This document provides details for a planned construction renovation project at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana. The project involves renovating and updating space for the library, computer training rooms, and simulation labs on the second floor of the A-wing building. Key aspects of the project include installing a new raised floor, acoustical dividers, large monitors to replace projectors and screens, relocating the circulation desk and offices, and adding a new classroom and VAM training room. The work will also include installing a new ceiling, carpeting, and finishes throughout the affected areas. The solicitation for this project is expected to be issued on or about February 3, 2020 via beta.SAM.gov, with a site visit scheduled prior to the closing date. The project is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $1-5 million.
36C25020B0018 20 583-15-112 PD103.pdf
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
INTERSTITIAL
SPACE
AREA #1
EXISTING
INTERSTITIAL
SPACE
AREA #2
2 1
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
SCALE: 1/4" = 1'-0"
PLUMBING - DEMOLITION - THIRD FLOOR PLAN
PD103
REMOVE SANITARY VENT PIPING TO POINT INDICATED AND CAP. REFER TO PD102
FOR CONTINUATION OF WORK.
REMOVE DOMESTIC HW AND CW PIPING AND PREPARE FOR RECONNECTION.
REMOVE VENT PIPING TO POINT INDICATED AND PREPARE FOR RECONNECTION.
REMOVE HOT WATER AND HOT WATER RETURN PIPING TO POINT INDICATED. PREPARE
PIPING FOR RECONNECTION. NO DEAD LEG PIPING IS TO REMAIN.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO
ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING
SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY
MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)
IMMEDIATELY.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS
AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY
THE CONTRACTOR - DAILY.
7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS
AND DAMAGE DURING CONSTRUCTION.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
9. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
10. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND
DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF
CONSTRUCTION.
NOT TO SCALE
THIRD FLOOR KEY PLAN
N
RICHARD L. ROUDEBUSH
VA MEDICAL CENTER
D-WING
C-WING
A-WING
RENOVATION
AREA
NOTE:
PATCH AND SEAL ALL UNUSED OPENINGS IN FLOOR TO MAINTAIN FIRE RATING OF
FLOOR.
NOTE:
CONTRACTOR TO TAKE CAUTION NOT TO DAMAGE ANY EXISTING FINISHES. ALL
DAMAGED FINISHED TO BE REPAIRED TO SHOW NO EVIDENCE OF CONSTRUCTION AT
NO ADDITIONAL COST TO VA.