36C25019B0022-0003003.docx

DOCX document 24 KB Posted

Attached to
4th Floor Pharmacy HVAC Construction Project no. 539-18-501 Federal contract opportunity
Solicitation number
36C25019B0022
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0022 0003 36C25019B0022 0003.docx

View the file

Other files for this federal contract opportunity

Other files attached to 4th Floor Pharmacy HVAC Construction Project no. 539-18-501, newest first.
File Type Posted
36C25019C0162-000.docx DOCX document
36C25019B0022-0002001.pdf PDF
36C25019B0022-0002002.pdf PDF
36C25019B0022-0002000.docx DOCX document
36C25019B0022-0001001.pdf PDF
36C25019B0022-0001002.pdf PDF
36C25019B0022-0001000.docx DOCX document
36C25019B0022-006.docx DOCX document
36C25019B0022-007.docx DOCX document
36C25019B0022-004.pdf PDF
36C25019B0022-005.pdf PDF
36C25019B0022-003.docx DOCX document
36C25019B0022-002.docx DOCX document
36C25019B0022-001.docx DOCX document
36C25019B0022-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-24-2019 539-19-2-6094-0036 539-18-501 539/90C Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati

OH 45219

Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219 To all Offerors/Bidders

36C25019B0022 03-25-2019

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 30 April 2019 at 2:00PM EST The purpose of this amendment is to post questions and answers, to extend the bid opening date, and to change the bid opening location.

1. Questions and answers are answered and attached to this amendme nt.

2. The bid opening date is extended to 30 April 2019 at 2:00PM EST.

See following page for questions/answers and bid l ocation.

CONTINUATION PAGE

3. The bid opening location is changed to

Network Contracting Office (NCO) 10 3140 Governor’s Place Blvd, Suite 210 Kettering, OH 45409

QUESTIONS/ANSWERS

Q1. The Specs reference commissioning and commissioning agent but doesn’t specify who will hire the commissioning agent.

A1. VA will hire commissioning agent. HVAC contractor is not responsible for commissioning.

Q2. The drawings show roof curbs being installed. There are no specs for roof work. It is assumed the VA will do all roof patching at the time of the curb installation?

A2. Contractor is responsible for installing roof curb and associated roof insulation (insulation, flashing, sealing, etc.).

Q3. I had our sheet metal contractor reach out with a question on the stainless steel ductwork, I am not sure if you can answer question at this time? It is below in red. It states on spec section 23 31 00-4 (Pharmacy Hood, Exhaust and Associated Ductwork (18 gage) all welded stainless steel. I assume this is all the hatched ductwork on the drawings? There is 3 lab valves on drawing M104 that only serve exhaust air devices. Does this need to be all welded as well or can it be lighter gauge stainless and sealed up to the main? On the all welded construction can the longitudinal seams be welded and the transverse joint connections be vanstoned with steel angle bolted connections where welding the transverse joints is not feasible?

A3. Per VA HVAC Design Manual Nov 1, 2017 Section 3.10 Fume Hood Exhaust Systems, Sub-Section 3.10.4.2 Specific Requirements Paragraph (g): Welded stainless-steel ductwork is required for laboratory fume hood exhaust and biosafety cabinet exhaust systems. Flanged and sealed ductwork is not acceptable on hood exhaust system.

File details come from the government source that posted it.