318-14, Building Code Requirements for Structural Concrete
C. AISC 360-10, Specification for Structural Steel Buildings
D. AWS D1.1-10, Structural Welding Code - Steel
E. SDI C-2011, Standard for Composite Steel Floor Deck
F. AISI S100-12, North American Specification for the Design of Cold-Formed Steel
Structural Members
GENERAL
1. All new construction shall comply with the Contract Documents and the Building
Code.
2. The structural drawings illustrate structural members. Refer to architectural, mechanical, and electrical drawings for non-structural items which require special provisions during the construction of the structural members.
3. Drawings are not to be scaled.
4. Existing conditions as shown on these plans are for reference only. The Contractor is required to field verify all existing conditions prior to construction.
5. The Contractor shall provide means, method, techniques, sequence, and procedure of construction as required.
6. The Contractor shall review shop drawings for completeness and compliance with contract documents. The Contractor shall stamp shop drawings prior to submission to the Architect and Engineer.
7. Shop drawings will not be processed if they are incomplete, lack coordination with relevant portion of contract documents, lack calculations if required, or if deviations, modifications, and substitutions are indicated without prior written approval from the
Architect/Engineer.
STEEL CONSTRUCTION
1. Steel detailing, fabrication, and erection shall conform to the AISC Specification for
Structural Steel Buildings and Code of Standard Practice, and the AWS Structural
Welding Code.
2. Stresses occurring during fabrication, shipment, and erection shall be temporary and not excessive. Stresses at all times shall be less than design and allowable stresses. The full design and load-carrying capacity of the steel work shall not be impaired due to fabrication, shipment, or erection procedures. Throughout the complete process, the stability of all individual members and assembles shall be maintained.
3. The Contractor shall be responsible for the control of all erection procedures and sequences with relation to temperature differentials and weld shrinkage.
4. All additional steel required for erection purposes shall be provided at no additional cost and shall be removed unless approved by the Owner in writing.
5. Connections - welded or high strength bolted:
A. Bolts shall be ASTM F3125 and shall be installed in accordance with
"Specifications for Structural Joints Using High-Strength Bolts".
B. Provide slip critical bolts for all moment connections, wind connections, hangers, and other connections as noted on drawings.
C. Provide bearing type connections with thread included in the shear plane for all connections other than slip critical connections.
D. Provide hardened washers under nuts at all high-strength bolts, except where plate washers are used per AISC Specifications.
E. All bolts should be tightened to full pretensioning load.
F. Use standard holes with the following exception: short slotted holes are permitted for shear loading perpendicular to the slot.
G. The length of connection shall not be less than one-half of the T distance of the beam web.
6. Welding electrodes shall be E70XX except where other electrodes are required for compatibility with material being welded.
7. All slip connections shall be provided with a means of preventing the nuts from unthreading.
8. Shop drawings are required and shall note type of electrodes, size of all welds, and type and size of all bolts. Shop drawings shall be prepared under the supervision of a professional engineer licensed in the jurisdiction where the project is located.
9. Primer, see specifications.
10. All shop and field welding shall be performed by a recently certified welder.
11. All welding and high strength bolting must be inspected by a qualified testing laboratory. Laboratory shall be approved by the Architect and/or Engineer.
12. Provide fills at splices of parts differing by more than 1/8" in thickness.
POST-INSTALLED ANCHORS
1. Anchorage to hardened concrete shall include torque controlled expansion anchors and adhesive anchors of size, number and spacing as shown on the drawings.
2. All anchors shall be installed in accordance with the Manufacturer's Printed
Installation Instructions (MPII).
3. Existing reinforcing bars in the concrete may conflict with specific anchor locations.
Reinforcing bars shall not be cut unless specifically noted on the drawings or approved by the Engineer of Record. The contractor shall review the structural drawings and shall locate the position of reinforcing bars in the vicinity of the anchors, by ground penetrating radar (GPR), x-ray, or other means.
4. Anchors shall be installed in holes drilled with a rotary impact hammer drill. Core drilling of holes is not permitted. Holes and anchor shall be thoroughly cleaned per the MPII prior to installation of the anchor.
5. Stainless steel anchors shall be used at all exterior locations and where specifically noted on the drawings.
6. Remove and replace misplaced or malfunctioning anchors. Patch failed anchor locations with high-strength non-shrink, non-metallic grout.
7. Installed adhesive anchors shall be securely held in-place to prevent displacement while the adhesive cures.
8. All anchors supporting structural elements shall be enclosed with a fire-resistance-rated envelope or protected by approved fire-resistance rated materials.
9. Quality Control:
A. All anchors shall be periodically inspected to meet the requirements of MPII and the ICC-ES ESR report for the product.
B. All anchor installers shall be trained by the manufacturer or manufacturer's representative for each individual product being installed.
10. Submittals:
A. Technical product literature, highlighting each anchor and size to be used on the project.
B. Manufacturer's Printed Installation Instructions (MPII) for each anchor type.
C. Engineering Design Data: For each substitution request, provide calculations substantiating specified design requirements, sealed by a professional engineer licensed in the jurisdiction where project is located.
11. Where a specific type of anchorage is indicated on the drawings, substitution for a different type of anchorage shall meet the requirements of ACI 355.2 Category 1 or
ACI 355.4 Category 1 for anchorage into concrete or shall have an ICC-ES ESR report for anchorage into masonry. Substitution shall not be permitted without prior written approval of the Engineer of Record.
12. Anchors to hardened concrete shall be supplied as an entire system and shall be as follows:
A. Torque Controlled Expansion Anchors (Expansion Anchors) in cracked and un-cracked concrete as indicated on the drawings shall be Hilti KWIK Bolt TZ
Expansion Anchor (ICC-ES Evaluation Report: ESR# 1917).
B. Adhesive anchors in cracked and un-cracked concrete indicated on the drawings shall be Hilti HIT-HY 200 Safe Set Adhesive Anchoring System
(ICC-ES Evaluation Report: ESR# 3187). The following anchor rods shall be used with the system:
1) Reinforcing bar meeting the requirements of ASTM A615/A706 Grade
60.
2) All-threaded rod shall be Hilti HIT-Z rods.
13. Requirements and design parameters of post-installed anchors into hardened concrete:
A. Concrete shall have a minimum compressive strength of 2,500 psi and a minimum age of 21-days at the time of installation for adhesive anchors and
7-days for expansion anchors.
B. Concrete temperature at the time of installation of adhesive anchors shall be a minimum of 50°F.
C. Concrete may be water saturated or dry; water filled holes shall not be allowed.
D. Embedment depth and anchor projection shall be as detailed on the drawings. Unless otherwise noted, minimum embedment depths, spacing, and edge distance shall be by the table below.
DESIGN STRESSES
Structural steel W shapes (ASTM A992 or ASTM A572/50) --------------------- Fy = 50,000 psi
Structural steel other shapes (ASTM A36) -------------------------------------------- Fy = 36,000 psi
Metal decks (ASTM A653)
Roof deck ------------------------------------------------------------------------------ Fy = 33,000 psi
Hollow structural sections (ASTM A500, Grade C)
Rectangular --------------------------------------------------------------------------- Fy = 50,000 psi
Round ---------------------------------------------------------------------------------- Fy = 46,000 psi
10"
4 1/2"
7 1/2"
8 3/4"
9"
5 3/4"
5"
6"
1/2" #4
3/4" #6
3/8" #3
5/8" #5
#9
#8
#7
4 3/4"
3 1/4"
2"
4"
8 1/2"
10 1/2"
12"
13 1/2"
6"
4 1/2"
7 1/2"
7"
10 1/2"
12"
13 1/2"
4 1/2"
3 1/2"
5 1/2"
8 1/2"
10 1/2"
12"
13 1/2"
6"
4 1/2"
7 1/2"
Post-installed Concrete Anchors
Minimum
Embed.
Min. Edge
DistanceDiameter
Minimum
Spacing
Minimum
Embed.
Min. Edge
Distance
Minimum
Spacing
Torque-controlled Anchors Adhesive Anchors
SC-1 - SEE PLAN
PL3/4x12x1'-0" WITH
(4) 3/4"ø EXPANSION
ANCHORS
EXISTING CONCRETE
REPAIR ROOFING - SEE
ARCHITECTURAL
DRAWINGS
SECTION 1
3/4"=1'-0"
SECTION 2
3/4"=1'-0"
L3x3x3/8 x 6" LONG
TOP AND BOTTOM
WITH (2) BOLTS TO
BEAM
STANDARD SHEAR
CONNECTION
SECTION 3
3/4"=1'-0"
W12 - SEE PLAN
HSS4x4 - SEE PLAN
FOR SPACING
HSS4x4 - MATCH
BACK SPAN
HSS4x4 - MATCH
BACK SPAN
CONTINUOUS
L2 1/2x2 1/2x1/4
CJP
SEE ARCHITECTURAL
DRAWINGS FOR DIMENSIONS
3/8" CAP PLATE
EXISTING CONCRETE
FLAT SLAB
REMOVE EXISTING
DAVIT AND RELOCATE -
SEE ARCHITECTURAL
DRAWINGS
PL1/2x9x0'-9" WITH (4)
1/2"ø EXPANSION
ANCHORS
DAVIT RELOCATION DETAIL
3/4"=1'-0"
LEGEND:
SC-1 HSS6x6x3/8 STEEL COLUMN
RD-1.5 1 1/2", GALVANIZED, 20 GAUGE, WIDE RIB METAL
ROOF DECK
PARTIALLY RESTRAINED MOMENT CONNCETION -
SEE SECTION 2 THIS SHEET.
PLAN NOTES:
1. EXISTING CONDITIONS SHOWN ARE BASED ON CONSTRUCTION
DOCUMENTS PREPARED BY CANNON DESIGN DATED JUNE 15,
2007. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
AND NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES.
2. ELEVATIONS ARE REFERENCE FROM EXISTING PENTHOUSE
SLAB = 747'-8"± = (0-'0").
3. SLOPE STEEL UNIFORMLY BETWEEN ELEVATIONS GIVEN.
S1.1
LJPJAM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
VAMC - WADE PARK
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833
REPLACE CARES TOWER
ROOF AND OVERHANGS
09-20-2019
541-18-103
Revisions: Date
PROJECT
LOCATION
KEY PLAN
Scale = None
B
A
C
B
A
C
B-B2
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4
B-C4
Bid Issue 09/20/19
FULLY SPRINKLERED
TRUE
NORTH
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350
Cleveland OH 44115-1257
216-875-0100/ (F) 216-875-0111 barberhoffman.com
PENTHOUSE FRAMING PLANS,
GENERAL NOTES, AND SECTIONS
BARBER & HOFFMAN, INC.
S
T
A
T
F
H
I
O
P
R
O
F
E
S
S
I
O
N A
N
G
I
N
E
E
R
R
E
G
I
S T
E
R
E
D
JON T.
LEUTHAEUSER
E-65601
AutoCAD SHX Text
TEL. (440) 546-9696
AutoCAD SHX Text
BROADVIEW HTS., OHIO 44147
AutoCAD SHX Text
672 EAST ROYALTON ROAD
AutoCAD SHX Text
FAX: (440) 546-9699
AutoCAD SHX Text
FREDRICK, FREDRICK & HELLER
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
AutoCAD SHX Text
ENGINEERS, INC.
| 1 - X1 |
| 2 - X2 |
| 3- S1.1 - FRAMING PLANS AND DETAILS |
| 4 - A0.0 |
| 5 - A1.1 |
| 6 - A1.1A |
| 7 - A1.2 |
| 8 - A1.3 |
| 9 - A2.1 |
| 10 - A2.1A |
| 11 - A2.1B |
File details come from the government source that posted it. Updated .