36C25018B0189-0002013.pdf
PDF 24 MB Posted
- Solicitation number
- 36C25018B0189
About this file
36C25018B0189 0002 539-17-101 Upgrade Water Systems Revised Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0070-001.docx | DOCX document | |
| 36C25018B0189-0003000.docx | DOCX document | |
| 36C25018B0189-0002012.docx | DOCX document | |
| 36C25018B0189-0002014.pdf | ||
| 36C25018B0189-0001003.docx | DOCX document | |
| 36C25018B0189-0001004.pdf | ||
| 36C25018B0189-0001005.pdf | ||
| 36C25018B0189-013.docx | DOCX document | |
| 36C25018B0189-010.pdf | ||
| 36C25018B0189-005.docx | DOCX document | |
| 36C25018B0189-007.pdf | ||
| 36C25018B0189-006.pdf | ||
| 36C25018B0189-008.docx | DOCX document | |
| 36C25018B0189-009.docx | DOCX document | |
| 36C25018B0189-004.docx | DOCX document | |
| 36C25018B0189-003.docx | DOCX document | |
| 36C25018B0189-002.docx | DOCX document | |
| 36C25018B0189-001.docx | DOCX document | |
| 36C25018B0189-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
PFB Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
Department of Veterans Affairs Medical Center
PFB Architects,Inc.
9461 Kenwood Road Cincinnati, Ohio 45242
(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528
/2
/2
:5
:0
A
M
Upgrade Water Systems for Legionella and
Improve Water Efficiency
06/11/2017
COVER
1P001.
16-3625
539-17-101
Cincinnati , Ohio
Upgrade Water Systems for Legionella and Improve Water Efficiency
3200 Vine Street Cincinnati, Ohio 45220
DPBMTS
9461 Kenwood Road Cincinnati, Ohio 45242
(513) 861-3200
PFB Architects
1400 W. Dorothy Lane Dayton, Ohio 45409-1310
(937) 224-0861 P.
(937) 224-5777 F.
HEAPY ENGINEERING
VICINITY MAP - CINCINNATI
INDEX OF DRAWINGS
Sheet Number Sheet Name
1P001. COVER
1P002 LEGEND & SYMBOLS
1PP099NE PARTIAL PIPE BASEMENT PLAN
1PP099NW PARTIAL PIPE BASEMENT PLAN
1PP099SW PARTIAL PIPE BASEMENT PLAN
1PP100NE PARTIAL BASEMENT PLAN
1PP100NW PARTIAL BASEMENT PLAN
1PP100SE PARTIAL BASEMENT PLAN
1PP100SW PARTIAL BASEMENT PLAN
1PP101NE PARTIAL FIRST FLOOR PLAN
1PP101NW PARTIAL FIRST FLOOR PLAN
1PP101SE PARTIAL FIRST FLOOR PLAN
1PP101SW PARTIAL FIRST FLOOR PLAN
1PP102NE PARTIAL SECOND FLOOR PLAN
1PP102NW PARTIAL SECOND FLOOR PLAN
1PP102SE PARTIAL SECOND FLOOR PLAN
1PP102SW PARTIAL SECOND FLOOR PLAN
1PP103NE PARTIAL THIRD FLOOR PLAN
1PP103NW PARTIAL THIRD FLOOR PLAN
1PP103SE PARTIAL THIRD FLOOR PLAN
1PP103SW PARTIAL THIRD FLOOR PLAN
1PP104NE PARTIAL FOURTH FLOOR PLAN
1PP104NW PARTIAL FOURTH FLOOR PLAN
1PP104SE PARTIAL FOURTH FLOOR PLAN
1PP104SW PARTIAL FOURTH FLOOR PLAN
1PP105NE PARTIAL FIFTH FLOOR PLAN
1PP105NW PARTIAL FIFTH FLOOR PLAN
1PP105SW PARTIAL FIFTH FLOOR PLAN
1PP106NE PARTIAL SIXTH FLOOR PLAN
1PP106NW PARTIAL SIXTH FLOOR PLAN
1PP106SW PARTIAL SIXTH FLOOR PLAN
1PP107NE PARTIAL SEVENTH FLOOR PLAN
1PP107NW PARTIAL SEVENTH FLOOR PLAN
1PP107SW PARTIAL SEVENTH FLOOR PLAN
1PP108NE PARTIAL EIGHTH FLOOR PLAN
1PP108NW PARTIAL EIGHTH FLOOR PLAN
1PP108SW PARTIAL EIGHTH FLOOR PLAN
1PP109NE PARTIAL NINTH FLOOR PLAN
1PP109NW PARTIAL NINTH FLOOR PLAN
1PP110 TENTH FLOOR & PENTHOUSE PLANS
1P401 MECHANICAL ROOM - ENLARGED PLAN
1P701 SCHEDULES, NOTES & DETAILS
Revisions Date
1 Addendum No. 1 08/20/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
06/04/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
12/21/2017
Upgrade Water Systems for Legionella and Improve Water Efficiency CD Submittal
08/21/2017
A1
P1 P1OR
A1
OH
P2
B
P2
GENERAL FLOOR PLAN NOTES
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
FIRE SUPPRESSION HAZARD CLASSIFICATION AND HAZARD
CLASSIFICATION GROUP
SECTION: 1 = SECTION DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER
DESIGNATIONS REFER TO SCHEDULES.
CONNECT TO EXISTING
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN
UNLESS NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
10" 10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOE: 3' - 0"
BOE: 0' - 6"
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR
BOTTOM OF EQUIPMENT, UNLESS NOTED OTHERWISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE
OF PIPE, UNLESS NOTED OTHERWISE
FIRE SUPPRESSION SYMBOLS
DOUBLE LINE SINGLE LINE
CONCEALED PENDENT SPRINKLER
FS
PIV
S
FIRE HYDRANT
FLOW SWITCH
GATE VALVE OS&Y
INSTITUTIONAL PENDENT SPRINKLER
PENDENT SPRINKLER
POST INDICATOR VALVE
RECESSED PENDENT SPRINKLER
SIDE WALL SPRINKLER
SUPERVISED VALVE
UPRIGHT SPRINKLER
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
DD
RR
SPECIALTY GAS SYMBOLS
AIR OUTLET - LAB TYPE
VC
VC
CARBON DIOXIDE OUTLET - HOSPITAL TYPE
MEDICAL AIR OUTLET - HOSPITAL TYPE
MEDICAL VACUUM INLET - HOSPITAL TYPE
NITROGEN OUTLET - HOSPITAL TYPE
NITROUS OXIDE OUTLET - HOSPITAL TYPE
OXYGEN OUTLET - HOSPITAL TYPE
WAGD INLET - HOSPITAL TYPE
NATURAL GAS OUTLET - LAB TYPE
VACUUM OUTLET - LAB TYPE
VACUUM CLEANING STATION - WALL
VACUUM CLEANING STATION - FLOOR
PLUMBING AND FIRE SUPPRESSION
PIPING DESIGNATIONS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
HOT WATER PIPE (140 DEGS. F.)
HOT WATER PIPE (180 DEGS. F.)
HOT WATER RETURN PIPE (140 DEGS. F.)
HOT WATER RETURN PIPE (180 DEGS. F.)
ARGON PIPE
COMPRESSED AIR PIPE
MEDICAL CARBON DIOXIDE PIPE
COMBINATION FIRE SUPPRESSION AND DOMESTIC
WATER SERVICE
DIESEL FUEL PIPE
SPRINKLER PIPE (DRY)
FIRE SUPPRESSION (STANDPIPE / SPRINKLER MAIN)
FIRE SERVICE
FUEL OIL FLOW LINE
FUEL OIL GAUGE LINE
FUEL OIL RETURN LINE
FUEL OIL SUPPLY LINE
NATURAL GAS PIPE
GARAGE DRAINAGE PIPE
GAS SERVICE
HYDROGEN PIPE
HELIUM PIPE
MEDICAL INSTRUMENT AIR PIPE
KITCHEN WASTE PIPE
LABORATORY COMPRESSED AIR PIPE
LABORATORY VENT PIPE
LABORATORY VACUUM PIPE
LABORATORY WASTE PIPE
MEDICAL NITROGEN PIPE
MEDICAL COMPRESSED AIR PIPE
MEDICAL-SURGICAL VACUUM PIPE
GASOLINE PIPE (NON-LEAD)
MEDICAL NITROUS OXIDE PIPE
NON-POTABLE
MEDICAL OXYGEN PIPE
(OVERFLOW) SECONDARY STORM DRAINAGE PIPE
PROPANE GAS PIPE
PUMP DISCHARGE PIPE
PRE-ACTION / DELUGE SPRINKLER PIPE
PURE WATER PIPE
SPRINKLER PIPE (WET)
SANITARY DRAINAGE PIPE
SOFT COLD WATER
SPRINKLER DRAIN PIPE
STORM DRAINAGE PIPE
FUEL TANK VENT PIPE
TRAP PRIMER DISCHARGE PIPE
TEMPERED WATER PIPE
SANITARY SEWER VENT
WASTE ANESTHESIA GAS DISPOSAL PIPE
WATER SERVICE
LV
140R
180R
AR
CA
CO2
CWS
DF
DS
F
FS
FOF
FOG
FOR
FOS
G
GD
GS
H2
HE
IA
IV
IW
LA
LV
LW
N2
MA
MV
NG
NO
NPW
O2
OD
P
PD
PS
PW
S
SAN
SCW
SD
STM
T
TP
TW
V
WAGD
WS
INDIRECT VENT PIPE
INDIRECT WASTE PIPE
K
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
UNION
CLEANOUT
STRAINER
STRAINER WITH A BLOW DOWN VALVE AND HOSE
CONNECTION
DRAIN VALVE WITH HOSE END CONNECTION
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG
IN AND OUT
EXPANSION JOINT
PRESSURE REGULATING VALVE
SAFETY RELIEF VALVE. PIPE DISCHARGE AIR
GAPPED TO FLOOR DRAIN UNLESS NOTED
OTHERWISE.
PRESSURE AND TEMPERATURE TEST PLUG
TRAP PRIMER
VACUUM GAUGE WITH STOP
CLEANOUT TO GRADE OR FINISHED FLOOR
END CAP
MIXING FAUCET
PLUG
HOSE BIB
WALL HYDRANT
PLUG VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
V
TP
CO
COMBINATION SHUTOFF AND BALANCING
VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
VALVES AND FITTINGS
DOUBLE LINE SINGLE LINE
SOLENOID VALVE
S
P/T PRESSURE AND TEMPERATURE SAFETY RELIEF
VALVE. PIPE DISCHARGE AIR GAPPED TO FLOOR
DRAIN UNLESS NOTED OTHERWISE.
FIRE DEPARTMENT VALVE
WATER METERM
ACID VENT PIPEAV
ACID WASTE PIPEAW
ABBREVIATIONS
AAP - AREA ALARM PANEL (MEDICAL GAS)
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACC - ACCESS
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
AR - AIR RECEIVER OR ARGON
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
AV - ACID VENT
AW - ACID WASTE
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG- BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BT - BATHTUB
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
BTWN - BETWEEN
CA - COMPRESSED AIR
CB - CATCH BASIN
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CI - CAST IRON
CK - CLINICAL SINK
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
COR - CONTRACTING OFFICER'S REPRESENTATIVE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
CORR - CORRIDOR
CS - CLINICAL SINK OR COLD SOFT WATER
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWS - COMBINATION WATER SERVICE
OR CONDENSER WATER SUPPLY
CWR - CONDENSER WATER RETURN
D - DEPTH OR DRAIN LINE
DD - DECK DRAIN
DET - DETAIL
DF - DRINKING FOUNTAIN OR WATER COOLER
OR DIESEL FUEL
DFU - DRAINAGE FIXTURE UNIT
DFW - DRINKING FOUNTAIN WATER
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DS - DOWN SPOUT OR SPRINKLER (DRY)
DT - PERFORATED DRAIN TILE
DWG - DRAWING
EA - EACH
EEW - EMERGENCY EYE WASH
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQ - EQUAL
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
ES - EMERGENCY SHOWER
EQS - EQUIPMENT SUPPLIER
EWC - ELECTRICAL WATER COOLER
EXH - EXHAUST AIR
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)
FCE - FIRE CONTROL EQUIPMENT
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FDC - FIRE DEPARTMENT CONNECTION
FDV - FIRE DEPARTMENT VALVE
FF - FINISHED FLOOR ELEVATION
FHC - FIRE HOSE CABINET
FLR - FLOOR
FM - FORCE MAIN
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FR - FIRE RISER
FS - FLOOR SINK OR FIRE SERVICE
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GD - GARAGE DRAINAGE
GPM - GALLONS PER MINUTE
GS - GAS SERVICE
GW - GREASE WASTE
H2 - HYDROGEN
HB - HOSE BIBB
HD - HUB DRAIN
HE - HELIUM
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER OR HIGH POINT
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HPW - HIGH PURITY WATER
HPWR - HIGH PURITY WATER RETURN
HR - HOSE REEL
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
IA - MEDICAL INSTRUMENT AIR
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
IV - INDIRECT VENT
IW - INDIRECT WASTE
JS - JANITOR SINK
K - KITCHEN WASTE
KEC - KITCHEN EQUIPMENT CONTRACTOR
K - KITCHEN WASTE
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LA - LABORATORY COMPRESSED AIR
LAV - LAVATORY
LBS - POUNDS
LCW - LABORATORY COLD WATER
LEC - LABORATORY EQUIPMENT CONTRACTOR
LHW - LABORATORY HOT WATER
LHWR - LABORATORY HOT WATER RETURN
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LV - LABORATORY VACUUM OR LABORATORY VENT
LW - LABORATORY WASTE
MA - MEDICAL COMPRESSED AIR
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MB - MOP BASIN
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
MV - MEDICAL SURGICAL VACUUM
N2 - MEDICAL NITROGEN
NG - GASOLINE (NON-LEAD)
NIC - NOT IN CONTRACT
NO - MEDICAL NITROUS OXIDE
NOM - NOMINAL
NPW - NON-POTABLE WATER
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
02 - MEDICAL OXYGEN
OA - OUTDOOR AIR
OD - OUTSIDE DIAMETER OR OVERFLOW DRAIN
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - OR PUMPED CONDENSATE RETURN
PD - PUMP DISCHARGE OR PARAPET DRAIN
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PS - PRE-ACTION/DELUGE SPRINKLER
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSV - PRESSURE SUSTAINING VALVE
PSIG - POUNDS PER SQUARE INCH GAUGE
PW - PURE WATER
RA - RETURN AIR
RAD - RADIUS
RCP - REINFORCED CONCRETE PIPE
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
RV - RELIEF VALVE
S - SPRINKLER (WET)
SA - SHOCK ARRESTOR OR SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SD - SPRINKLER DRAIN OR SUBSOIL DRAIN
SH - SHOWER
SHT - SHEET
SK - SINK
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SS - SANITARY STACK (SOIL OR WASTE) OR
STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
T - FUEL TANK VENT
TD - TRENCH DRAIN
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TF - TRAP FILLER
TP - TRAP PRIMER OR TRAP PRIMER
DISCHARGE
TW - TEMPERED WATER
TYP - TYPICAL
UR - URINAL
UNO - UNLESS NOTED OTHERWISE
V - VENT OR SANITARY SEWER VENT
VAC - VACUUM
VC - VACUUM CLEANING
VCV - VACUUM CLEANING VALVE
VE - VACUUM EXHAUST
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
VP - VACUUM PUMP
VS - VENT STACK
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/0 - WITHOUT
W - WASTE
WAGD - WASTE ANESTHESIA GAS DISPOSAL
WC - WATER CLOSET
WCO - WALL CLEANOUT
WH - WALL HYDRANT OR WATER HEATER
WIV - WALL INDICATOR VALVE
WS - WATER SERVICE
YCO - YARD CLEANOUT
ZVC - ZONE VALVE CABINET
PIPE RISER
NOTE: ALL SYMBOLS AND ABBREVIATIONS
ARE SUBJECT TO MODIFICATIONS ON
OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT
NOT NECESSARILY BE USED ON THIS
PROJECT.
DRINKING FOUNTAIN WATERDFW
ELECTRICAL SYMBOLS
JUNCTION BOX.
ELECTRICAL PANELBOARD
J
EACH ARROWHEAD REPRESENTS ONE COMPLETE CIRCUIT; "X" DENOTES PANEL NAME;
NUMBER(S) DENOTES CIRCUIT(S).
X - 1,2
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
PFB Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
PFB Architects,Inc.
9461 Kenwood Road Cincinnati, Ohio 45242
(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528
/2
/2
:5
:0
A
M
Upgrade Water Systems for Legionella and
Improve Water Efficiency
06/11/2017
LEGEND & SYMBOLS
1P002
16-3625
539-17-101
Cincinnati , Ohio
DPBMTSRevisions Date
1 Addendum No. 1 08/20/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
06/04/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
12/21/2017
Upgrade Water Systems for Legionella and Improve Water
BFP
B F
P
B F
P
P
J
P
M
M
TP
2.5"
3"
1.25"1.5"
2.5"1"
1.25"
1"
1.25"1.25"
0.5"
0.75"0.75"
0.75"
0.5"
0.5"
1.5"
1.5" 1.5"1"
0.75"
0.5"
0.75"
0.5"
0.75"
SB08
SB09
SB07
SB08A
C*SB*01
SB10
1P401
PIPE BASEMENT
PIPE BASEMENT
PIPE BASEMENT
0.75" - DCW
0.75" - DHWR
0.75" - DHWR
0.75" - DHWR
0.5" - DHWR
0.75" - DHWR
DCW
01 - PB
DCW
01 - PB
DHWR
01 - PB
004 DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
0.5"
DHWR
01 - PB
DHWR
01 - PB
0.5" - DHWR
DHWR
01 - PB
DCW
01 - PB
DHWR
01 - PB
0.75" - DFW
0.75"
0.5" - DHWR
DHWR
01 - PB
0.5" - DHWR
DHWR
01 - PB
0.5" - DHWR
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
0.75"0.75"
0.375" - DFW
0.75"
0.5" - DHWR
DHWR
01 - PB
016 DHWR
01 - PB
0.375" - DFW
0.75"
2"
3"
2"
0.75"
0.5" - DHWR
DHWR
01 - PB
DCW
01 - PB
2"
2"
0.75"
UN-EXCAVATED
UP
UP
UP
DFW
D F
W
DFW
DFW
01 - PB
DFW
01 - PB
DFW
01 - PB
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
ELEVATOR
1"
UP
0.5"
1"
1"
0.75" - DHWR
CS*SB*010
CS*SB*010
SB06
3"
0.5" - DHWR
0.5" - DHWR
0.5" - DHWR
1"
1.25"
1.25"
DHWR
01 - PB
0.5" - DHWR
0.5" - DHWR
PIPING SERVES BLDG 14 & 15
CSB
EX
CSB
15 3
0.375" - DFW
3" - DHW
GENERAL NOTES:
A. REFER TO 1P001 & 1P002 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.
B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.
C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE
INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND
MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.
PLAN NOTES:
1. EXISTING ACCESS PANEL LOCATION.
2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN
ASSUMED.
3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END
MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING
STRATEGIES.
4. EXISTING NON-FUNCTIONING FIXTURE.
5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.
6. EXISTING UNINSULATED PIPING.
7. EXISTING PIPING LEAK.
8. EXISTING CROSS-CONNECTION.
9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.
10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS
INDICATED).
11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.
12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.
13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.
14. EXISTING DRAIN VALVE.
15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR
TERMINATION IS UNKNOWN BEYOND THIS POINT.
16. EXISTING FIXTURE NOT IN USE.
17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR
IMPENDING RENOVATION.
18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING
SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO
EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER
TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT
LEVEL ABOVE.
22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON
SUB-BASEMENT LEVEL BELOW.
23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,
CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.
CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY
DUTY MOUNTING BRACKET.
24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING
1P701 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,
AND PHASING STRATEGIES.
25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL
ON DRAWING 1P701 FOR INSTALLATION AND EQUIPMENT DETAILS.
26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL
ON DRAWING 1P701 FOR INSTALLATION AND EQUIPMENT DETAILS.
27. PROVIDE REAGENT TANK CONTAINMENT SKID. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
28. PROVIDE 250 GALLON REAGENT TANKS SERVING MONOCHLORAMINE
SECONDARY WATER TREATMENT SYSTEMS. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
29. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #2.
30. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #3.
31. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #4.
32. PROVIDE 120V CONNECTION TO SECONDARY WATER TREATMENT SYSTEM.
COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER.
33. UTILIZE SPARE 120V-20A/1P BREAKER IN EXISTING PANEL CBC LOCATED IN
ROOM A001D.
34. PROVIDE NEW TRAP PRIMER. REFER TO TRAP PRIMER DETAIL LOCATED
ON DRAWING 1PP100NW.
35. CONNECT TO EXISTING 3" DHW MAIN AND REVISE SUPPLY PIPING AT
EXISTING DOMESTIC WATER HEATERS TO ACCOMMODATE INSTALLATION
OF NEW 0.75" MONOCHLORAMINE INJECTION PORT. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701 FOR
INSTALLATION AND EQUIPMENT DETAILS.
36. PROVIDE NEW PULSE EMITTING WATER METER SERVING DHW PIPING
SYSTEM. EXTEND METER WIRE TO DHW MONOCHLORAMINE EQUIPMENT
LOCATED IN BASEMENT MECHANICAL ROOM #A013B.
37. EXISTING FLOW METER SERVING DCW PIPING SYSTEM. CONNECT NEW
METER WIRE TO EXTRA EXISTING DRY CONTACT RELAY OUTPUTS AND
EXTEND TO DCW MONOCHLORAMINE EQUIPMENT LOCATED IN BASEMENT
MECHANICAL ROOM #A013B.
38. EXTEND CAT 6 ETHERNET CABLE WITH CONDUIT, FITTINGS, AND BOXES
TO FORM COMPLETE, COORDINATED RACEWAY SYSTEM, FROM WATER
MONITORING STATION(S) TO TERMINATE AT SIGNALS CLOSET AND
CONNECT TO BUILDING AUTOMATION SYSTEM. THE WATER MONITORING
SYSTEM SHALL BE BACNET CAPABLE DIRECT DIGITAL CONTROL SYSTEM
UTILIZING ELECTRIC ACTUATION, AND SHALL BE TIED INTO THE EXISTING
HOSPITAL AUTOMATED LOGIC CONTROLS BUILDING AUTOMATION
SYSTEM OR JOHNSON CONTROLS METASYS BUILDING AUTOMATION
SYSTEM, INCLUDING ALL GRAPHICS, TRENDS, ALARMS, ETC. ALL NEW
GRAPHICS PROVIDED UNDER THIS CONTRACT SHALL MATCH EXISTING
GRAPHICS - OBTAIN ALL REQUIRED GRAPHICS FILES FROM COR.
PROVIDE 14 DAYS NOTICE IN ADVANCE OF REQUIRING FILES.
39. PROVIDE 120V CONNECTION TO WATER MONITORING STATION. RUN 2-#12,
#12 GRD. TO INDICATED PANEL. UTILIZE SPARE 120V-20A/1P CIRCUIT
BREAKER .
40. EXISTING ELECTRICAL PANELBOARD.
AREA OF WORK
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
PFB Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
PFB Architects,Inc.
9461 Kenwood Road Cincinnati, Ohio 45242
(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528
/2
/2
:5
:2
A
M
Upgrade Water Systems for Legionella and
Improve Water Efficiency
06/11/2017
PARTIAL PIPE BASEMENT PLAN
1PP099NE
16-3625
539-17-101
Cincinnati , Ohio
DPBMTS
N
Scale: 1/8" = 1'-0"
PARTIAL PIPE BASEMENT PLAN
N.T.S.Scale:
KEYPLAN
Revisions Date
1 Addendum No. 1 08/20/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
06/04/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
12/21/2017
Upgrade Water Systems for Legionella and Improve Water
BFP
F
P
M
TP
2"
0.5"
0.75"
0.75"
0.75"
0.5"
1.5"
1.5"
2"
0.75"
0.75"
1"
0.75"
1"
1"
2"
0.75"
0.75"
C*SB*01
S*SB*1
SB02
PIPE BASEMENT
PIPE BASEMENT
PIPE BASEMENT
0.75" - DHW
UN-EXCAVATED
0.75" - DCW
0.75" - DHW
DCW
01 - PB
DHW
01 - PB
DHW
01 - PB
DHW
01 - PB
DCW
01 - PB
DCW
01 - PB
DHW
01 - PB
DHW
01 - PB
DCW
01 - PB
DCW
01 - PB
DHW
01 - PB
DCW
01 - PB
1"
DCW
01 - PB
DHW
01 - PB
0.75"
FLOW CONTROLLER
DHW
01 - PB
008 DHW
01 - PB
DHWR
01 - PB
DHWR
01 - PB
020DHWR
01 - PB
DHWR
01 - PB
0.75"3"
1.5"
3"
3"
DHW
01 - PB
DCW
01 - PB
DHW
01 - PB
DCW
01 - PB
DHWR
01 - PB
DHWR
01 - PB
025DHWR
01 - PB
026 DHWR
01 - PB
DCW
01 - PB
DCW
01 - PB
015 DCW
01 - PB
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
DCW
01 - PB
0.75" - DCW
0.75" - DCW
DHWR
01 - PB
0.5" - DHWR
1"
0.75"
0.75" - DHWR
DCW
01 - PB
DCW
01 - PB
0.375"
D F
W
DFW
1"
UP
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
0.5"DHWR
01 - PB
0.5"
1.5" 1.25"
1"
0.375" - DFWDHWR
01 - PB
DHWR
01 - PB
DCW
01 - PB
DHWR
01 - PB
DCW
01 - PB
6" 4"
1" 1"
D F
W
D F
W
DFW
01 - PB
DFW
01 - PB
0.75"
3" 0.75" 3"
D F
W
D F
W
1"
DFW
01 - PB
1"
DFW
1.25"1.5"
2"
1.5"
0.5" - DHWR
1.5"1.25"
1.25"1.25"
DCW
01 - PB
0.5" - DHWR
MAIN 6"DCW & 4"DHW RISERS
TO THE PENTHOUSE.
DHWR
01 - PB
ELEVATOR
ELEVATOR
ELEVATOR
DHWR
01 - PB
1" - DHWR
1.5"
1" - DFW
FD1
P708
5"
8"
S A
N
8"
SANSAN
5"
5"
S A
N
3"
1.5"
CO
0.5"
1"
1"
0.75" 0.75"
1" - DCW
0.5" - DCW
0.5" - DHWR
0.75" - DHW 12
CS*SB*011
DCW
01 - PB
DCW
01 - PB
DHWR
01 - PB
DFW
01 - PB
DFW
01 - PB
FD1
3"
3"
0.75" - DHWR12
0.5"
0.5"
0.75" - DHW
0.75" - DCW
0.75" - DCW
0.5" 1.5"
0.5"0.75"0.75"
1" - DHW
0.75" - DHWR
1.5" - DCW
2"
0.5" - DHWR
1" - DCW
1" - DHWR
1"
1"
1"0.75" 2"3"
0.5" - DHWR
1" - DCW
S A
N
2"
1.5"
P530
CO
1.5"
1.5"
GENERAL NOTES:
A. REFER TO 1P001 & 1P002 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.
B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.
C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE
INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND
MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.
PLAN NOTES:
1. EXISTING ACCESS PANEL LOCATION.
2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN
ASSUMED.
3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END
MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING
STRATEGIES.
4. EXISTING NON-FUNCTIONING FIXTURE.
5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.
6. EXISTING UNINSULATED PIPING.
7. EXISTING PIPING LEAK.
8. EXISTING CROSS-CONNECTION.
9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.
10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS
INDICATED).
11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.
12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.
13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.
14. EXISTING DRAIN VALVE.
15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR
TERMINATION IS UNKNOWN BEYOND THIS POINT.
16. EXISTING FIXTURE NOT IN USE.
17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR
IMPENDING RENOVATION.
18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING
SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO
EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER
TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT
LEVEL ABOVE.
22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON
SUB-BASEMENT LEVEL BELOW.
23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,
CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.
CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY
DUTY MOUNTING BRACKET.
24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING
1P701 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,
AND PHASING STRATEGIES.
25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL
ON DRAWING 1P701 FOR INSTALLATION AND EQUIPMENT DETAILS.
26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL
ON DRAWING 1P701 FOR INSTALLATION AND EQUIPMENT DETAILS.
27. PROVIDE REAGENT TANK CONTAINMENT SKID. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
28. PROVIDE 250 GALLON REAGENT TANKS SERVING MONOCHLORAMINE
SECONDARY WATER TREATMENT SYSTEMS. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
29. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #2.
30. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #3.
31. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #4.
32. PROVIDE 120V CONNECTION TO SECONDARY WATER TREATMENT SYSTEM.
COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER.
33. UTILIZE SPARE 120V-20A/1P BREAKER IN EXISTING PANEL CBC LOCATED IN
ROOM A001D.
34. PROVIDE NEW TRAP PRIMER. REFER TO TRAP PRIMER DETAIL LOCATED
ON DRAWING 1PP100NW.
35. CONNECT TO EXISTING 3" DHW MAIN AND REVISE SUPPLY PIPING AT
EXISTING DOMESTIC WATER HEATERS TO ACCOMMODATE INSTALLATION
OF NEW 0.75" MONOCHLORAMINE INJECTION PORT. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701 FOR
INSTALLATION AND EQUIPMENT DETAILS.
36. PROVIDE NEW PULSE EMITTING WATER METER SERVING DHW PIPING
SYSTEM. EXTEND METER WIRE TO DHW MONOCHLORAMINE EQUIPMENT
LOCATED IN BASEMENT MECHANICAL ROOM #A013B.
37. EXISTING FLOW METER SERVING DCW PIPING SYSTEM. CONNECT NEW
METER WIRE TO EXTRA EXISTING DRY CONTACT RELAY OUTPUTS AND
EXTEND TO DCW MONOCHLORAMINE EQUIPMENT LOCATED IN BASEMENT
MECHANICAL ROOM #A013B.
38. EXTEND CAT 6 ETHERNET CABLE WITH CONDUIT, FITTINGS, AND BOXES
TO FORM COMPLETE, COORDINATED RACEWAY SYSTEM, FROM WATER
MONITORING STATION(S) TO TERMINATE AT SIGNALS CLOSET AND
CONNECT TO BUILDING AUTOMATION SYSTEM. THE WATER MONITORING
SYSTEM SHALL BE BACNET CAPABLE DIRECT DIGITAL CONTROL SYSTEM
UTILIZING ELECTRIC ACTUATION, AND SHALL BE TIED INTO THE EXISTING
HOSPITAL AUTOMATED LOGIC CONTROLS BUILDING AUTOMATION
SYSTEM OR JOHNSON CONTROLS METASYS BUILDING AUTOMATION
SYSTEM, INCLUDING ALL GRAPHICS, TRENDS, ALARMS, ETC. ALL NEW
GRAPHICS PROVIDED UNDER THIS CONTRACT SHALL MATCH EXISTING
GRAPHICS - OBTAIN ALL REQUIRED GRAPHICS FILES FROM COR.
PROVIDE 14 DAYS NOTICE IN ADVANCE OF REQUIRING FILES.
39. PROVIDE 120V CONNECTION TO WATER MONITORING STATION. RUN 2-#12,
#12 GRD. TO INDICATED PANEL. UTILIZE SPARE 120V-20A/1P CIRCUIT
BREAKER .
40. EXISTING ELECTRICAL PANELBOARD.
AREA OF WORK
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
PFB Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
PFB Architects,Inc.
9461 Kenwood Road Cincinnati, Ohio 45242
(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528
/2
/2
:5
:2
A
M
Upgrade Water Systems for Legionella and
Improve Water Efficiency
06/11/2017
PARTIAL PIPE BASEMENT PLAN
1PP099NW
16-3625
539-17-101
Cincinnati , Ohio
DPBMTS
N
Scale: 1/8" = 1'-0"
PARTIAL SUB-BASEMENT PLAN
N.T.S.Scale:
KEYPLAN
Revisions Date
1 Addendum No. 1 08/20/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
06/04/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
12/21/2017
Upgrade Water Systems for Legionella and Improve Water
0.75"
0.75"
0.75"
0.75"
1.5"
PIPE BASEMENT
PIPE BASEMENT
DCW
01 - PB
DCW
01 - PB
DCW
01 - PB
DCW
01 - PB
0.75" - DCW
DHWR
01 - PB
DHWR
01 - PB
0.75"
1"
0.5" - DHWR
0.5" - DCW
DHWR
01 - PB
DHWR
01 - PB
0.75" 3 DCW
01 - PB
1.5"
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
0.5" - DHWR
0.5"
DCW
01 - PB
DHWR
01 - PB
DHWR
01 - PB
0.75" - DCW
0.75"
DCW
01 - PB
DCW
01 - PB
DCW
01 - PB
DCW
01 - PB
DHWR
01 - PB
DHWR
01 - PB
1"
1"
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
0.5" 1"
0.5"
0.5"
1" - DHWR
1" - DCW
1" - DHWR
1" - DCW
1"
DCW
01 - PB
DHWR
01 - PB
050DCW
01 - PB
DHWR
01 - PB
DCW
01 - PB
DHWR
01 - PB
1.5"
1.5"
1"
0.5"
1.25"0.75"1"
DHWR
01 - PB
DCW
01 - PB
0.75"
UP
1" - DFW12
12 0.75" - DCW
0.75" - DHWR
1" - DHWR
0.75"
0.75"
1.5"
15 3
15 312 15 3
15 3
12 15 0.5"
1.5"
0.75" - DHWR
1.5" - DCW
1"
1"
0.5"
0.75" - DFW
1" - DHW
2.5" - DCW
1" - DHW
0.75" - DHWR
0.5" - DHWR
0.75"
0.5" - DHWR
DHW
01 - PB
DHW
01 - PB
DHWR
01 - PB
DHWR
01 - PB
DHWR
01 - PB
0.75"1"1"
AREA OF WORK
AREA OF WORK
GENERAL NOTES:
A. REFER TO 1P001 & 1P002 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.
B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.
C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE
INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND
MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.
PLAN NOTES:
1. EXISTING ACCESS PANEL LOCATION.
2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN
ASSUMED.
3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END
MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING
STRATEGIES.
4. EXISTING NON-FUNCTIONING FIXTURE.
5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.
6. EXISTING UNINSULATED PIPING.
7. EXISTING PIPING LEAK.
8. EXISTING CROSS-CONNECTION.
9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.
10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS
INDICATED).
11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.
12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.
13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.
14. EXISTING DRAIN VALVE.
15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR
TERMINATION IS UNKNOWN BEYOND THIS POINT.
16. EXISTING FIXTURE NOT IN USE.
17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR
IMPENDING RENOVATION.
18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING
SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO
EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER
TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT
LEVEL ABOVE.
22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON
SUB-BASEMENT LEVEL BELOW.
23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,
CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.
CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY
DUTY MOUNTING BRACKET.
24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING
1P701 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,
AND PHASING STRATEGIES.
25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL
ON DRAWING 1P701 FOR INSTALLATION AND EQUIPMENT DETAILS.
26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL
ON DRAWING 1P701 FOR INSTALLATION AND EQUIPMENT DETAILS.
27. PROVIDE REAGENT TANK CONTAINMENT SKID. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
28. PROVIDE 250 GALLON REAGENT TANKS SERVING MONOCHLORAMINE
SECONDARY WATER TREATMENT SYSTEMS. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
29. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #2.
30. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #3.
31. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #4.
32. PROVIDE 120V CONNECTION TO SECONDARY WATER TREATMENT SYSTEM.
COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER.
33. UTILIZE SPARE 120V-20A/1P BREAKER IN EXISTING PANEL CBC LOCATED IN
ROOM A001D.
34. PROVIDE NEW TRAP PRIMER. REFER TO TRAP PRIMER DETAIL LOCATED
ON DRAWING 1PP100NW.
35. CONNECT TO EXISTING 3" DHW MAIN AND REVISE SUPPLY PIPING AT
EXISTING DOMESTIC WATER HEATERS TO ACCOMMODATE INSTALLATION
OF NEW 0.75" MONOCHLORAMINE INJECTION PORT. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701 FOR
INSTALLATION AND EQUIPMENT DETAILS.
36. PROVIDE NEW PULSE EMITTING WATER METER SERVING DHW PIPING
SYSTEM. EXTEND METER WIRE TO DHW MONOCHLORAMINE EQUIPMENT
LOCATED IN BASEMENT MECHANICAL ROOM #A013B.
37. EXISTING FLOW METER SERVING DCW PIPING SYSTEM. CONNECT NEW
METER WIRE TO EXTRA EXISTING DRY CONTACT RELAY OUTPUTS AND
EXTEND TO DCW MONOCHLORAMINE EQUIPMENT LOCATED IN BASEMENT
MECHANICAL ROOM #A013B.
38. EXTEND CAT 6 ETHERNET CABLE WITH CONDUIT, FITTINGS, AND BOXES
TO FORM COMPLETE, COORDINATED RACEWAY SYSTEM, FROM WATER
MONITORING STATION(S) TO TERMINATE AT SIGNALS CLOSET AND
CONNECT TO BUILDING AUTOMATION SYSTEM. THE WATER MONITORING
SYSTEM SHALL BE BACNET CAPABLE DIRECT DIGITAL CONTROL SYSTEM
UTILIZING ELECTRIC ACTUATION, AND SHALL BE TIED INTO THE EXISTING
HOSPITAL AUTOMATED LOGIC CONTROLS BUILDING AUTOMATION
SYSTEM OR JOHNSON CONTROLS METASYS BUILDING AUTOMATION
SYSTEM, INCLUDING ALL GRAPHICS, TRENDS, ALARMS, ETC. ALL NEW
GRAPHICS PROVIDED UNDER THIS CONTRACT SHALL MATCH EXISTING
GRAPHICS - OBTAIN ALL REQUIRED GRAPHICS FILES FROM COR.
PROVIDE 14 DAYS NOTICE IN ADVANCE OF REQUIRING FILES.
39. PROVIDE 120V CONNECTION TO WATER MONITORING STATION. RUN 2-#12,
#12 GRD. TO INDICATED PANEL. UTILIZE SPARE 120V-20A/1P CIRCUIT
BREAKER .
40. EXISTING ELECTRICAL PANELBOARD.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
PFB Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
PFB Architects,Inc.
9461 Kenwood Road Cincinnati, Ohio 45242
(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528
/2
/2
:5
:3
A
M
Upgrade Water Systems for Legionella and
Improve Water Efficiency
06/11/2017
PARTIAL PIPE BASEMENT PLAN
1PP099SW
16-3625
539-17-101
Cincinnati , Ohio
DPBMTS
N
Scale: 1/8" = 1'-0"
PARTIAL PIPE BASEMENT PLAN
N.T.S.Scale:
KEYPLAN
Revisions Date
1 Addendum No. 1 08/20/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
06/04/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
12/21/2017
Upgrade Water Systems for Legionella and Improve Water
F
P
2" 2"
2"
1" 1.25"
1"
1.5"
2"
0.5"
0.75"
0.5"
0.5"
2"
0.75"
2"
0.5"
0.5"
2"
2"
0.5"
0.5"0.5"
1.5" 0.75"
0.75" - DHWR
0.75" 3"
3"
0.75"
0.75"
3"
0.75"
SB10
A023
G2
F1
F1
F1 D1
A1 A1
A1
B3
B3
B3
B3B3
J1
J1
C1 C1
G4
B022
B001
B010
B015
B016
B014
B012
B011
B008
B3
B017A
B017
A022
B007
B018
B019
B020
A015
A016 A012
A012A
C - B - 1
A014A014D
A014A
A014B A014C
A021
A021A
A021B
A022B
A022C
C - B - 4
B005 B005A
B004
B006 B006A B006B
B007B
B007AB013
B013B B013A
B001A
B001B
B001CB003
B021
B021A B021B
A022A
0.75" - DHWR
0.5" - DHWR
0.5" - DHWR
0.5" - DHWR
0.75" - DFW
LOADING DOCK
0.75" - DCW
B008A
B016A
B009
UP
UP
UP
UP
UP
UP
UP
DN
UP
0.5" - DHWR
DHWR
01 - B
DHW
01 - B
2"
DHW
01 - B
DCW
01 - B
ELEVATOR
ELEVATOR
DHWR
01 - B
DHWR
01 - B
DCW
01 - B
DHW
01 - B
DCW
01 - B
0.5"
0.5"
0.75"
DCW
01 - B
0.75"
0.75" - DCW
DCW
01 - B
DCW
01 - B
DCW
01 - B B002
DCW
01 - B
DHW
01 - B
DCW
01 - B
DCW
01 - B
DCW
01 - B
DHW
01 - B
DHW
01 - B
DCW
01 - B
DCW
01 - B
0.75" C.W. TO W.H.
D6
1" - DHW
2" - DCW
31 31
0.5" - DCW
0.5" - DHW
0.5" DHWR
0.5" DHWR
0.75" - DFW 11 12
0.375" - DFW
0.75" - DHW
0.75" - DCW
1" - DHW 12
11 12
0.5" - DHWR
0.75"
1.5"
0.75"
1.5"
0.5" - DHWR
0.5" - DHWR
0.5" - DHWR
0.5" - DHW
0.5" - DCW
DCW
01 - B
0.5" - DHWR
0.75" - DHWR
12 15
0.75" - DHWR
3 9
E1
TMV CABINET
DHWR
01 - B
11 12
0.5" - DHWR
11 15
DFW
01 - B
0.75" - DFW
0.75"
0.5"
0.75" - DFW
0.5" - DFW
GENERAL NOTES:
A. REFER TO 1P001 & 1P002 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.
B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.
C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE
INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND
MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.
PLAN NOTES:
1. EXISTING ACCESS PANEL LOCATION.
2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN
ASSUMED.
3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END
MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING
STRATEGIES.
4. EXISTING NON-FUNCTIONING FIXTURE.
5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.
6. EXISTING UNINSULATED PIPING.
7. EXISTING PIPING LEAK.
8. EXISTING CROSS-CONNECTION.
9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.
10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS
INDICATED).
11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.
12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.
13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.
14. EXISTING DRAIN VALVE.
15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR
TERMINATION IS UNKNOWN BEYOND THIS POINT.
16. EXISTING FIXTURE NOT IN USE.
17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR
IMPENDING RENOVATION.
18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING
SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO
EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER
TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT
LEVEL ABOVE.
22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON
SUB-BASEMENT LEVEL BELOW.
23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,
CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.
CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY
DUTY MOUNTING BRACKET.
24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING
1P701 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,
AND PHASING STRATEGIES.
25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DCW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL
ON DRAWING 1P701 FOR INSTALLATION AND EQUIPMENT DETAILS.
26. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DHW. REFER TO SECONDARY WATER TREATMENT SYSTEM DETAIL
ON DRAWING 1P701 FOR INSTALLATION AND EQUIPMENT DETAILS.
27. PROVIDE REAGENT TANK CONTAINMENT SKID. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
28. PROVIDE 250 GALLON REAGENT TANKS SERVING MONOCHLORAMINE
SECONDARY WATER TREATMENT SYSTEMS. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
29. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #2.
30. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #3.
31. DELETE REMOVAL OF DEAD-END PIPING IN AREA INDICATED UNDER
BID ITEM #4.
32. PROVIDE 120V CONNECTION TO SECONDARY WATER TREATMENT SYSTEM.
COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER.
33. UTILIZE SPARE 120V-20A/1P BREAKER IN EXISTING PANEL CBC LOCATED IN
ROOM A001D.
34. PROVIDE NEW TRAP PRIMER. REFER TO TRAP PRIMER DETAIL LOCATED
ON DRAWING 1PP100NW.
35. CONNECT TO EXISTING 3" DHW MAIN AND REVISE SUPPLY PIPING AT
EXISTING DOMESTIC WATER HEATERS TO ACCOMMODATE INSTALLATION
OF NEW 0.75" MONOCHLORAMINE INJECTION PORT. REFER TO SECONDARY
WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701 FOR
INSTALLATION AND EQUIPMENT DETAILS.
36. PROVIDE NEW PULSE EMITTING WATER METER SERVING DHW PIPING
SYSTEM. EXTEND METER WIRE TO DHW MONOCHLORAMINE EQUIPMENT
LOCATED IN BASEMENT MECHANICAL ROOM #A013B.
37. EXISTING FLOW METER SERVING DCW PIPING SYSTEM. CONNECT NEW
METER WIRE TO EXTRA EXISTING DRY CONTACT RELAY OUTPUTS AND
EXTEND TO DCW MONOCHLORAMINE EQUIPMENT LOCATED IN BASEMENT
MECHANICAL ROOM #A013B.
38. EXTEND CAT 6 ETHERNET CABLE WITH CONDUIT, FITTINGS, AND BOXES
TO FORM COMPLETE, COORDINATED RACEWAY SYSTEM, FROM WATER
MONITORING STATION(S) TO TERMINATE AT SIGNALS CLOSET AND
CONNECT TO BUILDING AUTOMATION SYSTEM. THE WATER MONITORING
SYSTEM SHALL BE BACNET CAPABLE DIRECT DIGITAL CONTROL SYSTEM
UTILIZING ELECTRIC ACTUATION, AND SHALL BE TIED INTO THE EXISTING
HOSPITAL AUTOMATED LOGIC CONTROLS BUILDING AUTOMATION
SYSTEM OR JOHNSON CONTROLS METASYS BUILDING AUTOMATION
SYSTEM, INCLUDING ALL GRAPHICS, TRENDS, ALARMS, ETC. ALL NEW
GRAPHICS PROVIDED UNDER THIS CONTRACT SHALL MATCH EXISTING
GRAPHICS - OBTAIN ALL REQUIRED GRAPHICS FILES FROM COR.
PROVIDE 14 DAYS NOTICE IN ADVANCE OF REQUIRING FILES.
39. PROVIDE 120V CONNECTION TO WATER MONITORING STATION. RUN 2-#12,
#12 GRD. TO INDICATED PANEL. UTILIZE SPARE 120V-20A/1P CIRCUIT
BREAKER .
40. EXISTING ELECTRICAL PANELBOARD.
AREA OF WORK
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
PFB Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
PFB Architects,Inc.
9461 Kenwood Road Cincinnati, Ohio 45242
(513) 861 3200Heapy Project No.: 2016-04011 Firm License No.: 01528
/2
/2
:5
:4
A
M
Upgrade Water Systems for Legionella and
Improve Water Efficiency
06/11/2017
PARTIAL BASEMENT PLAN
1PP100NE
16-3625
539-17-101
Cincinnati , Ohio
DPBMTS
N
Scale: 1/8" = 1'-0"
PARTIAL BASEMENT PLAN
N.T.S.Scale:
KEYPLAN
Revisions Date
1 Addendum No. 1 08/20/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
06/04/2018
Upgrade Water Systems for Legionella and Improve Water Efficiency Revised CD Submittal
12/21/2017
Upgrade Water Systems for Legionella and Improve Water
F
P
B F
P
T P
T P
J1J1
0.5" 0.75" 0.5"0.5"
0.75"
0.75"
0.5"0.5" 0.5"
0.75"
1"
1"
1.25"
1"
1.5" - DHW
2" - DCW
1" - DHWR
0.75" - DCW
0.5"
0.5"
0.5"
2" 2"
0.5"
1.5"
0.5"
1" 0.5"
1"
1"
1"
2"2"
0.5"
1"
D6
D6
D6
S*SB*1
DCW
01 - B
DHW
01 - B
DHW
01 - B
DCW
01 - B
A005D
A004B
C - B - 2
A004C
A004D
A004E
A004F
A004G
A004A
A004
A001C
A001B
A001A
A008
C - B - 13
A005C A005B
A005A
A007A A007B
A013B
A013A
A013 A013D
C - B - 2
A003
A002
A001D
A001
A011
A001F
A035A
A0021A
A0016 A0012A0017
A0002
A0003
A0004
A0018
A0019
A0020
A0017
A0021D
A0022
A0023
A0021B
A0011
A0005
A0006
A0007
A0008
S-1
A0022
A001E
A0010
A026
A025A
A025
A010
A023A
E1
B3
B3
B3
A1 B3
A1
D1
A1
B3
B3 B3
A1
D1
D1 F1F1
F1
F1
D1
B3
A1
C1
D1
D5
F1
G3
B1
A0001 A0011
FILTER
D7
B1
B1
B1
A0012
1.25"
1.25" 1"
0.5"
0.5"
0.5"
D8
F1
F1
SPRAY NOZZLE
A018
A012A
A019 A012B
LOADING DOCK
DCW
01 - B
DCW
01 - B
DCW
01 - B B003
TW
TW
01 - B
TMV
CABINET
0.75"
0.75"
TW
01 - B
TW
01 - B
TW
01 - B
TW
TW
C - B - 1
DHWR
01 - B
0.75" - DHWR
A/C SHAFT
UP
UP
UP
UP
UP
UP
G3
0.375" - DFW
MAIN 6"DCW & 4"DHW RISERS
TO THE PENTHOUSE.
11 11
0.5" - DHWR
DCW
01 - B
UP
DHW
01 - B
DCW
01 - B
DHW
01 - B
DCW
01 - B
DCW
01 - B
DHW
01 - B
DHW
01 - B
DCW
01 - B
1.25"1"
0.5"
0.5"
1.5" 1.5"
1.5"
2"
0.75"
2"
0.75"
1"
2"
1"2"
UP
1.25"1.5"
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
DCW
01 - B
DCW
01 - B
DCW
01 - B
006DHW
01 - B
DCW
01 - B
DCW
01 - B
DHW
01 - B
DCW
01 - B
DCW
01 - B
DHW
01 - B
DHW
01 - B
DCW
01 - B
DCW
01 - B
DHW
01 - B
DHW
01 - B
DCW
01 - B
DHW
01 - B
DHW
01 - B
DCW
01 - B
DHW
01 - B
DCW
01 - B
DCW
01 - B
067DHW
01 - B
035DCW
01 - B
DHW
01 - B
DFW
01 - B
DFW
01 - B
DHWR
01 - B
DCW
01 - B
DHWR
01 - B
0.75"
D6
TMV
1PP100NW
CBC
BC1
BC2
DPC
1PP100NW
1.25"
1.25" - DCW
0.75" - DHW
A036
A0011
DCW
01 - B
0.75" - DHW
2" - DCW11 12
0.5" - DHWR
0.5" - DHWR
1.25" - DCW
1" - DCW
0.5" - DCW
0.5" - DHWR 11 15
0.75" - DHW
12 11
11 12
0.75" - DHW
0.5" - DHWR
EX
1" - DCW
0.5" - DCW
0.5" - DHW
0.75" - DCW
0.75" - DHWR12
0.75" - DCW11
1.5" - DCW
11 1" - DHW
1" - DCW
0.5" - DHW
1.5" - DCW
11 11
11 15
0.75" - DCW
0.75" - DHW
10 10 10 10
1" - DHW
TMV CABINET
1"
1"
1.25" - TW
1" - DFW
0.5" 0.5"
TRAP PRIMER
TRAP PRIMER
0.5"
0.5"
SPRAY NOZZLE
SPRAY NOZZLE
SPRAY NOZZLE
0.5" 0.5"
DHW
01 - B
0.75"
0.75"
1"
1.25"
0.75"0.75"
0.75"
0.75"
11 12
1"
1.5"
2"
TMV CABINET
0.5"
DCW
01 - B B001
E3
1.5"
V
1"
1"
DRINKING FOUNTAIN CHILLER UNIT
0.5" 0.5"
V
1.5" P530
CO
GENERAL NOTES:
A. REFER TO 1P001 & 1P002 FOR LEGEND, SYMBOLS AND INDEX OF DRAWINGS.
B. NOT ALL NOTES NECESSARILY APPLY TO THIS SHEET.
C. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON SITE
INSPECTION AND / OR AVAILABLE DRAWING INFORMATION, AND
MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE.
PLAN NOTES:
1. EXISTING ACCESS PANEL LOCATION.
2. EXISTING HARD CEILING AREA. PIPE ROUTING AND SIZE HAS BEEN
ASSUMED.
3. REMOVE DEAD-END PIPING. REFER TO DRAWING 1P701 FOR DEAD-END
MITIGATION PLAN, SEQUENCE OF CONSTRUCTION NOTES, AND PHASING
STRATEGIES.
4. EXISTING NON-FUNCTIONING FIXTURE.
5. EXISTING CLOSED VALVE WITH OPEN ENDED PIPING.
6. EXISTING UNINSULATED PIPING.
7. EXISTING PIPING LEAK.
8. EXISTING CROSS-CONNECTION.
9. EXISTING PIPING IS CAPPED AND / OR VALVED AND CAPPED.
10. EXISTING EXCESSIVE LENGTH OF UNCIRCULATED DHW PIPING (SIZE AS
INDICATED).
11. EXISTING DHW AND/OR DCW SUPPLY TO FLOOR BELOW.
12. EXISTING DHW AND/OR DCW SUPPLY FROM FLOOR ABOVE.
13. EXISTING PIPING CONTINUES TO MECHANICAL OR PLUMBING EQUIPMENT.
14. EXISTING DRAIN VALVE.
15. EXTENT OF FIELD VERIFIED PIPE ROUTING. CONNECTIONS AND / OR
TERMINATION IS UNKNOWN BEYOND THIS POINT.
16. EXISTING FIXTURE NOT IN USE.
17. NOT IN CONTRACT. AREA IS CURRENTLY UNDER OR SCHEDULED FOR
IMPENDING RENOVATION.
18. CONNECT NEW 0.5" SCHEDULE 80 CPVC DHWR SAMPLING LOOP PIPING
SERVING DOMESTIC HOT WATER SECONDARY TREATMENT SYSTEM TO
EXISTING DHWR MAIN AT EXISTING DHWR RECIRCULATION PUMP. REFER
TO SECONDARY WATER TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
19. CONNECT NEW 0.75" SCHEDULE 80 CPVC DHW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC HOT WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DHW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
20. CONNECT NEW 0.75" SCHEDULE 80 CPVC DCW INJECTION AND SAMPLING
LOOP PIPING SERVING DOMESTIC COLD WATER SECONDARY TREATMENT
SYSTEM TO EXISTING DCW MAIN. REFER TO SECONDARY WATER
TREATMENT SYSTEM DETAIL ON DRAWING 1P701.
21. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM MECHANICAL ROOM #A013B LOCATED ON BASEMENT
LEVEL ABOVE.
22. EXTEND NEW 0.5" DHWR SAMPLING LOOP PIPING, 0.75" DCW INJECTION AND
SAMPLING LOOP PIPING, AND 0.75" DHW INJECTION AND SAMPLING LOOP
PIPING TO / FROM EXISTING MECHANICAL ROOM LOCATED ON
SUB-BASEMENT LEVEL BELOW.
23. EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BYPASS,
CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY EYE/FACEWASH/SHOWER.
CAPACITY: 25 GPM @ 10 PSI PRESSURE DROP
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL 8'-0" ABOVE FINISHED FLOOR LEVEL WITH HEAVY
DUTY MOUNTING BRACKET.
24. PROVIDE WATER QUALITY MONITORING STATION. REFER TO DRAWING
1P701 FOR MONITORING STATION DETAIL, SEQUENCE OF CONSTRUCTION,
AND PHASING STRATEGIES.
25. PROVIDE MONOCHLORAMINE SECONDARY WATER TREATMENT EQUIPMENT
SERVING DCW. REFER TO SECONDARY WATER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.