36C25018B0189-006.pdf

PDF 23 MB Posted

Attached to
Upgrade Water Systems for Legionella and Improve Water Efficiency 539-17-101
Solicitation number
36C25018B0189
Issued by

About this file

36C25018B0189 539-17-101 Revised Bid Set Drawings.pdf

View the file

Other files

File Type Posted
36C25019C0070-001.docx DOCX document
36C25018B0189-0003000.docx DOCX document
36C25018B0189-0002012.docx DOCX document
36C25018B0189-0002013.pdf PDF
36C25018B0189-0002014.pdf PDF
36C25018B0189-0001003.docx DOCX document
36C25018B0189-0001004.pdf PDF
36C25018B0189-0001005.pdf PDF
36C25018B0189-013.docx DOCX document
36C25018B0189-010.pdf PDF
36C25018B0189-005.docx DOCX document
36C25018B0189-007.pdf PDF
36C25018B0189-008.docx DOCX document
36C25018B0189-009.docx DOCX document
36C25018B0189-004.docx DOCX document
36C25018B0189-003.docx DOCX document
36C25018B0189-002.docx DOCX document
36C25018B0189-001.docx DOCX document
36C25018B0189-000.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

PFB Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

Department of Veterans Affairs Medical Center

PFB Architects,Inc.

9461 Kenwood Road Cincinnati, Ohio 45242

(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528

/4

/2

:5

:4

P

M

Upgrade Water Systems for Legionella and

Improve Water Efficiency

06/11/2017

COVER

1P001.

16-3625

539-17-101

Cincinnati , Ohio

Upgrade Water Systems for Legionella and Improve Water Efficiency

3200 Vine Street Cincinnati, Ohio 45220

DPBMTS

9461 Kenwood Road Cincinnati, Ohio 45242

(513) 861-3200

PFB Architects

1400 W. Dorothy Lane Dayton, Ohio 45409-1310

(937) 224-0861 P.

(937) 224-5777 F.

HEAPY ENGINEERING

VICINITY MAP - CINCINNATI

INDEX OF DRAWINGS

Sheet Number Sheet Name

1P001. COVER

1P002 LEGEND & SYMBOLS

1PP099NE PARTIAL PIPE BASEMENT PLAN

1PP099NW PARTIAL PIPE BASEMENT PLAN

1PP099SW PARTIAL PIPE BASEMENT PLAN

1PP100NE PARTIAL BASEMENT PLAN

1PP100NW PARTIAL BASEMENT PLAN

1PP100SE PARTIAL BASEMENT PLAN

1PP100SW PARTIAL BASEMENT PLAN

1PP101NE PARTIAL FIRST FLOOR PLAN

1PP101NW PARTIAL FIRST FLOOR PLAN

1PP101SE PARTIAL FIRST FLOOR PLAN

1PP101SW PARTIAL FIRST FLOOR PLAN

1PP102NE PARTIAL SECOND FLOOR PLAN

1PP102NW PARTIAL SECOND FLOOR PLAN

1PP102SE PARTIAL SECOND FLOOR PLAN

1PP102SW PARTIAL SECOND FLOOR PLAN

1PP103NE PARTIAL THIRD FLOOR PLAN

1PP103NW PARTIAL THIRD FLOOR PLAN

1PP103SE PARTIAL THIRD FLOOR PLAN

1PP103SW PARTIAL THIRD FLOOR PLAN

1PP104NE PARTIAL FOURTH FLOOR PLAN

1PP104NW PARTIAL FOURTH FLOOR PLAN

1PP104SE PARTIAL FOURTH FLOOR PLAN

1PP104SW PARTIAL FOURTH FLOOR PLAN

1PP105NE PARTIAL FIFTH FLOOR PLAN

1PP105NW PARTIAL FIFTH FLOOR PLAN

1PP105SW PARTIAL FIFTH FLOOR PLAN

1PP106NE PARTIAL SIXTH FLOOR PLAN

1PP106NW PARTIAL SIXTH FLOOR PLAN

1PP106SW PARTIAL SIXTH FLOOR PLAN

1PP107NE PARTIAL SEVENTH FLOOR PLAN

1PP107NW PARTIAL SEVENTH FLOOR PLAN

1PP107SW PARTIAL SEVENTH FLOOR PLAN

1PP108NE PARTIAL EIGHTH FLOOR PLAN

1PP108NW PARTIAL EIGHTH FLOOR PLAN

1PP108SW PARTIAL EIGHTH FLOOR PLAN

1PP109NE PARTIAL NINTH FLOOR PLAN

1PP109NW PARTIAL NINTH FLOOR PLAN

1PP110 TENTH FLOOR & PENTHOUSE PLANS

1P401 MECHANICAL ROOM - ENLARGED PLAN

1P701 SCHEDULES, NOTES & DETAILS

Revisions Date

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

06/04/2018

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

12/21/2017

Upgrade Water Systems for Legionella and Improve Water Efficiency CD Submittal

08/21/2017

A1

P1 P1OR

A1

OH

P2

B

P2

GENERAL FLOOR PLAN NOTES

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

P2 = SHEET WHERE DETAIL IS LOCATED

FIRE SUPPRESSION HAZARD CLASSIFICATION AND HAZARD

CLASSIFICATION GROUP

SECTION: 1 = SECTION DESIGNATION

P2 = SHEET WHERE DETAIL IS LOCATED

EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO

SCHEDULES.

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER

DESIGNATIONS REFER TO SCHEDULES.

CONNECT TO EXISTING

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN

UNLESS NOTED OTHERWISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

10" 10"

ELEV: 8' - 0"ELEV: 8' - 0"

TOE: 3' - 0"

BOE: 0' - 6"

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR

BOTTOM OF EQUIPMENT, UNLESS NOTED OTHERWISE

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE

OF PIPE, UNLESS NOTED OTHERWISE

FIRE SUPPRESSION SYMBOLS

DOUBLE LINE SINGLE LINE

CONCEALED PENDENT SPRINKLER

FS

PIV

S

FIRE HYDRANT

FLOW SWITCH

GATE VALVE OS&Y

INSTITUTIONAL PENDENT SPRINKLER

PENDENT SPRINKLER

POST INDICATOR VALVE

RECESSED PENDENT SPRINKLER

SIDE WALL SPRINKLER

SUPERVISED VALVE

UPRIGHT SPRINKLER

PIPING SYMBOLS

DOUBLE LINE SINGLE LINE

BOTTOM CONNECTION (45°)

BRANCH TEE CONNECTION (NOTE:

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOWN

ELBOW UP

EXISTING PIPE TO BE REMOVED

EXISTING PIPE TO REMAIN

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

DD

RR

SPECIALTY GAS SYMBOLS

AIR OUTLET - LAB TYPE

VC

VC

CARBON DIOXIDE OUTLET - HOSPITAL TYPE

MEDICAL AIR OUTLET - HOSPITAL TYPE

MEDICAL VACUUM INLET - HOSPITAL TYPE

NITROGEN OUTLET - HOSPITAL TYPE

NITROUS OXIDE OUTLET - HOSPITAL TYPE

OXYGEN OUTLET - HOSPITAL TYPE

WAGD INLET - HOSPITAL TYPE

NATURAL GAS OUTLET - LAB TYPE

VACUUM OUTLET - LAB TYPE

VACUUM CLEANING STATION - WALL

VACUUM CLEANING STATION - FLOOR

PLUMBING AND FIRE SUPPRESSION

PIPING DESIGNATIONS

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

EXISTING PIPE TO REMAIN

EXISTING PIPE TO BE REMOVED

HOT WATER PIPE (140 DEGS. F.)

HOT WATER PIPE (180 DEGS. F.)

HOT WATER RETURN PIPE (140 DEGS. F.)

HOT WATER RETURN PIPE (180 DEGS. F.)

ARGON PIPE

COMPRESSED AIR PIPE

MEDICAL CARBON DIOXIDE PIPE

COMBINATION FIRE SUPPRESSION AND DOMESTIC

WATER SERVICE

DIESEL FUEL PIPE

SPRINKLER PIPE (DRY)

FIRE SUPPRESSION (STANDPIPE / SPRINKLER MAIN)

FIRE SERVICE

FUEL OIL FLOW LINE

FUEL OIL GAUGE LINE

FUEL OIL RETURN LINE

FUEL OIL SUPPLY LINE

NATURAL GAS PIPE

GARAGE DRAINAGE PIPE

GAS SERVICE

HYDROGEN PIPE

HELIUM PIPE

MEDICAL INSTRUMENT AIR PIPE

KITCHEN WASTE PIPE

LABORATORY COMPRESSED AIR PIPE

LABORATORY VENT PIPE

LABORATORY VACUUM PIPE

LABORATORY WASTE PIPE

MEDICAL NITROGEN PIPE

MEDICAL COMPRESSED AIR PIPE

MEDICAL-SURGICAL VACUUM PIPE

GASOLINE PIPE (NON-LEAD)

MEDICAL NITROUS OXIDE PIPE

NON-POTABLE

MEDICAL OXYGEN PIPE

(OVERFLOW) SECONDARY STORM DRAINAGE PIPE

PROPANE GAS PIPE

PUMP DISCHARGE PIPE

PRE-ACTION / DELUGE SPRINKLER PIPE

PURE WATER PIPE

SPRINKLER PIPE (WET)

SANITARY DRAINAGE PIPE

SOFT COLD WATER

SPRINKLER DRAIN PIPE

STORM DRAINAGE PIPE

FUEL TANK VENT PIPE

TRAP PRIMER DISCHARGE PIPE

TEMPERED WATER PIPE

SANITARY SEWER VENT

WASTE ANESTHESIA GAS DISPOSAL PIPE

WATER SERVICE

LV

140R

180R

AR

CA

CO2

CWS

DF

DS

F

FS

FOF

FOG

FOR

FOS

G

GD

GS

H2

HE

IA

IV

IW

LA

LV

LW

N2

MA

MV

NG

NO

NPW

O2

OD

P

PD

PS

PW

S

SAN

SCW

SD

STM

T

TP

TW

V

WAGD

WS

INDIRECT VENT PIPE

INDIRECT WASTE PIPE

K

CHECK VALVE

T

P

FOB

FOT

SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

PRESSURE GAUGE

TEMPERATURE GAUGE OR THERMOMETER

UNION

CLEANOUT

STRAINER

STRAINER WITH A BLOW DOWN VALVE AND HOSE

CONNECTION

DRAIN VALVE WITH HOSE END CONNECTION

AUTOMATIC FLOW CONTROLLER WITH P/T PLUG

IN AND OUT

EXPANSION JOINT

PRESSURE REGULATING VALVE

SAFETY RELIEF VALVE. PIPE DISCHARGE AIR

GAPPED TO FLOOR DRAIN UNLESS NOTED

OTHERWISE.

PRESSURE AND TEMPERATURE TEST PLUG

TRAP PRIMER

VACUUM GAUGE WITH STOP

CLEANOUT TO GRADE OR FINISHED FLOOR

END CAP

MIXING FAUCET

PLUG

HOSE BIB

WALL HYDRANT

PLUG VALVE

SHUTOFF VALVE AND BOX

SHUTOFF VALVE ON RISER

V

TP

CO

COMBINATION SHUTOFF AND BALANCING

VALVE (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

BALL VALVE

BUTTERFLY VALVE

GATE VALVE

VALVES AND FITTINGS

DOUBLE LINE SINGLE LINE

SOLENOID VALVE

S

P/T PRESSURE AND TEMPERATURE SAFETY RELIEF

VALVE. PIPE DISCHARGE AIR GAPPED TO FLOOR

DRAIN UNLESS NOTED OTHERWISE.

FIRE DEPARTMENT VALVE

WATER METERM

ACID VENT PIPEAV

ACID WASTE PIPEAW

ABBREVIATIONS

AAP - AREA ALARM PANEL (MEDICAL GAS)

AC - AIR COMPRESSOR OR AIR CONDITIONER

ACC - ACCESS

ACCU - AIR COOLED CONDENSING UNIT

AD - ACCESS DOOR OR AREA DRAIN

ADB - ACID DILUTION BASIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

AR - AIR RECEIVER OR ARGON

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

AV - ACID VENT

AW - ACID WASTE

BDD - BACK DRAFT DAMPER

BFP - BACKFLOW PREVENTER

BLDG - BUILDING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG- BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BT - BATHTUB

BTU - BRITISH THERMAL UNIT

BTUH - BRITISH THERMAL UNIT PER HOUR

BTWN - BETWEEN

CA - COMPRESSED AIR

CB - CATCH BASIN

CBD - COUNTER BALANCED BACKDRAFT DAMPER

CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CFM - CUBIC FEET PER MINUTE

CHS - CHILLED WATER SUPPLY

CHR - CHILLED WATER RETURN

CI - CAST IRON

CK - CLINICAL SINK

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CO - CLEAN OUT

COR - CONTRACTING OFFICER'S REPRESENTATIVE

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

CORR - CORRIDOR

CS - CLINICAL SINK OR COLD SOFT WATER

CTR - CENTER

CU - COPPER

CW - COLD WATER

CWS - COMBINATION WATER SERVICE

OR CONDENSER WATER SUPPLY

CWR - CONDENSER WATER RETURN

D - DEPTH OR DRAIN LINE

DD - DECK DRAIN

DET - DETAIL

DF - DRINKING FOUNTAIN OR WATER COOLER

OR DIESEL FUEL

DFU - DRAINAGE FIXTURE UNIT

DFW - DRINKING FOUNTAIN WATER

DI - DEIONIZED WATER

DIA - DIAMETER

DIM - DIMENSION

DN - DOWN

DS - DOWN SPOUT OR SPRINKLER (DRY)

DT - PERFORATED DRAIN TILE

DWG - DRAWING

EA - EACH

EEW - EMERGENCY EYE WASH

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQ - EQUAL

EQUIP - EQUIPMENT

ET - EXPANSION TANK

ETR - EXISTING TO REMAIN

ES - EMERGENCY SHOWER

EQS - EQUIPMENT SUPPLIER

EWC - ELECTRICAL WATER COOLER

EXH - EXHAUST AIR

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)

FCE - FIRE CONTROL EQUIPMENT

FCO - FLOOR CLEANOUT

FD - FLOOR DRAIN

FDC - FIRE DEPARTMENT CONNECTION

FDV - FIRE DEPARTMENT VALVE

FF - FINISHED FLOOR ELEVATION

FHC - FIRE HOSE CABINET

FLR - FLOOR

FM - FORCE MAIN

FOB - FLAT ON BOTTOM

FOF - FUEL OIL FLOW

FOG - FUEL OIL GAUGE

FOR - FUEL OIL RETURN

FOS - FUEL OIL SUPPLY

FOT - FLAT ON TOP

FPM - FEET PER MINUTE

FR - FIRE RISER

FS - FLOOR SINK OR FIRE SERVICE

FT - FEET

FTG - FOOTING

G - GAS OR NATURAL GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES CONTRACTOR

GD - GARAGE DRAINAGE

GPM - GALLONS PER MINUTE

GS - GAS SERVICE

GW - GREASE WASTE

H2 - HYDROGEN

HB - HOSE BIBB

HD - HUB DRAIN

HE - HELIUM

HG - REFRIGERANT HOT GAS

HP - HORSEPOWER OR HIGH POINT

HPC - HIGH PRESSURE CONDENSATE RETURN

HPS - HIGH PRESSURE STEAM SUPPLY

HPW - HIGH PURITY WATER

HPWR - HIGH PURITY WATER RETURN

HR - HOSE REEL

HT - HEAT TRACE

HTR - HEATER

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

HW - HOT WATER

HWR - HEATING HOT WATER RETURN

HWS - HEATING HOT WATER SUPPLY

IA - MEDICAL INSTRUMENT AIR

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

IV - INDIRECT VENT

IW - INDIRECT WASTE

JS - JANITOR SINK

K - KITCHEN WASTE

KEC - KITCHEN EQUIPMENT CONTRACTOR

K - KITCHEN WASTE

KEC - KITCHEN EQUIPMENT CONTRACTOR

L - LENGTH

LA - LABORATORY COMPRESSED AIR

LAV - LAVATORY

LBS - POUNDS

LCW - LABORATORY COLD WATER

LEC - LABORATORY EQUIPMENT CONTRACTOR

LHW - LABORATORY HOT WATER

LHWR - LABORATORY HOT WATER RETURN

LPC - LOW PRESSURE CONDENSATE RETURN

LPS - LOW PRESSURE STEAM SUPPLY

LV - LABORATORY VACUUM OR LABORATORY VENT

LW - LABORATORY WASTE

MA - MEDICAL COMPRESSED AIR

MAP - MASTER ALARM PANEL (MEDICAL GAS)

MAX - MAXIMUM

MB - MOP BASIN

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE

MIN - MINIMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

MPC - MEDIUM PRESSURE CONDENSATE RETURN

MPS - MEDIUM PRESSURE STEAM SUPPLY

MU - WATER MAKE-UP

MV - MEDICAL SURGICAL VACUUM

N2 - MEDICAL NITROGEN

NG - GASOLINE (NON-LEAD)

NIC - NOT IN CONTRACT

NO - MEDICAL NITROUS OXIDE

NOM - NOMINAL

NPW - NON-POTABLE WATER

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

02 - MEDICAL OXYGEN

OA - OUTDOOR AIR

OD - OUTSIDE DIAMETER OR OVERFLOW DRAIN

OFCI - OWNER FURNISHED CONTRACTOR

INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

P - PROPANE GAS

PC - OR PUMPED CONDENSATE RETURN

PD - PUMP DISCHARGE OR PARAPET DRAIN

PIV - POST INDICATOR VALVE

PLBG - PLUMBING

PS - PRE-ACTION/DELUGE SPRINKLER

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSV - PRESSURE SUSTAINING VALVE

PSIG - POUNDS PER SQUARE INCH GAUGE

PW - PURE WATER

RA - RETURN AIR

RAD - RADIUS

RCP - REINFORCED CONCRETE PIPE

RD - ROOF DRAIN

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RL - REFRIGERANT LIQUID

ROS - REVERSE OSMOSIS WATER SUPPLY

ROR - REVERSE OSMOSIS WATER RETURN

RPM - REVOLUTIONS PER MINUTE

RS - REFRIGERANT SUCTION

RV - RELIEF VALVE

S - SPRINKLER (WET)

SA - SHOCK ARRESTOR OR SUPPLY AIR

SAN - SANITARY OR SANITARY DRAIN

SCH - SCHEDULE

SCW - SOFT COLD WATER

SD - SPRINKLER DRAIN OR SUBSOIL DRAIN

SH - SHOWER

SHT - SHEET

SK - SINK

SPEC - SPECIFICATIONS

SQ - SQUARE

SR - SUPPLY RISER

SS - SANITARY STACK (SOIL OR WASTE) OR

STAINLESS STEEL

STD - STANDARD

STM - STORM OR STORM DRAINAGE

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

T - FUEL TANK VENT

TD - TRENCH DRAIN

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TF - TRAP FILLER

TP - TRAP PRIMER OR TRAP PRIMER

DISCHARGE

TW - TEMPERED WATER

TYP - TYPICAL

UR - URINAL

UNO - UNLESS NOTED OTHERWISE

V - VENT OR SANITARY SEWER VENT

VAC - VACUUM

VC - VACUUM CLEANING

VCV - VACUUM CLEANING VALVE

VE - VACUUM EXHAUST

VEL - VELOCITY

VIB - VALVE IN BOX

VOL - VOLUME

VP - VACUUM PUMP

VS - VENT STACK

VTR - VENT THROUGH ROOF

VR - VENT RISER

W/ - WITH

W/0 - WITHOUT

W - WASTE

WAGD - WASTE ANESTHESIA GAS DISPOSAL

WC - WATER CLOSET

WCO - WALL CLEANOUT

WH - WALL HYDRANT OR WATER HEATER

WIV - WALL INDICATOR VALVE

WS - WATER SERVICE

YCO - YARD CLEANOUT

ZVC - ZONE VALVE CABINET

PIPE RISER

NOTE: ALL SYMBOLS AND ABBREVIATIONS

ARE SUBJECT TO MODIFICATIONS ON

OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS MIGHT

NOT NECESSARILY BE USED ON THIS

PROJECT.

DRINKING FOUNTAIN WATERDFW

ELECTRICAL SYMBOLS

JUNCTION BOX.

ELECTRICAL PANELBOARD

J

EACH ARROWHEAD REPRESENTS ONE COMPLETE CIRCUIT; "X" DENOTES PANEL NAME;

NUMBER(S) DENOTES CIRCUIT(S).

X - 1,2

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

PFB Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

PFB Architects,Inc.

9461 Kenwood Road Cincinnati, Ohio 45242

(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528

/4

/2

:5

:4

P

M

Upgrade Water Systems for Legionella and

Improve Water Efficiency

06/11/2017

LEGEND & SYMBOLS

1P002

16-3625

539-17-101

Cincinnati , Ohio

DPBMTSRevisions Date

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

06/04/2018

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

12/21/2017

Upgrade Water Systems for Legionella and Improve Water

BFP

B F

P

B F

P

P

J

P

M

M

TP

2.5"

3"

1.25"1.5"

2.5"1"

1.25"

1"

1.25"1.25"

0.5"

0.75"0.75"

0.75"

0.5"

0.5"

1.5"

1.5" 1.5"1"

0.75"

0.5"

0.75"

0.5"

0.75"

SB08

SB09

SB07

SB08A

C*SB*01

SB10

1P401

PIPE BASEMENT

PIPE BASEMENT

PIPE BASEMENT

0.75" - DCW

0.75" - DHWR

0.75" - DHWR

0.75" - DHWR

0.5" - DHWR

0.75" - DHWR

DCW

01 - PB

DCW

01 - PB

DHWR

01 - PB

004 DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

0.5"

DHWR

01 - PB

DHWR

01 - PB

0.5" - DHWR

DHWR

01 - PB

DCW

01 - PB

DHWR

01 - PB

0.75" - DFW

0.75"

0.5" - DHWR

DHWR

01 - PB

0.5" - DHWR

DHWR

01 - PB

0.5" - DHWR

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

0.75"0.75"

0.375" - DFW

0.75"

0.5" - DHWR

DHWR

01 - PB

016 DHWR

01 - PB

0.375" - DFW

0.75"

2"

3"

2"

0.75"

0.5" - DHWR

DHWR

01 - PB

DCW

01 - PB

2"

2"

0.75"

UN-EXCAVATED

UP

UP

UP

DFW

D F

W

DFW

DFW

01 - PB

DFW

01 - PB

DFW

01 - PB

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

ELEVATOR

1"

UP

0.5"

1"

1"

0.75" - DHWR

CS*SB*010

CS*SB*010

SB06

3"

0.5" - DHWR

0.5" - DHWR

0.5" - DHWR

1"

1.25"

1.25"

DHWR

01 - PB

0.5" - DHWR

0.5" - DHWR

PIPING SERVES BLDG 14 & 15

CSB

EX

CSB

15 3

0.375" - DFW

3" - DHW

GENERAL NOTES:

A. REFER TO 1P001 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.

B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.

C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE

INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND

MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.

PLAN NOTES:

1. EXISTING ACCESS PANEL LOCATION.

2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN

ASSUMED.

3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END

MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING

STRATEGIES.

4. EXISTING NON-FUNCTIONING FIXTURE.

5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.

6. EXISTING UNINSULATED PIPING.

7. EXISTING PIPING LEAK.

8. EXISTING CROSS-CONNECTION.

9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.

10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS

INDICATED).

11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.

12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.

13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.

14. EXISTING DRAIN VALVE.

15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR

TERMINATION IS UNKNOWN BEYOND THIS POINT.

16. EXISTING FIXTURE NOT IN USE.

17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR

IMPENDING RENOVATION.

18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING

SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO

EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER

TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT

LEVEL ABOVE.

22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON

SUB-BASEMENT LEVEL BELOW.

23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,

CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.

CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP

SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.

SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY

DUTY MOUNTING BRACKET.

24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING

1P702 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,

AND PHASING STRATEGIES.

25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

27. PROVIDE REAGENT TANK CONTAINMENT SKID. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

28. PROVIDE 250 GALLON REAGENT TANKS SERVING MONOCHLORAMINE

SECONDARY WATER TREATMENT SYSTEMS. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

29. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #1.

30. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #2.

31. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #3.

32. PROVIDE 120V CONNECTION TO SECONDARY WATER TREATMENT SYSTEM.

COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER.

33. UTILIZE SPARE 120V-20A/1P BREAKER IN EXISTING PANEL CBC LOCATED IN

ROOM A001D.

34. PROVIDE NEW TRAP PRIMER. REFER TO TRAP PRIMER DETAIL LOCATED

ON DRAWING 1PP100NW.

35. CONNECT TO EXISTING 3" DHW MAIN AND REVISE SUPPLY PIPING AT

EXISTING DOMESTIC WATER HEATERS TO ACCOMMODATE INSTALLATION

OF NEW 0.75" MONOCHLORAMINE INJECTION PORT. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703 FOR

INSTALLATION AND EQUIPMENT DETAILS.

36. PROVIDE NEW PULSE EMITTING WATER METER SERVING DHW PIPING

SYSTEM. EXTEND METER WIRE TO DHW MONOCHLORAMINE EQUIPMENT

LOCATED IN BASEMENT MECHANICAL ROOM #A013B.

37. EXISTING FLOW METER SERVING DCW PIPING SYSTEM. CONNECT NEW

METER WIRE TO EXTRA EXISTING DRY CONTACT RELAY OUTPUTS AND

EXTEND TO DCW MONOCHLORAMINE EQUIPMENT LOCATED IN BASEMENT

MECHANICAL ROOM #A013B.

38. EXTEND CAT 6 ETHERNET CABLE WITH CONDUIT, FITTINGS, AND BOXES

TO FORM COMPLETE, COORDINATED RACEWAY SYSTEM, FROM WATER

MONITORING STATION(S) TO TERMINATE AT SIGNALS CLOSET AND

CONNECT TO BUILDING AUTOMATION SYSTEM. THE WATER MONITORING

SYSTEM SHALL BE BACNET CAPABLE DIRECT DIGITAL CONTROL SYSTEM

UTILIZING ELECTRIC ACTUATION, AND SHALL BE TIED INTO THE EXISTING

HOSPITAL AUTOMATED LOGIC CONTROLS BUILDING AUTOMATION

SYSTEM OR JOHNSON CONTROLS METASYS BUILDING AUTOMATION

SYSTEM, INCLUDING ALL GRAPHICS, TRENDS, ALARMS, ETC. ALL NEW

GRAPHICS PROVIDED UNDER THIS CONTRACT SHALL MATCH EXISTING

GRAPHICS - OBTAIN ALL REQUIRED GRAPHICS FILES FROM COR.

PROVIDE 14 DAYS NOTICE IN ADVANCE OF REQUIRING FILES.

39. PROVIDE 120V CONNECTION TO WATER MONITORING STATION. RUN 2-#12,

#12 GRD. TO INDICATED PANEL. UTILIZE SPARE 120V-20A/1P CIRCUIT

BREAKER .

40. EXISTING ELECTRICAL PANELBOARD.

AREA OF WORK

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

PFB Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

PFB Architects,Inc.

9461 Kenwood Road Cincinnati, Ohio 45242

(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528

/4

/2

:5

:1

P

M

Upgrade Water Systems for Legionella and

Improve Water Efficiency

06/11/2017

PARTIAL PIPE BASEMENT PLAN

1PP099NE

16-3625

539-17-101

Cincinnati , Ohio

DPBMTS

N

Scale: 1/8" = 1'-0"

PARTIAL PIPE BASEMENT PLAN

N.T.S.Scale:

KEYPLAN

Revisions Date

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

06/04/2018

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

12/21/2017

Upgrade Water Systems for Legionella and Improve Water

BFP

F

P

M

TP

2"

0.5"

0.75"

0.75"

0.75"

0.5"

1.5"

1.5"

2"

0.75"

0.75"

1"

0.75"

1"

1"

2"

0.75"

0.75"

C*SB*01

S*SB*1

SB02

PIPE BASEMENT

PIPE BASEMENT

PIPE BASEMENT

0.75" - DHW

UN-EXCAVATED

0.75" - DCW

0.75" - DHW

DCW

01 - PB

DHW

01 - PB

DHW

01 - PB

DHW

01 - PB

DCW

01 - PB

DCW

01 - PB

DHW

01 - PB

DHW

01 - PB

DCW

01 - PB

DCW

01 - PB

DHW

01 - PB

DCW

01 - PB

1"

DCW

01 - PB

DHW

01 - PB

0.75"

FLOW CONTROLLER

DHW

01 - PB

008 DHW

01 - PB

DHWR

01 - PB

DHWR

01 - PB

020DHWR

01 - PB

DHWR

01 - PB

0.75"3"

1.5"

3"

3"

DHW

01 - PB

DCW

01 - PB

DHW

01 - PB

DCW

01 - PB

DHWR

01 - PB

DHWR

01 - PB

025DHWR

01 - PB

026 DHWR

01 - PB

DCW

01 - PB

DCW

01 - PB

015 DCW

01 - PB

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

DCW

01 - PB

0.75" - DCW

0.75" - DCW

DHWR

01 - PB

0.5" - DHWR

1"

0.75"

0.75" - DHWR

DCW

01 - PB

DCW

01 - PB

0.375"

D F

W

DFW

1"

UP

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

0.5"DHWR

01 - PB

0.5"

1.5" 1.25"

1"

0.375" - DFWDHWR

01 - PB

DHWR

01 - PB

DCW

01 - PB

DHWR

01 - PB

DCW

01 - PB

6" 4"

1" 1"

D F

W

D F

W

DFW

01 - PB

DFW

01 - PB

0.75"

3" 0.75" 3"

D F

W

D F

W

1"

DFW

01 - PB

1"

DFW

1.25"1.5"

2"

1.5"

0.5" - DHWR

1.5"1.25"

1.25"1.25"

DCW

01 - PB

0.5" - DHWR

MAIN 6"DCW & 4"DHW RISERS

TO THE PENTHOUSE.

DHWR

01 - PB

ELEVATOR

ELEVATOR

ELEVATOR

DHWR

01 - PB

1" - DHWR

1.5"

1" - DFW

FD1

P708

5"

8"

S A

N

8"

SANSAN

5"

5"

S A

N

3"

1.5"

CO

0.5"

1"

1"

0.75" 0.75"

1" - DCW

0.5" - DCW

0.5" - DHWR

0.75" - DHW 12

CS*SB*011

DCW

01 - PB

DCW

01 - PB

DHWR

01 - PB

DFW

01 - PB

DFW

01 - PB

FD1

3"

3"

0.75" - DHWR12

0.5"

0.5"

0.75" - DHW

0.75" - DCW

0.75" - DCW

0.5" 1.5"

0.5"0.75"0.75"

1" - DHW

0.75" - DHWR

1.5" - DCW

2"

0.5" - DHWR

1" - DCW

1" - DHWR

1"

1"

1"0.75" 2"3"

0.5" - DHWR

1" - DCW

S A

N

2"

1.5"

P530

CO

1.5"

1.5"

GENERAL NOTES:

A. REFER TO 1P001 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.

B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.

C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE

INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND

MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.

PLAN NOTES:

1. EXISTING ACCESS PANEL LOCATION.

2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN

ASSUMED.

3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END

MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING

STRATEGIES.

4. EXISTING NON-FUNCTIONING FIXTURE.

5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.

6. EXISTING UNINSULATED PIPING.

7. EXISTING PIPING LEAK.

8. EXISTING CROSS-CONNECTION.

9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.

10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS

INDICATED).

11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.

12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.

13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.

14. EXISTING DRAIN VALVE.

15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR

TERMINATION IS UNKNOWN BEYOND THIS POINT.

16. EXISTING FIXTURE NOT IN USE.

17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR

IMPENDING RENOVATION.

18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING

SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO

EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER

TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT

LEVEL ABOVE.

22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON

SUB-BASEMENT LEVEL BELOW.

23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,

CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.

CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP

SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.

SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY

DUTY MOUNTING BRACKET.

24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING

1P702 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,

AND PHASING STRATEGIES.

25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

27. PROVIDE REAGENT TANK CONTAINMENT SKID. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

28. PROVIDE 250 GALLON REAGENT TANKS SERVING MONOCHLORAMINE

SECONDARY WATER TREATMENT SYSTEMS. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

29. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #1.

30. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #2.

31. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #3.

32. PROVIDE 120V CONNECTION TO SECONDARY WATER TREATMENT SYSTEM.

COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER.

33. UTILIZE SPARE 120V-20A/1P BREAKER IN EXISTING PANEL CBC LOCATED IN

ROOM A001D.

34. PROVIDE NEW TRAP PRIMER. REFER TO TRAP PRIMER DETAIL LOCATED

ON DRAWING 1PP100NW.

35. CONNECT TO EXISTING 3" DHW MAIN AND REVISE SUPPLY PIPING AT

EXISTING DOMESTIC WATER HEATERS TO ACCOMMODATE INSTALLATION

OF NEW 0.75" MONOCHLORAMINE INJECTION PORT. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703 FOR

INSTALLATION AND EQUIPMENT DETAILS.

36. PROVIDE NEW PULSE EMITTING WATER METER SERVING DHW PIPING

SYSTEM. EXTEND METER WIRE TO DHW MONOCHLORAMINE EQUIPMENT

LOCATED IN BASEMENT MECHANICAL ROOM #A013B.

37. EXISTING FLOW METER SERVING DCW PIPING SYSTEM. CONNECT NEW

METER WIRE TO EXTRA EXISTING DRY CONTACT RELAY OUTPUTS AND

EXTEND TO DCW MONOCHLORAMINE EQUIPMENT LOCATED IN BASEMENT

MECHANICAL ROOM #A013B.

38. EXTEND CAT 6 ETHERNET CABLE WITH CONDUIT, FITTINGS, AND BOXES

TO FORM COMPLETE, COORDINATED RACEWAY SYSTEM, FROM WATER

MONITORING STATION(S) TO TERMINATE AT SIGNALS CLOSET AND

CONNECT TO BUILDING AUTOMATION SYSTEM. THE WATER MONITORING

SYSTEM SHALL BE BACNET CAPABLE DIRECT DIGITAL CONTROL SYSTEM

UTILIZING ELECTRIC ACTUATION, AND SHALL BE TIED INTO THE EXISTING

HOSPITAL AUTOMATED LOGIC CONTROLS BUILDING AUTOMATION

SYSTEM OR JOHNSON CONTROLS METASYS BUILDING AUTOMATION

SYSTEM, INCLUDING ALL GRAPHICS, TRENDS, ALARMS, ETC. ALL NEW

GRAPHICS PROVIDED UNDER THIS CONTRACT SHALL MATCH EXISTING

GRAPHICS - OBTAIN ALL REQUIRED GRAPHICS FILES FROM COR.

PROVIDE 14 DAYS NOTICE IN ADVANCE OF REQUIRING FILES.

39. PROVIDE 120V CONNECTION TO WATER MONITORING STATION. RUN 2-#12,

#12 GRD. TO INDICATED PANEL. UTILIZE SPARE 120V-20A/1P CIRCUIT

BREAKER .

40. EXISTING ELECTRICAL PANELBOARD.

AREA OF WORK

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

PFB Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

PFB Architects,Inc.

9461 Kenwood Road Cincinnati, Ohio 45242

(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528

/4

/2

:5

:3

P

M

Upgrade Water Systems for Legionella and

Improve Water Efficiency

06/11/2017

PARTIAL PIPE BASEMENT PLAN

1PP099NW

16-3625

539-17-101

Cincinnati , Ohio

DPBMTS

N

Scale: 1/8" = 1'-0"

PARTIAL SUB-BASEMENT PLAN

N.T.S.Scale:

KEYPLAN

Revisions Date

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

06/04/2018

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

12/21/2017

Upgrade Water Systems for Legionella and Improve Water

0.75"

0.75"

0.75"

0.75"

1.5"

PIPE BASEMENT

PIPE BASEMENT

DCW

01 - PB

DCW

01 - PB

DCW

01 - PB

DCW

01 - PB

0.75" - DCW

DHWR

01 - PB

DHWR

01 - PB

0.75"

1"

0.5" - DHWR

0.5" - DCW

DHWR

01 - PB

DHWR

01 - PB

0.75" 3 DCW

01 - PB

1.5"

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

0.5" - DHWR

0.5"

DCW

01 - PB

DHWR

01 - PB

DHWR

01 - PB

0.75" - DCW

0.75"

DCW

01 - PB

DCW

01 - PB

DCW

01 - PB

DCW

01 - PB

DHWR

01 - PB

DHWR

01 - PB

1"

1"

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

0.5" 1"

0.5"

0.5"

1" - DHWR

1" - DCW

1" - DHWR

1" - DCW

1"

DCW

01 - PB

DHWR

01 - PB

050DCW

01 - PB

DHWR

01 - PB

DCW

01 - PB

DHWR

01 - PB

1.5"

1.5"

1"

0.5"

1.25"0.75"1"

DHWR

01 - PB

DCW

01 - PB

0.75"

UP

1" - DFW12

12 0.75" - DCW

0.75" - DHWR

1" - DHWR

0.75"

0.75"

1.5"

15 3

15 312 15 3

15 3

12 15 0.5"

1.5"

0.75" - DHWR

1.5" - DCW

1"

1"

0.5"

0.75" - DFW

1" - DHW

2.5" - DCW

1" - DHW

0.75" - DHWR

0.5" - DHWR

0.75"

0.5" - DHWR

DHW

01 - PB

DHW

01 - PB

DHWR

01 - PB

DHWR

01 - PB

DHWR

01 - PB

0.75"1"1"

AREA OF WORK

AREA OF WORK

GENERAL NOTES:

A. REFER TO 1P001 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.

B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.

C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE

INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND

MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.

PLAN NOTES:

1. EXISTING ACCESS PANEL LOCATION.

2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN

ASSUMED.

3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END

MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING

STRATEGIES.

4. EXISTING NON-FUNCTIONING FIXTURE.

5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.

6. EXISTING UNINSULATED PIPING.

7. EXISTING PIPING LEAK.

8. EXISTING CROSS-CONNECTION.

9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.

10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS

INDICATED).

11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.

12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.

13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.

14. EXISTING DRAIN VALVE.

15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR

TERMINATION IS UNKNOWN BEYOND THIS POINT.

16. EXISTING FIXTURE NOT IN USE.

17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR

IMPENDING RENOVATION.

18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING

SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO

EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER

TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT

LEVEL ABOVE.

22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON

SUB-BASEMENT LEVEL BELOW.

23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,

CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.

CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP

SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.

SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY

DUTY MOUNTING BRACKET.

24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING

1P702 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,

AND PHASING STRATEGIES.

25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

27. PROVIDE REAGENT TANK CONTAINMENT SKID. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

28. PROVIDE 250 GALLON REAGENT TANKS SERVING MONOCHLORAMINE

SECONDARY WATER TREATMENT SYSTEMS. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

29. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #1.

30. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #2.

31. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #3.

32. PROVIDE 120V CONNECTION TO SECONDARY WATER TREATMENT SYSTEM.

COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER.

33. UTILIZE SPARE 120V-20A/1P BREAKER IN EXISTING PANEL CBC LOCATED IN

ROOM A001D.

34. PROVIDE NEW TRAP PRIMER. REFER TO TRAP PRIMER DETAIL LOCATED

ON DRAWING 1PP100NW.

35. CONNECT TO EXISTING 3" DHW MAIN AND REVISE SUPPLY PIPING AT

EXISTING DOMESTIC WATER HEATERS TO ACCOMMODATE INSTALLATION

OF NEW 0.75" MONOCHLORAMINE INJECTION PORT. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703 FOR

INSTALLATION AND EQUIPMENT DETAILS.

36. PROVIDE NEW PULSE EMITTING WATER METER SERVING DHW PIPING

SYSTEM. EXTEND METER WIRE TO DHW MONOCHLORAMINE EQUIPMENT

LOCATED IN BASEMENT MECHANICAL ROOM #A013B.

37. EXISTING FLOW METER SERVING DCW PIPING SYSTEM. CONNECT NEW

METER WIRE TO EXTRA EXISTING DRY CONTACT RELAY OUTPUTS AND

EXTEND TO DCW MONOCHLORAMINE EQUIPMENT LOCATED IN BASEMENT

MECHANICAL ROOM #A013B.

38. EXTEND CAT 6 ETHERNET CABLE WITH CONDUIT, FITTINGS, AND BOXES

TO FORM COMPLETE, COORDINATED RACEWAY SYSTEM, FROM WATER

MONITORING STATION(S) TO TERMINATE AT SIGNALS CLOSET AND

CONNECT TO BUILDING AUTOMATION SYSTEM. THE WATER MONITORING

SYSTEM SHALL BE BACNET CAPABLE DIRECT DIGITAL CONTROL SYSTEM

UTILIZING ELECTRIC ACTUATION, AND SHALL BE TIED INTO THE EXISTING

HOSPITAL AUTOMATED LOGIC CONTROLS BUILDING AUTOMATION

SYSTEM OR JOHNSON CONTROLS METASYS BUILDING AUTOMATION

SYSTEM, INCLUDING ALL GRAPHICS, TRENDS, ALARMS, ETC. ALL NEW

GRAPHICS PROVIDED UNDER THIS CONTRACT SHALL MATCH EXISTING

GRAPHICS - OBTAIN ALL REQUIRED GRAPHICS FILES FROM COR.

PROVIDE 14 DAYS NOTICE IN ADVANCE OF REQUIRING FILES.

39. PROVIDE 120V CONNECTION TO WATER MONITORING STATION. RUN 2-#12,

#12 GRD. TO INDICATED PANEL. UTILIZE SPARE 120V-20A/1P CIRCUIT

BREAKER .

40. EXISTING ELECTRICAL PANELBOARD.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

PFB Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

PFB Architects,Inc.

9461 Kenwood Road Cincinnati, Ohio 45242

(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528

/4

/2

:5

:4

P

M

Upgrade Water Systems for Legionella and

Improve Water Efficiency

06/11/2017

PARTIAL PIPE BASEMENT PLAN

1PP099SW

16-3625

539-17-101

Cincinnati , Ohio

DPBMTS

N

Scale: 1/8" = 1'-0"

PARTIAL PIPE BASEMENT PLAN

N.T.S.Scale:

KEYPLAN

Revisions Date

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

06/04/2018

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

12/21/2017

Upgrade Water Systems for Legionella and Improve Water

F

P

2" 2"

2"

1" 1.25"

1"

1.5"

2"

0.5"

0.75"

0.5"

0.5"

2"

0.75"

2"

0.5"

0.5"

2"

2"

0.5"

0.5"0.5"

1.5" 0.75"

0.75" - DHWR

0.75" 3"

3"

0.75"

0.75"

3"

0.75"

SB10

A023

G2

F1

F1

F1 D1

A1 A1

A1

B3

B3

B3

B3B3

J1

J1

C1 C1

G4

B022

B001

B010

B015

B016

B014

B012

B011

B008

B3

B017A

B017

A022

B007

B018

B019

B020

A015

A016 A012

A012A

C - B - 1

A014A014D

A014A

A014B A014C

A021

A021A

A021B

A022B

A022C

C - B - 4

B005 B005A

B004

B006 B006A B006B

B007B

B007AB013

B013B B013A

B001A

B001B

B001CB003

B021

B021A B021B

A022A

0.75" - DHWR

0.5" - DHWR

0.5" - DHWR

0.5" - DHWR

0.75" - DFW

LOADING DOCK

0.75" - DCW

B008A

B016A

B009

UP

UP

UP

UP

UP

UP

UP

DN

UP

0.5" - DHWR

DHWR

01 - B

DHW

01 - B

2"

DHW

01 - B

DCW

01 - B

ELEVATOR

ELEVATOR

DHWR

01 - B

DHWR

01 - B

DCW

01 - B

DHW

01 - B

DCW

01 - B

0.5"

0.5"

0.75"

DCW

01 - B

0.75"

0.75" - DCW

DCW

01 - B

DCW

01 - B

DCW

01 - B B002

DCW

01 - B

DHW

01 - B

DCW

01 - B

DCW

01 - B

DCW

01 - B

DHW

01 - B

DHW

01 - B

DCW

01 - B

DCW

01 - B

0.75" C.W. TO W.H.

D6

1" - DHW

2" - DCW

31 31

0.5" - DCW

0.5" - DHW

0.5" DHWR

0.5" DHWR

0.75" - DFW 11 12

0.375" - DFW

0.75" - DHW

0.75" - DCW

1" - DHW 12

11 12

0.5" - DHWR

0.75"

1.5"

0.75"

1.5"

0.5" - DHWR

0.5" - DHWR

0.5" - DHWR

0.5" - DHW

0.5" - DCW

DCW

01 - B

0.5" - DHWR

0.75" - DHWR

12 15

0.75" - DHWR

3 9

E1

TMV CABINET

DHWR

01 - B

11 12

0.5" - DHWR

11 15

DFW

01 - B

0.75" - DFW

0.75"

0.5"

0.75" - DFW

0.5" - DFW

GENERAL NOTES:

A. REFER TO 1P001 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.

B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.

C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE

INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND

MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.

PLAN NOTES:

1. EXISTING ACCESS PANEL LOCATION.

2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN

ASSUMED.

3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END

MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING

STRATEGIES.

4. EXISTING NON-FUNCTIONING FIXTURE.

5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.

6. EXISTING UNINSULATED PIPING.

7. EXISTING PIPING LEAK.

8. EXISTING CROSS-CONNECTION.

9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.

10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS

INDICATED).

11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.

12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.

13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.

14. EXISTING DRAIN VALVE.

15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR

TERMINATION IS UNKNOWN BEYOND THIS POINT.

16. EXISTING FIXTURE NOT IN USE.

17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR

IMPENDING RENOVATION.

18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING

SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO

EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER

TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT

LEVEL ABOVE.

22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON

SUB-BASEMENT LEVEL BELOW.

23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,

CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.

CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP

SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.

SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY

DUTY MOUNTING BRACKET.

24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING

1P702 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,

AND PHASING STRATEGIES.

25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

27. PROVIDE REAGENT TANK CONTAINMENT SKID. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

28. PROVIDE 250 GALLON REAGENT TANKS SERVING MONOCHLORAMINE

SECONDARY WATER TREATMENT SYSTEMS. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

29. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #1.

30. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #2.

31. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER

BID ITEM #3.

32. PROVIDE 120V CONNECTION TO SECONDARY WATER TREATMENT SYSTEM.

COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER.

33. UTILIZE SPARE 120V-20A/1P BREAKER IN EXISTING PANEL CBC LOCATED IN

ROOM A001D.

34. PROVIDE NEW TRAP PRIMER. REFER TO TRAP PRIMER DETAIL LOCATED

ON DRAWING 1PP100NW.

35. CONNECT TO EXISTING 3" DHW MAIN AND REVISE SUPPLY PIPING AT

EXISTING DOMESTIC WATER HEATERS TO ACCOMMODATE INSTALLATION

OF NEW 0.75" MONOCHLORAMINE INJECTION PORT. REFER TO SECONDARY

WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703 FOR

INSTALLATION AND EQUIPMENT DETAILS.

36. PROVIDE NEW PULSE EMITTING WATER METER SERVING DHW PIPING

SYSTEM. EXTEND METER WIRE TO DHW MONOCHLORAMINE EQUIPMENT

LOCATED IN BASEMENT MECHANICAL ROOM #A013B.

37. EXISTING FLOW METER SERVING DCW PIPING SYSTEM. CONNECT NEW

METER WIRE TO EXTRA EXISTING DRY CONTACT RELAY OUTPUTS AND

EXTEND TO DCW MONOCHLORAMINE EQUIPMENT LOCATED IN BASEMENT

MECHANICAL ROOM #A013B.

38. EXTEND CAT 6 ETHERNET CABLE WITH CONDUIT, FITTINGS, AND BOXES

TO FORM COMPLETE, COORDINATED RACEWAY SYSTEM, FROM WATER

MONITORING STATION(S) TO TERMINATE AT SIGNALS CLOSET AND

CONNECT TO BUILDING AUTOMATION SYSTEM. THE WATER MONITORING

SYSTEM SHALL BE BACNET CAPABLE DIRECT DIGITAL CONTROL SYSTEM

UTILIZING ELECTRIC ACTUATION, AND SHALL BE TIED INTO THE EXISTING

HOSPITAL AUTOMATED LOGIC CONTROLS BUILDING AUTOMATION

SYSTEM OR JOHNSON CONTROLS METASYS BUILDING AUTOMATION

SYSTEM, INCLUDING ALL GRAPHICS, TRENDS, ALARMS, ETC. ALL NEW

GRAPHICS PROVIDED UNDER THIS CONTRACT SHALL MATCH EXISTING

GRAPHICS - OBTAIN ALL REQUIRED GRAPHICS FILES FROM COR.

PROVIDE 14 DAYS NOTICE IN ADVANCE OF REQUIRING FILES.

39. PROVIDE 120V CONNECTION TO WATER MONITORING STATION. RUN 2-#12,

#12 GRD. TO INDICATED PANEL. UTILIZE SPARE 120V-20A/1P CIRCUIT

BREAKER .

40. EXISTING ELECTRICAL PANELBOARD.

AREA OF WORK

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

PFB Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

PFB Architects,Inc.

9461 Kenwood Road Cincinnati, Ohio 45242

(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528

/4

/2

:0

:0

P

M

Upgrade Water Systems for Legionella and

Improve Water Efficiency

06/11/2017

PARTIAL BASEMENT PLAN

1PP100NE

16-3625

539-17-101

Cincinnati , Ohio

DPBMTS

N

Scale: 1/8" = 1'-0"

PARTIAL BASEMENT PLAN

N.T.S.Scale:

KEYPLAN

Revisions Date

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

06/04/2018

Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal

12/21/2017

Upgrade Water Systems for Legionella and Improve Water

F

P

B F

P

T P

T P

J1J1

0.5" 0.75" 0.5"0.5"

0.75"

0.75"

0.5"0.5" 0.5"

0.75"

1"

1"

1.25"

1"

1.5" - DHW

2" - DCW

1" - DHWR

0.75" - DCW

0.5"

0.5"

0.5"

2" 2"

0.5"

1.5"

0.5"

1" 0.5"

1"

1"

1"

2"2"

0.5"

1"

D6

D6

D6

S*SB*1

DCW

01 - B

DHW

01 - B

DHW

01 - B

DCW

01 - B

A005D

A004B

C - B - 2

A004C

A004D

A004E

A004F

A004G

A004A

A004

A001C

A001B

A001A

A008

C - B - 13

A005C A005B

A005A

A007A A007B

A013B

A013A

A013 A013D

C - B - 2

A003

A002

A001D

A001

A011

A001F

A035A

A0021A

A0016 A0012A0017

A0002

A0003

A0004

A0018

A0019

A0020

A0017

A0021D

A0022

A0023

A0021B

A0011

A0005

A0006

A0007

A0008

S-1

A0022

A001E

A0010

A026

A025A

A025

A010

A023A

E1

B3

B3

B3

A1 B3

A1

D1

A1

B3

B3 B3

A1

D1

D1 F1F1

F1

F1

D1

B3

A1

C1

D1

D5

F1

G3

B1

A0001 A0011

FILTER

D7

B1

B1

B1

A0012

1.25"

1.25" 1"

0.5"

0.5"

0.5"

D8

F1

F1

SPRAY NOZZLE

A018

A012A

A019 A012B

LOADING DOCK

DCW

01 - B

DCW

01 - B

DCW

01 - B B003

TW

TW

01 - B

TMV

CABINET

0.75"

0.75"

TW

01 - B

TW

01 - B

TW

01 - B

TW

TW

C - B - 1

DHWR

01 - B

0.75" - DHWR

A/C SHAFT

UP

UP

UP

UP

UP

UP

G3

0.375" - DFW

MAIN 6"DCW & 4"DHW RISERS

TO THE PENTHOUSE.

11 11

0.5" - DHWR

DCW

01 - B

UP

DHW

01 - B

DCW

01 - B

DHW

01 - B

DCW

01 - B

DCW

01 - B

DHW

01 - B

DHW

01 - B

DCW

01 - B

1.25"1"

0.5"

0.5"

1.5" 1.5"

1.5"

2"

0.75"

2"

0.75"

1"

2"

1"2"

UP

1.25"1.5"

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

DCW

01 - B

DCW

01 - B

DCW

01 - B

006DHW

01 - B

DCW

01 - B

DCW

01 - B

DHW

01 - B

DCW

01 - B

DCW

01 - B

DHW

01 - B

DHW

01 - B

DCW

01 - B

DCW

01 - B

DHW

01 - B

DHW

01 - B

DCW

01 - B

DHW

01 - B

DHW

01 - B

DCW

01 - B

DHW

01 - B

DCW

01 - B

DCW

01 - B

067DHW

01 - B

035DCW

01 - B

DHW

01 - B

DFW

01 - B

DFW

01 - B

DHWR

01 - B

DCW

01 - B

DHWR

01 - B

0.75"

D6

TMV

1PP100NW

CBC

BC1

BC2

DPC

1PP100NW

1.25"

1.25" - DCW

0.75" - DHW

A036

A0011

DCW

01 - B

0.75" - DHW

2" - DCW11 12

0.5" - DHWR

0.5" - DHWR

1.25" - DCW

1" - DCW

0.5" - DCW

0.5" - DHWR 11 15

0.75" - DHW

12 11

11 12

0.75" - DHW

0.5" - DHWR

EX

1" - DCW

0.5" - DCW

0.5" - DHW

0.75" - DCW

0.75" - DHWR12

0.75" - DCW11

1.5" - DCW

11 1" - DHW

1" - DCW

0.5" - DHW

1.5" - DCW

11 11

11 15

0.75" - DCW

0.75" - DHW

10 10 10 10

1" - DHW

TMV CABINET

1"

1"

1.25" - TW

1" - DFW

0.5" 0.5"

TRAP PRIMER

TRAP PRIMER

0.5"

0.5"

SPRAY NOZZLE

SPRAY NOZZLE

SPRAY NOZZLE

0.5" 0.5"

DHW

01 - B

0.75"

0.75"

1"

1.25"

0.75"0.75"

0.75"

0.75"

11 12

1"

1.5"

2"

TMV CABINET

0.5"

DCW

01 - B B001

E3

1.5"

V

1"

1"

DRINKING FOUNTAIN CHILLER UNIT

0.5" 0.5"

V

1.5" P530

CO

GENERAL NOTES:

A. REFER TO 1P001 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.

B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.

C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE

INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND

MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.

PLAN NOTES:

1. EXISTING ACCESS PANEL LOCATION.

2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN

ASSUMED.

3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END

MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING

STRATEGIES.

4. EXISTING NON-FUNCTIONING FIXTURE.

5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.

6. EXISTING UNINSULATED PIPING.

7. EXISTING PIPING LEAK.

8. EXISTING CROSS-CONNECTION.

9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.

10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS

INDICATED).

11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.

12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.

13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.

14. EXISTING DRAIN VALVE.

15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR

TERMINATION IS UNKNOWN BEYOND THIS POINT.

16. EXISTING FIXTURE NOT IN USE.

17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR

IMPENDING RENOVATION.

18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING

SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO

EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER

TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING

LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT

SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER

TREATMENT SYSTEM DETAIL ON DRAWING 1P703.

21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT

LEVEL ABOVE.

22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND

SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP

PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON

SUB-BASEMENT LEVEL BELOW.

23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,

CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.

CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP

SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.

SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY

DUTY MOUNTING BRACKET.

24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING

1P702 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,

AND PHASING STRATEGIES.

25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON DRAWING 1P703 FOR INSTALLATION AND EQUIPMENT DETAILS.

26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT

SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL

ON…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.