36C25019B0022-0003003.docx
DOCX document 24 KB Posted
- Attached to
- 4th Floor Pharmacy HVAC Construction Project no. 539-18-501 Federal contract opportunity
- Solicitation number
- 36C25019B0022
About this file
36C25019B0022 0003 36C25019B0022 0003.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019C0162-000.docx | DOCX document | |
| 36C25019B0022-0002001.pdf | ||
| 36C25019B0022-0002002.pdf | ||
| 36C25019B0022-0002000.docx | DOCX document | |
| 36C25019B0022-0001001.pdf | ||
| 36C25019B0022-0001002.pdf | ||
| 36C25019B0022-0001000.docx | DOCX document | |
| 36C25019B0022-006.docx | DOCX document | |
| 36C25019B0022-007.docx | DOCX document | |
| 36C25019B0022-004.pdf | ||
| 36C25019B0022-005.pdf | ||
| 36C25019B0022-003.docx | DOCX document | |
| 36C25019B0022-002.docx | DOCX document | |
| 36C25019B0022-001.docx | DOCX document | |
| 36C25019B0022-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 04-24-2019 539-19-2-6094-0036 539-18-501 539/90C Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati
OH 45219
Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219 To all Offerors/Bidders
36C25019B0022 03-25-2019
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 30 April 2019 at 2:00PM EST The purpose of this amendment is to post questions and answers, to extend the bid opening date, and to change the bid opening location.
1. Questions and answers are answered and attached to this amendme nt.
2. The bid opening date is extended to 30 April 2019 at 2:00PM EST.
See following page for questions/answers and bid l ocation.
CONTINUATION PAGE
3. The bid opening location is changed to
Network Contracting Office (NCO) 10 3140 Governor’s Place Blvd, Suite 210 Kettering, OH 45409
QUESTIONS/ANSWERS
Q1. The Specs reference commissioning and commissioning agent but doesn’t specify who will hire the commissioning agent.
A1. VA will hire commissioning agent. HVAC contractor is not responsible for commissioning.
Q2. The drawings show roof curbs being installed. There are no specs for roof work. It is assumed the VA will do all roof patching at the time of the curb installation?
A2. Contractor is responsible for installing roof curb and associated roof insulation (insulation, flashing, sealing, etc.).
Q3. I had our sheet metal contractor reach out with a question on the stainless steel ductwork, I am not sure if you can answer question at this time? It is below in red. It states on spec section 23 31 00-4 (Pharmacy Hood, Exhaust and Associated Ductwork (18 gage) all welded stainless steel. I assume this is all the hatched ductwork on the drawings? There is 3 lab valves on drawing M104 that only serve exhaust air devices. Does this need to be all welded as well or can it be lighter gauge stainless and sealed up to the main? On the all welded construction can the longitudinal seams be welded and the transverse joint connections be vanstoned with steel angle bolted connections where welding the transverse joints is not feasible?
A3. Per VA HVAC Design Manual Nov 1, 2017 Section 3.10 Fume Hood Exhaust Systems, Sub-Section 3.10.4.2 Specific Requirements Paragraph (g): Welded stainless-steel ductwork is required for laboratory fume hood exhaust and biosafety cabinet exhaust systems. Flanged and sealed ductwork is not acceptable on hood exhaust system.