36C25018B0109-00002000.docx

DOCX document 21 KB Posted

Attached to
Install ADA Compliant Access 515-14-104 Federal contract opportunity
Solicitation number
36C25018B0109
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0109 00002 36C25018B0109 00002.docx

View the file

Other files for this federal contract opportunity

Other files attached to Install ADA Compliant Access 515-14-104, newest first.
File Type Posted
36C25018B0109-00005000.docx DOCX document
36C25018B0109-00005001.pdf PDF
36C25018B0109-00004000.docx DOCX document
36C25018B0109-00003000.docx DOCX document
36C25018B0109-00002001.pdf PDF
36C25018B0109-00001000.docx DOCX document
36C25018B0109-00001001.docx DOCX document
36C25018B0109-00001002.pdf PDF
36C25018B0109-004.pdf PDF
36C25018B0109-008.docx DOCX document
36C25018B0109-005.pdf PDF
36C25018B0109-002.pdf PDF
36C25018B0109-003.pdf PDF
36C25018B0109-010.docx DOCX document
36C25018B0109-009.docx DOCX document
36C25018B0109-006.doc DOC document
36C25018B0109-001.docx DOCX document
36C25018B0109-007.docx DOCX document
36C25018B0109-000.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 02-23-2018 515-14-104 Department of Veterans Affairs Network Contracting Office (NCO) 10 24 Frank Lloyd Wright. Dr.

Lobby M, Suite M2200 Ann Arbor

MI

48105 Y Department of Veterans Affair Network Contracting Office (NCO) 10 24 Frank Lloyd Wright. Dr.

Lobby M, Suite M2200 Ann Arbor

MI

48105 To all Offerors/Bidders

36C25018B0109

X X X 2:00PM Local on 03-01-2018 The purpose of this Amendment is to issue RFI and responses. Please see continuation pages. All Amendments shall be Acknowledged by offeror on this solicitation.

Bid opening location unchanged NCO 10 Office, Ann Arbor MI, new due date March 1, 2018 (Thursday) at 2:00PM local.

All other solicitation provisions remain unchanged.

Darrell T. Maxwell Contracting Officer

NCO1015L3-77169

RFI Responses RFI 001 References: DWG. #: 9-A100, 82-A100 and CW-A100

1. Please provide the rough openings for the doors to be installed in the covered porches for buildings 8, 9, 10, 11, 12.

Reply: There are no new doors being installed in building 8, 9, 10, 11 & 12. Only adding new auto door operator and electric strike, with push button actuators, to each of these existing doors, refer to plans and door hardware spec. for complete information.

2. Please provide the rough opening for the door to be installed in building 82, between the lobby and the corridor.

Reply: There are no new doors being installed in building 82. Only adding new auto door operator and electric strike, with push button actuators, to each of the active leaf of this existing pair of doors, refer to plans and door hardware spec. for complete information.

3. The operator for the access door is not normally exposed to weather. It is recommended by the contractor to install flashing over the automatic door operators.

Reply: Not sure exactly which door you are referring to as the question only references access door and does not included any building number or door number or type of door. However, if this is in reference to the covered walkway, then please refer to sections 6 & 7 on CW‐A100 that show metal flashing above the header/auto operator of the sliding automatic entrance door.

RFI 002 References: DWG. Spec Section 05 12 00 - paragraph 1.3

1. Due to the small quantity of steel required for this project please confirm that all steel work is to be in accordance with AISC standards, and that a certified AISC stamp is not required. Only large steel fabricators in Michigan have the AISC stamp, the monetary cost would not be to the benefit of the project. Also, the specs state in numerous areas that the steel is to be in accordance with AISC. Below was the only notation that required the AISC.

Section 05 12 00

1.3 QUALITY ASSURANCE

1. A. Fabricator and erector shall maintain a program of quality assurance in conformance with Section 8, Code of Standard Practice for Steel Buildings and Bridges. Work shall be fabricated in an AISC certified Category Std. fabrication plant.

Reply: Due to the amount of steel on this project we will waive the requirement for the steel to be fabricated in an AISC certified plant. All steel is required to be fabricated in conformance with AISC standards.

RFI 003 References: None

1. Detectable warning surfaces are being shown as installed in existing sidewalks. These are embedded items. Is the intention to remove slab section and re-pour to install embed?

Reply: Yes

2. Will there be a need to provide temporary egress to any of the building thru the construction area during construction?

Reply: No. All Building have multiple exits and egress or ingress (emergency or otherwise) will be through other exits. The exit adjacent to the construction area will be closed to all traffic and an Intermediate Life Safety Measures will be implemented.

3. Will sprinkler lines be replaced at the governments cost, if they are not marked and damaged during construction?

Reply: No. the General Contractor is ultimately responsible for field locating all underground utilities, protecting all utilities, and repairing all damaged utilities. Should be minimal underground irrigation piping within limits of construction (assuming sprinkler is referring to irrigation).

4. Hardware schedule indicates that #2 is assigned to opening B25.1. Can you clarify where this opening is?

Reply: Door Hardware associated with B25.1 shall be disregarded.

5. Is there a need for fire rated strikes at any of the doors in the projects?

Reply: Electronic Strikes do not necessarily need to be Fire Rated. However, all electronic strikes on exterior doors shall be fail secure.

6. Is electric locking required on any of the bi-parting doors?

Reply: No

7. Is electric locking required on sliding door?

Reply: No. Manual lock keyed on both sides (interior and exterior).

RFI 004 Reference: 07 54 16 / 5-A300 Detail #2

1. The specified roofing product for the new marketplace is incompatible with the roofing product currently on building 5. The detail shows to tie the new roofing system into the existing roofing system. I don’t believe this can be accomplished or warrantable.

From our vantage point a few options could possibly be recommended:

• Re-design the new roof to tie-in high on the bldg 5 wall and below the existing bldg 5 roof to avoid patching into the existing. This would also eliminate the ponding created toward building 5 below the roof drain location specified.

• Add re-roof of building 5 to the scope of the project

• Change the new roof to a product that is compatible with the existing building 5 roof system

Reply: Please refer to attachment ADDENDUM #1

End of Amendment See attached document: ADDENDUM #1.