Attachment 9 SF33 36C24927B0004.pdf
PDF 707 KB Posted
- Solicitation number
- 36C24927B0004-626-25-101_UpgradeCriticalEnvironmentsI
About this file
This is a sealed bid solicitation for construction work issued by the Department of Veterans Affairs, Network Contracting Office 9 (90C).
The solicitation seeks completion of Project 626-25-101, "Upgrade Critical Environments I," at the Tennessee Valley Healthcare System VA Medical Center in Nashville, Tennessee. The contractor must furnish all labor, materials, equipment, supervision, and other necessary items to accomplish demolition and new construction work, including general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, controls, and industrial hygiene work. The contract period requires completion of all work within 487 calendar days of Notice to Proceed, with final payment contingent on system validation and full functionality. The base bid encompasses the complete project scope, with four optional bid deduct items allowing bidders to exclude specific work elements such as ACT ceiling suspension grids, light fixtures, work in certain rooms, and architectural finishes. Work must be performed primarily during restricted hours (5:00 a.m.–7:00 a.m. and 5:00 p.m.–midnight on weekdays; 6:00 p.m. Friday–9:00 p.m. Sunday on weekends) to minimize disruption to ongoing medical center operations. The contract is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with bidders required to be certified and listed in the SBA certification database at both bid and award. Sealed bids are due December 21, 2026, at 2:00 p.m. EST via electronic submission. A mandatory site visit is scheduled for November 23, 2026, at 12:00 p.m. Central Time. Bidders must submit a bid bond of 20% of bid price (not to exceed $3,000,000), completed certifications, SAM and DSBS registrations, and an EMR certification. Performance and payment bonds are required within ten days of award. The estimated project value ranges from $10,000,000 to $20,000,000, with NAICS code 236220 and standard small business size of $45 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 DRAWINGS - FINAL - 03-02-2026.pdf | ||
| Attachment 6 General Condition Breakdown.docx | DOCX document | |
| Attachment 5 Contractor EMR Certification Form.docx | DOCX document | |
| 36C24927B0004.docx | DOCX document | |
| Attachment 8 Wage Determination - TN20260178 - Modification 1 - 05-18-2026.pdf | ||
| Attachment 4 Calc. of Self Performed Work.xlsx | XLSX spreadsheet | |
| Attachment 1 SPECIFCIATIONS - FINAL - 03-02-2026.pdf | ||
| Attachment 3 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| Attachment 7 Request For Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATIONSOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 55
36C24927B0004 X 11-20-2026
626-26-4-4566-0212 626-25-101
90C
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129
Robert Glenn Jr 615-225-3413
This project is for Upgrade Critical Environments I at the TVHS, VAMC, 1310 24th Avenue South, Nashville, TN.
The Contractor shall furnish all labor, materials, equipment, supervision and all other necessary items required in accordance with the specifications and drawings for 626-25-101 - Upgrade Critical Environments I at TVHS, Nashville, TN.
See: Important Bidders Information
NAICS Code: 236220 Standard Size: $45M Set-Aside: 100% Service-Disabled Veteran Owned Small Business (SDVOSB) (see VAAR Clause 852.219-10) Magnitude of Construction: $10,000,000.00 to $20,000,000.00
There will only be one (1) site visit for this requirement on Monday, November 23, 2026, at 12PM CT. Bidders will meet in the Multipurpose Room B-104. Please make sure you bring any necessary items to properly inspect the site.
Note that if parking on site they must park on the 6th floor of the Garage.
Set-Aside: 100% Service-Disabled Veteran Owned Small Business (SDVOSB) (See VAAR Clause 852.219-10) To be eligible for an award under this solicitation, the SDVOSB contractor must be registered in the U.S. Small Business Administration (SBA) Dynamic Small Business Search https://dsbs.sba. site at the time of submission of proposal and award. All Bidders including Joint Venture's (JVs) submitting a bid must submit printed DSBS AND SAM certification with their bid and those that fail to do so shall be rendered non-responsive outright and shall not be eligible for award.
To obtain clarifications and/or additional information concerning the contract requirement, specifications and/or drawings, submit a written request for information (RFI) via email to Robert.glenn2@va.gov. RFIs must be specific in identifying section, paragraph, and page number and must be in question format. All RFIs submitted shall include the project number and title, contractor name, city, state, phone number, date submitted and RFI questions. Questions received after 2:00 PM ET November 30, 2026, will not be answered unless determined to be in the best interest of the government. Telephone requests will NOT be accepted. Technical questions will not be answered at the site visit as questions MUST BE in writing and submitted as an RFI.
The official bid opening will be December 21, 2026, at 3PM ET and will occur via Microsoft Teams meeting. Please call 1-205-235-3524 Conf. No. 328 672 369# five minutes before the bid opening to be present for the bid opening.
Submit electronic copy of bids with bid bond(s) via email to robert.glenn2@va.gov and john.mccomas@va.gov. All bid documents must be received on or before the due date/time stated in Block 13.
10 487
X X 52.211-10
X 10
1 2PM EST
12-21-2026
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
626-3660162-4566-854200-3220 23NR4JA57
90C
Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 204 Murfreesboro TN 37129
90C FSC e-Invoicing Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 Invoice must be submitted electronically
Setup 1-877-489-6135
John L. Mccomas Contracting Officer
36C24927B0004
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
STATEMENT OF WORK
IMPORTANT SUBMISSION INFORMATION
SMALL BUSINESS ADMINISTRATION (SBA) DYNAMIC SMALL BUSINESS SEARCH
BONDING INFORMATION
REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT
ENGINEER,
REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE
ASSESSMENT SYSTEM (CPARS)
END OF SUBMISSION INFORMATION DOCUMENT
A.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (NOV 2025) (DEVIATION)
2.3 52.228-1 BID GUARANTEE (SEP 1996)
2.4 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB
2021)
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.6 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS
AND CERTIFICATIONS (NOV 2025) (DEVIATION)
2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
2.8 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
2.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025)
(DEVIATION)
3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (NOV 2025) (DEVIATION)
GENERAL CONDITIONS
4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)
4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2025) (DEVIATION)
4.4 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (NOV 2025) (DEVIATION)
4.5 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS
(DEVIATION APR 2026)
4.6 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.7 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
4.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.9 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-
DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)
4.10 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
4.11 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.12 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.13 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
4.14 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.15 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.16 MANDATORY WRITTEN DISCLOSURES
4.17 List of Attachments
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVICE
S
QUANTIT
Y
UNI
T UNIT PRICE AMOUNT
0001 1.00 JB ________________ ____________
Upgrade Critical Environments I The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626-25-101 at the Nashville Campus of the VA Tennessee Valley Healthcare System, located at 1310 24th Avenue South, Nashville, TN 37212, in accordance with the specifications and drawings. Work includes demolition and new construction, including, but not limited to general construction, civil, structural, architectural, mechanical, plumbing, electrical, low voltage, controls, industrial hygiene, and certain other items. Provide new gasketed tiles only. Existing grid system may remain in place. Refer to drawings for applicable bid deduct areas. 2) Reuse existing light fixture unless otherwise noted in the design drawings.
Contract Period: Base POP Begin:
POP End:
LOCAL STOCK NUMBER: 626-25-101
0002 1.00 JB ________________ ____________
Bid Deduct 1: Do not include new ACT ceiling suspension grids indicated as part of BID Deduct 1. All indicated rooms shall receive new ACT Tiles.
Contract Period: Base POP Begin:
POP End:
LOCAL STOCK NUMBER: 626-25-101
0003 1.00 JB ________________ ____________
Bid Deduct 2: Do not include new light fixtures indicated as part of bid deduct 2. See electrical sheets for additional information.
0004 1.00 JB ________________ ____________
Bid Deduct 3: Do not include architectural, mechanical, and electrical work in rooms E-23 and G-121S.
0005 1.00 JB _________________
Bid Deduct 4: Do not include new architectural finishes in rooms G-105, G-105I, and G-105J.
GRAND TOTAL ____________
STATEMENT OF WORK
A. GENERAL INFORMATION
1. Title of Project: Project# 626-25-101 “Upgrade Critical Environments I”
2. Scope of Work: The contractor shall furnish all labor, material, equipment, and supervision necessary to accomplish the work for this project, including architectural, plumbing, fire protection, controls, medical gas, mechanical, electrical power and systems, construction, alterations, necessary removal of selective existing construction and certain other items to complete the project; to the satisfaction of the VA and COR. Relating to Project# 626-25-101 “Upgrade Critical Environments I” at the Tennessee Valley Healthcare System, VA Medical Center, 1310 24th Avenue South, Nashville, TN 37212. All times will be based on local time zone.
3. Statement of Bid Item(s):
Base Bid: Complete Project 626-25-101 to “Upgrade Critical Environments I” in strict accordance with the specifications and drawings at the Tennessee Valley Healthcare System, VAMC, 1310 24th Avenue South, Nashville, TN 37212.
Bid Deduct Items:
1. Do not include new ACT ceiling suspension grids indicated as part of BID Deduct 1. All indicated rooms shall receive new ACT Tiles.
2. Do not include new light fixtures indicated as part of bid deduct 2. See electrical sheets for additional information.
3. Do not include architectural, mechanical, and electrical work in rooms E-23 and G-121S.
4. Do not include new architectural finishes in rooms G-105, G-105I, and G-105J.
Period of Performance: Complete all work within 487 calendar days of issuance of the Notice to Proceed, regardless of any deducts taken. Final payment and contract closeout are contingent upon validation that the system is fully functional.
B. GENERAL REQUIREMENTS
1. All work, including materials, shall have a one-year warranty, or as noted in project specifications. Elements of the project that require a warranty beyond one year. The warranty period will commence once all work is complete.
2. Medical Center normal working hours are Monday thru Friday from 6 a.m. to 2:30 p.m. On-site work time shall be managed to minimize the effect on the medical center and the existing Cardiac Catheterization procedures.
3. Portions of work that require shutdowns, noise, vibration or interruption of adjacent service operations will be performed from 5:00 a.m. to 7:00 a.m. and 5:00 p.m. to midnight. On weekends, the work can be performed between 6:00 p.m. Friday to 9:00 p.m. Sunday.
4. The contractor will be required to work nights and weekends to complete the work, in order to maintain the functionality of affected areas and to minimize disruptions to the Medical Centers operations. Before evening and weekend work begins, the project schedule shall be submitted by the contractor and approved by the VA COR one week before the work takes place.
5. The contractor will coordinate all work in advance with VA COR.
6. The contractor superintendent will always be on-site during the performance of the work associated with this contract.
7. When using “furnish”, “provide”, “install”, or similar term is used regarding all labor, materials, and equipment to perform the job it shall mean a complete installation that is ready for use.
8. The contractor shall identify all employees that will be working under the awarded contract. The contractor personnel shall include employees, sub-contractors, suppliers, and delivery personnel entering the medical center. Those employees shall bring one photo ID and the second form of state /federally issued id to obtain a VA Contractor identification badge (REAL ID is required as one source of ID). A Passport or Social Security Card will suffice as the second form of ID. This badge must always be worn above the belt while on medical center property.
The contractor’s employees shall return all I.D. badges to designated personnel at the end of the period of performance of the contract. Lost badges will result in a surcharge.
9. The contractor's safety manager is responsible for safety inspections of all contract operations and will be identified to the contractor. All VA and OSHA safety regulations shall be observed during the performance of work identified on this contract. Provide signage and barricades, as required, to maintain safety and protection of work around the project work site. Daily safety reports shall be provided to the COR daily. Additionally, on-site workers are screened daily at facility entrances prior to work.
10. The contractor shall visit the job site to thoroughly familiarize themselves with all the details of this work and working conditions. The contractor shall also verify all dimensions in the field and shall advise the CO and COR of any discrepancy before performing any work. The contractor shall be responsible for the coordination and proper relation of his work to the building, structure, phasing, ensuring the safety of employees, and workmen.
11. The contractor shall not allow smoking in any building or vehicle (located on VA property) and shall ensure employees do not smoke on VA property. This is a smoke free facility. Violation of VA directive will result in a Federal Fine.
12. The contractor will take adequate precautions to protect all adjacent equipment, concrete pads, and walkways in the work area from spills, drips, runs, and damage from the use of power tools.
13. The general contractor will be provided with two parking space (additional drivers of the general contractor will be issued a parking violation ticket). Employees can park in designated areas if available. Paid parking is available in adjacent parking garages. The government isn’t responsible for additional parking. Drivers should be particularly concerned with pedestrian traffic and yield to pedestrians. Seat Belt use is mandatory on all VA grounds.
14. The Contractor shall always keep the work area and stored materials / equipment(s) areas free from the accumulation of waste materials. The Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. This includes the area around the dumpster/Connex. Material stored on-site shall be organized and inside a conditioned storage space. A messy work area is dangerous;
the COR has the authority to request that the site be cleaned in lieu of proceeding with work.
15. Equipment (building service equipment and systems) shall be provided by nationally recognized manufacturers that produce and distribute mechanical products across the United States for over 5 years. Manufacturers must have local vender representation. Materials for this project must be sourced from the USA, materials submitted from other countries will not be accepted.
16. When fixture/devices are being removed, remove all appurtenances related or connected to the items being removed or demolished. Utilities shall be removed back to the source or active main/branch. Do not leave any abandoned utilities/lines or dead-end lines. Final verification required by COR before “covering” up connection.
17. The type of controls throughout project work shall be consistent. Controls must be of the same manufacturer and type. Our building automation system is structured around Siemens, and this company should be utilized for this project.
18. (Alternate version) The type of controls throughout the project work shall be consistent.
Contractors must utilize existing BAS infrastructure when tying in all controls.
19. Due to space limitations, the contractor will only be provided with one location for staging (one small conex and one small dumpster). For equipment/material that is no longer needed and/or waste, the contractor is responsible for their proper and daily removal. Staging area location will be determined by the COR. No material is to be stored outside. If material is found to be stored outside the COR can request that the material be replaced with new material.
20. There is only one final project inspection, and it will take place at the end of the project, The contractor shall request a final inspection two weeks after providing a certified inspection report(s) (in writing), and a copy of their completed and corrected QA inspection. At the time of the request there shall be no incomplete work. There are additional inspections required while the work progresses but only one final inspection.
21. Burn permits are required at this facility on a daily basis. Neglecting to use the form may result in the removal of violators from the campus.
22. Safety is no accident; OSHA standards are to be met at this facility. Periodic safety reviews are made of the site multiply times each week. Violations may result in the removal of violators from the campus and repeat violations may result in additional enforcement from FED OSHA.
Enclosure (1) Hot Work Permit
IMPORTANT SUBMISSION INFORMATION
SOLICITATION MATERIALS: All solicitation materials consisting of drawings, specifications, contract forms, amendments, and other documents will be posted to the Contract Opportunities Government website located at https://sam.gov/. Enter “36C24927B0004” into the search box to access the solicitation materials. This is the only official location where these documents can be obtained and where updates are posted. No ‘hard copy’ solicitation materials are available.
SOLICITATION SUBMISSION: The following documents must be included in the solicitation submission in the formats as stated:
- Any bids that come in some other format(s) other than what is specified in the solicitation will be rendered non-responsive outright.
- One (1) electronic copy of an original, fully completed and signed and dated Standard Form (SF) 33 Bid page, acknowledgment of all amendments issued by either completing block 19 of the SF33 or completing blocks 15a, b, and c of the Amendment(s) and providing them with the SF33 Bid page; prices on all line items listed on the Price/Cost Schedule; completed Representations and Certifications section (Revolutionary Federal Acquisition Regulation (RFO) Overhaul 52.209-5 and 52.209-7); and fully completed Contractor Experience Modification Rate (EMR) Certification documents.
- One (1) electronic copy of an original, completed and signed, SF24 Bid Bond or other allowable Bid Security. Document shall be emailed to the CS Robert Glenn, Jr at robert.glenn2@va.gov and CO John L. Mccomas III at john.mccomas@va.gov responsible for solicitation in accordance with RFO 28.101 and RFO 28.102. Any missing elements of the bid bond submission could render the bidder ineligible, and their bid will not be considered.
Bidders are responsible for insuring and verifying their bid and all required solicitation documents are received at the office and point of contact designated in block 8 of the SF33 and by the date and time specified in block 13a of the SF33 (subject to amendment).
FEDERAL HOLIDAYS: Federal Law (5 U.S.C. 6103) establishes the following public holidays for Federal employees: New Year’s Day, Martin Luther King, Jr. Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving, and Christmas. Please note that most Federal employees work on a Monday through Friday schedule. For these employees, when a holiday falls on a non-workday -- Saturday or Sunday - the holiday usually is observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday).
Contractor employees shall not be considered government employees for any purpose under this contract.
Changes to any resultant contract may only be made by a written modification which is formally executed by the contractor and the CO.
DATABASE REGISTRA) and INFORMATION SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION: The SAM website (https://sam.gov/) is the official U.S.
Government system that consolidated the Central Contractor Registration (CCR, including FedReg), Online Representations and Certifications Application (ORCA), and
Excluded Parties List System (EPLS). Federal Acquisition Regulations require bidders to have an active SAM registration at the time of bid submission and award. Bidders must submit with their bid a printout of their SAM entity registration record and a printout of their Dynamic Small Business Search (DSBS) listing (https://search.certifications.sba.gov/) showing Service-Disabled Veteran-Owned Small Business (SDVOSB) status, each showing an active status as of the time of bid submission and bearing a date and time stamp on or before the bid due date and time.
Both SAM and DSBS must be active at both the time of bid and the time of award. Joint ventures (JVs) submitting a bid must instead submit with its bid a valid SDVOSB certification issued by SBA, OSDBU, or another certifying authority acceptable to the Contracting Officer, and must maintain that certification and its SAM registration through award. Any bidder or JV that fails to submit the required proof or certification with its bid, or whose registration, listing, or certification is not active as of the time of bid submission, shall be rendered non-responsive outright and will not be considered for award.
THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the EPLS located at https://sam.gov/ for each person or business providing services under this contract. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.
SMALL BUSINESS ADMINISTRATION (SBA) DYNAMIC SMALL BUSINESS SEARCH
(DSBS) REGISTRATION: The SBA DSBS website located at https://search.certifications.sba.gov/ is the Official U.S. Government system. VAAR 819.7001(a) requires contractors wishing to do business with the Government and bid on work shall have an active registration in SBA DSBS at both time of bid and time of award. If the Bidder does not have an active registration in the SBA DSBS database at the time of bid submission and are the apparently successful low bidder, the CO shall deem the bidder’s proposal non-responsive to the solicitation requirements and proceed to award to the next lowest bid. Bidders must submit proof of current (as of time of bid) SBA DSBS registries with their bid and that any bidder that fails to do so will be rendered non-responsive/non-responsive outright and will not be considered for award. Joint Ventures (JVs) submitting a bid must submit SBA DSBS and/or SBA certification of some type with their bid and those that fail to do so shall be rendered non-responsive and shall not be eligible for award.
VETS-4212 REPORTING REQUIREMENT: Contractors are required to submit the required annual Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $100,000 or more in any fiscal year. COs are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C.
4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process. For more information on this requirement and/or for completing the web-based reporting form, visit the following website https://www.dol.gov/agencies/vets/programs/vets4212. See RFO clause 52.222-37, Employment Reports on Veterans under the General Conditions.
BONDING INFORMATION
BID GUARANTEE: A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000.00. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, shall require rejection of the bid in all cases except those listed in RFO 28.101-4. Bid Bonds must be provided using SF24 (see RFO 28.106-1) and the form must be provided in original (no white outs, faxed or copied signatures, seals) with ‘wet ink’ signatures and contain the proper solicitation number, bid opening date, and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties shall be determined acceptable to the CO (see RFO 28.203) and be accompanied by SF28 Affidavit of Individual Surety. Other forms of bid security may be acceptable as denoted in RFO 28.203-2.
PERFORMANCE AND PAYMENT BONDS: Pursuant to 40 U.S.C Chapter 31 and in accordance with Contract Clause 52.228-15, and RFO 28.102-1(a), requires Performance Bond (SF25) and Payment Bond (SF25A) for any construction contract exceeding $150,000. Performance and Payment bonds are due no later than ten (10) calendar days after notification of award. Bonds must be provided with original ‘wet ink’ signatures - no white-outs or other corrections are allowable. Copies and facsimiles of bonds shall not be accepted.
MEDICAL CENTER ACCESS: Anyone participating in the site visit, or for any other reason that involves visiting the medical center related to this solicitation, must have a valid ID on their person and their vehicle must be properly registered and insured.
Visitors are prohibited from possessing weapons while on a federal installation (See 18 U.S.C. 930 – Possession of Firearms and Dangerous Weapons in Federal Facilities).
Handheld cellphone usage or texting while driving is also prohibited. All VA Medical Centers and associated properties are Federal Property.
PRIVACY TRAINING: All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the COR.
E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall enroll in E-Verify within 30 calendar days of the contract award date. They shall also begin using the E-Verify system to confirm that all their new hires and their employees directly working on federal contracts are authorized to legally work in the United States.
E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (RFO 52.222-54).
PRIME CONTRACTOR INFORMATION- SAFETY OR ENVIRONMENTAL
VIOLATIONS AND EXPERIENCE MODIFICATION RATING INFORMATION
All Bidders/Bidders shall submit information pertaining to their past Safety and Environmental record (using the attached EMR information/data form). The information must contain a certification that the bidder/bidder has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three (3) years.
If such certification cannot be made, a Bidder/Bidder shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
All Bidders/Bidders shall submit information regarding their current EMR. This information shall be obtained from the Bidders/Bidder’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Bidder’s EMR is above 1.0, Bidder/Bidder must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and Puerto Rico shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau. If the NCCI cannot issue an EMR because the Bidder/Bidder lacks insurance history, Bidder/Bidder shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that it has assigned Bidder/Bidder a Unity Rating of 1.0.
The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS: The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for the contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.
All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the COR will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location.
REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT ENGINEER,
OR PROJECT MANAGER (PM): Any reference contained within contract specifications and/or drawings to the “VA Engineer”, “Resident Engineer”, “Senior Resident Engineer”, “PM”, or their abbreviations are to be replaced with “COR”.
PAYMENT FOR MATERIALS STORED OFF-SITE: The COR and the contractor / PM
(whoever will oversee submitting the invoice) shall meet and discuss the items listed on a draft copy of the invoice prior to submission to OB10. All items will be approved prior to submission. It is the CO’s discretion to pay for any stored materials. This should be discussed prior to submission of the first invoice. Contract financing is not part of this contract.
SCHEDULE OF MATERIAL SUBMITTALS: The submittals contemplated by RFO 52.236-5, Material and Workmanship, are listed on the Schedule of Material Submittals in the Specifications, if provided. The schedule is for reference only – the selected contractor is responsible to provide all submittals required by the contract.
REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE
ASSESSMENT SYSTEM (CPARS)
As prescribed in RFO Part 42.11, the Department of Veterans Affairs (VA) evaluates contractor past performance on all contracts that exceed $900,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The RFO requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the Federal Awardee Performance and Integrity Information System (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
Each contractor whose contract award is estimated to exceed $900,000 is required to register with CPARS database at the following web address:
https://www.cpars.gov/cparsweb/home. Help in registering can be obtained by contacting Customer Support Desk at 207-438-1690. Registration should occur no later than 30 calendar days after contract award and must be kept current should there be any change to the contractor's registered representative.
For contracts with a period of one (1) year or less, the CO will perform a single evaluation when the contract is complete. For contracts exceeding one (1) year, the CO will evaluate the contractor's performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor's designated representative for comment. The contractor representative will have 30 calendar days to submit any comments and re-assign the report to the VA CO.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA CO within those 30 calendar days, will result in the Government's evaluation being placed on file in the database with a statement that the “contractor failed to respond.”
END OF SUBMISSION INFORMATION DOCUMENT
A.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE
AND BONDS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)
(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.
(b) (1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3 Million, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.4 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID
GUARANTEE) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
(End of Provision)
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
John L. Mccomas III Contracting Officer Mailing Address:
Department of Veterans Affairs Network Contracting Office - 9 3400 Lebanon Pike Murfreesboro TN 37129
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
2.6 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS
REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)
(a) Definitions. As used in this provision—
Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.
Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.
Marginalized populations of Sudan means—
(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and
(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.
Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted under specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;
(3) Consist of providing goods or services to marginalized populations of Sudan;
(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;
(5) Consist of providing goods or services that are used only to promote health or education;
or
(6) Have been voluntarily suspended.
Sensitive technology—
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—
(i) To restrict the free flow of unbiased information in Iran; or
(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
(b) Procedures.
(1) Covered telecommunications and video surveillance. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”
(2) FASCSA Orders.
(i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
(ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
(iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.
(c) Covered telecommunications equipment or services representations. By submission of its offer, the Offeror represents that, after conducting a reasonable inquiry (that looks…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .