36C25018B0109-00004000.docx

DOCX document 19 KB Posted

Attached to
Install ADA Compliant Access 515-14-104 Federal contract opportunity
Solicitation number
36C25018B0109
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0109 00004 36C25018B0109 00004.docx

View the file

Other files for this federal contract opportunity

Other files attached to Install ADA Compliant Access 515-14-104, newest first.
File Type Posted
36C25018B0109-00005000.docx DOCX document
36C25018B0109-00005001.pdf PDF
36C25018B0109-00003000.docx DOCX document
36C25018B0109-00002001.pdf PDF
36C25018B0109-00002000.docx DOCX document
36C25018B0109-00001000.docx DOCX document
36C25018B0109-00001001.docx DOCX document
36C25018B0109-00001002.pdf PDF
36C25018B0109-010.docx DOCX document
36C25018B0109-009.docx DOCX document
36C25018B0109-006.doc DOC document
36C25018B0109-004.pdf PDF
36C25018B0109-008.docx DOCX document
36C25018B0109-005.pdf PDF
36C25018B0109-002.pdf PDF
36C25018B0109-003.pdf PDF
36C25018B0109-001.docx DOCX document
36C25018B0109-007.docx DOCX document
36C25018B0109-000.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00004 03-06-2018 515-14-104 Department of Veterans Affairs Network Contracting Office (NCO) 10 24 Frank Lloyd Wright Dr.

Lobby M, Suite M2200 Ann Arbor

MI

48105 Y Department of Veterans Affair Ann Arbor Healthcare System Network Contracting Office 10 2215 Fuller Road Ann Arbor

MI

48105 To all Offerors/Bidders

36C25018B0109 03-06-2018

X x x 2:00PM Local on 03-14-2018 The purpose of amendment is to extend bid opening to March 14, 2018 (Wednesday) at 2:00PM local.

Additional RFI and reponses on continuation page. All Amendments shall be Acknowledged by offeror on this solicitation.

All other solicitations provisions remain unchanged.

Darrell T. Maxwell Contracting Officer

NCO1015L3-77169

RFI Responses 2

RFI 005 References: None

1. Building #1 The panel legend show's the existing panel is full, where are we getting the two new circuits for the snow melt circulation pumps.

Reply: Existing snow melt system to be removed; connect existing snow melt system to breakers for existing snow melt system.

2. Building #5 Are we supplying new fire alarm devices, or are they existing?

Reply: New

3, How far away is the IT room for new data cabling and devices shown on plan.

Reply: MAIN ELECTRICAL ROOM and IT CLOSET IS APPROX 200’.

4. What size, and where are the new snow melt circulation pumps going.

Reply: Mechanical room in basement of B5 accessed through Bilco doors or in crawl space.

5. General Question, are all push to enter button's ETC. supplied by the power door Contractor.

Reply: Yes

6. What is preferred: saw cut and patch, or directional boring to pick up existing site lighting power, when crossing roads.

Reply: Directional Bore.

RFI 006 Reference: None

1. Bldg. 5 and Bldg. 12 steam details have a pumping trap shown. This is to be used because the modulating control on the HX will modulate and the steam needs to be lifted. Due to the very small loads, in lieu of installing a steam trap discharging into a pumping trap and from the pumping trap into an electric pump, would you consider the use of a Double Duty Trap? This one item which is a combination steam trap and pumping trap, will eliminate the need for a separate steam trap, pumping trap and electric pump. Will this be acceptable?

Reply: No. It will work but, we cannot eliminate the electric pump (because it serves other systems) and the function of the combination device might be misunderstood by a servicing technician.

2. Steam PRV piping detail (with an external pilot) is typical for a PRV station along with orifice plates and insulation jackets. Due to the very small loads (42#/hr – 141#/hr) a direct acting PRV (see attached) will meet the requirements for each station and is the style of PRV’s I’d suggest using. An orifice plate would not be appropriate for these stations, without the orifice plate, the dBa levels would be from 41-52dBa. As these valves are small, an insulation jacket could not be cost justified, unless used for burn protection. Please advise if my suggestions will be accepted when bidding the PRV’s.

Reply: The proposed equipment would require changes to the existing system, not just proposed, and the functionality of the proposed system cannot be confirmed or verified without engineering evaluation. The VA does not accept the proposed change at this time.

End of Amendment

File details come from the government source that posted it.