About this file

36C25019B0041 Part 1 - Drawings - Pharmacy USP (541-19-103).pdf

View the file

Other files

File Type Posted
36C25019B0041-0004000.docx DOCX document
36C25019B0041-0003001.pdf PDF
36C25019B0041-0003005.pdf PDF
36C25019B0041-0003000.docx DOCX document
36C25019B0041-0003003.pdf PDF
36C25019B0041-0003002.pdf PDF
36C25019B0041-0003004.pdf PDF
36C25019B0041-0003006.pdf PDF
36C25019B0041-0002000.docx DOCX document
36C25019B0041-0002001.pdf PDF
36C25019B0041-0001000.docx DOCX document
36C25019B0041-006.pdf PDF
36C25019B0041-004.pdf PDF
36C25019B0041-002.pdf PDF
36C25019B0041-007.pdf PDF
36C25019B0041-005.pdf PDF
36C25019B0041-001.docx DOCX document
36C25019B0041-000.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project Number

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch es o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

FULLY SPRINKLERED

ARCHITECT:CONSULTANTS:

Office of Construction and Facilities Management

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

1468 WEST 9TH STREET #400 CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

E T

G

DE

I

RE

T

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

A

TE

I

T C

J.

O

O

FO

H

VETERANS AFFAIRS MEDICAL CENTER

RENOVATE PHARMACY TO COMPLY WITH

USP DIRECTIVES

5.30.19

TITLE SHEET & DRAWING INDEX

GI-1

541-19-103

10701 EAST BLVD. CLEVELAND, OHIO

CJK DAK

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

RENOVATE PHARMACY TO COMPLY WITH USP DIRECTIVES

10701 EAST BLVD. CLEVELAND, OH 44106

PROJECT NO. 541-19-103

Cleveland Veterans Affairs Medical Center

INPATIENT

PHARMACY SCOPE

OF WORK

OUTPATIENT

PHARMACY SCOPE

OF WORK

2ND FLOOR

MODULE J

ONCOLOGY CLINIC

SCOPE OF WORK

BASEMENT LEVEL

NORTH

PARTIAL 2ND FLOOR

NORTH

CODE INFORMATION:

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER

10701 EAST BLVD.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING

A. NATURE OF PROJECT: INTERIOR RENOVATIONS OF EXISTING BASEMENT LEVEL INPATIENT &

OUTPATIENT PHARMACY

DEPARTMENTS AND 2ND FLOOR MODULE J ONCOLOGY CLINIC

B. DESIGN CODES: 2015 NFPA LIFE SAFETY CODE 101, IBC 2015

USP 795 - PHARMACEUTICAL COMPOUNDING - NON-STERILE PREPARATIONS

USP 797 - PHARMACEUTICAL COMPOUNDING - STERILE PREPARATIONS

USP 800 - HAZARDOUS DRUGS - HANDLING IN HEALTHCARE SETTINGS

C. USE GROUP: I-2 HEALTH CARE - NO CHANGE PROPOSED

D. CONSTRUCTION TYPE: TYPE I-332, IB - NON-COMBUSTIBLE, PROTECTED

FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)

EXTERIOR BEARING WALLS 3 HRS

INTERIOR BEARING WALLS 3 HRS

STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)

2 HRS (SUPPORTING 1 FLOOR ONLY)

2 HRS (SUPPORTING ROOF ONLY)

BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)

FLOOR-CEILING ASSEMBLIES 2 HRS

ROOF-CEILING ASSEMBLIES 1-1/2 HRS

INTERIOR NON-BEARING WALLS 0 HRS

EXTERIOR NON-BEARING WALLS 0 HRS

WALL ASSEMBLIES

EXIT ACCESS CORRIDOR WALLS0 HR SMOKE PARTITIONS

E. PROJECT AREA: INPATIENT PHARMACY: 6,818 SF

OUTPATIENT PHARMACY: 460 SF

MODULE J CLINIC: 558 SF

F. PROJECT AREA OCCUPANT LOAD: INPATIENT PHARMACY: 69

OUTPATIENT PHARMACY: 2

MODULE J CLINIC: 7

G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS REQUIRED PER NEW

IMPROVEMENTS PROPOSED

DRAWING INDEX:

BID ISSUE SUBMISSION

5.30.19

GI-1 TITLE SHEET & DRAWING INDEX

AS-0.1 PHASE IA & IB LIFE SAFETY PLANS

AS-0.2 PHASE II & III LIFE SAFETY PLANS

ARCHITECTURAL

INPATIENT PHARMACY:

AS-IP.0 BASEMENT LEVEL EXISTING CONDITIONS PLAN - INPATIENT PHARMACY

AS-IP.D1A BASEMENT LEVEL PHASE IA DEMOLITION PLAN - INPATIENT PHARMACY

AS-IP.D1AC BASEMENT LEVEL PHASE IA CEILING DEMOLITION PLAN - INPATIENT PHARMACY

AS-IP.1A BASEMENT LEVEL PHASE IA IMPROVEMENT PLAN - INPATIENT PHARMACY

AS-IP.1AC BASEMENT LEVEL PHASE IA REFLECTED CEILING PLAN - INPATIENT PHARMACY

AS-IP.D1B BASEMENT LEVEL PHASE IB DEMOLITION PLAN - INPATIENT PHARMACY

AS-IP.1B BASEMENT LEVEL PHASE IB IMPROVEMENT PLAN - INPATIENT PHARMACY

AS-IP.1BC BASEMENT LEVEL PHASE IB REFLECTED CEILING PLAN - INPATIENT PHARMACY

AS-IP.D2 BASEMENT LEVEL PHASE II DEMOLITION PLAN - INPATIENT PHARMACY

AS-IP.D2C BASEMENT LEVEL PHASE II CEILING DEMOLITION PLAN - INPATIENT PHARMACY

AS-IP.2 BASEMENT LEVEL PHASE II IMPROVEMENT PLAN - INPATIENT PHARMACY

AS-IP.2A FIRST AND SECOND FLOOR PHASE II IMPROVEMENT PLANS - INPATIENT PHARMACY

AS-IP.2B FIRST AND SECOND FLOOR PHASE II AIR HANDLER/DUCT ROUTING PLANS

AS-IP.2C BASEMENT LEVEL PHASE II REFLECTED CEILING PLAN - INPATIENT PHARMACY

AS-IP.D3 BASEMENT LEVEL PHASE III DEMOLITION PLAN - INPATIENT PHARMACY

AS-IP.D3C BASEMENT LEVEL PHASE III CEILING DEMOLITION PLAN - INPATIENT PHARMACY

AS-IP.3 BASEMENT LEVEL PHASE III IMPROVEMENT PLAN - INPATIENT PHARMACY

AS-IP.3C BASEMENT LEVEL PHASE III REFLECTED CEILING PLAN - INPATIENT PHARMACY

OUTPATIENT PHARMACY:

AS-OP.0 BASEMENT LEVEL EXISTING CONDITIONS PLAN - OUTPATIENT PHARMACY

AS-OP.D1 BASEMENT LEVEL PHASE I DEMOLITION PLAN - OUTPATIENT PHARMACY

AS-OP.1 BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - OUTPATIENT PHARMACY

AS-OP.1C BASEMENT LEVEL PHASE I REFLECTED CEILING PLAN - OUTPATIENT PHARMACY

SECOND FLOOR MODULE J ONCOLOGY CLINIC:

AS-J2.0 SECOND FLOOR EXISTING CONDITIONS PLAN - MODULE J

AS-J2.D3 SECOND FLOOR PHASE III DEMOLITION PLAN - MODULE J

AS-J2.3 SECOND FLOOR PHASE III IMPROVEMENT PLAN - MODULE J

AS-J2.3C SECOND FLOOR PHASE III REFLECTED CEILING PLAN - MODULE J

AS-3.0 ENLARGED PLANS AND INTERIOR ELEVATIONS

AS-3.1 INTERIOR ELEVATIONS & MILLWORK DETAILS

AS-7.0 DOOR SCHEDULE, WALL TYPES, & DETAILS

AS-7.1 FINISH PLAN - PHASES I, II, & III - INPATIENT PHARMACY

AS-7.1.4 FINISH PLAN - PHASE IV - INPATIENT PHARMACY

AS-7.2 OUTPATIENT PHARMACY & MODULE J FINISH PLANS AND OVERALL FINISH SCHEDULE/DETAILS

MECHANICAL/HVAC

H-001 HVAC GENERAL NOTES AND SYMBOL LEGEND

INPATIENT PHARMACY:

H-IP.D1A BASEMENT LEVEL PHASE IA HVAC DEMOLITION PLAN - INPATIENT PHARMACY

H-IP.1A BASEMENT LEVEL PHASE IA HVAC IMPROVEMENT PLAN - INPATIENT PHARMACY

H-IP.D2 BASEMENT LEVEL PHASE II HVAC DEMOLITION PLAN - INPATIENT PHARMACY

H-IP.2.1 BASEMENT LEVEL PHASE II HVAC IMPROVEMENT PLAN - INPATIENT PHARMACY

H-IP.2.2 FIRST FLOOR LEVEL PHASE II HVAC IMPROVEMENT PLAN - INPATIENT PHARMACY

H-IP.2.3 SECOND FLOOR LEVEL PHASE II HVAC IMPROVEMENT PLAN - INPATIENT PHARMACY

H-IP.2.4 SECOND AND THIRD FLOOR SOUTH PHASE II HVAC IMPROVEMENT PLAN - INPATIENT PHARMACY

H-IP.D3 BASEMENT LEVEL PHASE III HVAC DEMOLITION PLAN - INPATIENT PHARMACY

H-IP.3.1 BASEMENT LEVEL PHASE III HVAC IMPROVEMENT PLAN - INPATIENT PHARMACY

OUTPATIENT PHARMACY:

H-OP.D1 BASEMENT LEVEL PHASE I HVAC DEMOLITION PLAN - OUTPATIENT PHARMACY

H-OP.1 BASEMENT LEVEL PHASE I HVAC IMPROVEMENT PLAN - OUTPATIENT PHARMACY

SECOND FLOOR MODULE J ONCOLOGY CLINIC:

H-J2.D3 SECOND FLOOR PHASE III HVAC DEMOLITION PLAN - MODULE J

H-J2.3 SECOND FLOOR PHASE III HVAC IMPROVEMENT PLAN - MODULE J

GENERAL HVAC:

H-100 HVAC DETAILS

H-200 HVAC TEMPERATURE CONTROLS

H-300 HVAC SCHEDULES

STRUCTURAL

S-IP.0 GENERAL NOTES AND SPECIFICATIONS

S-IP.1 PHASE I - ENLARGED CAROUSEL SUPPORT FRAMING PLAN - INPATIENT PHARMACY

S-IP.2 STRUCTURAL FRAMING PLANS

PLUMBING

P-001 PLUMBING GENERAL NOTES, SCHEDULES, DETAILS, AND SYMBOL LEGEND

INPATIENT PHARMACY:

P-IP.D1A BASEMENT LEVEL PHASE IA PLUMBING DEMOLITION PLAN - INPATIENT PHARMACY

P-IP.1A BASEMENT LEVEL PHASE IA PLUMBING IMPROVEMENT PLAN - INPATIENT PHARMACY

P-IP.D2 BASEMENT LEVEL PHASE II PLUMBING DEMOLITION PLAN - INPATIENT PHARMACY

P-IP.2 BASEMENT LEVEL PHASE II PLUMBING IMPROVEMENT PLAN - INPATIENT PHARMACY

P-IP.D3 BASEMENT LEVEL PHASE III PLUMBING DEMOLITION PLAN - INPATIENT PHARMACY

P-IP.3 BASEMENT LEVEL PHASE III PLUMBING IMPROVEMENT PLAN - INPATIENT PHARMACY

OUTPATIENT PHARMACY:

P-OP.1 BASEMENT LEVEL PHASE I PLUMBING IMPROVEMENT PLAN - OUTPATIENT PHARMACY

SECOND FLOOR MODULE J ONCOLOGY CLINIC:

P-J2.D3 SECOND FLOOR PHASE III PLUMBING DEMOLITION PLAN - MODULE J

P-J2.3 SECOND FLOOR PHASE III PLUMBING IMPROVEMENT PLAN - MODULE J

P-100 PLUMBING ISOMETRIC

FIRE PROTECTION

FP-001 FIRE PROTECTION GENERAL NOTES, DETAILS AND SYMBOL LEGEND

INPATIENT PHARMACY:

FP-IP.1A BASEMENT LEVEL PHASE IA FIRE PROTECTION IMPROVEMENT PLAN - INPATIENT PHARMACY

FP-IP.2 BASEMENT LEVEL PHASE II FIRE PROTECTION IMPROVEMENT PLAN - INPATIENT PHARMACY

FP-IP.3 BASEMENT LEVEL PHASE III FIRE PROTECTION IMPROVEMENT PLAN - INPATIENT PHARMACY

OUTPATIENT PHARMACY:

FP-OP.1 BASEMENT LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN - OUTPATIENT PHARMACY

SECOND FLOOR MODULE J ONCOLOGY CLINIC:

FP-J2.3 SECOND FLOOR PHASE III FIRE PROTECTION IMPROVEMENT PLAN - MODULE J

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND

INPATIENT PHARMACY:

E-IP.D1 BASEMENT LEVEL PHASE I ELECTRICAL DEMOLITION PLAN - INPATIENT PHARMACY

E-IP.1.0 BASEMENT LEVEL PHASE I ELECTRICAL LIGHTING IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.1.1 BASEMENT LEVEL PHASE I ELECTIRCAL POWER IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.1.2 BASEMENT LEVEL PHASE I ELECTIRCAL SYSTEMS IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.D2 BASEMENT LEVEL PHASE II ELECTRICAL DEMOLITION PLAN - INPATIENT PHARMACY

E-IP.1.3 BASEMENT LEVEL PHASE II ELECTRICAL LIGHTING IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.1.4 BASEMENT LEVEL PHASE II ELECTIRCAL POWER IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.1.5 BASEMENT LEVEL PHASE II ELECTIRCAL SYSTEMS IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.D3 BASEMENT LEVEL PHASE III ELECTRICAL DEMOLITION PLAN - INPATIENT PHARMACY

E-IP.1.6 BASEMENT LEVEL PHASE III ELECTRICAL LIGHTING IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.1.7 BASEMENT LEVEL PHASE III ELECTIRCAL POWER IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.1.8 BASEMENT LEVEL PHASE III ELECTIRCAL SYSTEMS IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.2.0 FIRST FLOOR LEVEL PHASE II ELECTRICAL LIGHTING IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.2.1 FIRST FLOOR LEVEL PHASE II ELECTRICAL POWER IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.2.2 FIRST FLOOR LEVEL PHASE II ELECTRICAL SYSTEMS IMPROVEMENT PLAN - INPATIENT PHARMACY

E-IP.3.1 SECOND FLOOR LEVEL PHASE II ELECTRICAL POWER IMPROVEMENT PLAN - INPATIENT PHARMACY

OUTPATIENT PHARMACY:

E-OP.D1 BASEMENT LEVEL PHASE I ELECTRICAL DEMOLITION PLAN - OUTPATIENT PHARMACY

E-OP.1 BASEMENT LEVEL PHASE I ELECTRICAL LIGHTING IMPROVEMENT PLAN - OUTPATIENT PHARMACY

E-OP.2 BASEMENT LEVEL PHASE I ELECTRICAL POWER IMPROVEMENT PLAN - OUTPATIENT PHARMACY

E-OP.3 BASEMENT LEVEL PHASE I ELECTRICAL SYSTEMS IMPROVEMENT PLAN - OUTPATIENT PHARMACY

SECOND FLOOR MODULE J ONCOLOGY CLINIC:

E-J2.D3 SECOND FLOOR PHASE III ELECTRICAL DEMOLITION PLAN - MODULE J

E-J2.0 SECOND FLOOR PHASE III ELECTRICAL LIGHTING IMPROVEMENT PLAN - MODULE J

E-J2.1 SECOND FLOOR PHASE III ELECTRICAL POWER IMPROVEMENT PLAN - MODULE J

E-J2.2 SECOND FLOOR PHASE III ELECTRICAL SYSTEMS IMPROVEMENT PLAN - MODULE J

GENERAL ELECTRICAL:

E-100 LIGHTING FIXTURE SCHEDULE

E-101 PANELBOARD SCHEDULE

E-102 MECHANICAL EQUIPMENT SCHEDULES

E-103 ELECTRICAL DETAILS

PHASING DURATION:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED

PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND

FUNCTION OF THE EXISTING HOSPITAL. THE PROPOSING PHASING DURATION PLAN IS AS

FOLLOWS:

PRE-CONSTRUCTION: 60 DAYS

PHASE IA: 10 DAYS

VA ACTIVATION: 5 DAYS

PHASE IB: 10 DAYS

VA ACTIVATION: 5 DAYS

PHASE II: 120 DAYS

VA ACTIVATION: 30 DAYS

PHASE III: 90 DAYS

VA ACTIVATION: 15 DAYS

PHASE IV: 15 DAYS

TOTAL TIMEFRAME: 360 DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

ALL INPATIENT PHARMACY CONSTRUCTION: NORMAL SHIFT HOURS PERMITTED

ALL OUTPATIENT PHARMACY CONSTRUCTION: NORMAL SHIFT HOURS PERMITTED

ALL 2ND FLOOR MODULE J CONSTRUCTION: EVENING SHIFT HOURS ONLY (AFTER 5:30 PM)

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES

AND, UNLESS APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

-UTILITY SHUTDOWNS

-EXISTING MEP SYSTEM SHUTDOWNS

-WORK IN PUBLIC CORRIDORS

-CUTTING OF FLOOR OPENINGS

-WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS

OF CEILING PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND

APPROVED BY COR. REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

Revisions Date

5 BID ISSUE SUBMISSION 5.30.19

4 100% CD's SUBMISSION 12.21.18

3 90% CD's SUBMSSION 11.16.18

2 65% CD's SUBMISSION 10.12.18

1 35% CD's 8.20.18

DN

7'

7' - 0"

3'

EXISTING STAFF ENTRY DOOR SHALL BE INACCESSIBLE

DURING PHASE IA. EXISTING DOOR SHALL BE FULLY

SEALED FROM CONSTRUCTION ACTIVITIES

RESTROOMS BC324 & BC323 SHALL BE

INACCESSIBLE DURING PHASE IA. EXISTING

DOORS SHALL BE FULLY SEALED FROM

CONSTRUCTION ACTIVITIES

EXISTING STAFF DOOR SHALL BE

UTILIZED FOR CONSTRUCTION ENTRY

ONLY DURING PHASE IA. CARD READER

SHALL BE TEMPORARILY DISABLED BY

THE VA TO PERMIT CONTRACTOR

ACCESS.

TEMP. CONST.

"ANTEROOM"

6'-0" +/-

3' - 0"

E

E

FE

FE

F E

FE

FE

F E

P H

A S

E I A

S C

O P

E O

F

W

O R

K

Women's Toilet

BD312A

Men's Toilet

BD312

Lab Procedure-C

BD310

Corridor

BD311

Corridor

B-D311

Stair 5

E03

Conference

B-D352

Storage

BB418

Stair #8

BB420

Dietitian

BC421

Conference Room

BC410

Reading Room

BC443

Cardiology Tech

BC442 Corridor

BC400

Staff

BC441

Echo

BC437

Echo

BC435

Echo

BC433

Reception

BC471A

Work

BC471

Toilet

BC472

Waiting

BC470

Tech Supv

BC311

IP Chief

BC312

Alcove

BC313

Staff Entry

BC314

ELEC.

BC315

Assistant Chief

BC316

Secretary & Waiting

BC317

Chief Pharm.

BC318

Admin. Assist.

BC319

Clinic Coord.

BC320

IT

BB379

Open Office

BC322

Mainstreet Corridor

BC402

Closet

BB375A Laminating Room

BB375

Machine Room

BB374

Cad Room

BB373

Corridor

BC401

Tech Area

BB372

Paster Room

BB376

Office

BB377

Casting Exam Room

BB378 Vestibule

BB370

Gait Room

BB371

Corridor

BB300E

Elect.

BB362Vestibule

BB360

Inventory Storeroom

BB361

Conference

BB261

Corridor

BB260

Reception

BB262

Office

BB262A

Exam Visual Test

BB263

Toilet

BC323

Toilet

BC324

Office

BC306

Staff Lounge

BC305

Inpatient Pharmacy

BC307

Lockers

BC307A

Narcotics Vault

BC310

Buffer Area

BC309

Anteroom

BC308

EMS

BC302

Future Machine Room

BC303

Receiving Area

BC304

Storage

BC301

Mainstreet

BD300A

Lobby

BD300B

Lobby

BD300C

Mechanical

BC310A

Elevator Lobby

BC403

EXISTING EGRESS DOOR TO REMAIN

156'-6" +/- EXIT

TRAVEL DISTANCEEXISTING EGRESS PATH FROM

INPATIENT PHARMACY SHALL

REMAIN UNAFFECTED DURING

PHASE IA CONSTRUCTION. EXISTING

DOORS WILL NOT BE BLOCKED

PHASE IA

SCOPE OF

WORK

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA SAFETY

STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING 2 HOUR RATED FIRE BARRIER

EXISTING 1 HOUR RATED FIRE BARRIER

EXISTING 1 HOUR RATED FIRE WALL/SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION (DIRECTIONAL ARROWS MAY

OCCUR, SEE PLAN)

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT

DEPICT EXIT PATHS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO

MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4) PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT FOR ALL

TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY STANDARDS.

HAZARDOUS ROOM

EXISTING 2 HOUR RATED SMOKE BARRIER

GYP. BD./METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD DOOR FOR

CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON COMPLETION OF WORK U.N.O.

PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY

CONSTRUCTION. REFER TO "SOLID BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-

7.0. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER

NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.

PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD DOOR FOR CONTRACTOR ACCESS ONLY. REQUIRED AT ALL ABOVE-CEILING MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED CONSTRUCTION AREAS - REFER TO MEP

DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE ISOLATED FROM THE SURROUNDING

ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "PLASTIC BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-7.0. SCHEDULE NOTE:

CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE ALL ABOVE-CEILING WORK AND

TEMPORARY BARRIER CONSTRUCTION WITH VA AND PHARMACY STAFF

E

E

FE

FE

F E

FE

FE

F E

P H

A S

E I B

S C

O P

E O

F

W

O R

K

Women's Toilet

BD312A

Men's Toilet

BD312

Lab Procedure-C

BD310

Corridor

BD311

Corridor

B-D311

Stair 5

E03

Conference

B-D352

Corridor

CE02

Storage

BB418

Stair #8

BB420

Dietitian

BC421

Conference Room

BC410

Reading Room

BC443

Cardiology Tech

BC442 Corridor

BC400

Staff

BC441

Echo

BC437

Echo

BC435

Echo

BC433

Reception

BC471A

Work

BC471

Toilet

BC472

Waiting

BC470

Tech Supv

BC311

IP Chief

BC312

Alcove

BC313

Staff Entry

BC314

ELEC.

BC315

Assistant Chief

BC316

Secretary & Waiting

BC317

Chief Pharm.

BC318

Admin. Assist.

BC319

Clinic Coord.

BC320

IT

BB379

Open Office

BC322

Mainstreet Corridor

BC402

Closet

BB375A Laminating Room

BB375

Machine Room

BB374

Cad Room

BB373

Corridor

BC401

Tech Area

BB372

Paster Room

BB376

Office

BB377

Casting Exam Room

BB378 Vestibule

BB370

Gait Room

BB371

Corridor

BB300E

Elect.

BB362Vestibule

BB360

Inventory Storeroom

BB361

Conference

BB261

Corridor

BB260

Reception

BB262

Office

BB262A

Exam Visual Test

BB263

Toilet

BC323

Toilet

BC324

Office

BC306

Staff Lounge

BC305

Inpatient Pharmacy

BC307

Lockers

BC307A

Narcotics Vault

BC310

Buffer Area

BC309

Anteroom

BC308

EMS

BC302

Future Machine Room

BC303

Receiving Area

BC304

Storage

BC301

Mainstreet

BD300A

Lobby

BD300B

Lobby

BD300C

Mechanical

BC310A

Elevator Lobby

BC403

EXISTING EGRESS PATH FROM

INPATIENT PHARMACY SHALL REMAIN

UNAFFECTED DURING PHASE IB

CONSTRUCTION. EXISTING DOORS

WILL NOT BE BLOCKED

FE

F E

E

TEMPORARY CONST. BARRIER FOR

CONSTRUCTION OF NEW HD STORAGE

ROOM SHALL NOT IMPEDE

NORMAL/EGRESS TRAFFIC IN ANY WAY.

EX. DOUBLE DOORS SHALL REMAIN IN

NORMAL OPERATION. SEE SPECIAL

NOTE REGARDING DUCTWORK

SCOPE/BARRIERS

NORMAL EGRESS PATHS FROM OUTPATIENT

PHARMACY SHALL REMAIN UNAFFECTED

DURING THE MAJORITY OF CONSTRUCTION.

SEE SPECIAL NOTE REGARDING DUCTWORK

SCOPE/BARRIERS

F E

F E

P H

A S

E I S

C O

P E

O F

W

O R

K

Outpatient Pharmacy

BAC311

Storage

BAC301

HD Storage Room

BAC301A

Tech Sup. Mail Order

BAC312

Consult Room

BAC313

Staff Lockers/Break

BAC303

HAC

BAC302

Work Room

BAC307

Electrical Closet

BAC309 Comm

BAC308

Stairway

BAC310

Supervisor

BAC316

Tech Supply

BAC317

Controlled Sub,/ Sec Disp

BAC318

Record Storage

BAC320

Staff Toilet

BAC319

Consult

BAC321

Waiting

BAC326

Corridor

BAC327

Elevator Lobby

BAC325

SPECIAL NOTE: TEMPORARY CORRUGATED

PLASTIC SHEETING PARTITION INDICATED IS

ONLY REQUIRED FOR NEW DUCTWORK

ROUTING WORK. WHILE INSTALLED, EXISTING

EXIT THROUGH STORAGE BC301 WILL BE

TEMPORARILY BLOCKED. GC SHALL COORD.

W/VA SAFETY DEPT. TO ENSURE ALL SAFETY

MEASURES ARE IN PLACE

STAFF LOCKER ROOM AND HAC ROOM TO

BE TEMPORARILY UNOCCUPIED DURING

DUCTWORK INSTALLATION

ACCESS TO EXISTING EGRESS

STAIR SHALL BE PROVIDED

THROUGHOUT CONSTRUCTION

136'-10" ACCESS

TRAVEL DISTANCE TO

CORRIDOR

INFECTION CONTROL CLASS & SAFETY MEASURES:

THE FOLLOW INFECTION CONTROL CLASSES SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF

CONSTRUCTION:

• INPATIENT PHARMACY - CLASS III WITH ANTEROOM REQUIREMENT

• OUTPATIENT PHARMACY - CLASS III

• MODULE J ONCOLOGY CLINIC - CLASS IV WITH ANTEROOM REQUIREMENT

REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT.

REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26 THROUGHOUT THE

ENTIRETY OF THE PROJECT.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project Number

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch es o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

FULLY SPRINKLERED

ARCHITECT:CONSULTANTS:

Office of Construction and Facilities Management

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

1468 WEST 9TH STREET #400 CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

E T

G

DE

I

RE

T

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

A

TE

I

T C

J.

O

O

FO

H

VETERANS AFFAIRS MEDICAL CENTER

RENOVATE PHARMACY TO COMPLY WITH

USP DIRECTIVES

5.30.19

PHASE IA & IB LIFE SAFETY PLANS

AS-0.1

541-19-103

10701 EAST BLVD. CLEVELAND, OHIO

Checker Author

SCALE: 3/32" = 1'-0"

PHASE IA LIFE SAFETY PLAN - INPATIENT PHARMACY

NORTH

SCALE: 3/32" = 1'-0"

PHASE IB LIFE SAFETY PLAN - INPATIENT PHARMACY

NORTH

SCALE: 3/32" = 1'-0"

PHASE IA LIFE SAFETY PLAN - OUTPATIENT PHARMACY

NORTH

Revisions Date

5 BID ISSUE SUBMISSION 5.30.19

4 100% CD's SUBMISSION 12.21.18

3 90% CD's SUBMSSION 11.16.18

DN

E

E

FE

F E

F E

FE

FE

F E

P H

A S

E I

II

S

C O

P E

O F

W

R

K

SPECIAL NOTE: THIS TEMPORARY DOOR SHALL BE PROVIDED WITH CARD READER WINTEGRAL SCRAMBLE PAD AND SHALL BE ACCESSIBLE BY VA STAFF ONLY. GC SHALL NOT HAVE ACCESS TO THIS DOOR UNLESS APPROVED BY THE COR UNDER SPECIAL CIRCUMSTANCES. INTENT OF TEMPORARY DOOR IS TO ALLOW VA STAFF ACCESS TO DELIVERIES DURING PHASE III CONSTRUCTION. GC SHALL COORD. W/VA PHARMACY STAFF AND PROVIDE DELIVERY ACCESS, AND SHALL MAINTAIN A CLEAR

DELIVERY PATH

SPECIAL NOTE: EXISTING, KEY-

CARD SECURED DOUBLE DOORS

SHALL SERVE AS THE SOLE

POINT OF PHARMACY DELIVERY

RECEIVING THROUGH PHASE III

CONSTRUCTION

SPECIAL NOTE: THIS ROOM WILL NOT

BE ACCESSIBLE TO CONSTRUCTION/GC

STAFF UNLESS APPROVED BY COR

UNDER SPECIAL CIRCUMSTANCES

Women's Toilet

BD312A

Men's Toilet

BD312

Lab Procedure-C

BD310

Corridor

BD311

Corridor

B-D311

Stair 5

E03

Conference

B-D352

Corridor

CE02

Storage

BB418

Stair #8

BB420

Theraputic Pool

BB421

Dietitian

BC421

Conference Room

BC410

Reading Room

BC443

Cardiology Tech

BC442 Corridor

BC400

Staff

BC441

Echo

BC437

Echo

BC435

Echo

BC433

Reception

BC471A

Work

BC471

Toilet

BC472

Waiting

BC470

Tech Supv

BC311

IP Chief

BC312

Alcove

BC313

Staff Entry

BC314

ELEC.

BC315

Assistant Chief

BC316

Secretary & Waiting

BC317

Chief Pharm.

BC318

Admin. Assist.

BC319

Clinic Coord.

BC320

IT

BB379

Open Office

BC322

Mainstreet Corridor

BC402

Closet

BB375A Laminating Room

BB375

Machine Room

BB374

Cad Room

BB373

Corridor

BC401

Tech Area

BB372

Paster Room

BB376

Office

BB377

Casting Exam Room

BB378 Vestibule

BB370

Gait Room

BB371

Corridor

BB300E

Elect.

BB362Vestibule

BB360

Inventory Storeroom

BB361

Conference

BB261

Corridor

BB260

Reception

BB262

Office

BB262A

Exam Visual Test

BB263

Inpatient Pharmacy

BC307

Corridor

BC307A

Narcotics Vault

BC310

EMS

BC302

Future Machine Room

BC303

Receiving Area

BC304

Storage

BC301

Mainstreet

BD300A

Lobby

BD300B

Lobby

BD300C

Mechanical

BC310A

Elevator Lobby

BC403

Sterile HD Buffer Area

BC305

HD Garbing

BC308

Open Work Area

BC327

Non-HD Garbing

BC325

Sterile Non-HD Buffer Area

BC324

Staff Lounge

BC321

HD Storage

BC309

Office

BC306

HD Anteroom

BC328

Non-HD Anteroom

BC326

Staff Toilet

BC323

181'-7" +/- EXIT ACCESS

TRAVEL DISTANCE

EGRESS FROM OPEN

OFFICE BC322 SHALL

REMAIN UNAFFECTED

DURING PHASE III

TEMP. CONST.

"ANTEROOM"

E

E

FE

F E

FE

FE

F E

PHASE II SCOPE OF WORK

F E

Women's Toilet

BD312A

Men's Toilet

BD312

Lab Procedure-C

BD310

Corridor

BD311

Corridor

B-D311

Stair 5

E03

Conference

B-D352

Storage

BB418

Stair #8

BB420

Dietitian

BC421

Conference Room

BC410

Reading Room

BC443

Cardiology Tech

BC442 Corridor

BC400

Staff

BC441

Echo

BC437

Echo

BC435

Echo

BC433

Reception

BC471A

Work

BC471

Toilet

BC472

Waiting

BC470

Tech Supv

BC311

IP Chief

BC312

Alcove

BC313

Staff Entry

BC314

ELEC.

BC315

Assistant Chief

BC316

Secretary & Waiting

BC317

Chief Pharm.

BC318

Admin. Assist.

BC319

Clinic Coord.

BC320

IT

BB379

Open Office

BC322

Mainstreet Corridor

BC402

Closet

BB375A Laminating Room

BB375

Machine Room

BB374

Cad Room

BB373

Corridor

BC401

Tech Area

BB372

Paster Room

BB376

Office

BB377

Casting Exam Room

BB378 Vestibule

BB370

Gait Room

BB371

Corridor

BB300E

Elect.

BB362Vestibule

BB360

Inventory Storeroom

BB361

Conference

BB261

Corridor

BB260

Reception

BB262

Office

BB262A

Exam Visual Test

BB263

Inpatient Pharmacy

BC307

Corridor

BC307A

Narcotics Vault

BC310

Buffer Area

BC309

Anteroom

BC308

EMS

BC302

Future Machine Room

BC303

Receiving Area

BC304

Storage

BC301

Mainstreet

BD300A

Lobby

BD300B

Lobby

BD300C

Mechanical

BC310A

Elevator Lobby

BC403

Sterile HD Buffer Area

BC305 HD Garbing

BC308

Open Work Area

BC327

Non-HD Garbing

BC325

Sterile Non-HD Buffer Area

BC324

Staff Lounge

BC321

Staff Toilet

BC323

HD Anteroom

BC328

Non-HD Anteroom

BC326

ACCESS TO EXISTING

EGRESS DOORS SHALL

REMAIN UNAFFECTED

DURING PHASE II

OPEN OFFICE BC322 SHALL HAVE

ACCESS TO TWO (2) EGRESS

DOORS DURING CONSTRUCTION.

THIRD DOOR SHALL ONLY BE

TEMPORARILY CLOSED OFF DURING

ADJACENT DUCTWORK

INSTALLATION WHEN TEMP.

BARRIER IS CONSTRUCTED

ACCESS TO NORTH EGRESS

DOORS SHALL PROVIDED AT ALL

TIMES - COORD. LOCATIONS OF

TEMP. CONSTRUCTION

BARRIERS AS REQ'D. IN COORD.

W/VA TO ACHIEVE SAME

184'-8" +/- EXIT ACCESS

TRAVEL DISTANCE

TEMP.

CONST.

"ANTEROOM"

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA SAFETY

STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING 2 HOUR RATED FIRE BARRIER

EXISTING 1 HOUR RATED FIRE BARRIER

EXISTING 1 HOUR RATED FIRE WALL/SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION (DIRECTIONAL ARROWS MAY

OCCUR, SEE PLAN)

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT

DEPICT EXIT PATHS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO

MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4) PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT FOR ALL

TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY STANDARDS.

HAZARDOUS ROOM

EXISTING 2 HOUR RATED SMOKE BARRIER

GYP. BD./METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD DOOR FOR

CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON COMPLETION OF WORK U.N.O.

PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY

CONSTRUCTION. REFER TO "SOLID BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-

7.0. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER

NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.

PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD DOOR FOR CONTRACTOR ACCESS ONLY. REQUIRED AT ALL ABOVE-CEILING MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED CONSTRUCTION AREAS - REFER TO MEP

DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE ISOLATED FROM THE SURROUNDING

ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "PLASTIC BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-7.0. SCHEDULE NOTE:

CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE ALL ABOVE-CEILING WORK AND

TEMPORARY BARRIER CONSTRUCTION WITH VA AND PHARMACY STAFF

P H

A S

E I

II

S

C O

P E

R

K

F E

F E

F E

Comm.

2B149

Hemodialysis Storage

2B150

Elect.

2B148

PFT

2B145

Passage

2B330

Stair #11

2B146

Corridor

2B147

Corridor

2B100A

Elect.

2B146A

Clean Linen

2B412

Procedure

2B413

Exam 8

2B414

Exam 7

2B415

Staff Lounge

2B411

Exam 4

2B420

Exam 3

2B421 Corridor

2B410

Corridor

2B418

Corridor

2B419

Exam 6

2B416

Exam 5

2B417

Exam 2

2B423

Exam 1

2B422

ASMT.

2B432Office

2B431

Nurse Intake

2B433

Storage

2B435 Corridor

2B459

Waiting

2B434

Recpt.

2B462

Pharmacy Office

2B461

Staff Toilet

2B460

Patient Toilet

2B438

EMS

2B436

Family/ Consult

2B437

Patient Toilet

2B439

Private Infusion

2B440

Med Room

2B456

Soiled

2B457 Infusion 1

2B441

Infusion 2

2B442

Infusion 3

2B443

Infusion 4

2B444

Infusion 5

2B445

Infusion 6

2B446 Infusion 7

2B447

Infusion 8

2B448

Infusion 9

2B449

Infusion 10

2B450

Infusion 11

2B451

Nurse Station

2B455

Corridor

2B459

Corridor

2B458

2B146B

Infusion 12

2B452

Infusion 13

2B453

Infusion 14

2B454

Infusion 15

2B454A

EXISTING

EGRESS

DOOR TO

REMAIN

EXISTING EGRESS PATH

TO REMAIN UNAFFECTED

DURING CONSTRUCTION

102'-4" +/- ACCESS

TRAVEL DISTANCE

TO MAIN ATRIUM

CORRIDOR

INFECTION CONTROL CLASS & SAFETY MEASURES:

THE FOLLOW INFECTION CONTROL CLASSES SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF

CONSTRUCTION:

• INPATIENT PHARMACY - CLASS III WITH ANTEROOM REQUIREMENT

• OUTPATIENT PHARMACY - CLASS III

• MODULE J ONCOLOGY CLINIC - CLASS IV WITH ANTEROOM REQUIREMENT

REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT.

REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26 THROUGHOUT THE

ENTIRETY OF THE PROJECT.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project Number

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch es o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

FULLY SPRINKLERED

ARCHITECT:CONSULTANTS:

Office of Construction and Facilities Management

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

1468 WEST 9TH STREET #400 CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

E T

G

DE

I

RE

T

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

A

TE

I

T C

J.

O

O

FO

H

VETERANS AFFAIRS MEDICAL CENTER

RENOVATE PHARMACY TO COMPLY WITH

USP DIRECTIVES

5.30.19

PHASE II & III LIFE SAFETY PLANS

AS-0.2

541-19-103

10701 EAST BLVD. CLEVELAND, OHIO

Checker Author

SCALE: 3/32" = 1'-0"

PHASE III LIFE SAFETY PLAN - INPATIENT PHARMACY

NORTH

SCALE: 3/32" = 1'-0"

PHASE II LIFE SAFETY PLAN - INPATIENT PHARMACY

NORTH

SCALE: 3/32" = 1'-0"

PHASE III LIFE SAFETY PLAN - MODULE J

NORTH

TEMP. CONST.

"ANTEROOM"

Revisions Date

5 BID ISSUE SUBMISSION 5.30.19

4 100% CD's SUBMISSION 12.21.18

3 90% CD's SUBMSSION 11.16.18

UP

UP

UP

DN

UP

UP

UP

24 25 26 27

2924a 30

E

G1

H

JJ

KK

LL

L1

L2

N

P

Q

F

G

L3

17a

17a

18a

23d 24b 25a 26a 28a28 30a31

23a

N1 N1

23c

Research Lab

BD316

Women's Toilet

BD312A

Men's Toilet

BD312

Lab Procedure-C

BD310

Office

BD313

Lab Procedure-B

B-D355

Equip. Alcove

BD314

Corridor

BD311

Corridor

B-D311

Office

B-D353

Lab 7

B-D354

Stair 5

E03

Conference

B-D352

Storage

BB418

Stair #8

BB420

Service Room

BB419Corridor

BC400A

Dietitian

BC421

Conference Room

BC410

Reading Room

BC443

Cardiology Tech

BC442

Corridor

BC400

Corridor

BC430

Staff

BC441

Echo

BC437

Echo

BC435

Echo

BC433

Reception

BC471A

Work

BC471

Corridor

BC470A

Toilet

BC472

Waiting

BC470

Biohazard Storage

E26

Service Lobby

BC404

Tech Supv

BC311

IP Chief

BC312

Alcove

BC313

Staff Entry

BC314 ELEC.

BC315

Assistant Chief

BC316

Secretary & Waiting

BC317

Chief Pharm.

BC318

Admin. Assist.

BC319

Clinic Coord.

BC320

IT

BB379

Open Office

BC322

Mainstreet Corridor

BC402

Closet

BB375A

Laminating

Room

BB375

Machine Room

BB374

Cad Room

BB373

Corridor

BC401

Paster Room

BB376

Office

BB377

Casting Exam Room

BB378

Vestibule

BB370

Gait Room

BB371

Corridor

BB300E

Elect.

BB362

Vestibule

BB360

Inventory Storeroom

BB361

Conference

BB261

Corridor

BB260

Reception

BB262

Office

BB262A

Student Office

BB266

Student Office

BB267

Office

BB268

Office

BB270

Office

BB265

Office

BB264

Exam Visual Test

BB263

Toilet

BC323

Toilet

BC324

Office

BC306

Staff Lounge

BC305

Inpatient Pharmacy

BC307

Lockers

BC307A

Narcotics Vault

BC310

Buffer Area

BC309

Anteroom

BC308

EMS

BC302

Future Machine Room

BC303

Receiving Area

BC304

Storage

BC301

Mainstreet

BD300A

Lobby

BD300B

Lobby

BD300C Mechanical

BC310A

Elevator Lobby

BC403

PHASE II SCOPE OF WORK

PHASE II SCOPE OF WORK

P H

A S

E I B

S C

O P

E O

F

W

O R

K

P H

A S

E I A

S C

O P

E O

F

W

O R

K

P H

A S

E I

II

S

C O

P E

R

K

P H

A S

E I

II

S

C O

P E

R

K

FINAL CHECKING

STATION

DRUG

CAROUSEL

DRUG

CAROUSEL

DRUG

CAROUSEL

P H

A R

M A C

Y T

E C

H W

O R

K S T A T

IO

N S

P H

A R

M A C

Y T

E C

H W

O R

K S T A T

IO

N S

FILL STATION

T C

G R

X

IN

S P E C

T R x

TCGRX

EQUIP.

P H

A S

E I V

S C

O P

E O

F

W

O R

K

P H

A S

E I V

S C

O P

E O

F

W

O R

K

PHASE IV SCOPE OF WORK

GENERAL NOTE: ALL EXISTING

PARTITIONED WORKSTATIONS IN

OPEN OFFICE BC322 ARE

CONSIDERED "FURNITURE," AND

SHALL BE THE RESPONSIBILITY OF

THE VA TO REMOVE, AS WELL AS

DISCONNECT FROM EXISTING

ELECTRICAL WHIPS. NEW

WORKSTATIONS TO BE LOCATED IN

THIS AREA SHALL ALSO BE

FURNISHED & INSTALLED BY THE VA

GENERAL NOTE: UNLESS NOTED OTHERWISE ON

DEMO/IMPROVEMENT PLANS, ALL EXISTING WORKSTATIONS IN

INPATIENT PHARMACY BC307 ARE CONSIDERED "MOBILE

CASEWORK" THAT SHALL BE INCLUDED IN THE GC'S SCOPE OF

WORK WITH REGARDS TO REMOVAL AND/OR RELOCATION

P H

A S

E I V

S C

O P

E O

F

W

O R

K

P H

A S

E I V

S C

O P

E O

F

W

O R

K

PHASE IA SCOPE

OF WORK

P H

A S

E I B

S C

O P

E O

F

W

O R

K

PHASE II SCOPE OF WORK

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE

CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW TO MATCH

EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED BY THE OWNER

UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY

REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO

VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE PROJECT

AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH

EXISTING.

ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS

SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR

ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.

ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED BY THE COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

SYMBOL LEGEND:

INDICATES EXISTING DOOR

INDICATES NEW DOOR

EXISTING WALLS TO REMAIN

NEW WALLS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER TO

MEP DWGS.

GYP. BD./METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD DOOR FOR

CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON COMPLETION OF WORK U.N.O.

PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY

CONSTRUCTION. REFER TO "SOLID BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-

7.0. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER

NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA SAFETY

STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

GENERAL NOTE CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS CONFLICT W/EX.

LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION PLANS), GC SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST LOCATION OF CONST.

PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE

PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD DOOR FOR CONTRACTOR ACCESS ONLY. REQUIRED AT ALL ABOVE-CEILING MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED CONSTRUCTION AREAS - REFER TO MEP

DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE ISOLATED FROM THE SURROUNDING

ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "PLASTIC BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-7.0. SCHEDULE NOTE:

CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE ALL ABOVE-CEILING WORK AND

TEMPORARY BARRIER CONSTRUCTION WITH VA AND PHARMACY STAFF

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project Number

Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch es o n e fo o t th re e in ch es o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

FULLY SPRINKLERED

ARCHITECT:CONSULTANTS:

Office of Construction and Facilities Management

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

1468 WEST 9TH STREET #400 CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

E T

G

DE

I

RE

T

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

A

TE

I

T C

J.

O

O

FO

H

VETERANS AFFAIRS MEDICAL CENTER

RENOVATE PHARMACY TO COMPLY WITH

USP DIRECTIVES

5.30.19

BASEMENT LEVEL EXISTING

CONDITIONS PLAN - INPATIENT

PHARMACY

AS-IP.0

541-19-103

10701 EAST BLVD. CLEVELAND, OHIO

CJK DAK

SCALE: 1/8" = 1'-0"

BASEMENT LEVEL EXISTING CONDITIONS PLAN - INPATIENT PHARMACY

NORTH

Revisions Date

5 BID ISSUE SUBMISSION 5.30.19

4 100% CD's SUBMISSION 12.21.18

3 90% CD's SUBMSSION 11.16.18

UP

UP

UP

UP

UP

UP

DRUG

CAROUSEL

DRUG

CAROUSEL

DRUG

CAROUSELT

C G R X

IN

S P E C T R x

TCGRX

EQUIP.

4'

Research Lab

BD316

Women's Toilet

BD312A

Men's Toilet

BD312

Lab Procedure-C

BD310

Office

BD313

Lab Procedure-B

B-D355

Equip. Alcove

BD314

Corridor

BD311

Corridor

B-D311

Office

B-D353

Lab 7

B-D354

Stair 5

E03

Conference

B-D352

Storage

BB418

Stair #8

BB420

Dietitian

BC421

Conference Room

BC410

Reading Room

BC443

Cardiology Tech

BC442

Corridor

BC400

Staff

BC441

Echo

BC437

Echo

BC435

Echo

BC433

Reception

BC471A

Work

BC471

Toilet

BC472

Waiting

BC470

Biohazard Storage

E26

Service Lobby

BC404

Tech Supv

BC311

IP Chief

BC312

Alcove

BC313

Staff Entry

BC314

ELEC.

BC315

Assistant Chief

BC316

Secretary & Waiting

BC317

Chief Pharm.

BC318

Admin. Assist.

BC319

Clinic Coord.

BC320

IT

BB379

Open Office

BC322

Mainstreet Corridor

BC402

Closet

BB375A

Laminating Room

BB375

Machine Room

BB374

Cad Room

BB373

Corridor

BC401

Tech Area

BB372

Paster Room

BB376

Office

BB377

Casting Exam Room

BB378

Vestibule

BB370

Gait Room

BB371

Corridor

BB300E

Elect.

BB362

Vestibule

BB360

Inventory Storeroom

BB361

Conference

BB261

Corridor

BB260

Reception

BB262

Office

BB262A

Student Office

BB266

Student Office

BB267

Office

BB268

Office

BB270

Stair 9

BCS2

Storage

BB269

Office

BB265

Office

BB264

Exam Visual Test

BB263

Toilet

BC323

Toilet

BC324

Office

BC306

Staff Lounge

BC305

Inpatient Pharmacy

BC307

Lockers

BC307A

Narcotics Vault

BC310

Buffer Area

BC309

Anteroom

BC308

EMS

BC302

Future Machine Room

BC303

Receiving Area

BC304

Storage

BC301

Mainstreet

BD300A

Lobby

BD300B

Lobby

BD300C

Mechanical

BC310A

Elevator Lobby

BC403

Corridor

BB300F

3' - 0"

RESTROOMS BC324 & BC323

SHALL BE INACCESSIBLE DURING

PHASE IA. EXISTING DOORS

SHALL BE FULLY SEALED FROM

CONSTRUCTION ACTIVITIES

ALIGN

ALIGN

7'

3'

7' - 0" 9' - 2 1/2"

ALIGN CONST. WALL

W/EDGE OF WORKSTATION

2' - 6"

ALIGN FLUSH

ALIGN

9 9

EXISTING STAFF ENTRY DOOR SHALL BE INACCESSIBLE

DURING PHASE IA. EXISTING DOOR SHALL BE FULLY

SEALED FROM CONSTRUCTION ACTIVITIES

6'

EXISTING STAFF DOOR SHALL BE

UTILIZED FOR CONSTRUCTION

ENTRY ONLY DURING PHASE IA.

CARD READER SHALL BE

TEMPORARILY DISABLED BY THE VA

TO PERMIT CONTRACTOR ACCESS.

ALIGN EXISTING

FLOORING/BASE REMOVAL

WITH EX. WORKSTATIONS AND

REAR OF DRUG CAROUSEL

TEMP. CONST.

"ANTEROOM"

EXISTING FIRE

EXTINGUISHERS TO REMAIN

ENTIRE OPEN

OFFICE BC322

SPACE

PHASING NOTE: THE INTENT IN DIVIDING PHASE I INTO TWO (2) SEPARATE PHASES - PHASE IA AND IB - IS TO ACCOMMODATE THE TEMPORARY RELOCATION OF PHARMACY STAFF IN PHASES SO AS NOT TO DISRUPT

OPERATIONS. THE PHASES ARE DESIGNED TO GENERALLY ACHIEVE THE FOLLOWING:

PHASE IA: DEMO EXISTING WALLS AND CONSTRUCT NEW WALL. STAFF LOCATED WITHIN CONSTRUCTION AREAS WILL BE TEMPORARILY RELOCATED BY THE VA, WHILE STAFF OUTSIDE CONSTRUCTION BARRIERS SHALL REMAIN IN PLACE AND UNINTERRUPTED. CREATE NEW WORKSTATIONS IN CONSTRUCTION AREA.

PHASE IB: NEW STAFF WORKSTATIONS CREATED IN PHASE IA WILL BE UTILIZED BY PHARMACY STAFF WHILE PHASE IB IS UNDERTAKEN. PHASE IB IS ALSO THE PHASE WHERE CRITICAL STATIONS AND EQUIPMENT WILL BE RELOCATED OR CREATED AT THEIR FINAL LOCATION (E.G. FINAL CHECKING, DRUG REFRIGERATORS, TCGRX EQUIPMENT, FILL STATION).

AT THE END OF PHASE IB - I.E. THE COMPLETION OF PHASE I - THE PHARMACY STAFF AND CRITICAL EQUIPMENT WILL BE LOCATED IN THEIR FINAL LOCATIONS AND IN FULL USE BY THE PHARMACY STAFF FOR

THE REMAINDER OF CONSTRUCTION. GC SHALL COORDINATE AND SCHEDULE ALL SUBSEQUENT

CONSTRUCTION PHASES (II, III, & IV) WITH VA/PHARMACY STAFF TO ENSURE THAT CONTINUOUS

OPERATIONS OF PHASE IA/IB STAFF AND EQUIPMENT CAN BE MAINTAINED.

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE

CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW TO MATCH

EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED BY THE OWNER

UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY

REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO

VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE PROJECT

AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH

EXISTING.

ALL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.