36C25018B0688-002.pdf

PDF 27 MB Posted

Attached to
Build Primary Care Clinic (PACT) Project 610-303
Solicitation number
36C25018B0688
Issued by

About this file

36C25018B0688 ATTACHMENT 1. 05.1a 610-303 VOL 1 Drawings.pdf

View the file

Other files

File Type Posted
36C25018B0688-010.docx DOCX document
36C25018B0688-0003000.docx DOCX document
36C25018B0688-0002001.pdf PDF
36C25018B0688-0002000.docx DOCX document
36C25018B0688-0001015.pdf PDF
36C25018B0688-0001017.pdf PDF
36C25018B0688-0001014.docx DOCX document
36C25018B0688-0001016.pdf PDF
36C25018B0688-0001013.pdf PDF
36C25018B0688-0001012.docx DOCX document
36C25018B0688-007.pdf PDF
36C25018B0688-001.docx DOCX document
36C25018B0688-009.docx DOCX document
36C25018B0688-008.pdf PDF
36C25018B0688-003.pdf PDF
36C25018B0688-005.pdf PDF
36C25018B0688-004.pdf PDF
36C25018B0688-006.docx DOCX document
36C25018B0688-000.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kuder Place

Indiana Avenue Indiana Avenue

H y d e R o a d

Irw in

D riv e

Chapman Avenue

H y d e R o a d

M a rio n R o a d

O rc h a rd

A v e n u e

Indiana Avenue

F lo w e r

S tre e t

F lo w e r

S tre e t

Chapman Avenue

N e ls o n A v e n u e

O rc h a rd

A v e n u e

Chapman Avenue

River Road

National Cemetary

National Cemetary

National Cemetary

D

IX

R O A D

P A R K

D R

IV

E

38 Street

L in c o ln

B o u le v a rd

McMahon

G ra y R o a d

Steel Circle

Avenue

C o tt a g e

A v e n u e

B la c k

R o a d

B la c k R o a d

C o tt a g e

A v e n u e

G ra y R o a d

Water Street

B lack R oad

Water Street

Nelson

Avenue

Orchard

Avenue

M c M a h o n

A v e n u e

Doctors Road

V in e

Drive

Vine

Water Street

Railroad Avenue

M e c h a n i c s A v e n u e

R

I

V

E

R

R o a d

Road

Material Compound

54 153

T504

T516

53144

51 52

75 55

17 184

93114

313029

91 125

(3001)

(1301)

Main Entrance

(3002)

(HA-2)

(4801)

(HA-4)

(HA-6)

(HA-5)

(3004)

(3G01)

(HA9)

(HA1)

(HA8)

PROJECT LAYDOWN

AREA / CONTRACTOR

PARKING AREA

PROJECT AREA

CONTRACTOR HAUL ROUTE

PROJECT LOCATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot

6"

6"

6"

6"

C :\r vt \2

6\

9 2

-A

-N ew C en tr a l _M

IN

E

LS

O

N .r vt

/2

/2

:5 :5

P

M

G-000

COVER 610-303 / 269296

03/19/18 MT ETD

ISSUED FOR

CONSTRUCTION

Project Director

1700 E 38TH ST, MARION, IN 46953

BUILD PRIMARY CARE CLINIC - PACT

FULLY SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTEL SR ,RA, LEED

AP BD+C

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

ABONMARCHE

750 LINCOLN WAY EAST

SOUTH BEND, IN 46601

574.232.8700

BRAD MOSNESS

CONTRACT DOCUMENTS - ISSUE FOR CONSTRUCTION

GENERAL/CIVIL/STRUCTURE/ARCHITECTURAL/FIRE PROTECTION/PLUMBING/MECHANICAL/ELECTICAL

Project No.

Date:

610-303 / 269296

BUILD PRIMARY CARE CLINIC - PACT

1700 E 38TH ST, MARION, IN 46953

03/19/2018

CAMPUS SITE PLAN LOCATION MAP

INDEX OF DRAWINGS

SHEET # DESCRIPTION

CURRENT

REVISION

INTERIORS

I-10B INTERIOR FLOOR AND WALL FINISH PLANS - BASEMENT

I-101 INTERIOR WALL FINISH PLAN - FIRST FLOOR

IN101 INTERIOR FLOOR FINISH PLAN - FIRST FLOOR

IP101 WALL PROTECTION PLAN - FIRST FLOOR

I-201 ELEVATIONS - INTERIOR

I-202 ELEVATIONS - INTERIOR

I-203 ELEVATIONS- INTERIOR

I-501 INTERIOR DETAILS

EQUIPMENT

Q-101D FURNITURE AND EQUIPMENT PLANS - AREA D

Q-101E FURNITURE AND EQUIPMENT PLANS - AREA E

Q-601 FURNITURE AND EQUIPMENT MASTER SCHEDULE

Q-602 EQUIPMENT SCHEDULE AREA D

Q-603 EQUIPMENT SCHEDULE AREA E

FIRE PROTECTION

FX201 FIRE PROTECTION PLANS

FJ501 FIRE PROTECTION SCHEDULES, DETAILS & SYMBOLS LIST

PLUMBING

PP200 PLUMBING BASEMENT & UNDERFLOOR PLANS

PP201 PLUMBING FIRST FLOOR PLANS

PP202 PLUMBING ROOF PLAN

PP401 PLUMBING ENLARGED PLAN

PP402 PLUMBING ENLARGED PLAN

PG301 MEDICAL GAS PIPING PLANS

PQ501 PLUMBING SCHEDULES & SYMBOLS LIST

PQ601 PLUMBING DETAILS

PQ602 PLUMBING DETAILS

PQ603 PLUMBING DETAILS

PW701 PLUMBING STACKS

PW702 PLUMBING STACKS

PW703 PLUMBING RISER & DIAGRAMS

MECHANICAL

MH201 HVAC FIRST FLOOR PLANS

MH301 HVAC PIPING FIRST FLOOR NEW WORK PLANS

MH401 HVAC ENLARGED PLAN

MH402 HVAC SECTIONS

MH501 HVAC SCHEDULES & SYMBOLS LIST

MH502 HVAC SCHEDULES

MH601 HVAC DETAILS

MH602 HVAC DETAILS

MH701 HVAC ZONE DIAGRAM

ELECTRICAL

E-000 ELECTRICAL SYMBOLS LIST

ED001 ELECTRICAL SITE PLAN - DEMO

ED101 ELECTRICAL FIRST FLOOR DEMOLITION

ES002 ELECTRICAL SITE PLAN - NEW

EL201 ELECTRICAL BASEMENT LIGHTING PLAN

EL202 ELECTRICAL FIRST FLOOR LIGHTING PLAN - AREA D

EL203 ELECTRICAL FIRST FLOOR LIGHTING PLAN - AREA E

EP301 ELECTRICAL BASEMENT POWER PLAN

EP302 ELECTRICAL FIRST FLOOR POWER PLAN - AREA D

EP303 ELECTRICAL FIRST FLOOR POWER PLAN - AREA E

EP304 ELECTRICAL FIRST LIGHTNING PLAN - OVERAL

EP401 ELECTRICAL ENLARGED PLANS

EJ501 ELECTRICAL SCHEDULES

EJ502 ELECTRICAL SCHEDULES

EJ601 ELECTRICAL ONE-LINE DIAGRAM

EJ602 ELECTRICAL ONE-LINE DIAGRAM SCHEDULES

EK701 ELECTRICAL DETAILS

EK702 ELECTRICAL DETAILS

EK703 ELECTRICAL DETAILS

FA801 ELECTRICAL BASEMENT FIRE ALARM PLAN

FA802 ELECTRICAL FIRST FLOOR FIRE ALARM PLAN -AREA D

FA803 ELECTRICAL FIRST FLOOR FIRE ALARM PLAN -AREA E

ET000 TECHNOLOGY SYMBOL LIST

ET001 TECHNOLOGY SITE PLAN

ET101 TECHNOLOGY BASEMENT PLAN

ET201 TECHNOLOGY FIRST FLOOR PLAN - AREA D

ET202 TECHNOLOGY FIRST FLOOR PLAN - AREA E

ET301 TECHNOLOGY ENLARGED PLANS

ET401 TECHNOLOGY DETAILS

ET402 TECHNOLOGY DETAILS

ET403 TECHNOLOGY DETAILS

INDEX OF DRAWINGS

SHEET # DESCRIPTION

CURRENT

REVISION

GENERAL

G-000 COVER

G-101 ABBREVIATIONS AND SYMBOLS

GC-101 PROJECT PHASING

GI-001 LIFE SAFETY PLANS

GI-200 INFECTION CONTROL PLAN

CIVIL

GS01 COVER SHEET

GS02 TOPOGRAPHIC SURVEY

GS03 REMOVALS PLAN

GS04 SITE DEVELOPMENT PLAN

GS05 UTILITY RELOCATION PLAN

GS06 DRAINAGE AND GRADING PLANS

GS07 CONSTRUCTION DETAILS

GS08 CONSTRUCTION DETAILS

GS09 CONSTRUCTION DETAILS

GS10 CONSTRUCTION DETAILS (VA STANDARDS)

GS11 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

GS12 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

GS13 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

GS14 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

GS15 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

STRUCTURAL

SB100 BASEMENT FOUNDATION

SF100 FOUNDATION AND FRAMING PLAN

SF101 ROOF BOTTOM REINFORCING

SF102 ROOF TOP REINFORCING

SF103 CANOPY PLANS AND DETAIL

SJ100 STRUCTURAL DETAILS

SJ101 STRUCTURAL DETAILS

SJ102 STUCTURAL NOTES

SJ103 BEAM SCHEDULE

ARCHITECTURE

A-002 TYP. MOUNTING HEIGHTS

A-003 ALTERNATE DEFINITIONS

AD101 PLAN - DEMOLITION

A-10B PLAN - BASEMENT

A-101 PLAN - FIRST FLOOR

A-101D FLOOR PLAN, FIRST FLOOR - AREA D

A-101E FLOOR PLAN, FIRST FLOOR - AREA E

A-103 PLAN - ROOF

AC10B REFLECTED CEILING PLAN - BASEMENT

AC101 REFLECTED CEILING PLAN - FIRST FLOOR

AC101D REFLECTED CEILING PLAN - AREA D

AC101E REFLECTED CEILING PLAN - AREA E

A-200 ELEVATIONS - EXTERIOR BUILDING

A-201 ELEVATIONS - EXTERIOR BUILDING

A-301 SECTIONS - BUILDING

A-302 SECTIONS - BUILDING

A-350 SECTIONS - EXTERIOR WALL

A-351 SECTIONS - EXTERIOR WALL

A-460 CASEWORK

A-461 CASEWORK

A-501 SECTIONS - DETAILS

A-502 SECTIONS - DETAILS

A-503 SECTIONS - DETAILS

A-520 PLAN DETAILS

A-521 PLAN DETAILS

A-540 SECTIONS/ PLANS DETAILS - STAIRS

A-550 DETAILS

A-601 DOOR AND FRAME SCHEDULE

A-710 DOOR AND FRAME TYPES & DETAILS

A-711 SLIDING DOOR DETAILS

A-712 SLIDING DOOR DETAILS

A-720 INTERIOR PARTITION TYPES AND DETAILS

A-721 HEAD-OF-WALL DETAILS

A-722 PARTITION FRAMING DETAILS

A-730 CEILING DETAILS

AW10A SIGNAGE MESSAGE SCHEDULE BASEMENT AND FIRST FLOOR

AW10B SIGNAGE- PLAN - BASEMENT - OVERALL

AW101 SIGNAGE- PLAN - FIRST FLOOR - OVERALL

AW102 INTERIOR SIGNAGE STANDARDS

AW103 INTERIOR SIGNAGE-LIFESAFETY SIGN TYPES IN-01.01.01- IN-01.05

AW104 INTERIOR SIGNAGE LIFE SAFETY SIGN TYPES IN-01.11- IN-01.22

AW105 INTERIOR SIGNAGE - ROOM ID SIGN TYPE IN-04.03 - IN-09.03

AW106 INTERIOR SIGNAGE – WAYFINDING SIGN TYPE IN-14.04 - IN-17.05

AW751 SIGNAGE

Mark: Revision: Date:

ISSUED FOR CONSTRUCTION 03/19/2018

STAMP

03-19-18

Page 1 of 141Page 1 of 141

VOLUME 1

GENERAL

CIVIL

STRUCTURAL

S

ARCHITECTURAL SYMBOLS

COLUMN GRID LINE

(EXISTING)

EXISTING TO REMAIN

EXISTING TO BE REMOVED

EXISTING TO REMAIN

NEW CONSTRUCTION

ROOM TAG

ROOM NAME

ROOM NUMBER

DOOR NUMBER

SYMBOL AND MINIMUM

CLEARANCES

WALL LEGEND

ACTUAL AREA OR VOLUME

DETAIL - SECTION

POSITION ON SHEET

SHEET NUMBER

DETAIL - PLAN/ RCP

POSITION ON SHEET

SHEET NUMBER

BUILDING SECTION

POSITION ON SHEET

SHEET NUMBER

WALL SECTION

POSITION ON SHEET

SHEET NUMBER

EXTERIOR ELEVATION

POSITION ON SHEET

SHEET NUMBER

INTERIOR ELEVATION

POSITION ON SHEET

SHEET NUMBER

WALL TYPE TAG

FRAME TYPE -

EXTERIOR & LOUVER

CURTAIN / GLAZING

PANEL TYPE

DRAWING NUMBER

DRAWING SCALE

DRAWING NUMBER

DRAWING SCALE

SHEET NUMBER

REFERENCING SHEET

NUMBER

VIEW TITLE

VIEW TITLE WITH REFERENCE

KEYNOTE

DRAWING REVISION

LEVEL DATUM

LEVEL NAME

LEVEL ELEVATION

NORTH ARROW

FRAME TYPE - INTERIOR

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

18" MIN.

12" MIN.

4" MIN.

1A

≠ X# X X

XX

XX

1T

X

Name Elevation

SIM

X-XXX

X

SIM

X-XXX

X

XXXX

X

X X

X

A-1 1/8" = 1'-0"

View Name

1/8" = 1'-0"

View NameA-1 A101R101

ROOM NAME

ABC123

P:200 SF

A:150 SF

7'-0"

R 3'-11"

100.0°

DIMENSION TO FACE OF

FINISH, FACE OF CONCRETE,

COLUMN CENTERLINE, OR AS

NOTED.

CENTERLINE

COLUMN GRID LINE

(NEW)

MATCHLINE

SEE: X/X-XXX

X

SEE: (X/X-XXX)

VIEW REFERENCE FOR

ADDITIONAL INFORMATION

REFERENCE TO AREA

MATCHLINE AND VIEW

REFERENCE

SIM

X

X-XXX

SIM

X

X-XXX

SIM

X

X-XXX

X

X-XXX

SIM

GRAPHIC SCALE

PROGRAMMED AREA

ROOM CODE

ABBREVIATIONS

° DEGREE

± PLUS/MINUS

Ø DIAMETER

≈ ALMOST EQUAL

∠ ANGLE

� BOUNDARY LINE

℄ CENTER LINE

∆ DELTA, DEFLECTION ANGLE

Φ ELECTRICAL PHASE

� FLOW LINE

≡ IDENTITY

� INITIAL LENGTH

� MOMENT LINE

≠ NOT EQUAL

Ω OHM

Ω OMEGA

� PROPERTY LINE

ABCDEFGHIJKMNOPQRSTUVWXYZ 1234567890

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT, AUGER BORING

ABA ARCHITECTURAL BARRIERS ACT

ABC AGGREGATE BASE COURSE

ABS AIR BREAK SWITCH

AC ASBESTOS CEMENT OR ASPHALTIC

CONCRETE

ACB AIR CIRCUIT BREAKER

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACSR ALUMINUM CONDUCTOR STEEL

REINFORCED

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

ADO AUTOMATIC DOOR OPERATOR

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

AL ALUMINUM

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AM ACOUSTIC MATERIAL

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

ANT ANTENNA

AP ACCESS PANEL, APPROX.,

APPROXIMATE

APA AMERICAN PLYWOOD ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARR ARRESTOR

ARCH ARCHITECT, ARCHITECTURAL

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING AND

MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B BASELINE, BOTTOM

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEJ BRICK EXPANSION JOINT

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BO BOARD

BOT BOTTOM

BR BEDROOM, BOTTOM REGISTER

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS, CHANNEL

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN, CORNER BEAD, CIRCUIT

BREAKER

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER, CONTRACTOR

SUPPLIED & INSTALLED

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS,

CONTRACT DOCUMENTS, CEILING

DIFFUSER

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER

INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY, CORNER GUARD

C&G CURB AND GUTTER

CGSFU CERAMIC GLAZED STRUCTURAL FACING

UNITS

CH CHILLER

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL

JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CM² SQUARE CENTIMETER

CM³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMP CORRUGATED METAL PIPE

CMPA CORRUGATED METAL PIPE ARCH

CMU CONCRETE MASONRY UNIT

CND CONDUIT

CNDS CONDENSATE

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CERTIFICATE OF

OCCUPANCY, CLEANOUT, OR COMPANY

CO∠ CARBON DIOXIDE

CODP CLEANOUT W/ DECK PLUG

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT, CONNECTION

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR, CONTRACTION

COORD COORDINATE

COR CONTRACTING OFFICER’S

REPRESENTATIVES

CORR CORRIDOR

CP NON-REINFORCED CONCRETE PIPE

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CR CHAIR, CRASH RAIL

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

INSTITUTE

CS CONCRETE SEALER/SURFACE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE, CURRENT

TRANSFORMER, COOLING TOWER

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER, CONTOUR, COOLING TOWER

RETURN

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CW COLD WATER

CWB CAPILLARY WATER BARRIER

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL, DRY BUILT, DIRECT BURIAL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DD DIVERSION DIKE

DEG, ° DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DI DUCTILE IRON

DIA, DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DMPR DAMPER

DN DOWN

DP DISTRIBUTION

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM, OR

DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT, STORM DRAINAGE

STRUCTURE

DSGN DESIGN

DW DISHWASHER, DOMESTIC WATER

DWD DRINKING WATER DISPENSER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EAM EXCEPT AS NOTED

EAT ENTERING AIR TEMPERATURE

EF EACH FACE, EXHAUST FAN

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EG EXHAUST GRILLE

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

E/P EDGE OF PAVEMEMNT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ER EXHAUST REGISTER

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EVAP EVAPORATIVE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXP JT EXPANSION JOINT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT, FEMALE, FIRE, FUSE,

FILTER

FA FIRE ALARM

FAB FABRIC

FABX FIRE ALARM BOX

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN, FIRE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E, FFE FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD, FLAT HEAD SCREWS, FIRE

HYDRANT

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FJ FELT JOINT

FL FLOORLINE, FLOOR, FLASHING, FLOW

LINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

4 WAY FOUR WAY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPH FROST PROOF HYDRANT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR

FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR

FIBERGLASS REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION, FULL SIZE

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FW FIRE WATER

FWC FABRIC WALLCOVERING

G GROUND, GAS LINE, GRAM

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON, GALVANIZED

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR, GLAZED

COATING

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFI GROUND FAULT INTERRUPT

GFMU GROUND FACE MASONRY UNIT

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR GRADE

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GW GROUND WATER

GWB GYPUSM WALL BOARD

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH, HEIGHT, HUMIDIFIER

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAC HOUSEKEEPING AIDS CLOSET

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE, HANDICAPPED

HCWD HOLLOW CORE WOOD DOOR

HD HARD DRAWN

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR

(FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HGSW HORN GAP SWITCH

HID HIGH INTENSITY DISCHARGE

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE, HIGH POINT,

HORSEPOWER

HPS HIGH PRESSURE SODIUM

HQ HEADQUARTERS

HR HOUR

HS HEAT-STRENGTHENED (GLASS) OR HIGH

STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER, HEAD WALL

HYD HYDRANT

HYDR HYDRAULIC

HZ HERTZ

I INTERSTATE (HIGHWAY) OR MOMENT OF

INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER, OR

INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

IE INVERT ELEVATION

ILLUM ILLUMINATION

IMC INTERMEDIATE METAL CONDUIT

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

INV INVERT

IP INLET PROTECTION

IRBF INDUSTRIAL RESIN BASE FLOORING

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX, JB JUNCTION BOX

JC JANITOR CLOSET

JCT JUNCTION

JT JOINT

JST JOIST

K KILO

KCP KEENE'S CEMENT PLASTER

KD KILN DRIED OR KNOCKED DOWN

KG KILOGRAM

KN KILONEWTON

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

KV KILOVOLT

KVA KILOVOLT-AMPERE

KW KILOWATT

L ANGLE, LOUVER, LENGTH, LENGTH OF

CURVE

LA LIGHTING ARRESTOR

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LC LEAD COVERED

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE, LATENT HEAT

RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED, LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

L/S LITERS PER SECOND

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVC LENGTH OF VERTICAL CURVE

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

M METER, MEGA

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MAS MASONRY

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD METAL DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL, MEDIUM

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLO MAIN LUG ONLY

MLWK MILLWORK

mm MILLIMETER

MMP MEMBRANE WATERPROOFING

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MP MEDIUM PRESSURE

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

M/S METERS PER SECOND

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA, NON-CORROSIVE

NCOMBL NONCOMBUSTIBLE

NDC NOSE DOWN CURB

NE NORTHEAST

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NPS NOMINAL PIPE SIZE

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING CONTRACTORS

ASSOCIATION

NRP NON-REMOVABLE

NS NARROW STILE

NTS NOT TO SCALE

NUM NUMERAL

NW NORTHWEST

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCB OIL CIRCUIT BREAKER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE

DIMENSION

OD OUTSIDE DIMENSION OUTSIDE

DIAMETER

OF/CI OWNER FURNISHED/CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG, OVERHEAD

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSD OPEN SITE DRAIN

OSHA OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION

OVHD OVERHEAD

OUT OUTLET

OZ OUNCE

P PIPE, POLE

Pa PASCALES

PA PUBLIC ADDRESS

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON, PULL BOX

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR PORTLAND

CEMENT

PCA PORTLAND CEMENT ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

PJF PREFORMED JOINT FILLER

PKG PACKAGE

PL PROPERTY LINE, PLATE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PNT PAINT

PO POST OFFICE, PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRIM PRIMARY

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PRV PRESSURE RELIEF VALVE

PS PULL SWITCH

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, PRESSURE

TREATED, POINT OF TANGENT

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC), POINT

OF VERTICAL CURVE

PVG PAVING

PVI POINT OF VERTICAL INTERSECTION

PVT POINT OF VERTICAL TANGENT

PVMT PAVEMENT

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS, RISER, RUBBER

RA RETURN AIR

RAD RADIATOR, RADIUS

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN, REINFORCED

CONCRETE PIPE

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

RED REDUCING

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY, REFRIGERATION

REG REGISTER, REGULATOR

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY, ROOF, RETURN

FAN

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RGS RIGID GALVANIZED STEEL

RH RIGHT HAND

RHC REHEAT COIL

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RI RUBBER INSULATED

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RVT RESILIENT VINYL TILE

RWD REDWOOD

RWL RAIN WATER LEADER

S SECOND, SOUTH, SANITARY, SEWER,

STRUCTURE

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY SEWER

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL, SCHEDULE

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR,

OR SOAP DISPENSER;

SDG SIDING

SE SOUTHEAST

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SG SUPPLY GRILLE

SGD SLIDING GLASS DOOR

1PH SINGLE PHASE

SGL SINGLE

SH SHEET

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FL SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKCP SUSPENDED KEENE'S CEMENT

PLASTER

SKLT SKYLIGHT

SL SLOPE

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMH SANITARY MODULE

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL UNIT

SP STATIC PRESSURE, SINGLE POLE

SPC SUSPENDED PLASTER CEILING

SPDT SINGLE POLE DOUBLE THROW

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPST SINGLE POLE SINGLE THROW

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SR SUPPLY REGISTER

SS SANITARY SEWER OR SERVICE SINK

SST STAINLESS STEEL

ST STAIRS, STREET, SINGLE THROW

STA STATION

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL STEEL

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUP SUPPORT

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH, SIDE WALK

SWBD SWITCHBOARD

SWDR SWING DOOR

SWGR SWITCH GEAR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD, TILE, TOP, TANGENT

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TC TOP OF CURB

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL

TEMPERATURE CONTROL PANEL;

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

TERM TERMINAL

TH TOTAL HEAD (PUMPS)

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRSLD THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK, TOP REGISTER

TRANS TRANSOM, TRANSITION

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH, TUBE STEEL, TOP

OF STEEL, TOP OF STONE, TOP OF

SLAB

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UCF UNDER COUNTER FREEZER

UCR UNDER COUNTER REFRIGERATOR

UGE UNDERGROUND ELECTRIC

UGND UNDERGROUND

UGT UNDERGROUND TELEPHONE

UH UNIT HEATER

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UNO UNLESS NOTED OTHER WISE

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT, VENT, VALVE

VA VOLT AMPRE

VAC VACUUM

VAR VARIES

VC VARNISH CAMBRIC, VITRIFIED CLAY, VA

SUPPLIED & CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE, VITRIFIED

CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VPI VERTICAL POINT OF INTERSECTION

VPOC VERTICAL POINT OF CURVE

VPOT VERTICAL POINT OF TANGENT

VR VAPOR RETARDER

VS VENT STACK

VTR VENT THROUGH ROOF

VV VA SUPPLIED & INSTALLED

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE, WEST, WIDTH, WASTE, WATER,

WATT, WIRE

W/ WITH

W/O WITHOUT

WA WATT

WARR WARRANTY

WB WET BULB

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD, WINDOW DIMENSION

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WL WATER LEVEL

WLD WELDED

WM WIRE MESH

WOM WALK OFF MATT

WP WATERPROOFING, WEATHERPROOF

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP, WASTE STACK, WATER

SURFACE, WATERSTOP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XFMR TRANSFORMER

XPS EXTRUDED POLYSTYRENE BOARD

(INSULATION)

X-STR EXISTING STRUCTURE

YD YARD

YR YEAR

MATERIALS LEGEND

CONCRETE (SECTION)

GRANULAR FILL

CONCRETE MASONRY UNITS

BRICK

RIGID INSULATION (SECTION)

ACOUSTIC/THERMAL INSULATION (SECTION)

DIMENSIONAL LUMBER

CONTINUOUS (SECTION)

DIMENSIONAL LUMBER BLOCKING

(SECTION)

STEEL (SECTION)

ALUMINUM (SECTION)

WOOD FINISH (SECTION)

LUMBER FINISH (SECTION)

EARTHWORK (SECTION)

STUD WALL (PLAN & SECTION)

EXISTING WALL TO REMAIN (PLAN & SECTION)

DEMOLISHED WALL (PLAN &

SECTION)

MINERAL WOOL INSULATION (SECTION)

RCP SYMBOL LEGEND

CHANDELIER, PENDANT MOUNTED

ACOUSTICAL TILE CEILING (24X24)

ACOUSTICAL TILE CEILING (24X48)

GYPSUM CEILING - PAINTED

RECESSED OR SURFACE MOUNTED LIGHT FIXTURE

LINEAR WALL WASH LUMINAIRE, MOUNTED WITHIN

ARCHITECTURAL COVE

SMOKE DETECTOR

SPEAKER

HVAC SUPPLY DIFFUSER

HVAC RETURN DIFFUSER

RADIANT HEAT PANEL

EXIT LIGHT

HEAT DETECTOR

HVAC EXHAUST DIFFUSER

LINEAR LUMINAIRE, WALL MOUNTED

(INDICATES DIRECTION OF LIGHT DISTRIBUTION.)

LINEAR LUMINAIRE, PENDANT MOUNTED

STRIP OR TURRET LUMINAIRE, PENDANT

MOUNTED

STRIP OR TURRET LUMINAIRE, SURFACE

MOUNTED

(INDICATES DIRECTION OF LIGHT DISTRIBUTION.)

RECESSED OR SURFACE MOUNTED SQUARE

DOWNLIGHT LUMINAIRE

RECESSED OR SURFACE MOUNTED ROUND

DOWNLIGHT LUMINAIRE

RECESSED OR SURFACE MOUNTED LIGHT FIXTURE

LINEAR METAL CEILINGS / SOFFIT

NOTE: REFER TO ELECTRICAL DRAWINS AND SPECS FOR

ADDITIONAL INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot

6"

6"

6"

6"

C :\r vt \2

6\

-A

-N ew C en tr al _J

A W

A R

R E

N . r vt

/1

/2

:3 :4

P

M

G-101

ABBREVIATIONS AND SYMBOLS 610-303 / 269296

02/28/2018 MT ETD

ISSUED FOR

CONSTRUCTION

Project Director

1700 E 38TH ST, MARION, IN 46953

BUILD PRIMARY CARE CLINIC - PACT

FULLY SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTEL SR ,RA, LEED

AP BD+C

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

ABONMARCHE

750 LINCOLN WAY EAST

SOUTH BEND, IN 46601

574.232.8700

BRAD MOSNESS

FLOOR PLAN GENERAL NOTES:

1. GENERAL NOTES APPLY TO ALL DRAWING SETS.

2. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT

INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN OTHER

PORTIONS OF THE CONTRACT DOCUMENTS. ALL NOTES ARE TO

BE REVIEWED AND APPLIED TO RELATED BUILDING DOCUMENTS.

3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.

IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS ARE

DISCOVERED FOLLOW PROCEDURES LISTED IN SECTION 01 26 13

REQUESTS FOR INFORMATION (RFI) BEFORE AND/OR DURING

CONSTRUCTION.

4. CROSS REFERENCES SHOWN ON DRAWINGS DO NOT

NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT LIMIT

APPLICATION OF ANY DRAWING OR DETAIL. WHERE SPECIFIC

DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE

DETERMINED, FOLLOW PROCEDURES LISTED IN SECTION 01 26

13 REQUESTS FOR INFORMATION (RFI) PRIOR TO PROCEEDING

WITH WORK.

5. REVIEW SPECIFICATIONS FOR INSTRUCTIONS NOT SHOWN ON

DRAWINGS. INFORMATION COMMON TO SEVERAL DRAWINGS

MAY BE NOTED ON ONLY ONCE. CONTRACTORS ARE

RESPONSIBLE FOR ENTIRE SET OF DOCUMENTS.

6. PATCH ALL HOLES IN EXISTING SURFACES AND WHERE

EQUIPMENT HAS BEEN REMOVED OR DEMOLITION HAS

OCCURRED AND PREPARE WALL SURFACES (PATCH, SKIM

COAT, PAINT AND FINISH TO MATCH ADJACENT SURFACES) AS

REQUIRED IN PREPARATION FOR NEW FINISHES SCHEDULED.

PATCH TO MATCH ADJACENT SURFACES IF NOT SCHEDULED.

7. DIMENSIONS ARE TO STRUCTURAL GRIDLINE OR FACE OF

FINISHED WALL UNLESS NOTED OTHERWISE.

8. PROVIDE METAL BACKING AND/OR METAL BLOCKING IN

WALLS AS REQUIRED AT ALL WALL-MOUNTED ITEMS. VERIFY

HEIGHT AND LENGTH WITH ACTUAL EQUIPMENT. REFER TO

METAL BACKING AND BLOCKING DETAILS ON SHEET A-722. AT

EXISTING WALLS, REMOVE WALL MATERIAL TO INSTALL METAL

BACKING/BLOCKING FOR NEW WALL-MOUNTED ITEMS.

9 ALL EXISTING FLOOR AND WALL OPENINGS AND

DEPRESSIONS NOT USED IN THE NEW WORK SHALL BE FILLED

OR CLOSED WITH MATERIALS TO MEET REQUIRED FIRE RATING

AND MATCH ADJACENT FINISHES.

10. DRAWINGS ARE NOT TO BE SCALED. CONTRACTOR TO

VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO

COMMENCING THE WORK.

11. COORDINATE WITH INTERIORS SHEETS FOR CORNER GUARD

AND WALL PROTECTION LOCATIONS AND DETAILS.

12. RADIUS EXPOSED COUNTERTOP CORNERS 2" RADIUS,

TYPICALLY. (2" WHERE 3MM EDGE BANDING, 1" RADIUS AT PLAM

EDGES.) SEE CASEWORK DETAILS.

13. CAULK ALL COUNTERTOPS, BACKSPLASHES AND CABINETS

AT LOCATIONS WHERE THEY MEET WALLS. SEAL ALL CUT-OUTS

IN COUNTERTOPS.

14. ALL CUTTING AND PATCHING REQUIRED FOR NEW

MECHANICAL AND ELECTRICAL WORK IN ALL EXISTING SPACES

SHALL BE BY THE RESPECTIVE CONTRACTORS.

15. MATCH ALL FINISHED WALL THICKNESS WHERE NEW WALLS

OCCUR IN LINE WITH EXISTING WALLS.

16. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST & NOISE

CONTAINMENT BARRIERS BETWEEN THE WORK AREA & THE

ADJACENT OCCUPIED SPACES.

17. ALL PIPING, CONDUITS, AND RELATED MECHANICAL AND

ELECTRICAL ITEMS SHALL BE CONCEALED WITHIN DRYWALL

AND/OR PLASTER FURRING AS REQUIRED IN FINISHED AREAS

WHETHER SHOWN ON DRAWINGS OR NOT UNLESS OTHERWISE

NOTED.

18. SEAL AROUND ALL MECHANICAL AND ELECTRICAL

EQUIPMENT PENETRATIONS AT RATED WALLS, ABOVE AND

BELOW CEILINGS, WITH A UL APPROVED FIRE-STOPPING

MATERIAL.

19. ALL INTERIOR WALLS WILL BE TYPE 'S' CONSTRUCTION

UNLESS OTHERWISE INDICATED. ALL FRAMING AROUND

COLUMNS WILL BE TYPE 'L2' CONSTRUCTION UNLESS

OTHERWISE INDICATED. REFER TO REGULATORY PLAN SHEETS

GI001 FOR WALL RATINGS.

20. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING

INTERSECT, THE HIGHEST RATED PARTITION TAKES PRECEDENT.

21. ALL EXISTING TO REMAIN CEILING AND WALL GRILLES,

DIFFUSERS AND LIGHTS, SPRINKLER HEADS, OCCUPANCY AND

FIRE ALARM DETECTORS TO BE CLEANED IN AREAS OF

CONSTRUCTION.

22. VERIFY THAT THE EXISTING WALLS REQUIRING FIRE RATING

ARE MAINTAINED, REPAIRED AND EXTENDED TO STRUCTURE.

23. ALL THERMOSTAT LOCATIONS TO BE COORDINATED WITH

COR PRIOR TO INSTALLATION.

1. ALL CEILING TO BE 9'-0" AFF UNLESS NOTED OTHERWISE.

2. PROVIDED GYPSUM WALL BOARD & STUD BULKHEADS WHERE

CEILING OF DIFFERENT HEIGHTS ABUT. DO NOT BUILD

BULKHEADS OF ACOUSTICAL CEILING MATERIAL UNLESS

SPECIFICALLY DETAILED.

3. REFER TO MECHANICAL DRAWINGS FOR QUANTITY AND TYPE

OF DIFFUSERS, RETURN AIR GRILLES, & EXHAUST GRILLES.

SCRIBE CEILING MATERIAL CAREFULLY FOR A TIGHT FIT.

4. REFER TO ELECTRICAL DRAWINGS FOR QUANTITY AND TYPES

OF LIGHTS AND DEVICES. SCRIBE CEILING MATERIAL

CAREFULLY FOR TIGHT FIT.

5. REFER TO FIRE PROTECTION DRAWINGS FOR FIRE SPRINKLER

HEAD LOCATIONS. CENTER HEADS IN CEILING TILE AND

SCRIBE CEILING MATERIALS FOR A TIGHT FIT.

6. REFER TO SPECIFICATIONS FOR GRID SYSTEM, TYPE OF

CEILING MATERIAL.

7. VERIFY CEILING HEIGHTS WITH STRUCTURE, MECHANICAL,

PLUMBING, FIRE PROTECTION, ELECTRICAL AND

CONTRACTOR'S REQUIRED COORDINATION DRAWINGS.

8. ALL GWB SOFFITS, CEILINGS & BULKHEADS RECEIVE PAINT OR

IF ALIGNING W/ ADJACENT WALL, PAINT TO MATCH ADJACENT

@ VERTICAL, PAINT @ UNDERSIDE.

REFLECTED CEILING

PLAN NOTES:

Mark: Revision: Date:

03-19-18

03/19/18Mark: Revision: Date:

ISSUED FOR CONSTRUCTION 03/19/2018

Page 2 of 141Page 2 of 141

UP

CBCB

S S

D A

N

N

A P

N

D

D

DA

PP

A P

A

PO

S

D

D

D

D

DO

S O

S

D

D

D

D D

D

N

N

N

N

N

N

N

N

N N

N

N

O S

N

N

N

N

N

N

O S

D

D D

D

D

D

O S

D

D

O S

C R

CR

CR

C R

C R

CR

A P

A P

A P

A P

A P

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

C R

CR

CR

CR

CR

CR

C R

D

D

C R

D H D

H

N

N

N

N

N

N

N

D

D

D

D

CR

OS

C R

C R

CR

CR

BUILDING

EXISTING BUILDING

PLAN

NORTH

D

E

KEY PLAN

CA

X21

X26B

A C GX29

XH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot

6"

6"

6"

6"

C :\r vt \2

6\

-A

-N ew C en tr al _J

A W

A R

R E

N . r vt

/1

/2

:3 :5

P

M

GC-101

PROJECT PHASING 610-303 / 269296

02/28/2018 MT ETD

ISSUED FOR

CONSTRUCTION

Project Director

1700 E 38TH ST, MARION, IN 46953

BUILD PRIMARY CARE CLINIC - PACT

FULLY SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTEL SR ,RA, LEED

AP BD+C

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

ABONMARCHE

750 LINCOLN WAY EAST

SOUTH BEND, IN 46601

574.232.8700

BRAD MOSNESS

PHASE 1:

SITE UTILITY RELOCATION & EXISTING BUILDING PREP.

1.0 SECURE SITE.

1.1 RELOCATE SITE UTILITIES. COORDINATE UTILITY SHUT

DOWNS WITH COR PER PROJECT REQUIREMENTS

1.2 PREP EXISTING BUILDING ADDITION:

1.2.1 REMOVE FIRST FLOOR WINDOWS ALONG GRID

x26 FROM xC TO xA, & FIRST FLOOR WINDOW IN STAIR

TOWER.

1.2.2 REMOVE WINDOW AND STONE FOR

TEMPORARY DOOR IN ROOM 152, INSTALL TEMPORARY

SIGNAGE FOR EXITING.

1.2.3 REMOVE WINDOWS IN BASEMENT ALONG GRID

xC FROM x27 TO x29.

PHASE 2:

CONSTRUCT NEW ADDITION & RENOVATION OF EXISTING

SPACE.

2.1 OPEN EGRESS S103A AS SOON AS PRACTICAL, REMOVE

TEMPORARY DOOR AND EXITING AND RESTORE EXISTING

BUILDING.

2.2 AFTER NEW ADDITION IS WEATHER TIGHT, CONTRACTOR

CAN START RENOVATION WITHIN EXISTING SPACE.

1" = 30'-0" F3

PHASING PLAN

PROJECT PHASING NOTES

Mark: Revision: Date:

ISSUED FOR CONSTRUCTION 03/19/2018

03-19-18 02/28/201803/19/18

Page 3 of 141Page 3 of 141

391996134

969043

872457

391996126

969061

872457

391996134

872457

391996126

872457

(ASSEMBLY) 122 SF

(ASSEMBLY) 776 SF

(BUSINESS) 13358 SF

1D

1D

1E

1E

1D

1F

1C

1B

1B

1F

P: 40 1/2" R: 36 1/4"

P : 1

/4

R : 3

1/

4"

P: 38 1/2" R: 36 1/4"

P: 38 1/2" R: 36 1/4"

(ASSEMBLY) 128 SF

1I

1I

1I

1I

P: 38 1/2" R: 36 1/4"

P : 3

1/

2" R

: 3

1/ 4"P: 38 1/2"

R: 36 1/4"

P: 38 1/2" R: 36 1/4"

(ASSEMBLY) 390 SF

1G

1H

1H

1I

FEFE

FE

(ASSEMBLY) 307 SF

(ASSEMBLY) 178 SF

(ASSEMBLY) 562 SF

(ASSEMBLY) 281 SF

(ASSEMBLY) 258 SF

(BUSINESS) 17779 SF

(STORAGE) 865 SF

FEC-1

FEC-1

FEC-1

FEC-1

EXISTING

FEC

EXISTING

FEC

TEMPORARY

SIDEWALK

THIS PROJECT HAS BEEN ● INTERNATIONAL BUILDING CODE

DESIGNED UNDER THE 2015 - CURRENT EDITION INCLUDING

REQUIREMENTS OF THE ● NFPA 101 LIFE SAFETY CODE

APPLICABLE CODES: ● ARCHITECTURAL BARRIERS ACT & VA PG18-13 BARRIER FREE DESIGN

STANDARD ● US DEPARTMENT OF VETERANS AFFAIRS DESIGN MANUALS &

STANDARDS

ADDITIONAL REFERENCED CODES, DOCUMENTS

AND STANDARDS AS NOTED IN THE SECTION 01 00 00.

OWNER: Veterans Administration Marion Campus

ARCHITECT: HDR Architecture, Inc.

600 Hennepin Avenue, Ste. 260 Minneapolis, MN 55403

LIFE SAFETY FEATURES:

FIRE SUPPRESSION SYSTEM - SPRINKLED

FIRE EXTINGUISHERS THROUGHOUT

CODE PLAN GENERAL NOTES:

1. SEE ELECTRICAL PLANS FOR EXIT LIGHTING LOCATIONS.

2. SEE FIRE PROTECTION PLANS FOR FIRE SPRINKLER SERVICE.

3. SEE ELECTRICAL FOR FIRE ALARM SERVICE.

PACT:

Occupancy: Group B (NEW BUSINESS) Occupancy Construction Type: Type 1B [II(222)] Sprinklers complying with NFPA 13.

Allowable Area:

B (NEW BUSINESS): UNLIMITED

Actual Area Sq Ft:

Basement: B: 2,988 SF Level 1: B: 13,750 SF Level 1: A: 1,584 SF

TOTAL: 18,322 SF

Allowable Number of Stories: Per Areas in table

B (NEW BUSINESS): UNLIMITED

Allowable Height: (180') 12 STORIES ABOVE GRADE PLANE Actual Number of Stories: 2 (1 ABOVE GRADE PLANE) Actual Height: 12'-7 1/4"

NEW BUSINESS:

Common Path of Travel: >100' Travel Distance to Exits: >300'

STORAGE:

Common Path of Travel: >100' Travel Distance to Exits: >400'

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS

(IBC TABLE 601) FOR TYPE I-B (II-222) CONSTRUCTION TYPE

B

Structural Frame 2 Hour Bearing Walls (Exterior) 2 Hour Bearing Walls (Interior) 2 Hour Non Bearing Walls (Exterior 10 < X < 30 ) 0 Hour

Non Bearing Walls (Interior) 0 Hour Floor Construction 2 Hour

(Including supporting beams and joists) Roof Construction* 2 Hour

(Including supporting beams and joists)

*(FUTURE SECOND FLOOR)

Per footnote d at IBC Table 601, ratings can be reduced by 1 hour if an approved sprinkler system is provided.

PLUMBING FIXTURES (IBC CH. 29):

TOTAL OCCUPANT LOAD IS 188

188/2 = 94 EACH:

B OCCUPANCY (TOILETS)-

1 PER 25 FOR FIRST 50, 1 PER 50 FOR REMAINDER

94=2 + 1 = 3 PER GENDER

B OCCUPANCY (LAVORATORIES)-

1 PER 40 FOR FIRST 80, 1 PER 80 FOR REMAINDER

94=2 + 1 = 3 PER GENDER

DRINKING FOUNTAINS: 1 PER 100 = 2

1 SERVICE SINK

LIFE SAFETY SYMBOLS

XXXX PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES REFER

TO SCHEDULE)

EXIT LIGHTING

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHERS

FIRE HOSE CABINETS

DIRECTION OF EGRESS

WIDTH PROVIDED

P: XX"

R: XX"

1A

WIDTH REQUIRED

FEC

FE

FHC

BUILDING SEPARATION

TEMPORARY EXIT PATH FOR STAIR

(STORAGE) 2982 SF

B-A

FE

FE

18A18A

18G18G

18F18F

18B18B18C18C18D18D 18E18E

S003S003

19A19A

21A21A

21B21B

1414 1515 1616 1717

C004C004

C005C005 25A25A

24A24A24B24B24C24C

C003C003

3E3E

S002S002

5B5B

5C5C

5A5A 3A3A

3B3B

3C3C

5D5D

A

A

7B7B

8A8A

999A9A

25A25A

25B25B

S001S001

1111 1212

C001C001

C002C002

(BUSINESS) 17263 SF

PROVIDE GYPSUM BOARD

PARTITION W/ DOOR FOR

DUST CONTROL DURING

DEMOLITION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot

6"

6"

6"

6"

C :\r vt \2

6\

-A

-N ew C en tr al _J

A W

A R

R E

N . r vt

/1

/2

:3 :1

P

M

GI-001

LIFE SAFETY PLANS 610-303 / 269296

02/28/2018 MT ETD

ISSUED FOR

CONSTRUCTION

Project Director

1700 E 38TH ST, MARION, IN 46953

BUILD PRIMARY CARE CLINIC - PACT

FULLY SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTEL SR ,RA, LEED

AP BD+C

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

ABONMARCHE

750 LINCOLN WAY EAST

SOUTH BEND, IN 46601

574.232.8700

BRAD MOSNESS

1/16" = 1'-0"

FIRST FLOOR

EGRESS TRAVEL DISTANCES

Path ID Travel Distance

1A 167' - 3 1/8"

1B 75' - 7 1/8"

1C 143' - 6 1/32"

1D 23' - 9 7/32"

1E 192' - 1 13/32"

1F 133' - 7 29/32"

1G 33' - 7 1/32"

1H 246' - 1 1/8"

1I 247' - 0 31/32"

B-A 79' - 3 3/16"

B-B 74' - 0 3/4"

1/16" = 1'-0"

BASEMENT

AREA SCHEDULE (occupancy area)

OCCUPANCY

CLASSIFICATION AREA USE SPACE USE SF PER OCCUPANT OCCUPANCY LOAD

CAPACITY

FACTOR -

STAIRWAYS

REQUIRED

STAIRWAY WIDTH

CAPACITY

FACTOR - OTHER

REQUIRED WIDTH

- OTHER

BASEMENT

(NFPA) BUSINESS 17263 SF NFPA_Business Use: (other than - Air traffic control tower observation levels) Business Use: (other than - Air traffic control tower observation levels)

100 SF 173 0.3 in 51.9 in 0.2 in 34.6 in

(NFPA) STORAGE 6953 SF NFPA_Storage Use: In other than storage and mercantile ccupancies In other than storage and mercantile ccupancies

500 SF 16 0.3 in 4.8 in 0.2 in 3.2 in

24216 SF 189 56.7 in 37.8 in

FIRST FLOOR

(NFPA) ASSEMBLY 390 SF NFPA_Assembly: Less concentrated use, without fixed seating Less concentrated use, without fixed seating 15 SF 27 0.3 in 8.1 in 0.2 in 5.4 in

(NFPA) ASSEMBLY 2612 SF NFPA_Assembly:Waiting spaces Waiting spaces 100 SF 30 0.3 in 9.0 in 0.2 in 6.0 in

(NFPA) BUSINESS 31137 SF NFPA_Business Use: (other than - Air traffic control tower observation levels) Business Use: (other than - Air traffic control tower observation levels)

100 SF 312 0.3 in 93.6 in 0.2 in 62.4 in

(NFPA) STORAGE 865 SF NFPA_Storage Use: In other than storage and mercantile ccupancies In other than storage and mercantile ccupancies

500 SF 2 0.3 in 0.6 in 0.2 in 0.4 in

35004 SF 371 111.3 in 74.2 in

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH FIRE

AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH HATCH

PATTERNS.

/ 3 stairs = 38" min. 44" / 5 stairs = 15.2" ~ min. 36"

Mark: Revision: Date:

03-19-18Mark: Revision: Date:

ISSUED FOR CONSTRUCTION 03/19/2018

Page 4 of 141Page 4 of 141

2 HR RATED PARTITION

BETWEEN EXISTING AND NEW

ADDITION. PARTITION IS

TEMPORARY PER DETAIL BELOW.

TEMPORARY DOOR.

PROVIDE

90 MINUTE RATING.

TEMPORARY DOOR.

PROVIDE 90 MINUTE

RATING.

2 HR RATED PARTITION

BETWEEN EXISTING AND NEW

ADDITION. PARTITION IS

TEMPORARY PER DETAIL BELOW.

TYP.

D5

GI-200

TYP.

D5

GI-200

STICKY MAT: PROVIDE NEW

REGULARLY WHEN OLD IS SPENT

STICKY MAT: PROVIDE NEW

REGULARLY WHEN OLD IS SPENT

NEW ADDITION

RENOVATED PORTION

OF EXISTING BUILDING

NON-RENOVATED

PORTION OF EXISTING

BUILDING

2 HR RATED PARTITION

BETWEEN EXISTING AND NEW

ADDITION. PARTITION IS

TEMPORARY PER DETAIL BELOW.

2 HR RATED PARTITION BETWEEN

EXISTING AND NEW ADDITION. PARTITION

IS TEMPORARY PER DETAIL BELOW.

TEMPORARY DOOR.

PROVIDE 90

MINUTE DOOR.

TEMPORARY DOOR.

PROVIDE 90 MINUTE

RATING.

TYP.

D5

GI-200

STICKY MAT: PROVIDE NEW

REGULARLY WHEN OLD IS SPENT

STICKY MAT:

PROVIDE NEW

REGULARLY WHEN

OLD IS SPENT

WEEKLY CHANGED OR

MORE AS NEEDED

PRE_FILTER

FLEX DUCT

MONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR

UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

INDICATOR SHALL BE AT 0.01 OR GREATER (VERIFY DAILY). IF NOT VERIFY ALL

OPENING SUCH AS DOOR ARE CLOSED AND/OR CHANGE OUR NEGATIVE AIR

PRE-FILTER.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN

RUNNING TO KEEP

DUST OUT.

A

V

O

TAPE ALL SERVICES TO

PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON PORTABLE FLOOR

BRACKET (SHALL REQUIRE MORE THAN

ONE.)

2 HR. TEMPORARY WALL

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

/1

F

IN

IS

H

E D

F

LO

O R

T O

U N

D E

R S

ID

E

O F

S T

R U

C T

U R

E

V E

R

IF

Y F

LO

O

R T

O F

LO

O

R H

E

IG

H T

RENOVATED SPRINKLER SYSTEM

REMOVE AND REPLACE

CEILING SYSTEM AT

EXISTING AS NEEDED TO INSTALL

2 HOUR WALL

INFECTION CONTROL 2 HOUR WALL

ICRA SYMBOL LEGEND

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR AND "STICKY MAT"

FLOOR PADS

PATH OF DEMOLITION/TRASH REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

• IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE MARION VA MEDICAL CENTER ICRA PLAN

AND AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE

(COR)

• CONTRACTORS SHALL COORDINATE WITH COR FOR ALL

CONSTRUCTION DUST/DEBRIS REQUIREMENTS & MEASURES DURING

DEMOLITION /CONSTRUCTION.

• COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH OF

TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH THE COR.

ALL INTERIOR DOORS THAT LEAD TO THE CONSTRUCTION SITE SHALL

BE POSTED AS PER THE ISLM PLAN.

• THE CONTRACTOR SHALL CONTINUE ALL OPERATIONS (INCLUDING

STORAGE OF MATERIALS) ON GOVERNMENT PREMISES TO AREAS

AUTHORIZED OR APPROVED BY THE COR.

INFECTION CONTROL RISK ASSESSMENT NOTES

PLAN

NORTH

D

E

KEY PLAN

CA

X21

X26B

A C GX29

XH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot

6"

6"

6"

6"

C :\r vt \2

6\

-A

-N ew C en tr al _J

A W

A R

R E

N . r vt

/1

/2

:3 :1

P

M

GI-200

INFECTION CONTROL PLAN 610-303 / 269296

02/28/2018 MN MN

ISSUED FOR

CONSTRUCTION

Project Director

1700 E 38TH ST, MARION, IN 46953

BUILD PRIMARY CARE CLINIC - PACT

FULLY SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTEL SR ,RA, LEED

AP BD+C

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

ABONMARCHE

750 LINCOLN WAY EAST

SOUTH BEND, IN 46601

574.232.8700

BRAD MOSNESS

1/16" = 1'-0" B1

BASEMENT

1/16" = 1'-0" E1

FIRST FLOOR

1/2" = 1'-0" C5

TYPICAL CONSTRUCTION LAYOUT - CLASS IV

1/2" = 1'-0" D5

CROSS SECTION AT TEMPORARY WALL

A. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL

BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

B. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR

OCCUPIED AREAS ON THE FLOOR.

C. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

D. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

E. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT

ALL TIMES (24/7).WHETHER OCCUPIED OR NOT , THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION

UNITS.

F. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER ;NO RETURN AIR OR

EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA.

G. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND

VISITORS SO THEY DO NOT EXIT THROUGH THE

CONSTRUCTION AREA .PROVIDE SIGNS ON DOORS INTO THE

CONSTRUCTION AREA THAT READS: "CONSTRUCTION AREA-DO

NOT ENTER".

H. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND

KEEP A CURRENT HOT WORK PERMIT ON SITE.

I. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE

SURE THEY REMAIN EFFECTIVE.

J. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA .ALL

DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR

CONTAINERS.

K. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

L. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO

PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM.

M. SEAL ALL HOLES,PUNCTURES,AND PENETRATIONS FROM PIPES

AND/CONDUITS APPROPRIATELY AND IMMEDIATELY TO

MAINTAIN DUST PROTECTION AND NEGATIVE AIR PRESSURE.

N. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION

AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO

PASS THROUGH THIS ROOM TO BE VACUUMED WITH HEPA

VACUUM CLEANER PRIOR TO LEAVING THE SITE.

O. CONSTRUCTION BARRIERS…