This document contains responses to questions regarding a solicitation for construction services. The solicitation involves renovating space at the Richard L. Roudebush VA Medical Center to update the library and computer training rooms. Work includes installing a new raised floor, acoustical dividers, classrooms, monitors, offices, storage rooms, and a voice activated module training room, along with associated electrical, data, ceiling, carpet and finish work. The magnitude of the project is between $1 million and $5 million. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and issued on or about February 3, 2020 via beta.sam.gov. A site visit will be scheduled prior to the closing date. The point of contact is Jeff Hairston and questions may be directed to him via email or telephone.

36C25020B0018 0006 RFI Responses (Cumulative).docx

View the file

Other files

File Type Posted
36C25020B0018-0007000.docx DOCX document
36C25020B0018-0006000.docx DOCX document
36C25020B0018-0006002.pdf PDF
36C25020B0018-0005001.pdf PDF
36C25020B0018-0005000.docx DOCX document
36C25020B0018-0004001.pdf PDF
36C25020B0018-0004000.docx DOCX document
36C25020B0018-0003000.docx DOCX document
36C25020B0018-0003001.pdf PDF
36C25020B0018-0003002.pdf PDF
36C25020B0018-0003003.pdf PDF
36C25020B0018-0003004.pdf PDF
36C25020B0018-0002003.pdf PDF
36C25020B0018-0002004.jpg JPG image
36C25020B0018-0002005.pdf PDF
36C25020B0018-0002001.docx DOCX document
36C25020B0018-0002000.docx DOCX document
36C25020B0018-0002002.pdf PDF
36C25020B0018-0001000.docx DOCX document
36C25020B0018-053.pdf PDF
36C25020B0018-046.pdf PDF
36C25020B0018-061.pdf PDF
36C25020B0018-067.pdf PDF
36C25020B0018-050.pdf PDF
36C25020B0018-062.pdf PDF
36C25020B0018-077.pdf PDF
36C25020B0018-045.pdf PDF
36C25020B0018-070.pdf PDF
36C25020B0018-066.pdf PDF
36C25020B0018-071.pdf PDF
36C25020B0018-051.pdf PDF
36C25020B0018-064.pdf PDF
36C25020B0018-076.pdf PDF
36C25020B0018-048.pdf PDF
36C25020B0018-054.pdf PDF
36C25020B0018-058.pdf PDF
36C25020B0018-049.pdf PDF
36C25020B0018-068.pdf PDF
36C25020B0018-047.pdf PDF
36C25020B0018-041.doc DOC document
36C25020B0018-056.pdf PDF
36C25020B0018-069.pdf PDF
36C25020B0018-060.pdf PDF
36C25020B0018-063.pdf PDF
36C25020B0018-074.pdf PDF
36C25020B0018-052.pdf PDF
36C25020B0018-055.pdf PDF
36C25020B0018-059.pdf PDF
36C25020B0018-040.docx DOCX document
36C25020B0018-073.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Responses (cumulative) Question: In the access floor spec it referred to spec section 26 05 26 for grounding. There is no grounding spec for access floor. Please provide a grounding detail for access floor.

Response: Raised floor should be bonded to electrical system as per NEC requirements.

Question: In regard to the raised access flooring: The specs call for an aluminum panel and Tate Access Floors no longer makes an aluminum system. They are more than double the cost and not as strong as the concrete filled panels. Can we bid a concrete panel system?

Also, the specs call for carpet and we usually bid a bare panel - carpet to be installed by others.

Response: Please refer to attachment ASI-2, included with this amendment.

Question: Division 27 specifications are not provided. Are we to include rough-in only?

Response: See attached Spec Sections 270511, 270526, 270533, 271000, 271500.

Question: If we are to provide data/voice, where is the existing IDF/MDF that data/voice cables are to route to?

Response: The data closet is located in A-2147. (See attached drawing entitled “Drawing for Data Closet Location”)

Question: If we are to provide data/voice, how many data/voice cables does each communications outlet require?

Response: See attached Data Outlet Detail.

Question: Do TV locations require RG6 coax cable, or data/voice cable, or both?

Response: Both RG6 coax cable and data/voice cable are needed.

Question: In regard to access floor RFI question and responses: The NEC does not provide wire size for raised access floor systems.

What wire size is required and does each pedestal need grounded or is one connection point to floor system good? Please provide grounding detail.

Response: It has been determined that grounding/bonding is not necessary for the raised access floor system. See ASI – 3 (attached) Question: I am unable to determine the heights that the window shades need to be. Are you able to share any information? Photos of the space would also be helpful if drawings are unavailable.

Also, specs indicate cordless shades with control on the right side and the provision of a pole for their use.This is not typical.

Shade specs indicate 5% openness fabric but division nine specs and drawings indicate 1% openness fabric. Going with the latter unless you advise otherwise.

Response: Window shades in rooms A-2017, A-2022, and A-2023 have been removed from the project. A new window shade has been added to the one-way mirrored glass observation window in room A-2022. See sheet AS1002 for window height.

The VA would like to go to a corded shade as opposed to cordless.

Blackout shades should be opaque.